This is a solicitation for a firm-fixed-price construction contract to remove approximately 45,000 cubic yards of sediment from the Kenmore navigation channel in Kenmore, Washington. The dredging work window is November 16, 2020 through February 1, 2021. The contractor will use a mechanical clamshell dredge and best practices to minimize environmental impacts during dredging. Dewatered dredged material will be transported to an approved transload site and then hauled to an appropriate landfill for disposal. Environmental coordination is not complete but expected to be provided in an amendment, with award contingent on receiving complete documentation. The solicitation is posted on beta.SAM.gov and the procurement is a 100% small business set-aside, with an estimated value between $5-10 million. The NAICS code is 237990 and size standard is $30 million in average annual receipts. Interested vendors can add themselves to the listing on beta.SAM.gov. All DoD contractors must register in SAM prior to award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The due date for the receipt of bids is not extended and it is 22 September 2020 at 10:00 AM Pacific Time.

The purpose of this amendment is to accomplish the follow ing:

1. Replace the Specifications in their entirety.

2. Provide the USACE Dredged Material Management Off ice- Dredged Material Suitability Determination dated December 2019.

3. Provide the follow ing: Note to Bidders - Lake Washington Ship Canal (LWSC) has a planned lock closure betw een 15 NOV 2020 to 06 DEC 2020 (subject to change).

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW20B0005

X 9B. DATED (SEE ITEM 11)

21-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Sep-2020

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW20B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

FY20 Kenmore Navigation Channel Maintenance Dredging, 20014

Kenmore, Washington

W912DW20B0005 01 00 00-1

TECHNICAL SPECIFICATIONS

TABLE OF CONTENTS

Section No Section Title

DIVISION 01 - GENERAL REQUIREMENTS

01 00 02 Supplementary Requirements for Dredging

01 00 02-A Project Benchmark Sheets

01 22 00 Measurement and Payment

01 33 00 Submittal Procedures

01 33 00-A Submittal Transmittal Form 4025

01 33 00-B Submittal Register Form 4288

01 45 00.00 10 Contractor Quality Control

01 45 00.15 10 Resident Management System Contractor Mode (RMS CM)

01 57 20.00 10 Environmental Protection

01 57 20.00 10-A Water Quality Monitoring Plan

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 Dredging

35 20 23-A U.S. Geologic Survey (USGS) Wentworth Grade Scale

35 20 23-B Dredging Best Management Practices

35 20 23-C National Dredging Quality Management Program

35 20 24 Unsuitable Material Transportation, Transloading, and Disposal

-- END OF SECTION --

FY20 Kenmore Navigation Channel Maintenance Dredging 20014

Kenmore, WA

W912DW20B0005 01 00 02-1

SECTION 01 00 02

SUPPLEMENTARY REQUIREMENTS FOR DREDGING

PART 1 – GENERAL

1.1. REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referenced to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 U.S. Army Corps of Engineers Safety and Health

Requirements Manual

EM 1110-2-1003 U.S. Army Corps of Engineers Hydrographic Survey

Manual

CODE OF FEDERAL REGULATIONS (CFR)

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1926 Safety and Health Regulations for Construction

1.2. SUBMITTALS

Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Construction Schedule; G

Accident Prevention Plan; G

Crane / Derrick Stability Analysis

1.3. SCHEDULE

The Contractor shall submit a Schedule within five (5) calendar days after date of receipt of notice to proceed (NTP).

Instruction and Information herein supplement requirements of FAR 52.236-15 Paragraph

SCHEDULE FOR CONSTRUCTION of the CONTRACT CLAUSES and Section 01 45 00.15

10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM).

The Schedule shall show the total bid amount distributed among the features of work and show the percentage of completion at close of each weekly period. This percentage shall be based on percentage of physical completion of work.

1.4. DREDGING SAFETY MANAGEMENT PROGRAM

The Contractor shall comply with the provisions of the EM 385 1-1, located the following website:

https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-

1.pdf

The Contractor shall submit within fourteen (14) calendar days of NTP, an Accident Prevention

Plan (APP). If the Contractor is a currently accepted participant in the Dredging Contractors of

America (DCA)/United States Army Corps of Engineers (USACE) Dredging Safety Management file://NWS-AS01DFS/NWS/SpecsIntact/SISGML/JOBS/09041/prntdata/word/01%2033%2000.doc https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

W912DW20B0005 01 00 02-2

Program (DSMP), as determined by the DCA/USACE Joint Committee, and holds a current valid

Certificate of Compliance for both the Contractor Program and the Dredge(s) to be used to perform the work required under this contract, the Contractor may, in lieu of the submission of an

APP, submit within fourteen (14) calendar days of NTP:

Submit upon request, the Contractor's current Safety Management System (SMS) documentation.

Submit the current valid Company Certificate of Compliance for its SMS.

Submit the current dredge(s) Certificate of Compliance based on third party audit, and a floating service Naval Architectural Analysis for all vessels utilizing floating cranes/derricks

(Crane/Derrick Stability Analysis) per the Consolidated EM 385-1-1 manual.

Submit site-specific addenda to the SMS as specified in the solicitation.

1.5. SITE SAFETY AND HEALTH OFFICER (SSHO) REQUIREMENTS FOR DREDGING:

Site Safety and Health Officer (SSHO) Staffing for USACE Dredging Contracts. This contract requires a minimum of one full time SSHO assigned per project site. For individual dredging project sites with a work force less than eight (8) employees, the SSHO may be a collateral duty, with the same responsibilities of a full time SSHO.

1.5.1. The SSHO must meet the following requirements:

a) A minimum of five (5) years of continuous construction industry safety experience in supervising/managing general construction (managing safety programs or processes or conducting hazard analyses and developing controls) on similar projects.

b) Thirty-hour OSHA Construction safety class or equivalent within the last four years.

c) SSHOs must maintain competency through having taken eight hours of documented formal, on-line, or self-study safety and health related coursework every year.

d) Competent person training as needed.

For projects with multiple shifts or when SSHO is temporarily off-site, a qualified Alternate SSHO shall be assigned to insure SSHO coverage for the project at all times work activities is conducted.

The Alternate SSHO must meet the same requirements and assume the responsibilities of the project SSHO. The Alternate SSHO position may be a collateral duty.

In addition to requirements stated elsewhere in these specifications, the SSHO/Alternate SSHO shall be present at the project site, located so they have full mobility and reasonable access to all major work operations, for at least one shift in each 24-hour period when work is being done. The

SSHO, or Alternate SSHO, shall be available during all shifts for immediate verbal consultation and notification, by either phone or radio, and be able to be on site within 30 minutes. The

SSHO/alternate SSHO shall be a full-time, dedicated position, except as noted above. The

SSHO/alt SSHO shall report to a senior project (or corporate) officials.

The SSHO/alternate SSHO shall inspect all work areas and operations during initial set-up and at least monthly observe and provide personal oversight on each shift during dredging operations for projects with many work sites, more often for those with less work sites.

If the SSHO is off-site for a period longer than 24 hours, the contractor shall provide a qualified replacement SSHO who shall fulfill the same roles and responsibilities as the primary/initial

SSHO. Qualifications shall be submitted to the Contracting Officer Representative (COR) for approval prior to the transition.

1.6. WORK HOURS

W912DW20B0005 01 00 02-3

Work hours in the construction area shall be approved by the Contracting Officer’s

Representative (COR). A proposed schedule of work hours, shifts, and days of the week shall be submitted for approval in the WORK PLAN. Notification of any proposed changes of the schedule of regular work hours, overtime work hours, and shifts of work crews and personnel at the site shall be submitted to the COR for approval. Initial coordination of such proposed changes shall occur with the Government during the weekly meeting. Alternate work schedules will not be approved if a Government quality assurance inspector is not available during all hours outside those previously stated.

1.7. WEEKLY COORDINATION MEETINGS

Contractor lead weekly (or more frequently if necessary for continued project progress) coordination meetings (in person or via phone) shall be held between the Contractor and the

Government. These meetings will be used to discuss the Contractor's proposed schedule, actual progress in the last week, and work planned in the upcoming two weeks. Planned work shall be shown in schedule format. The Contractor shall make particular note of any work requiring

Government support. The Contractor shall keep meeting minutes and shall document all action items and decisions made. Meeting minutes shall be attached with the daily Quality Control report. A time and place shall be mutually agreed upon for the same time each week for the coordination meeting.

1.8. CORRESPONDENCE

All correspondence shall be addressed to the Contracting Officer or COR. All copies provided shall be legible. Enclosures attached or transmitted with the correspondence shall also be furnished with the original and each copy. Each correspondence shall make reference to the contract name, contract number and shall have only one subject.

For submission of Contractor payment requests, See Section 01 22 00, MEASUREMENT AND

PAYMENT and 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM).

An informal process (without use of serial letters) may be proposed and adopted with approval from both the Contractor and the Government.

1.9. EXISTING CONDITION AND SURVEY CROSS-SECTIONS

Government provided drawings showing condition surveys and cross section sheets are furnished for information only.

Drawings shall be provided by the Government electronically, via email or other electronic methods such as the governments file transferred site after Notice to Proceed (NTP).

1.10. PROJECT SPECIFIC PHYSICAL DATA:

Data and information furnished or referred to below is for the Contractor's information. The

Government will not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. Please see FAR clause 52.236-4 PHYSICAL DATA for additional information.

a) Right-of-Way: The right-of-way for the work covered by these specifications will be furnished by the Government. The Contractor may use such portions of the land within the right-of-way not otherwise occupied as may be designated by the Contracting Officer. The Contractor shall, without expense to the Government, and at any time during the progress of the work when space is needed within the right-of-way for any other purposes, promptly vacate and clean up any part of the grounds that have been allotted to, or have been in use by, him when

W912DW20B0005 01 00 02-4

directed to do so by the Contracting Officer. The Contractor shall keep the buildings and grounds in use by him at the site of the work in an orderly and sanitary condition. If the

Contractor requires additional working space or lands for material yards, job offices, or other purposes, he shall obtain such additional lands or easements at his expense.

e) Condition of Area: The condition of the area when last bathymetric surveyed is shown on the drawings. Elevations reference Lake Washington Low Water Datum.

f) Temporary Removal of Aids to Navigation: The temporary removal or changes in locations of channel markers may be required to facilitate dredging operations. The Contractor shall notify the Contracting Officer at least 21 days prior to the date that the removal or change in location of channel markers will be required so the U.S. Coast Guard can perform the work and so navigation interests may be informed sufficiently in advance of the proposed removal or change in location.

g) Obstruction of Channel: The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the

Rivers and Harbors Act approved 8 August 1917. The Contractor shall be required to conduct the work in such manner as to obstruct navigation as little as possible, and in case the

Contractor's plant so obstructs the channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon the completion of the work, the

Contractor shall promptly remove his plant, including ranges, buoys, piles, and other marks placed by him under the Contract in navigable waters or on shore. No additional payment shall be made for delays due to waterway activities.

h) Datum and Bench Marks: The vertical plane of reference is Lake Washington Low Water

Datum (LWLW) (U.S, Survey feet, epoch 1983-2001). Horizontal control is based on Lambert

Grid Projection for Washington North Zone 4601, NAD 83/2010. The Bench Marks for this area are designated as the following:

1. LPCP-6: Monument ID: LPCP-6. Located near Kenmore, King County, WA.

Located in Log Boom Park. 3.25" brass disk set in concrete at end of concrete path at southeasterly corner of park at entrance to public pier set at top of bank of Lake

Washington 2ft north of fence, 15 ft southwest of park bench with table and 5 ft east of flat bench.

2. LPCP-7: Monument ID: LPCP-7. Located near Kenmore, King County, WA.

Located in Log Boom Park. 3.25" brass disk set in concrete area at edge of loose pebble beach west of public restrooms and children’s play area of Log Boom Park.

19 ft southeast of gren utility box and 16 ft west of manhole and 0.83 ft from edge of

Pebble Beach.

3. KBC-17: Monument ID: KC-B-17 1993. Located near Kenmore, King County, WA. Located in Log Boom Park. 3” brass disk set in sidewalk. Stamped “KING

COUNTY KC-B-17 1993.” Located in Log Boom Park south of SR 522. Just up the stairs and to the west of the public restrooms on west corner of stairs. Just off Burk

Gilman trail.

4. GP17522-235: Monument ID: 3077. Located near Lake Forest Park, King County, WA. To reach the station from the Junction of SR 405 and SR 522, east of Bothell, go west 4.3 miles along SR 522 to the mark on left. It is located on the south side of

SR 522 in a raised concrete curb on the west side of Cliffords Food and Spirits

W912DW20B0005 01 00 02-5

restaurant, 11.7 m at 155 degrees from the approximate centerline of SR 522, 2.8 m at 235 degrees from a storm grate 17.5 meters at 255 degrees from a fire hydrant and

36.4 m at 60 degrees from a power pole with two transformer and luminaire

(227983164972). The mark is a WSDOT brass disk cemented into a drill hole and set level with the concrete surface. *Note: this station sights GP17522-153.

i) Overhead, Underground, and Underwater Facilities: Clearances of overhead, underground, and underwater facilities are shown when known. Each bidder shall satisfy himself as to accuracy of locations and clearances by consultation with owners of the facilities. See the applicable National Oceanic and Atmospheric Administration (NOAA) Chart for location of known overhead power and telephone cables and bridges.

j) Channel Traffic: Marine Traffic consists of waterborne aircrafts (Kenmore Air), shallow-draft vessels, small boats, fishing boats with nets deployed, commercial, and recreational and

USCG vessels. Some interference with dredging operations is to be expected.

k) Local Conditions: Utility locations and elevations are approximate, and it shall be

Contractor's responsibility to obtain exact locations and elevations from owners.

1.11. NOTICE TO MARINERS (NTM)

Contractor shall request a Notice to Mariners (NTM) from the U.S. Coast Guard at least fourteen

(14) calendar days prior to the start of any dredging, in writing via email (D13-SMB-D13-

LNM@uscg.mil):

Commander, 13th Coast Guard District (dpw)

915 Second Avenue, 35th Floor, Room 3510

Seattle, Washington 98174

A copy must be submitted to the COR at least fourteen (14) calendar days prior to start of any dredging.

The NTM shall be updated and submitted to the USCG every two weeks within each work window, with a copy submitted to the COR.

1.12. PUBLIC CONVENIENCE AND SAFETY

Contractor shall take necessary care at all times in operations and use of its equipment to protect the public and to facilitate traffic.

1.13. FLOATING VESSELS

All self-propelled floating vessels, and operators thereof, shall be certified and conform to the requirements as specified in EM 385 1-1 (Nov 2014), Copies of the Coast Guard certification (if applicable) and crane test certificates (if applicable) shall be submitted with the APP.

1.14. SIGNAL LIGHTS

The Contractor shall display signal lights and conduct its operations in accordance with the

General Regulations of the Department of the Army and of the Coast Guard governing lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed;

vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations, lights to be displayed on dredge pipe lines, and day signals to be displayed by vessels of more than 65-feet in length moored or anchored in a fairway or channel, and the passing by other vessels of floating plant working in navigable channels, as set forth in

Commandant U.S. Coast Guard Instruction M16672.2, Navigation Rules: International Inland

W912DW20B0005 01 00 02-6

(COMDTINST M16672.2), of 33 CFR 81 Appendix A (International) and 33 CFR 84 through 33

CFR 89 (Inland) as applicable.

1.15. PERMITS AND RESPONSIBILITIES:

It is the responsibility of the Contractor to obtain all permits/licenses required for this project as required under the Contract Clauses “PERMITS AND RESPONSIBILITIES.” It is the responsibility of the Contractor to comply with the provisions and conditions of these obtained permits, authorizations, and/or licenses.

Contractor shall secure a permitted and Government-approved Transload Facility permitted to handle the dredged material (see 35 20 24 UNSUITABLE MATERIAL TRANSPORTATION, TRANSLOADING, AND DISPOSAL).

Contractor shall secure a permitted and Government-approved Disposal Facility, permitted to accept the dredged material (see 35 20 24 UNSUITABLE MATERIAL TRANSPORTATION, TRANSLOADING, AND DISPOSAL).

1.16. TRIBAL COORDINATION

The project is located within the boundaries of the Muckleshoot Indian Tribe’s Usual and

Accustomed fishing area. Dredging and disposal of dredged materials shall not interfere with

Tribal fishermen. Prior to commencing dredging operations, the Contractor shall coordinate its dredging and disposal activities with Mr. Mike Mahovlich, Fisheries Biologist (Harvest

Management) Muckleshoot Tribe, 39015 172nd Ave. SE, Auburn, WA 98092, phone 253-939-

3311 x 3113.

This project is located within the boundaries of the Suquamish Indian Tribe’s Usual and

Accustomed fishing area. Prior to commencing dredging operations, the Contractor shall coordinate its dredging and disposal activities with Mr. John Oleyar, Fisheries Biologist, Suquamish Tribe Fisheries Dept., 18490 Suquamish Way, Suquamish, WA 98392, phone 360-

394-8445.

1.17. REQUIRED INSURANCE:

Workers’ compensation and employer's liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when Contract operations are so commingled with a Contractor's commercial operation that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.

a) General Liability:

1. The Contracting Officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $5,000,000 per person, per occurrence.

2. Property damage liability insurance shall be required only in special circumstances as determined by the agency.

b) Automobile liability: The Contracting Officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the Contract. Policies covering automobiles operated in the United States shall

W912DW20B0005 01 00 02-7

provide coverage of at least $1,000,000 per person and $1,000,000 per occurrence for bodily injury and $1,000,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

c) Aircraft public and passenger liability: When aircraft are used in connection with performing the Contract, the Contracting Officer shall require aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage.

Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

d) Vessel liability: When Contract performance involves use of vessels, the Contracting Officer shall require, as determined by the agency, vessel collision liability and protection and indemnity liability insurance.

e) When Contract performance includes the transport, treatment, storage, or disposal of hazardous material waste the following coverage is required. The Contractor shall ensure the transporter and disposal facility have liability insurance in effect for claims arising out of the death or bodily injury and property damage from hazardous material/waste transport, treatment, storage and disposal, including vehicle liability and legal defense costs in the amount of $1,000,000.00 as evidenced by a certificate of insurance for General, Automobile, and Environmental Liability Coverage.

f) Proof of insurance shall be provided to the Contracting Officer.

1.18. MISPLACED MATERIAL

If the Contractor, during the progress of the work, loses, dumps, throws overboard, sinks, or misplaces any material, plant, machinery, or appliance, which in the opinion of the COR may be dangerous to or obstruct navigation, or cause damage to the environment, the Contactor shall recover and remove the same with the utmost dispatch. The Contractor shall give immediate notice, with description and location of any such misplaced material or obstruction’s, to the COR or inspector, and when required, shall mark or buoy such obstructions until the same are removed.

If the Contractor refuses, neglects, or delays compliance with the above requirements, such obstructions may be removed by the COR, and the cost of such removal may be deducted from any money due or to become due to the Contractor, or may be recovered under his bond. The liability of the Contractor for the removal of a vessel wrecked or sunk without fault or negligence shall be limited to that provided in Sections 15, 19 and 20 of the River and Harbor Act of March

3, 1899 (33 U.S.C. 410 et seq.).

Payment shall not be made for any material that is deposited elsewhere other than in disposal areas shown or as approved by the COR. The Contractor shall be required to move any such misplaced material and deposit it in an area acceptable to the COR at no additional cost to the

Government.

1.19. PROPOSED PROJECT MODIFICATIONS

Price proposals for proposed modifications shall be submitted in accordance with the requirements of the Contract Clause MODIFICATION PROPOSALS - PRICE BREAKDOWNS.

If change order work impacts or delays other unchanged contract work, the costs of such impacts or delays shall be included in the proposals and separately identified.

W912DW20B0005 01 00 02-8

Additional instructions for submitting price proposals can be found in NPSP-415-1-1, INSTRUCTION AND INFORMATION FOR CONTRACTORS. For information applicable to equipment rates used in contract modifications, refer to clause (UAI 31.105-101) "EQUIPMENT

OWNERSHIP AND OPERATING EXPENSE SCHEDULE."

1.20. SURVEY

a) Quantity Surveys

The Government shall conduct the bathymetric surveys of the dredge work area for any periods for which progress payments are requested and shall make the computations based on these bathymetric surveys. Bathymetric surveys will be conducted at a frequency no greater than once every two weeks (14 calendar days) but may occur more frequently at the discretion of the COR.

Failure by the Government to adhere to these bathymetric survey schedules shall not be the basis for a claim by the Contractor or subcontractors for extra compensation for any reason. Additional bathymetric surveys can be requested by the COR if/when unusual circumstances arise or as required by the COR.

COVID-19 Contingency – If there are state, federal, and/or USACE-specific restrictions due to

COVID-19 that prevent the normally performed surveys, surveys will be conducted as soon as possible, within the allowable restrictions and requirements.

Hydrographic surveys will be conducted by the Government to meet USACE Performance

Standards as defined in the Hydrographic Surveying Manual EM 1110-2-1003. Surveys will be conducted utilizing depth sounding and horizontal positioning equipment. Sounding depths will generally be derived utilizing multi-beam or single-beam acoustic methods. However, the

Government reserves the right to take soundings by any method, including leadline or trigonometric leveling (total station)/differential leveling. The same method will be used for the pre, progress, and post dredging surveys of a given pay area.

Cubic yard volumes will be computed by comparing the Government's bathymetric soundings against the channel design template. The Government intends to use Hypack v2016 or later, or

Bentley InRoads Software Package versions v8i or Bentley OpenRoads Software Package version (current version) or later to compute pay volumes. Computed pay volumes will be the difference between the computations of the pre-to-post-dredge survey. Volumes may be computed by comparing the Government's bathymetric progress soundings against other progress surveys, or an after-dredge survey, but only at the COR’s discretion.

All Contractor owned equipment including all attendant plant, pipes and anchor lines in the survey area must be removed from the acceptance area prior to the initiation of all pre and post-dredge survey. Any failure by the Contractor to remove attendant plant, pipes and anchor lines in the survey area may result in the postponement of the government survey.

All surveys conducted by the Contractor shall be in accordance with the USACE Hydrographic

Surveying Manual EM-1110-2-1003. Accuracy(ies) will be in accordance with stated quality control values in USACE Hydrographic Surveying Manual EM-1110-2-1003.

The Contractor is responsible for requesting Government pre-dredge and post dredge surveys of all work areas. The request shall be submitted in writing to the Government representative(s) identified at the pre-construction conference. The Government Survey periods stated above are contingent on availability of government equipment, weather and water conditions.

In the event it becomes necessary to reschedule a request for survey, the Contractor shall notify the Government at least two business days prior to the first day of the scheduled survey period.

W912DW20B0005 01 00 02-9

All depths obtained from multibeam surveys will be utilized for volume computation purposes.

Multibeam surveys will use a 2-foot-by-2-foot matrix using the median depth of all depths recorded in a cell will be generated from the edited multibeam data to perform the TIN volume computations, following the procedures outlined in EM 1110-2-1003. Any corresponding plotted plan view sounding sheets depicting representative depths over a dredging project will be generated using a cell size that is plot-scale dependent, utilizing a randomly selected sounding that is closest to cell center (shot depth) shifted to the center of the cell from the edited multi-beam data, as described in EM 1110-2-1003. All edited/processed bathymetric survey data (xyz) used for volume computations shall be made available to the Contractor upon request.

No separate payment will be made for impacts associated with these surveys.

b) Positioning Equipment

Dredging and material placement plant shall be positioned using a differential GPS with an accuracy of +/- 3 feet. The system shall be used to ensure that dredging is performed within the designated pay area(s) and that material will be evenly distributed within the dredged material placement areas, as shown. Any delay or suspension for noncompliance of this requirement will be at no cost to the Government nor shall it be considered grounds for a time extension.

c) Gauge Equipment - Tide Data

All vertical control shall be referenced to the Government staff gauge provided by the

Government at pre-dredge meeting. The datum used for each project is specified on the layout charts. The Contractor shall check their operations by comparing readings to the specified lake water level gage board. The QC reports shall reflect the time and results of these inspections.

d) Dispute of Surveys Performed by the Government

In the event that the Contractor disputes the accuracy of any survey performed by the

Government, the Contractor shall immediately notify the COR in writing, concerning the nature of the dispute. If the dispute cannot be resolved immediately, the Contractor shall immediately resurvey the shoal using multibeam, or all remaining area not been dredged or unaffected portions of the shoal with a Government representative onboard the Contractor’s survey boat. At the conclusion of the survey, the Contractor shall provide copies of all raw and edited data files for that shoal. The files shall be in Hypack format. The Contractor shall submit the following information (as a minimum) in support of the survey data:

1. Edited survey data in xyz format (2x2 and 5x5 matrix); coordinates shall be WA State Plane

Coordinates, NAD 1983.

2. Method of horizontal and vertical positioning used (RTK or Tide Gauge).

3. Date, time, and stage of tide.

4. Water surface conditions.

5. Plan drawing in pdf format showing the edited depth soundings.

6. Plotted cross sections of the latest Contractor survey compared with the Government survey.

The individual cross sections shall be performed at 25 feet increments.

7. Plan drawing in pdf format of channel showing areas that were worked by the dredge.

8. Speed of sound through the water column in area of survey and method used to determine the speed of sound.

9. Draft of survey boat and method used to determine the draft.

W912DW20B0005 01 00 02-10

10. A table listing all current status of all calibrations to include patch performance test area designated by the COR and required by EM 1110-2-1003, HYDROGRAPHIC SURVEYING

MANUAL, and the date equipment was set up and last checked.

The Government will evaluate the data provided by the Contractor and use this information to assist in making a determination of the dispute.

1.21. CONTRACTOR FIELD OFFICE

The Government will not be responsible for providing Contractor work areas. If used, the

Contractor shall locate all field office elements at one site, regardless of the numbers and types of equipment used. The Contractor shall be responsible for identifying a location and making all and any arrangements with the property owner. If a Field Office location is used, it shall be identified in the Contractor Quality Control and Work Plan.

1.22. CONTRACTOR PLANT AND EQUIPMENT

Unless otherwise specifically cited elsewhere in these specifications, the Contractor shall provide cranes, rigging, lifts, operators, and other necessary means to unload, load, and move equipment or materials as required to perform the work.

Complete Plant and Equipment List to be used onsite shall be provided to the COR. The

Contractor shall update and submit this list monthly with each progress payment request. The list shall include rented equipment as well as lease-purchase or sale-leaseback equipment. The list shall indicate dates equipment is assigned to or removed from the project, dates scheduled for repairs and returned for use, and adequate identification or description of each item of equipment including manufacturer's name (abbreviated), model number, manufacturer's serial number, year of manufacture, and Contractor's assigned serial or record number.

The Contractor’s equipment shall be conspicuously marked for identification. Contractor vehicles shall be marked on the outside with the company name.

Any barge used as a base for any equipment or materials shall not be allowed to ground. Any positioning shall be accomplished using anchors or spuds.

1.23. CONTRACTOR PROPERTY SECURITY

The Government will not be responsible for providing security for Contractor work areas and

Contractor-owned/controlled equipment, supplies, or materials. The Contractor shall provide those necessary security measures.

1.24. INSPECTION

The presence of the Government inspector shall not relieve the Contractor of responsibility for the proper execution of the work in accordance with the specifications. The Contractor shall be required:

a) To furnish, on the request of the COR or any inspector, the use of such boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment and crew of the dredging plant as may be reasonably necessary in inspecting and supervising the work.

b) To furnish, on request of the COR or any inspector, suitable transportation from all points on shore designated by the COR to and from the various pieces of plant and to and from the dumping grounds. If the Contractor refuses, neglects, or delays compliance with these requirements, the specific facilities may be furnished and maintained by the COR, and the cost thereof will be deducted from any amounts due, or to become due, the Contractor.

W912DW20B0005 01 00 02-11

c) To allow, on request of the COR or any inspector, the Government to temporarily install a construction camera, provided by the Government, on the dredge vessel. In general, the location provided shall provide for a 360 degree viewpoint permitting the observation of the crane deck and dredge barge. The mounting point shall consist of a wooden or metal stanchion, a minimum of 3 inches in diameter, but not greater than 6 inches in diameter. In addition, the contractor shall provide a source of electrical power consisting of 110v, 20 Amp.

Mounting location shall be agreed upon after contract award. Contractor shall be given access to the camera’s web based video feed.

At the Government’s discretion, if the Government designated QA representative is unable to be physically present on the Contractor’s plant to verify the CQC procedures, the Contractor must provide real time video capability for the Government to perform inspections, witness tests, participate in meetings, and other tasks of a similar nature. Anticipate these efforts may take up to

3 hours each week.

At the Government’s discretion, QA equipment inspections may be completed from a distance using electronic methods such as a video chat or live-time video call (compatible with

Government cell phones or computer). The Contractor must provide real time video, if requested by the Government, for the Government to perform the inspection remotely, and anticipate the inspection may take up to 3 hours each week.

No separate payment will be made for impacts associated with Government QA inspections.

1.25. SHOALING:

If, before the Contract is completed, shoaling occurs in any section previously accepted, including shoaling in the finished channel, because of the natural lowering of the side slopes, re-dredging at contract price, within the limit of available funds, may be done if agreeable to both the Contractor and the COR in writing before work commences.

1.26. PROTECTION AND RESTORATION OF PROPERTY

The work shall include the preservation of all public and private property, monuments, power and telephone lines, other utilities, etc., along and adjacent to the disposal areas insofar as they may be endangered. All utility lines shall be repaired. When or where any direct or indirect damages or injury are done to public or private property by, on account of, any act, omission, neglect, or misconduct in the execution of the work, or in consequence of the non-execution thereof, such property shall be restored to a condition similar and equal to existing before such damage or injury was done. The restoration shall be completed before final acceptance of the project.

1.27. FINAL EXAMINATION AND ACCEPTANCE

As soon as practicable after the completion of the entire work or any section or subsection thereof

(if the work is divided into sections and/or subsections) as in the opinion of the COR will not be subject to damage by further operations under the Contract, such work will be thoroughly examined at the cost and expense of the Government by sounding or by sweeping, or both, as determined by the COR. Acceptance will be based on the removal of all dredge material above the “Required Dredging Depth.” The Government will verify full removal by visual examination of a bathymetric drawing showing multi-beam survey data, that is plot-scale dependent, utilizing a randomly selected sounding. If there are sections of concern, an additional analysis using cross-sections at 25-foot intervals from a 2x2 or 5x5 matrix surface will be used to confirm whether material was removed to specified depth required in the channel prism, including channel side-slopes. If any shoals, lumps, or other lack of Contract depth be disclosed by this examination, the

Contractor shall be required to remove these areas by dredging at Contract rate for dredging. If

W912DW20B0005 01 00 02-12

the bottom is soft and the shoaled areas are small and form no material obstruction to navigation, the removal of such shoal may be waived by the discretion of the COR. The Contractor or his authorized representative will be notified when soundings and/or sweepings are to be made and will be permitted to accompany the survey party. When the area is found in a satisfactory condition per contract specifications, it will be accepted.

Final acceptance of the whole or a part of the work and the deductions or corrections of deductions made thereon will not be reopened after having once been made, except on evidence of collusion, fraud, or obvious error, and the acceptance of a completed section shall not change the time of payment of the retained percentages of the whole or part of the work.

1.28. CONTRACTOR PERFORMANCE EVALUATIONS:

In accordance with the provisions of Subpart 36.201(Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), dredging contractor’s performance shall be evaluated throughout the performance of the contract. The United States Army Corps of Engineers

(USACE) follows the procedures outlined in Engineering Regulation 415-1-17 to fulfill this FAR requirement. For construction contracts awarded at or above $700,000.00, the USACE will evaluate contractor’s performance and prepare a performance report using the Contractor

Performance Appraisal Reporting System (CPARS). After an evaluation (interim or final) is written up by the USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 60 days. Access is granted by a network of government Focal

Points. Typically there are many Focal Points assigned to the agency. If you require assistance with identifying your Focal Point, please email the CPARS helpdesk (webptsmh@navy.mil) with the contract/order number you are trying to access and they will provide you with the Focal Point name and contact information.

PART 2 – PRODUCTS

NOT USED

PART 3 – EXECUTION

NOT USED

--END OF SECTION--

Description/Comments:

Survey/Computation Method:

Designation:

State:

District:

Nearest Town:

USGS Quad:

T.R.S.:

Nearest Hwy/Mi:

NGS:PID COE:

Date Observed:

Date Recovered:

By:

Condition/Stability:

Owner:

Obstructions: N SE W

Datum: ( ) Lat:

Lon:

)(Datum:

Elevation Ht:

Ellip Ht:

Project:

NSRS Accuracy:

Local Accuracy:

- Horizontal - - Vertical -

Survey/Computation Method:

Date Observed:

Local Accuracy:

NSRS Accuracy:

County:

Stamping:

Setting/Monument Type:

Northing 2: Easting 2:

Zone 1:

Convergence 2: CSF 2:

Required Fields In Red

- Tidal/Hydraulic Gage Relationships -

- Datum - - Elevation -

Yes NoGPS Suitable:

Gage ID: Epoch:

Magnetic: Yes No

System Fields in Green

Owner:

Access:

Type:USACE Survey Marker Archive & Retrieval Tool Datasheet

U-SMART ver 5.0

23 AUG 2012

- Horizon/Setup View - - Close-Up View-

Zone 2:

Northing 1: Easting 1: Convergence 1: CSF 1:

3.25" BRASS DISK SET IN CONCRETE AT END OF CONCRETE PATH AT SOUTHEASTERLY CORNER OF PARK AT ENTRANCE TO PUBLIC PIER.

SET AT TOP OF BANK OF LAKE WASHINGTON 2 FEET NORTH OF FENCE, 15 FEET SOUTHWEST OF PARK BENCH WITH TABLE AND 5 FEET

EAST OF FLAT BENCH.

LPCP-6

Washington

Seattle

KENMORE

EDMONDS EAST

T26N, R4E, SEC 11

SR 522 0.1 Mi

11/7/2013

11/7/2013

TERRASOND LIMITED

Good C

USACE

GOOD, IN LOG BOOM PARK

NAD83 2011

47 45 23.92457 122 15 46.85490

NAVD88

21.1

-56.23 Ft

Geodetic Levels

W912EF-10-D-0002 EC04

2-cm

OPUS-DB

11/14/2013 Geoid12A

5-cm

1-cm

2-cm

KING

LPCP-6

CONCRETE

N W

USFT

New

Submit

USFT

USFT USFT

Designation:

State:

District:

Nearest Town:

USGS Quad:

T.R.S.:

Nearest Hwy/Mi:

NGS:PID COE:

Date Observed:

Date Recovered:

By:

Condition/Stability:

Owner:

Obstructions: N SE W

Datum: ( ) Lat:

Lon:

)(Datum:

Elevation Ht:

Ellip Ht:

Project:

NSRS Accuracy:

Local Accuracy:

- Horizontal - - Vertical -

Survey/Computation Method:

Date Observed:

Local Accuracy:

NSRS Accuracy:

County:

Stamping:

Setting/Monument Type:

Northing 2: Easting 2:

Zone 1:

Convergence 2: CSF 2:

Required Fields In Red

- Tidal/Hydraulic Gage Relationships -

- Datum - - Elevation -

Yes NoGPS Suitable:

Gage ID: Epoch:

Magnetic: Yes No

System Fields in Green

Owner:

Access:

Type:USACE Survey Marker Archive & Retrieval Tool Datasheet

U-SMART ver 5.0

23 AUG 2012

- Horizon/Setup View - - Close-Up View-

3.25" BRASS DISK SET IN CONCRETE AREA AT EDGE OF LOOSE PEBBLE BEACH WEST OF PUBLIC RESTROOMS AND CHILDRENS PLAY AREA OF LOG BOOM PARK. 19 FEET SOUTHEAST OF GREN UTILITY BOX AND 16 FEET WEST OF MANHOLE AND 0.83 FEET FROM EDGE OF PEBBLE

BEACH.

LPCP-7

Washington

Seattle

KENMORE

EDMONDS EAST

T26N, R4E, SEC 11

SR 522 0.1 Mi

11/7/2013

11/7/2013

TERRASOND LIMITED

Good C

USACE

NAD83 2011

47 45 27.99336 122 15 55.79352

NAVD88

22.07

-56.22 Ft

Geodetic Levels

W912EF-10-D-0002 EC04

2-cm

RTK

11/14/2013 Geoid12A

5-cm

1-cm

2-cm

KING

LPCP-7

CONCRETE

N W

USFT

New

Submit

Designation:

State:

District:

Nearest Town:

USGS Quad:

T.R.S.:

Nearest Hwy/Mi:

NGS:PID COE:

Date Observed:

Date Recovered:

By:

Condition/Stability:

Owner:

Obstructions: N SE W

Datum: ( ) Lat:

Lon:

)(Datum:

Elevation Ht:

Ellip Ht:

Project:

NSRS Accuracy:

Local Accuracy:

- Horizontal - - Vertical -

Survey/Computation Method:

Date Observed:

Local Accuracy:

NSRS Accuracy:

County:

Stamping:

Setting/Monument Type:

Northing 2: Easting 2:

Zone 1:

Convergence 2: CSF 2:

Required Fields In Red

- Tidal/Hydraulic Gage Relationships -

- Datum - - Elevation -

Yes NoGPS Suitable:

Gage ID: Epoch:

Magnetic: Yes No

System Fields in Green

Owner:

Access:

Type:USACE Survey Marker Archive & Retrieval Tool Datasheet

U-SMART ver 5.0

23 AUG 2012

- Horizon/Setup View - - Close-Up View-

3" BRASS DISK SET IN SIDEWALK.STAMPED "KING COUNTY KC-B-17 1993". LOCATED IN LOG BOOM PARK, SOUTH OF SR522. JUST UP THE STAIRS AND TO THE WEST OF THE PUBLIC RESTROOMS ON WEST CORNER OF STAIRS. JUST OFF BURKE GILMAN TRAIL.

KBC-17

Washington

Seattle

KENMORE

EDMONDS EAST

T26N, R4E, SEC 11

SR 522 0.1 Mi

11/7/2013

11/7/2013

TERRASOND LIMITED

Good D

KING COUNTY

NAD83

47 45 28.81586 122 15 53.69214

NAVD88

35.86

-41.45 Ft

Geodetic Levels

W912EF-10-D-0002 EC04

2-cm

RTK

11/14/2013 Geoid12A

5-cm

1-cm

2-cm

KING

KC-B-17

CONCRETE

N W

USFT

New

Submit

Report of Survey Mark Page 1 of 311/6/2013 10:59:37 AM

TO REACH THE STATION FROM THE JUNCTION OF SR 405 AND

SR 522, EAST OF BOTHELL, GO WEST 4.30 MILES ALONG SR 522

TO THE MARK ON LEFT. IT IS LOCATED ON THE SOUTH SIDE OF

SR 522 IN A RAISED CONCRETE CURB ON THE WEST SIDE OF

CLIFFORDS FOOD AND SPIRITS RESTAURANT, 11.7 METERS @

155 DEGREES FROM THE APPROXIMATE CENTERLINE OF SR

522, 2.8 METERS @ 235 DEGREES FROM A STORM GRATE

INLET, 17.5 METERS @ 255 DEGREES FROM A FIRE HYDRANT

AND 36.4 METERS @ 60 DEGREES FROM A POWER POLE WITH

TWO TRANSFORMERS AND LUMINAIRE (227983164972). THE

MARK IS A WSDOT BRASS DISK CEMENTED INTO A DRILL HOLE

AND SET LEVEL WITH THE CONCRETE SURFACE.

*NOTE: THIS STATION SIGHTS GP17522-153.

Report of Survey Mark

Region: NW Offset:

County: KING Station:

USGS Quad: EDMONDS EAST Bearing: M

Nearest Town: LAKE FOREST PARK Owner: GS

Monument ID: 3077 Corner Code:

Designation: GP17522-235 T.R.S: 26N, 4E, 11

State: WASHINGTON Mile Post: 6.820

NGS Pid: State Route: 522

NA MT0319 23-11026

284/308 MS5400 23-05032

0 MS3011 23-97060

ACCOUNTS INFORMATION

BOOK PROJECT INVOICE

Lat: 47 45 30.220971 N Long: 122 15 30.655722 W Ellips: (Mt) -4.102 (USFt) -13.458 Geoid: (Mt) -23.539

Datum: NAD 83/11 Date: 11/15/2012

(Mt) 85309.005 (USFt) 279884.627 (Mt) 393159.832 (USFt) 1289891.882 0.99996183 0.99996247 -1 03 39.9

Northing Easting Scale Comb Factor Conv Angle

Washington State Plane Zone: North

Elevation: (Mt) 19.437 (USFt) 63.770

Ortho: Date: 09/29/1997

Datum: NAVD 88

Ellips 5 CM GPS

Horizontal 2 CM PRIMARY GPS

Survey Info Accuracy Network Method

Ortho 1 CM PRIMARY DIFF LEVELS

Survey Control

Geographic Services

Report of Survey Mark Page 2 of 311/6/2013 10:59:37 AM

Lat: 47 45 30.217087 N Long: 122 15 30.660788 W Ellips: (Mt) -3.904 (USFt) -12.808 Geoid: (Mt) -23.341

Datum: NAD 83/91 Date: 09/29/1997

(Mt) 85308.887 (USFt) 279884.240 (Mt) 393159.725 (USFt) 1289891.531 0.99996183 0.99996244 -1 03 39.9

Northing Easting Scale Comb Factor Conv Angle

Washington State Plane Zone: North

Elevation: (Mt) 19.437 (USFt) 63.770

Ortho: Date: 09/29/1997

Datum: NAVD 88

Ellips 5 CM GPS

Horizontal 2 CM PRIMARY GPS

Survey Info Accuracy Network Method

Ortho 1 CM PRIMARY DIFF LEVELS

Lat: 47 45 30.217431 N Long: 122 15 30.660551 W Ellips: (Mt) -3.879 (USFt) -12.726 Geoid: (Mt) -23.316

Datum: NAD 83/91 Date: 06/25/2007

(Mt) 85308.897 (USFt) 279884.273 (Mt) 393159.730 (USFt) 1289891.547 0.99996183 0.99996244 -1 03 39.9

Northing Easting Scale Comb Factor Conv Angle

Washington State Plane Zone: North

Elevation: (Mt) 19.437 (USFt) 63.770

Ortho: Date: 09/29/1997

Datum: NAVD 88

Ellips 5 CM GPS

Horizontal 2 CM PRIMARY GPS

Survey Info Accuracy Network Method

Ortho 1 CM PRIMARY DIFF LEVELS

Lat: 47 45 30.220304 N Long: 122 15 30.657805 W Ellips: (Mt) -4.089 (USFt) -13.415 Geoid: (Mt) -23.526

Datum: NAD 83/07 Date: 06/04/2008

(Mt) 85308.985 (USFt) 279884.562 (Mt) 393159.789 (USFt) 1289891.741 0.99996183 0.99996247 -1 03 39.9

Northing Easting Scale Comb Factor Conv Angle

Washington State Plane Zone: North

Elevation: (Mt) 19.437 (USFt) 63.770

Ortho:…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .