AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to provide responses to submitted questions associated w ith the requirement revise extended CLIN descriptions for CLINS 0001-0004, and extend the closing date. All other terms and conditions remain unchanged. Accordingly, This solicitation is amended as follow s:
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW23Q8011
X 9B. DATED (SEE ITEM 11)
26-Apr-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-May-2023
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW23Q8011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS & ANSWERS
QUESTION: Due to the site visit taking place on 5/2, please consider a bid extension to 5/9 for bidders to review equipment requirements and anticipated response to questions.
RESPONSE: Yes
QUESTION: Please provide approximate dimensions and bare (design) weights of intake stop logs so head room can be considered for rigging and crane boom configurations.
RESPONSE: The dimensions are approximately 15’ high X 24’ wide. Each panel is Approximately 75,000LBS
QUESTION: SOW Pick #4 states “Crane rental with operator, rigger, and rigging gear required to install 3 tunnel entrance stoplogs…”. Please clarify if “install” should be revised to “remove” as these stop logs are installed under SOW Pick #2.
RESPONSE: This statement is correct Pick #4 is to “Remove”.
QUESTION: SOW Pick #3 states “Remove the 9-foot stoplog”. Please confirm installation is not part of this contract (i.e. installed by others) as it is currently not installed and not included in the SOW’s.
RESPONSE: Correct this is removal only.
QUESTION: Please confirm SOW Pick #3 and SOW Pick #4 will take place during the same mobilization.
Understanding the dates are subject to weather and site conditions, they will still be aligned if the dates were to move earlier or later.
RESPONSE: There is a potential for these to be aligned but no guarantee.
QUESTION: SOW’s all state “Crane rental with operator, rigger, and rigging” which leads the bidder to believe one rigger. Please confirm the bidder should provide all necessary labor and equipment needed to complete the SOW, including multiple riggers.
RESPONSE: Bidder will need to provide all necessary labor and equipment to make each lift.
QUESTION: SOW Pick #3 and Bid Item 003 state “Similar to 175 Ton or Larger”. Please confirm SOW crane sizes are only recommendations, final sizing and pick plan preparation for a non-critical pick (per EM 385-1-1) are the responsibility of the bidder based on site conditions and required capacities/radius.
RESPONSE: The item description is recommendation of the equipment type used in the past to make the same lifts.
QUESTION: Due to all bid items being lump sum, please confirm durations are solely dependent on bidder provided services. For example, there will be no shut downs, inspections, government provided services, etc. that would cause delays and increase the time required to complete the SOW’s.
RESPONSE: Added 8 hours to each item
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 04-May-2023 12:30 PM to 09-May-2023 12:30 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
(All-Wheel Drive)Minimum 100,000-lbs lifting capacity at 40'.Mobilization/Demobilization (Include in total price)1 Job $_________Davis Bacon Wage Determination No.: WA20230070 Revision 1 dated 02/03/2023 is applicable to this procurement as incorporated herein.
To:
(All-Wheel Drive)Minimum 100,000-lbs lifting capacity at 40'.
Regular Hourly Rate x Est. Quantity = Amount $__________ x 8 Hours $_________
Mobilization/Demobilization (Include in total price) 1 Job $_________
Davis Bacon Wage Determination No.: WA20230070 Revision 1 dated 02/03/2023 is applicable to this procurement as incorporated herein.
CLIN 0002
(All-Wheel Drive)Minimum 100,000-lbs lifting capacity at 40'.Mobilization/Demobilization (Include in total price)1
Regular Hourly Rate x Est. Quantity = Amount $__________ x 8 Hours $_________
Mobilization/Demobilization (Include in total price) 1 Job $_________
Davis Bacon Wage Determination No.: WA20230070 Revision 1 dated 02/03/2023 is applicable to this procurement
CLIN 0003
SIMILAR TO 175 TON OR LARGER(8 Wheel Drive / Hydraulic Boom Crane / Rigger and gear to make the pick)Minimum of 18,000lbs lift capacity with an estimated radius of about 100'Mobilization/Demobilization (Include in total price)1 Job $_________Davis Bacon Wage Determination No.: WA20230070 Revision 1 dated 02/03/2023 is applicable to this procurement as incorporated herein.
SIMILAR TO 175 TON OR LARGER
(8 Wheel Drive / Hydraulic Boom Crane / Rigger and gear to make the pick) Minimum of 18,000lbs lift capacity with an estimated radius of about 100'
Regular Hourly Rate x Est. Quantity = Amount $__________ x 8 Hours $_________
Mobilization/Demobilization (Include in total price) 1 Job $_________
Davis Bacon Wage Determination No.: WA20230070 Revision 1 dated 02/03/2023 is applicable to this procurement
CLIN 0004
(All-Wheel Drive)Minimum 100,000-lbs lifting capacity at 40'.Mobilization/Demobilization (Include in total price)1
Regular Hourly Rate x Est. Quantity = Amount $__________ x 8 Hours $_________
Mobilization/Demobilization (Include in total price) 1 Job $_________
Davis Bacon Wage Determination No.: WA20230070 Revision 1 dated 02/03/2023 is applicable to this procurement as incorporated herein.
(End of Summary of Changes)