A.07.23_-_W912DW-16-Q-0015_(Solicitation).pdf
PDF 2 MB Posted
- Solicitation number
- W912DW-16-Q-0015
About this file
Provide all labor and equipment necessary to furnish and deliver materials to aid in stabilizing existing banks on the Priest River.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24_-_W912DW-16-Q-0015-0002.pdf | ||
| A.07.24_-_W912DW-16-Q-0015-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912DW-16-Q-0015 16-Dec-2015
b. TELEPHONE NUMBER
206-764-6573
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 29 Dec 2015
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DW9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
VINCENT E DANIELS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W68MD953233549
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CECT-NWS
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 960506 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
US ARMY CORPS OF ENGINEERS
SEATTLE DISTRICT
PO BOX 3755
SEATTLE WA 98124-3755
TEL: FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$15.0 million
NAICS:
238910
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF63
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912DW-16-Q-0015
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Priest River Bank Protection (Equipment)
Provide all labor, materials, equipment, and personnel necessary to furnish equipment rental services to aid in stabilizing existing banks on the Priest River by placement of rock and earthen materials.
**NOTE: Reference Bid Schedule (Base Items)
Davis Bacon Wage Determination No.: ID20140040_4 dated 10/9/2015 is applicable to this procurement as incorporated herein.
FOB: Destination
PURCHASE REQUEST NUMBER: W68MD953233549
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job OPTION Priest River Bank Protection (Equipment)
Provide all labor, materials, equipment, and personnel necessary to furnish equipment rental services to aid in stabilizing existing banks on the Priest River by placement of rock and earthen materials.
**NOTE: Reference Bid Schedule (Optional Items)
Davis Bacon Wage Determination No.: ID20140040_4 dated 10/9/2015 is applicable to this procurement as incorporated herein.
FOB: Destination
FFP
NET AMT
INSTRUCTIONS TO OFFERORS
Instructions to Offerors
1. REPRESENTATIONS AND CERTIFICATIONS CONTAINED HEREIN MUST BE COMPLETED BY
QUOTERS AND RETURNED WITH OFFERS:
IF YOUR REPRESENTATIONS AND CERTIFICATIONS ARE REGISTERED IN THE SYSTEM
FOR AWARD MANAGEMENT (SAM) CHECK HERE . IF NOT, YOU CAN
REGISTER ONLINE AT www.sam.gov
2. Marking of Quote Envelopes:
Envelopes shall be plainly marked as follows:
Quote for: Priest River Bank Protection (Equipment w/ Operator)
Request for Quote No.: W912DW-16-Q-0015
Closing Date and Time: December 29, 2015, 2:00 P.M. Pacific Time
AMENDMENTS NUMBERED________HAVE BEEN RECEIVED
Hand carried quote submittal procedures have changed. When dropping off all hand carried proposals, the official delivery location is now the guard station in the main foyer of Federal Center South, located at Building 1202, 4735 E. Marginal Way South where the official time clock is also located. Notify the guard on duty that you have a quote for Contracting Division. The point of contract will be notified and a representative from Contracting Division will sign in your package(s) and transport them to Contracting Division. Please allow sufficient time for these procedures when submitting hand carried quotes. All other quote submittal procedures remain the same.
3. For questions call (206)-764-6573. Mailed quotes shall be accepted before closing at US Army Corps of
Engineers, Seattle District, P.O. Box 3755 Seattle, WA. 98124. Physical street address is US Army Corps of Engineers, Seattle District, 4735 E. Marginal Way S., Building 1202, Seattle, WA 98134. All emailed offers shall contain the RFQ No. W912DW-16-Q-0015 in the subject line and emailed to the following email address: vincent.e.daniels@usace.army.mil.
4. PROSPECTIVE OFFERORS: Contractors are required to be registered in the System for Awards
Management (SAM) for awards resulting from solicitations.
This rule more efficiently implements the Debt Collection Improvement Act of 1996, as it requires contractors to be registered in SAM for consideration of future solicitations, awards, and payment.
Registration is required prior to award of any contract, basic agreement, basic ordering agreement, or blanket purchase agreement from a solicitation. LACK OF REGISTRATION IN THE SAM DATABASE WILL MAKE AN OFFER INELIGIBLE FOR AWARD. The web site may be accessed at www.sam.gov.
5. ELECTRONIC FUNDS TRANSFER (EFT): Effective 99 Jun 01, the Government will make all payments by EFT (unless the Government VISA credit card is accepted). The only exceptions are: 1) Foreign Vendors, 2) Government Agencies, and 3) One time payments. The EFT forms and instructions are on the USACE Finance Center (UFC) Web Page; www.fc.usace.army.mil. The UFC point of contact for this action is Mr. Michael Rye, (901) 874-8543.
6. Offerors will be evaluated on the basis of advantages and disadvantages to the Government that might result from making more than one award (multiple awards). It is assumed, for the purpose of evaluating offers that $1,000.00 would be the administrative cost to the Government for issuing and administering each contract awarded under this solicitation, and individual awards will be for the items or combination of items that result in the lowest aggregate cost to the Government.
7. Required Submittals:
a) Instruction Page (2 pages)
Indicate if you are registered SAM.
Must acknowledge any/all amendments to the solicitation.
Must fill in all company information requested All submittals as required by evaluation criteria
b) Fill in all pricing information.
c) 52.204-17 OWNERSHIP OF CONTROL OF OFFEROR (NOV 2014). Must fill in all applicable blanks.
d) 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS--REPRESENTATION (NOV 2015)
e) 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL
ITEMS (MAR 2015) ALTERNATE I (OCT 2014). Must fill in all applicable blanks.
f) 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014) - ALTERNATE I (MAY 2014). Must fill in all applicable blanks.
g) 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JULY 2013). Must fill in all applicable blanks.
h) 52.222-18 CERTIFICATION REGARDING KNOWLEDGE OF CHILD LABOR FOR LISTED END PRODUCTS (FEBRUARY 2001). Must fill in all applicable blanks.
All of these must be filled in and returned in order to be eligible for evaluation.
DO NOT return the rest of the solicitation form.
8. The contractor is required to provide the following information with your quote:
Federal Taxpayer’s ID Number:
DUNS Number:
Cage Code Number This requires registration in SAM, web site for registration is www.sam.gov.
Remit to Address:
Company Name:
Address:
City/State/Zip:
Phone & Fax Numbers:
Point of Contact:
E-Mail Address:
The offeror must provide pricing for all items in the solicitation for its quote to be acceptable to the Government.
All quoted items must meet the requirements of the Request for Quote (RFQ) including specifications stated in all attachments.
Multiple quotes are not accepted for this RFQ. If multiple quotes are received only one quote (as determined by the Contracting Officer) will be evaluated by the Government. The quote shall be determined acceptable based on the date and time received.
The contractor should list any special features or warranty information applicable to the quoted product(s).
ANNOUNCEMENT TO OFFERORS
Due to recent national events Seattle District US Army Corps of Engineers shall be conducting business under heightened security for the foreseeable future.
Access to Federal Center South, 4735 E Marginal Way S, Building 1202, Seattle, WA 98124 will be through the front lobby only. The building is under Federal Protective Service, which means that persons entering the facility are subject to inspection; including purses, packages, etc. All deliveries shall be thoroughly inspected. In addition, visitors may be required to be escorted by Corps personnel while in the building.
For any questions please contact the Contract Specialist assigned to your project or check our website at www.nws.usace.army.mil for up-to-date information.
ITEM(S) 0001 - BID SCHEDULE (BASE ITEMS)
ITEM NO DESCRIPTION QTY UNIT U. PRICE AMOUNT
0001 CE-1: Track Mounted Hydraulic Excavator 1 Job $________ $________ w/ Hydraulic Thumb
**Minimum 80-hp / Minimum 23,000-lbs / Minimum 20-ft reach
Regular Hourly Rate x Est. Quantity = Amount $__________ x 160 Hours $_________
Overtime Hourly Rate x Est. Quantity = Amount $__________ x 56 Hours $_________
Mobilization / Demobilization 1 Job $_________
0002 CE-2: Track Mounted Hydraulic Excavator 1 Job $________ $________
$__________ x 160 Hours $_________
$__________ x 56 Hours $_________
Mobilization / Demobilization 1 Job $_________
0003 CE-3: Track Mounted Dump Truck 1 Job $________ $________
**Minimum 5-cy / Similar to a Morooka
Regular Hourly Rate x Estimated Quantity = Amount $__________ x 160 Hours =$_________
Overtime Hourly Rate x Estimated Quantity = Amount $__________ x 56 Hours =$_________
Mobilization and Demobilization 1 Job =$_________
0004 CE-4: Track Mounted Dump Truck 1 Job $________ $________
0005 CE-5: Track Mounted Dump Truck 1 Job $________ $________
0006 CE-6: Track Mounted Dump Truck 1 Job $________ $________
0007 CE-7: Track Mounted Dump Truck 1 Job $________ $________
0008 CE-8: Track Mounted Dump Truck 1 Job $________ $________
0009 CE-9: Track Mounted Dump Truck 1 Job $________ $________
$__________ x 120 Hours =$_________
$__________ x 42 Hours =$_________
0010 CE-10: Track Mounted Dump Truck 1 Job $________ $________
$__________ x 80 Hours =$_________
$__________ x 28 Hours =$_________
0011 CE-11: Dozer 1 Job $________ $________
**Minimum 80-hp / Minimum 17,000-lbs / 6-way Blade
$__________ x 60 Hours =$_________
$__________ x 20 Hours =$_________
2 EA =$_________
ITEM(S) 0002 - BID SCHEDULE (OPTIONAL ITEMS)
1001 (Option) CE-1: Track Mounted Hydraulic Excavator 1 Job $________ $________
$__________ x 40 Hours $_________
$__________ x 14 Hours $_________
1002 (Option) CE-2: Track Mounted Hydraulic Excavator 1 Job $________ $________
$__________ x 40 Hours $_________
$__________ x 14 Hours $_________
1003 (Option) CE-3: Track Mounted Dump Truck 1 Job $________ $________
$__________ x 40 Hours =$_________
$__________ x 14 Hours =$_________
1004 (Option) CE-4: Track Mounted Dump Truck 1 Job $________ $________
1005 (Option) CE-5: Track Mounted Dump Truck 1 Job $________ $________
1006 (Option) CE-6: Track Mounted Dump Truck 1 Job $________ $________
1007 (Option) CE-7: Track Mounted Dump Truck 1 Job $________ $________
1008 (Option) CE-8: Track Mounted Dump Truck 1 Job $________ $________
1009 (Option) CE-9: Track Mounted Dump Truck 1 Job $________ $________
1010 (Option) CE-10: Track Mounted Dump Truck 1 Job $________ $________
1011 (Option) CE-11: Dozer 1 Job $________ $________
**Minimum 80-hp / Minimum 17,000-lbs / 6-way Blade
$__________ x 20 Hours =$_________
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 11-JAN-2016 TO
28-FEB-2016
N/A US ARMY CORPS OF ENGINEERS
SEATTLE DISTRICT
PO BOX 3755
SEATTLE WA 98124-3755
960506
0002 POP 11-JAN-2016 TO
28-FEB-2016
N/A (SAME AS PREVIOUS LOCATION)
960506
ITEM(S) 0001, 0002 - SCOPE OF WORK
Performance Work Statement Priest River Bank Protection
Equipment w/ Operator
1. GENERAL: This is a non-personnel services contract to provide equipment rental services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.
Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide equipment rental services as defined in this Performance Work Statement (PWS); except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2. Objectives: Stabilize existing banks by placement of rock and earthen materials:
Place Spall Rock Place Topsoil Place RipRap
1.3. Scope: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide equipment rental services. The contractor shall perform to the standards in Section 4 of this PWS.
1.4. General Information
1.4.1. Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.
1.4.2. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
2. LOCATION:
The project is located near the town of Priest River, ID on the right bank of the Pend Oreille River at mile 96.
(Reference attached maps.)
3. EQUIPMENT REQUIRED
Track Mounted Hydraulic Excavator w/ Hydraulic Thumb; (2 each) Minimum 80hp, Minimum 23,000lbs, Minimum reach 20ft.
Track Mounted Dump Truck; (8 each) Minimum 5cy; Similar to a Morooka.
Dozer; (1 each) Minimum 80hp, Minimum 17,000lbs, 6-way blade.
Dozer will be used at the beginning of the project for site prep and at the end of the project for cleanup.
4. PERFORMANCE STANDARDS:
4.1. Basic Services: The Contractor shall provide all necessary equipment and personnel to operate and maintain the equipment as prescribed in their contract. The Contractor shall provide experienced operators for equipment and insure that safety regulations are being followed.
4.2. Deliverables: The Contractor shall deliver and maintain all equipment on a daily basis to be ready for work each day. Contractor shall perform work in accordance with this PWS. Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
5. PERIOD OF PERFORMANCE (PoP):
It is anticipated work shall commence on or about January 11, 2016 and be completed on or about February 28, 2016.
6. SECURITY
All contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This form will be provided to the Contracting Officer and shall become part of the official contract file.
Pre-screen candidates using E-Verify Program. Proposed language: "The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify ) website to meet the established employment eligibility requirements. The vendor must ensure that the candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible candidates must be provided to the QAR no later than 3 business days after the initial contract award.
7. SAFETY REQUIREMENTS:
Operation of equipment shall be conducted in accordance with the requirements of EM 385-1-1, “Safety and Health Requirements Manual”. All personnel are required to have PPE in accordance with EM 385 1-1. All dump trucks are required to have backup alarms and tailgates. All dozers shall have Rollover Protection System (ROPS) and backup alarms. EM 385 1-1 can be found at http://www.usace.army.mil/SafetyandOccupationalHealth/EM38511,2008BeingRevised.aspx
8. DAVIS-BACON WAGE RATE:
Davis-Bacon wage rates are to be paid unless equipment is owner operated. Owner operators are reminded when a twenty-four hour operation is in effect, and if another individual is operating this equipment, the owner operator is REQUIRED to pay that individual Davis-Bacon wage rates for the type of equipment operated.
Some employees might not be covered under this Davis-Bacon award. Material delivery truck drivers not employed directly on the site of work are currently not covered by the Davis-Bacon wage rate.
9. MOBILIZATION AND DEMOBILIZATION:
Payment will be made at the purchase order lump sum price for (items including) mobilization and demobilization. Payment shall constitute full compensation for assembling equipment at site preparatory to starting work, and for removing it there from at completion of the work under direction of the Contracting Officer.
10. INSPECTION AND SUPERVISION:
All work shall be conducted under the direction of the Emergency Management Branch, Seattle District, Corps of Engineers.
11. WORK WEEK:
For the purpose of calculating payrolls, the work week is based on seven (7) consecutive days, beginning at 0001 hours Monday and ending 2359 hours Sunday. This work-week shall remain fixed throughout the performance period of this contract.
12. OVERTIME:
Overtime is paid after an individual operator has worked in excess of 40 hours for the Corps of Engineers during the work week.
13. LUNCH:
A ½ hour lunch break is mandatory during an eight to twelve hour shift and will be deducted whether it is taken or not. All contractor and owner operators are strongly encouraged to take half hour break.
14. MAIL INVOICES TO:
Corps of Engineers, Seattle District
ATTN: CENWS-OD-EM
PO Box 3755 Seattle, WA 98124-3755
Certified payrolls and owner/operator statements should be sent to the field office, if applicable. Otherwise, mail to the above address or fax to (206) 764-3319.
Payment will be based on the actual hours worked as reflected by the US Army Corps of Engineers, Seattle District rented equipment record. Invoices will show actual hours worked, partial payments authorized.
TECHNICAL EXHIBIT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required— usually a shall statement.)
Standard
Performance Threshold (This is the maximum error rate.
It could possibly be “zero deviation from standard”)
Method of Surveillance
Task #1: Contractor shall deliver equipment in Section 3.
Management: Achieve required delivery of equipment in working condition.
Coordination: Effective/timely coordination with QAR.
Deliverables: Functioning equipment and operator.
Equipment functions.
100% inspection of completed work and periodic surveillance inspection of work.
Field work oversight to ensure work is completed per PWS specifications.
Work coordination and scheduling.
100% inspection of deliverables.
Review and approval.
Task #2: Equipment shall remain working and maintained throughout the PoP.
Management: Quality, effectively prioritize work, ensure security and safety measures are met.
Coordination: Effective/timely coordination QAR.
Deliverables: Suspense’s, accuracy, quality.
Quality, timeliness, and/or safety requirements for marginal performance as detailed in
QASP.
Periodic surveillance inspection of work.
Field work oversight to ensure work is completed per PWS specifications.
Work coordination and scheduling.
100% inspection of deliverables.
Review and approval.
QUALITY ASSURANCE SURVEILLANCE PLAN
Priest River Bank Protection
Equipment Rental w/ Operator
Contract Description: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform equipment rental for the Priest River Bank Protection project. The contractor shall perform to the standards in this Performance Work Statement (PWS).
Contractor’s name: (TBD) (hereafter referred to as the contractor).
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored?
How monitoring will take place?
Who will conduct the monitoring?
How monitoring efforts and results will be documented?
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
This QASP was developed to comply with the Federal Acquisition Regulation (FAR), Subpart 37.6, Performance Based Acquisition and 46.4, Government Contract Quality Assurance. In addition, FAR Subpart 46.103, Contracting Officer Responsibilities, states that agencies shall develop quality assurance surveillance plans when acquiring services.
2. GOVERNMENT ROLES AND RESPONSIBILITIES.
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
b. Contract Specialist - The Contract Specialist acts as an acquisition consultant and serves as the liaison between the contractor and the KO.
c. Quality Assurance Representative (QAR) - The QAR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The QAR shall keep a quality assurance file. At the conclusion of the contract or when requested by the KO, the QAR shall provide documentation to the KO. The QAR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.
Assigned QAR: Tony Doersam Telephone: 206-764 -3406 Email: Anthony.w.doersam@usace.army.mil
Assigned QAR: Travis Hightower Telephone: 206-764-6937 Email: Travis.J.Hightower@usace.army.mil
3. CONTRACTOR REPRESENTATIVES:
The following employees of the contractor serve as the contractor’s Primary and Alternate Point of Contact for this contract.
Primary Point of Contact – (TBD) Telephone:
Email:
Alternate Point of Contact – (TBD) Telephone:
Email:
4. PERFORMANCE STANDARDS.
4.1. Basic Services: The Contractor shall provide all necessary equipment and personnel to operate and maintain the equipment as prescribed in their contract. The Contractor shall provide experienced operators for equipment and insure that safety regulations are being followed.
4.2. Deliverables: The Contractor shall deliver and maintain all equipment on a daily basis to be ready for work each day.
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix, Technical Exhibit 1 within the Performance Work Statement includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the PRS thresholds.
5. METHODS OF QA SURVEILLANCE.
Various methods exist to monitor performance. The QAR shall use the surveillance methods listed below in the administration of this QASP.
Regardless of the surveillance method, the QAR shall always contact the contractor's primary point of contact when a defect is identified and inform the point of contact of the specifics of the problem. The QAR shall be responsible for monitoring the contractor’s performance in meeting a specific performance standards.
100% INSPECTION. (Evaluates all outputs. Most applicable to small quantity, but highly important services.
May be used where there are written deliverables and stringent requirements such as tasks required by law, safety, or security.)
Contractors Equipment shall be safe and operable at all times.
The Contractor shall be at appointed location on time and equipment shall be ready for the days work.
Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor.
In such cases, the Inspection of Services clause in the Contract becomes the basis for the KO’s actions.
6. RATINGS.
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given PRS standard. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
EXCEPTIONAL:
Performance significantly exceeds contract requirements to the Government’s benefit.
ABOVE
SATISFACTORY
Performance exceeds contract requirements to the Government’s benefit.
SATISFACTORY: Performance meets contractual requirements.
UNSATISFACTORY: Performance does not meet contractual requirements.
7. DOCUMENTING PERFORMANCE.
7.1. ACCEPTABLE PERFORMANCE.
The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.
7.2. UNACCEPTABLE PERFORMANCE.
When unacceptable performance occurs, the QAR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the QAR shall document the discussion and place it in the QAR file and courtesy copy the KO.
When the QAR determines formal written communication is required, the QAR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's primary or alternate point of contact. A CDR template is attached to this QASP.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the QAR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.
8. FREQUENCY OF MEASUREMENT.
a. Frequency of Measurement.
During contract/order performance, the QAR shall take periodic measurements of all validated user complaints as specified in the PRS matrix and analyze whether the negotiated frequency of measurement is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The QAR shall meet with the contractor to assess performance and shall provide a written assessment on an annual basis. This applies to the base contract and any awarded option years.
9. DOCUMENTING EVALUATIONS.
a. Payment Deductions.
Due to the critical nature of the support, the Contractor’s performance will be compared to contract requirements on a monthly basis against the Acceptable Quality Levels using this Quality Assurance Surveillance Plan to guide evaluations and validate user complaints to document findings. If the performance in any required service fails to meet the performance threshold identified in the PWS, payments to the contractor may be reduced by the contracting officer.
The Government’s primary quality assurance procedures are based on validated customer complaints and incidental inspections by the Quality Assurance Representative (QAR)
Prepared by: Travis Hightower
Travis J Hightower
Signature – Quality Assurance Representative
PERFORMANCE REPORT
1. CONTRACT NUMBER:
2. Prepared by:
3. Date and time of observation:
4. Observation:
Prepared by:
Signature – Quality Assurance Representative Date
CONTRACT DISCREPANCY REPORT (CDR)
1. Contract Number:
2. TO: (Contractor Point of Contact)
3. FROM: (Name of QAR)
4. Date and time observed discrepancy:
5. Source of Complaint
6. Discrepancy of Problem:
7. Corrective action plan:
A written corrective action plan is / is not required.
The written Corrective Action Plan will be provided to the undersigned not later than 5 working days after receipt of this CDR.
8. Government actions (payment deductions, performance evaluation meetings, or other actions):
Prepared by:
Signature – Quality Assurance Representative Date
Received by:
Signature - Contractor Task Manager or on-site representative Date
CLAUSES INCORPORATED BY REFERENCE
NOTE: The QAR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-6 Alt I Restrictions On Subcontractor Sales To The Government
(Sep 2006) -- Alternate I
OCT 1995
52.203-11 Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions
SEP 2007
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.204-7 System for Award Management JUL 2013 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2015
52.204-13 System for Award Management Maintenance JUL 2013 52.204-16 Commercial and Government Entity Code Reporting JUL 2015 52.204-18 Commercial and Government Entity Code Maintenance JUL 2015 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-1 Instructions to Offerors--Commercial Items OCT 2015 52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns OCT 2014 52.219-14 Limitations On Subcontracting NOV 2011 52.222-3 Convict Labor JUN 2003 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-22 Previous Contracts And Compliance Reports FEB 1999 52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-37 Employment Reports on Veterans OCT 2015 52.222-50 Combating Trafficking in Persons MAR 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2014 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
OCT 2015
52.229-3 Federal, State And Local Taxes FEB 2013 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.242-13 Bankruptcy JUL 1995 52.246-4 Inspection Of Services--Fixed Price AUG 1996 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7005 Oral Attestation of Security Responsibilities NOV 2001 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting.
SEP 2015
252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014 252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7006 Wide Area WorkFlow Payment Instructions MAY 2013 252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Alt I Transportation of Supplies by Sea (APR 2014) Alternate I APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.204-17 OWNERSHIP OF CONTROL OF OFFEROR (NOV 2014)
(a) Definitions. As used in this provision--
Commercial and Government Entity (CAGE) code means—
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Contractor and Government Entity (CAGE) Branch to identify a commercial or government entity, or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Contractor and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as an NCAGE code.
Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.
Immediate owner means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.
(b) The Offeror represents that it [ ___ ] has or [ ___ ] does not have an immediate owner. If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.
(c) If the Offeror indicates ``has'' in paragraph (b) of this provision, enter the following information:
Immediate owner CAGE code:
Immediate owner legal name: ___
(Do not use a ``doing business as'' name)
Is the immediate owner owned or controlled by another entity?:
[ ___ ] Yes or [ ___ ] No.
(d) If the Offeror indicates ``yes'' in paragraph (c) of this provision, indicating that the immediate owner is owned or controlled by another entity, then enter the following information:
Highest-level owner CAGE code:
Highest-level owner legal name:
(Do not use a ``doing business as'' name)
(End of provision)
52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS--
REPRESENTATION (NOV 2015)
(a) Definitions. Inverted domestic corporation and subsidiary have the meaning given in the clause of this contract entitled Prohibition on Contracting with Inverted Domestic Corporations (52.209-10).
(b) Government agencies are not permitted to use appropriated (or otherwise made available) funds for contracts with either an inverted domestic corporation, or a subsidiary of an inverted domestic corporation, unless the exception at 9.108-2(b) applies or the requirement is waived in accordance with the procedures at 9.108-4.
(c) Representation. The Offeror represents that--
(1) It [ ___ ] is, [ ___ ] is not an inverted domestic corporation; and
(2) It [ ___ ] is, [ ___ ] is not a subsidiary of an inverted domestic corporation.
52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)
(a)(1) The Offeror certifies, to the best of its knowledge and belief, that-
(i) The Offeror and/or any of its Principals-
(A) Are ( ) are not ( ) presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;
(B) Have ( ) have not ( ), within a three-year period preceding this offer, been convicted of or had a civil judgment rendered against them for: commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) contract or subcontract; violation of Federal or State antitrust statutes relating to the submission of offers; or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violating Federal criminal tax laws, or receiving stolen property (if offeror checks “have”, the offeror shall also see 52.209-7, if included in this solicitation); and
(C) Are ( ) are not ( ) presently indicted for, or otherwise criminally or civilly charged by a governmental entity with, commission of any of the offenses enumerated in paragraph (a)(1)(i)(B) of this provision.;
and
(D) Have , have not , within a three-year period preceding this offer, been notified of any delinquent Federal taxes in an amount that exceeds $3,500 for which the liability remains unsatisfied.
(1) Federal taxes are considered delinquent if both of the following criteria apply:
(i) The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge to the liability, the liability is not finally determined until all judicial appeal rights have been exhausted.
(ii) The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.
(2) Examples. (i) The taxpayer has received a statutory notice of deficiency, under I.R.C. Sec. 6212, which entitles the taxpayer to seek Tax Court review of a proposed tax deficiency. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek Tax Court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.
(ii) The IRS has filed a notice of Federal tax lien with respect to an assessed tax liability, and the taxpayer has been issued a notice under I.R.C. Sec. 6320 entitling the taxpayer to request a hearing with the IRS Office of Appeals contesting the lien filing, and to further appeal to the Tax Court if the IRS determines to sustain the lien filing. In the course of the hearing, the taxpayer is entitled to contest the underlying tax liability because the taxpayer has had no prior opportunity to contest the liability. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek tax court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.
(iii) The taxpayer has entered into an installment agreement pursuant to I.R.C. Sec. 6159. The taxpayer is making timely payments and is in full compliance with the agreement terms. The taxpayer is not delinquent because the taxpayer is not currently required to make full payment.
(iv) The taxpayer has filed for bankruptcy protection. The taxpayer is not delinquent because enforced collection action is stayed under 11 U.S.C. 362 (the Bankruptcy Code).
(ii) The Offeror has ( ) has not ( ), within a three-year period preceding this offer, had one or more contracts terminated for default by any Federal agency.
(2) Principal, for the purposes of this certification, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager;
head of a division or business segment; and similar positions).
(b) The Offeror shall provide immediate written notice to the Contracting Officer if, at any time prior to contract award, the Offeror learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
(c) A certification that any of the items in paragraph (a) of this provision exists will not necessarily result in withholding of an award under this solicitation. However, the certification will be considered in connection with a determination of the Offeror's responsibility. Failure of the Offeror to furnish a certification or provide such additional information as requested by the Contracting Officer may render the Offeror nonresponsible.
(d) Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by paragraph (a) of this provision. The knowledge and information of an Offeror is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
(e) The certification in paragraph (a) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Offeror knowingly rendered an erroneous certification, in addition to other remedies available to the Government, the Contracting Officer may terminate the contract resulting from this solicitation for default.
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (NOV 2015)
ALTERNATE I (OCT 2014)
The offeror shall complete only paragraphs (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov . If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (p) of this provision.
(a) Definitions. As used in this provision--
“Economically disadvantaged women-owned small business (EDWOSB) concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.
“Forced or indentured child labor” means all work or service—
(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or
(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.
“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.
“Immediate owner” means an entity, other than the offeror, that has direct control of the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .