Drawings.pdf
PDF 44 MB Posted
- Solicitation number
- W912DS-15-B-0023
About this file
Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0002_Drawings.pdf | ||
| Amendment_0002_Specifications.pdf | ||
| Amendment_0001.pdf | ||
| W912DS-15-B-0023.pdf | ||
| Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
G001 COVER SHEET
SITE / CIVIL ENGINEERING
C001 CIVIL LEGENDS, ABBREVIATIONS AND GENERAL NOTES
C101 GENERAL LOCATION PLAN
C102 EXISTING CONDITIONS AND REMOVALS PLAN
C103 SITE PLAN
C104 SITE PLAN
C105 GRADING, PLANTING & EROSION CONTROL PLAN
C106 GRADING, PLANTING & EROSION CONTROL PLAN
C201 UTILITY PROFILES
C501 CONSTRUCTION DETAILS
C502 CONSTRUCTION DETAILS
C503 CONSTRUCTION DETAILS
C504 CONSTRUCTION DETAILS
STRUCTURAL ENGINEERING
S011 DESIGN CRITERIA AND GENERAL NOTES
S111 FOUNDATION AND ROOF FRAMING PLANS
S311 FOUNDATION SECTIONS & DETAILS
S511 FRAMING SECTIONS & DETAILS
S512 FRAMING SECTIONS & DETAILS
S513 PHOTOGRAPHS OF EXISTING CONDITIONS
ARCHITECTURAL
A001 ABBREVIATIONS, SYMBOLS & LEGEND
AD111 EDUCATION CENTER REMOVALS PLAN
A111 EDUCATION CENTER FIRST FLOOR PLAN
A112 EDUCATION CENTER ROOF PLAN
A211 EDUCATION CENTER BUILDING ELEVATIONS
A212 EDUCATION CENTER BUILDING SECTIONS
A213 EDUCATION CENTER EXISTING PHOTOGRAPHS
ARCHITECTURAL
A311 EDUCATION CENTER WALL SECTIONS AND DETAILS
A312 EDUCATION CENTER CHIMNEY & EXTERIOR DETAILS
A411 EDUCATION CENTER ROOF DETAILS
A811 EDUCATION CENTER REFLECTED CEILING PLAN AND DETAILS
A911 EDUCATION CENTER WINDOW SCHEDULE & DETAILS
A912 EDUCATION CENTER DOOR SCHEDULE, DOOR AND LOUVER
DETAILS
A915 FINISH SCHEDULES
MECHANICAL ENGINEERING
H001 HVAC LEGEND
H111 EDUCATION CENTER HVAC PLAN
H511 HVAC DETAILS, CONTROLS AND SCHEDULES
ELECTRICAL ENGINEERING
E001 ELECTRICAL LEGEND
ED002 ELECTRICAL SITE PLAN REMOVALS
E002 ELECTRICAL SITE PLAN
E100 EDUCATION CENTER FLOOR PLAN
E104 EDUCATION CENTER ROOF PLAN – LIGHTNING PROTECTION
E121 CARRIAGE HOUSE REMOVALS AND NEW WORK PLAN
E401 ELECTRICAL RISER DIAGRAM
E501 ELECTRICAL SCHEDULES
E502 ELECTRICAL PANELS
E601 ELECTRICAL DETAILS
E602 ELECTRICAL DETAILS
E603 LIGHTNING PROTECTION DETAILS
FIRE ALARM ENGINEERING
FA011 SYMBOLS, NOTES AND ABBREVIATIONS
FA111 EDUCATION CENTER FLOOR PLAN
FA311 FIRE ALARM RISER DIAGRAM
E Y
P
A rc h it e c tu re
E n g in e e ri n g e y p a e .c o m
N a n o
F a b E a s t
F u lle r R o a d s t F lo o r A lb a n y N
Y
T e le p h o n e
.7
.3
F a x
.7
.3
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
SHEET OF
U S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W Y
O R
K D
IS
T
R
IC
T
C O
N S
T
IT
U T
IO
N
I S
L A
N D
E D
U C
A T
IO
N
C E
N T
E R
P R
O J E
C T
G O
S H
O W
P R
O J E
C T
.0
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
M Z
C K
D B
Y
M B
D E
S
IG
N E
D B
Y
T O
D A
T E
S
IZ
E
S U
B M
IT
T
E D
B Y
G
O S
H O
W A
R C
H
IT
E C
T S
P L O
T S
C A
L E
C O
N T
R A
C T
N O
A N
S I D
W D
S -1
-D
-0
SHEET
IDENTIFICATION
W e s t th S tr e e t, F l N e w
Y o rk N
Y
P
.2
.3
F
.2
.7
P L O
T D
A T
E
C re s c e n t R o a d
C li ft o n
P a rk
N
Y
M .J
E n g in e e ri n g a n d L a n d S u rv e y in g P
.C
C U s e rs
\m p ic c ir ill o \D o c u m e n ts
\A C
C I-
-A -W
A R
N E
R P
A C
K A
G E
A
N D
C e n tr a l_ m p ic c ir ill o .r v t
/1
/2
:0
:1
P
M
/2
G-001 (1)
.1
.2
C O
V E
R S
H E
E T
C O
V E
R S
H E
E T
CONSTITUTION ISLAND
EDUCATION CENTER PROJECT
CONSTITUTION ISLAND, COLD SPRING, NEW YORK 10516
LIST OF DRAWINGS
VICINITY MAP LOCATION MAP
PROJECT SITE
PROJECT SITE
100% CONSTRUCTION DOCUMENTS
CONSTITUTION ISLAND - EDUCATION CENTER
14 AUGUST 2015
F i l e
P a t h
F m j
P
K G
C
C
I V
I L
E G
E N
D S
A
B B
R E
V I A
T I O
N S
A
D
G
N
E R
O T
E S d w g
A
F
G
H
I
J
L
M
N
O
P
Q
R
S
T
U
V
W
S
E
E
WL WL WL
P C
K G
C
C
I V
I L
L E
G E
N
B B
R E
V
N
N
O T
E S
C001
C I V
I L
L E
G E
N D
B B
R E
V I A
T I O
N S
G
E N
E R
A L
N
O T
E S
E Y
P
A r c h i t e c t u r n g i n e e r i n g e y p a e c o m
N a n o
F a b
E a s t
F u l l e r
R o a d s t
F l o o r
A l b a n y
N
Y
T e l e p h o n e
F a x
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N A
P P
R
D A
T E
SHEET OF
U
S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
C O
N S
T I T
U T
I O
N
I S
L A
N D
W A
R N
R
H
U
N
O V
A T
I O
N
A N
D
R
E P
A C
K A
G I N
G
P
R O
J E
C T
G O
S H
W
O
J E
C T
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
J F
C K
D
B
Y
B C
D E
S I G
N E
D
B
Y
S D
P
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
M J
E n g i n e e r i n g n d
S u r v e y i n g
P
C
P L
A
L E
C O
N T
R A
A N
S I
D
W
D S
D
SHEET
IDENTIFICATION
s t t h r e e t
N w
Y o r k
N
Y
P
P L
T
E e s c e n t
R o a d
C l i f t o n
P a r k
N
Y
M J
E n g i n e e r i n g a n d
L a d u r v e y i n g
P
C
S
H O
W N
C O
N S
T I T
U T
I O
N
I S
L A
N D
E D
U C
A T
I O
N
C
E N
T E
R
P R
O J E
C T
G O
S H
O
J E
W
D S
D
P
A r c h i t e c t u g i n e e r i n g e y p a e c o m
N a n o
F a b
E a s t
F u l l e r
R o a d s t
F l o o r
A l b a n y
N
Y
T e l e p h o n e
F a x
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N A
P P
R
D A
T E
SHEET OF
U
S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
C O
N S
T I T
U T
I O
N
I S
L A
N D
W A
R N
U
N
O V
A T
I O
N
A N
D
R
E P
A C
K A
G I N
G
P
R O
J E
C T
G O
S H
O
J E
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
J F
C K
D
B
Y
B C
D E
S I G
N E
D
B
Y
S D
P
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
M J
E n g i n e e r i n n d
S u r v e y i n g
P
C
P L
A
L E
C O
N T
R A
A N
S I
D
W
D S
D
SHEET
IDENTIFICATION
s t r e e t
N r k
N
Y
P
P L
T
E e s c e n t
R o a d
C l i f t o n
P a r k
N
Y
M J
E n g i n e e r i n g a n d
L a r v e y i n g
P
C
S
H O
W N
C O
N S
T I T
U T
I O
N
I S
L A
N D
E D
U C
A T
I O
N
C
E N
T E
R
P R
O J E
C T
G O
S H
O
J E
W
D S
D
C101
G E
N E
R A
L
L O
C A
T I O
N
P
L A
N
P K
G
E N
E R
C
A T
I O
N
P
L
ORDNANCE GENERAL NOTE:
IN THE EVENT ANY ORDNANCE RELATED ITEMS ARE
DISCOVERED THE CONTRACTOR WILL STOP WORK IMMEDIATELY
AND IMMEDIATELY CONTACT THE WEST POINT MILITARY POLICE
AND THEN IMMEDIATELY CONTACT THE CONTRACTING OFFICER.
1 FFE = 112.17
threshold = 112.23 landing = 111.67
2 FFE = 112.36
threshold = 112.35 landing = 111.91
3 FFE = 112.26
threshold = 112.31 landing = 111.67
4 FFE = 112.21
threshold = 112.24 deck = 112.26
5 FFE = 111.56
threshold = 111.74 landing = 111.13
6 FFE = 110.34
landing = 110.17
7 FFE = 110.38
(no door)
8 top ramp = 113.60 threshold = 113.31 landing = 113.24
9 FFE = 114.06
10 FFE = 114.14
threshold = 114.80
11 FFE = 114.24
threshold = 114.49
12 FFE = 114.34
(dirt)
13 FFE = 115.45
threshold = 115.82 dirt = 116.15
14 FFE = 122.18
threshold = 122.23 landing = 121.96
15 FFE = 122.19
threshold = 122.23 landing = 121.97
E Y
P
A r c h i t e c t u g i n e e r i n g e y p a e c o m
N a n o
F a b
E a s t
F u l l e r
R o a d s t
F l o o r
A l b a n y
N
Y
T e l e p h o n e
F a x
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N A
P P
R
D A
T E
SHEET OF
U
S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
C O
N S
T I T
U T
I O
N
I S
L A
N D
W A
R N
U
N
O V
A T
I O
N
A N
D
R
E P
A C
K A
G I N
G
P
R O
J E
C T
G O
S H
O
J E
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
J F
C K
D
B
Y
B C
D E
S I G
N E
D
B
Y
S D
P
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
M J
E n g i n e e r i n n d
S u r v e y i n g
P
C
P L
A
L E
C O
N T
R A
A N
S I
D
W
D S
D
SHEET
IDENTIFICATION
s t r e e t
N r k
N
Y
P
P L
T
E e s c e n t
R o a d
C l i f t o n
P a r k
N
Y
M J
E n g i n e e r i n g a n d
L a r v e y i n g
P
C
S
H O
W N
C O
N S
T I T
U T
I O
N
I S
L A
N D
E D
U C
A T
I O
N
C
E N
T E
R
P R
O J E
C T
G O
S H
O
J E
W
D S
D
C102
P K
G
C
E
X I S
T I N
G
C
O N
D I T
I O
M
O V
A L
S
P
L A
N
C
X I S
T I N
G
C
O N
D I T
I O
D
R E
M O
V A
DISCOVERED THE CONTRACTOR WILL STOP WORK IMMEDIATELY
AND IMMEDIATELY CONTACT THE WEST POINT MILITARY POLICE
AND THEN IMMEDIATELY CONTACT THE CONTRACTING OFFICER.
E Y
P
A r c h i t e c t u g i n e e r i n g e y p a e c o m
N a n o
F a b
E a s t
F u l l e r
R o a d s t
F l o o r
A l b a n y
N
Y
T e l e p h o n e
F a x
US Army Corps of Engineers
New York District
D
C
A
B
M A
R K
D E
S C
R I P
T I O
N A
P P
R
D A
T E
SHEET OF
U
S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
C O
N S
T I T
U T
I O
N
I S
L A
N D
W A
R N
U
N
O V
A T
I O
N
A N
D
R
E P
A C
K A
G I N
G
P
R O
J E
C T
G O
S H
O
J E
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
J F
C K
D
B
Y
B C
D E
S I G
N E
D
B
Y
S D
P
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
M J
E n g i n e e r i n n d
S u r v e y i n g
P
C
P L
A
L E
C O
N T
R A
A N
S I
D
W
D S
D
SHEET
IDENTIFICATION
s t r e e t
N r k
N
Y
P
P L
T
E e s c e n t
R o a d
C l i f t o n
P a r k
N
Y
M J
E n g i n e e r i n g a n d
L a r v e y i n g
P
C
S
H O
W N
C O
N S
T I T
U T
I O
N
I S
L A
N D
E D
U C
A T
I O
N
C
E N
T E
R
P R
O J E
C T
G O
S H
O
J E
W
D S
D
C103
S I T
E
P
L A
N
P K
S
I T
E
P
L
DISCOVERED THE CONTRACTOR WILL STOP WORK IMMEDIATELY
AND IMMEDIATELY CONTACT THE WEST POINT MILITARY POLICE
AND THEN IMMEDIATELY CONTACT THE CONTRACTING OFFICER.
E Y
P
A r c h i t e c t u g i n e e r i n g e y p a e c o m
N a n o
F a b
E a s t
F u l l e r
R o a d s t
F l o o r
A l b a n y
N
Y
T e l e p h o n e
F a x
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N A
P P
R
D A
T E
SHEET OF
U
S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
C O
N S
T I T
U T
I O
N
I S
L A
N D
W A
R N
U
N
O V
A T
I O
N
A N
D
R
E P
A C
K A
G I N
G
P
R O
J E
C T
G O
S H
O
J E
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
J F
C K
D
B
Y
B C
D E
S I G
N E
D
B
Y
S D
P
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
M J
E n g i n e e r i n n d
S u r v e y i n g
P
C
P L
A
L E
C O
N T
R A
A N
S I
D
W
D S
D
SHEET
IDENTIFICATION
s t r e e t
N r k
N
Y
P
P L
T
E e s c e n t
R o a d
C l i f t o n
P a r k
N
Y
M J
E n g i n e e r i n g a n d
L a r v e y i n g
P
C
S
H O
W N
C O
N S
T I T
U T
I O
N
I S
L A
N D
E D
U C
A T
I O
N
C
E N
T E
R
P R
O J E
C T
G O
S H
O
J E
W
D S
D
C104
S I T
E
P
L A
N
P K
S
I T
E
P
L
E Y
P
A r c h i t e c t u g i n e e r i n g e y p a e c o m
N a n o
F a b
E a s t
F u l l e r
R o a d s t
F l o o r
A l b a n y
N
Y
T e l e p h o n e
F a x
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N A
P P
R
D A
T E
SHEET OF
U
S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
C O
N S
T I T
U T
I O
N
I S
L A
N D
W A
R N
U
N
O V
A T
I O
N
A N
D
R
E P
A C
K A
G I N
G
P
R O
J E
C T
G O
S H
O
J E
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
J F
C K
D
B
Y
B C
D E
S I G
N E
D
B
Y
S D
P
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
M J
E n g i n e e r i n n d
S u r v e y i n g
P
C
P L
A
L E
C O
N T
R A
A N
S I
D
W
D S
D
SHEET
IDENTIFICATION
s t r e e t
N r k
N
Y
P
P L
T
E e s c e n t
R o a d
C l i f t o n
P a r k
N
Y
M J
E n g i n e e r i n g a n d
L a r v e y i n g
P
C
S
H O
W N
C O
N S
T I T
U T
I O
N
I S
L A
N D
E D
U C
A T
I O
N
C
E N
T E
R
P R
O J E
C T
G O
S H
O
J E
W
D S
D
C105
G R
A D
I N
G
P
L A
N T
I N
O
S I O
N
C O
N T
R O
L
P
L A
N
P K
G
C
G
R A
D I N
G
P
L A
N T
I N
O
S I O
N
C
O N
T R
P
A r c h i t e c t u g i n e e r i n g e y p a e c o m
N a n o
F a b
E a s t
F u l l e r
R o a d s t
F l o o r
A l b a n y
N
Y
T e l e p h o n e
F a x
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N A
P P
R
D A
T E
SHEET OF
U
S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
C O
N S
T I T
U T
I O
N
I S
L A
N D
W A
R N
U
N
O V
A T
I O
N
A N
D
R
E P
A C
K A
G I N
G
P
R O
J E
C T
G O
S H
O
J E
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
J F
C K
D
B
Y
B C
D E
S I G
N E
D
B
Y
S D
P
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
M J
E n g i n e e r i n n d
S u r v e y i n g
P
C
P L
A
L E
C O
N T
R A
A N
S I
D
W
D S
D
SHEET
IDENTIFICATION
s t r e e t
N r k
N
Y
P
P L
T
E e s c e n t
R o a d
C l i f t o n
P a r k
N
Y
M J
E n g i n e e r i n g a n d
L a r v e y i n g
P
C
S
H O
W N
C O
N S
T I T
U T
I O
N
I S
L A
N D
E D
U C
A T
I O
N
C
E N
T E
R
P R
O J E
C T
G O
S H
O
J E
W
D S
D
C106
G R
A D
I N
G
P
L A
N T
I N
O
S I O
N
C O
N T
R O
L
P
L A
N
P K
G
R A
D I N
G
P
L A
N T
I N
O
S I O
N
C
O N
T R
P
A r c h i t e c t u g i n e e r i n g e y p a e c o m
N a n o
F a b
E a s t
F u l l e r
R o a d s t
F l o o r
A l b a n y
N
Y
T e l e p h o n e
F a x
US Army Corps of Engineers
New York District
D
C
A
B
M A
R K
D E
S C
R I P
T I O
N A
P P
R
D A
T E
SHEET OF
U
S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
C O
N S
T I T
U T
I O
N
I S
L A
N D
W A
R N
U
N
O V
A T
I O
N
A N
D
R
E P
A C
K A
G I N
G
P
R O
J E
C T
G O
S H
O
J E
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
J F
C K
D
B
Y
B C
D E
S I G
N E
D
B
Y
S D
P
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
M J
E n g i n e e r i n n d
S u r v e y i n g
P
C
P L
A
L E
C O
N T
R A
A N
S I
D
W
D S
D
SHEET
IDENTIFICATION
s t r e e t
N r k
N
Y
P
P L
T
E e s c e n t
R o a d
C l i f t o n
P a r k
N
Y
M J
E n g i n e e r i n g a n d
L a r v e y i n g
P
C
S
H O
W N
C O
N S
T I T
U T
I O
N
I S
L A
N D
E D
U C
A T
I O
N
C
E N
T E
R
P R
O J E
C T
G O
S H
O
J E
W
D S
D
C201
U T
I L I T
Y
P
R O
F I L E
S
P K
S
T R
M
P
R O
F I L
E S
ORDNANCE GENERAL NOTE:
IN THE EVENT ANY ORDNANCE RELATED ITEMS ARE
DISCOVERED THE CONTRACTOR WILL STOP WORK IMMEDIATELY
AND IMMEDIATELY CONTACT THE WEST POINT MILITARY POLICE
AND THEN IMMEDIATELY CONTACT THE CONTRACTING OFFICER.
WARNING SIGN DETAIL
C501
C O
N S
T R
U C
T I O
N
D
E T
A I L S
P K
G
C
C
O N
S T
R U
C T
I O
N
D
E T
A I L
S
E Y
P
A r c h i t e c t u g i n e e r i n g e y p a e c o m
N a n o
F a b
E a s t
F u l l e r
R o a d s t
F l o o r
A l b a n y
N
Y
T e l e p h o n e
F a x
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N A
P P
R
D A
T E
SHEET OF
U
S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
C O
N S
T I T
U T
I O
N
I S
L A
N D
W A
R N
U
N
O V
A T
I O
N
A N
D
R
E P
A C
K A
G I N
G
P
R O
J E
C T
G O
S H
O
J E
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
J F
C K
D
B
Y
B C
D E
S I G
N E
D
B
Y
S D
P
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
M J
E n g i n e e r i n n d
S u r v e y i n g
P
C
P L
A
L E
C O
N T
R A
A N
S I
D
W
D S
D
SHEET
IDENTIFICATION
s t r e e t
N r k
N
Y
P
P L
T
E e s c e n t
R o a d
C l i f t o n
P a r k
N
Y
M J
E n g i n e e r i n g a n d
L a r v e y i n g
P
C
S
H O
W N
C O
N S
T I T
U T
I O
N
I S
L A
N D
E D
U C
A T
I O
N
C
E N
T E
R
P R
O J E
C T
G O
S H
O
J E
W
D S
D
CU O
EI L I R
N
LYN SLO P A T
T D
CU O
EI L I R
N
LYN SLO P A T
C502
C O
N S
T R
U C
T I O
N
D
E T
A I L S
P K
C
O N
S T
R U
C T
I O
N
D
E T
A I L
S
E Y
P
A r c h i t e c t u g i n e e r i n g e y p a e c o m
N a n o
F a b
E a s t
F u l l e r
R o a d s t
F l o o r
A l b a n y
N
Y
T e l e p h o n e
F a x
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N A
P P
R
D A
T E
SHEET OF
U
S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
C O
N S
T I T
U T
I O
N
I S
L A
N D
W A
R N
U
N
O V
A T
I O
N
A N
D
R
E P
A C
K A
G I N
G
P
R O
J E
C T
G O
S H
O
J E
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
J F
C K
D
B
Y
B C
D E
S I G
N E
D
B
Y
S D
P
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
M J
E n g i n e e r i n n d
S u r v e y i n g
P
C
P L
A
L E
C O
N T
R A
A N
S I
D
W
D S
D
SHEET
IDENTIFICATION
s t r e e t
N r k
N
Y
P
P L
T
E e s c e n t
R o a d
C l i f t o n
P a r k
N
Y
M J
E n g i n e e r i n g a n d
L a r v e y i n g
P
C
S
H O
W N
C O
N S
T I T
U T
I O
N
I S
L A
N D
E D
U C
A T
I O
N
C
E N
T E
R
P R
O J E
C T
G O
S H
O
J E
W
D S
D
C503
O
N S
T R
U C
T I O
N
D
E T
A I L S
P K
C
O N
S T
R U
C T
I O
N
D
E T
A I L
S
E Y
P
A r c h i t e c t u g i n e e r i n g e y p a e c o m
N a n o
F a b
E a s t
F u l l e r
R o a d s t
F l o o r
A l b a n y
N
Y
T e l e p h o n e
F a x
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N A
P P
R
D A
T E
SHEET OF
U
S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
C O
N S
T I T
U T
I O
N
I S
L A
N D
W A
R N
U
N
O V
A T
I O
N
A N
D
R
E P
A C
K A
G I N
G
P
R O
J E
C T
G O
S H
O
J E
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
J F
C K
D
B
Y
B C
D E
S I G
N E
D
B
Y
S D
P
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
M J
E n g i n e e r i n n d
S u r v e y i n g
P
C
P L
A
L E
C O
N T
R A
A N
S I
D
W
D S
D
SHEET
IDENTIFICATION
s t r e e t
N r k
N
Y
P
P L
T
E e s c e n t
R o a d
C l i f t o n
P a r k
N
Y
M J
E n g i n e e r i n g a n d
L a r v e y i n g
P
C
S
H O
W N
C O
N S
T I T
U T
I O
N
I S
L A
N D
E D
U C
A T
I O
N
C
E N
T E
R
P R
O J E
C T
G O
S H
O
J E
W
D S
D
PROFILE
SECTION A-A
SECTION B-B
SWPPP (STORMWATER POLLUTION PREVENTION PLAN)
SECTION VIEW
PLAN
SECTION
PERSPECTIVE VIEW
SECTION
STABILIZED CONSTRUCTION ENTRANCE
PROFILE
PLAN VIEW
TEMPORARY OUT-OF-PAVEMENT FILTER
PLAN
SECTION
C504
C O
N S
T R
U C
T I O
N
D
E T
A I L S
P K
C
O N
S T
R U
C T
I O
N
D
E T
A I L
S
E Y
P
A r c h i t e c t u g i n e e r i n g e y p a e c o m
N a n o
F a b
E a s t
F u l l e r
R o a d s t
F l o o r
A l b a n y
N
Y
T e l e p h o n e
F a x
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N A
P P
R
D A
T E
SHEET OF
U
S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
C O
N S
T I T
U T
I O
N
I S
L A
N D
W A
R N
U
N
O V
A T
I O
N
A N
D
R
E P
A C
K A
G I N
G
P
R O
J E
C T
G O
S H
O
J E
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
J F
C K
D
B
Y
B C
D E
S I G
N E
D
B
Y
S D
P
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
M J
E n g i n e e r i n n d
S u r v e y i n g
P
C
P L
A
L E
C O
N T
R A
A N
S I
D
W
D S
D
SHEET
IDENTIFICATION
s t r e e t
N r k
N
Y
P
P L
T
E e s c e n t
R o a d
C l i f t o n
P a r k
N
Y
M J
E n g i n e e r i n g a n d
L a r v e y i n g
P
C
S
H O
W N
C O
N S
T I T
U T
I O
N
I S
L A
N D
E D
U C
A T
I O
N
C
E N
T E
R
P R
O J E
C T
G O
S H
O
J E
W
D S
D
YP
A rc hi te ct ur e
E ng in ee rin g ey pa e.
co m
N an oF ab
E as t
Fu lle r R oa d
- 1 st
F lo or A lb an y, N
Y
Te le ph on e:
.7
.3
Fa x:
.7
.3
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M
AR
K D
ES
C
R
IP
TI
O
N A
PP
R
D
AT
E
SHEET OF
U . S
. A
RM
Y C
O
RP
S O
F
EN
G
IN
EE
RS
N
EW
Y O
R K
D
IS
TR
IC
T
C O
N S
TI
TU
TI
O
N
IS
LA
N
D
ED
U C
AT
IO
N C
EN
TE
R
PR
O
JE
C T
G O
SH
O
W P
R O
JE
C
T
.0
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
M
Z C
KD
B
Y:
M
B
D
ES
IG
N
E D
B Y:
TO
D
AT
E:
S
IZ
E
S U
BM
IT
TE
D
B Y:
G O
SH
O
W A
R C
H
IT
EC
TS
P
LO
T
SC
AL
E:
C O
N
TR
A C
T N
O
A N
S I D
W
2D S-
-D
-0
SHEET
IDENTIFICATION
W es t 2 8t h St re et
, 5 F l / N ew Y or k, N Y
P
.2
.3
/ F
.2
.7
P
LO
T D
AT
E:
C re sc en t R oa d
- C lif to n Pa rk , N
Y
M .J
. E ng in ee rin g an d
La nd
S ur ve yi ng , P
.C
S001 GENERAL, INDEX, SYMBOLS, ABBREVIATIONS, LEGEND
S100 FLOOR PLANS
S301 FOUNDATIONS SECTIONS AND DETAILS
S501 SUPERSTRUCTURE SECTIONS AND DETAILS
STRUCTURAL DISCIPLINE PREFIX
GROUP DESIGNATION
BUILDING NUMBER
DRAWING NUMBER
BUILDING NUMBER LEGEND
0 = WARNER HOUSE
1 = EDUCATION CENTER
SECTION INDICATION
DIRECTION OF VIEWDRAWING NUMBER WHERE
SECTION IS DRAWN
SECTION NUMBER
DETAIL INDICATION
DRAWING NUMBER WHERE
DETAIL IS DRAWN
DETAIL NUMBER
DETAIL TITLE
NO SCALE
DETAIL TYPE/NAME
SCALE
DETAIL NUMBER
XX
XXX
XX
XXX
XX
XXX
DRAWN ON SHEET
PHOTO INDICATION
DRAWING NUMBER WHERE
DETAIL IS DRAWN
DETAIL NUMBER
XX
XXX
DESIGN CRITERIA
STRUCTURAL AND MISCELLANEOUS STEEL
CHANNELS AND ANGLES: ASTM A36
STAINLESS STEEL PLATES: ASTM A666, TYPE 316
PLATES AND ALL OTHER STEEL MEMBERS: ASTM A36
HIGH STRENGTH BOLTS,NUTS, AND WASHERS (MIN. 3/4"Ø):ASTM A325 OR A490
CONCRETE
FOOTINGS: f'c = 4000 PSI FOUNDATION WALLS: f'c = 4000 PSI SLAB ON GROUND: f'c = 4000 PSI
(SEE SPECIFICATIONS FOR SLUMP, AIR ENTRAINMENT, ETC.)
MASONRY f'm = 1500 PSI
REINFORCING STEEL FOR CONCRETE AND MASONRY ASTM A615, GRADE 60
DIMENSION LUMBER
STUD: STUD GRADE OR BETTER
Fb = 690 PSI Fc = 425 PSI (PERPENDICULAR TO GRAIN) E = 1,200,000 PSI Fc = 725 PSI (PARALLEL TO GRAIN)
FRAMING: NO. 1 / NO. 2 OR BETTER
Fb = 875 PSI Fc = 425 PSI (PERPENDICULAR TO GRAIN) E = 1,400,000 PSI Fc = 1150 PSI (PERPENDICULAR TO GRAIN)
SPECIES: DOUGLAS FIR, DOUGLAS FIR/LARCH, HEM-FIR, OR SPRUCE-PINE-FIR (SPF)
KILN-DRIED, STRESS-GRADED
STRUCTURAL MATERIAL CRITERIA
1. DIMENSIONS TO, OF, AND IN EXISTING STRUCTURE SHALL BE VERIFIED IN FIELD BY CONTRACTOR.
2. DO NOT SCALE DRAWINGS. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES IN DIMENSIONS BETWEEN EXISTING CONDITIONS AND/OR ARCHITECTURAL DRAWINGS AND STRUCTURAL
DRAWINGS.
3. EXISTING CONDITIONS SHALL BE VERIFIED IN FIELD BY CONTRACTOR PRIOR TO COMMENCING WORK.
4. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES TO REMAIN AT ALL TIMES DURING THE WORK.
NOTE REQUIREMENTS ON PLANS AND IN SPECIFICATIONS FOR PROTECTION OF EXISTING
STRUCTURES.
5. CONTRACTOR SHALL DETERMINE LOCATIONS OF EXISTING UTILITIES BEFORE COMMENCING WORK.
CONTRACTOR SHALL NOTIFY ARCHITECT/ENGINEER IF UNCHARTED OR INCORRECTLY LOCATED UTILITIES ARE FOUND. CONTRACTOR SHALL NOT INTERRUPT UTILITIES WITHOUT PRIOR WRITTEN APPROVAL OF THE
OWNER.
EXISTING CONSTRUCTION NOTES
1. REFER TO DIVISION 31 SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO THOSE LISTED BELOW.
2. BEAR ALL FOOTINGS ON UNDISTURBED SOILS OR COMPACTED STRUCTURAL FILL HAVING A MINIMUM NET ALLOWABLE BEARING CAPACITY OF 3 KIPS PER SQUARE FOOT. FOUNDATIONS BEARING ENTIRELY ON BEDROCK SHALL BE HAVE A NET ALLOWABLE ROCK BEARING CAPACITY OF 20 KIPS PER SQUARE FOOT. BEARING CAPACITY SHALL BE CONFIRMED BY CONTRACTOR'S GEOTECHNICAL ENGINEER PRIOR
TO CONSTRUCTING FOOTINGS.
3. EXTEND EXTERIOR CONSTRUCTION DOWN A MINIMUM OF 54 INCHES BELOW EXTERIOR GRADE.
FOUNDATIONS BEARING ON SOUND BEDROCK MAY BE SEATED ABOVE MINIMUM EMBEDMENT DEPTH
REQUIRED FOR FROST PROTECTION.
4. THE SUBSURFACE CONDITIONS DESCRIBED ON THE DRAWINGS, TEST BORINGS, OR TEST PITS REPRESENT CONDITIONS ONLY AT THOSE SPECIFIC LOCATIONS AT THE PARTICULAR TIME THEY
WERE MADE.
5. REMOVE ALL ORGANIC AND UNSUITABLE MATERIAL PRIOR TO PLACING FILL. PLACE FILL IN HORIZONTAL LAYERS NOT TO EXCEED 8 INCHES IN LOOSE THICKNESS FOR COHESIVE MATERIALS AND 12 INCHES FOR NON-COHESIVE MATERIALS AND COMPACT TO A MINIMUM OF 95% MODIFIED
PROCTOR DENSITY AT OPTIMUM MOISTURE CONTENT. IF ACCEPTABLE TO THE CONTRACTOR'S
GEOTECHNICAL ENGINEER, ON-SITE MATERIALS THAT MEET PROJECT SPECIFICATION
REQUIREMENTS MAY BE USED FOR ENGINEERED FILL IF MAINTAINED AT OPTIMUM MOISTURE
CONTENT AND COMPACTED TO THE ABOVE CRITERIA. SELECT BORROW MATERIALS WILL BE
REQUIRED WHEN ON-SITE MATERIALS ARE UNSUITABLE OR CANNOT BE COMPACTED TO THE
CRITERIA STATED ABOVE.
6. EXCAVATION TO SUITABLE BEARING SUBGRADES MAY BE PROCEED BY CONVENTIONAL METHODS
TO WITHIN 2.5 FEET OF THE PROPOSED FINAL SUBGRADES. PERFORM EXCAVATION TO FINAL
SUBGRADE USING A BACKHOE EQUIPPED WITH A SMOOTH BLADE TO MINIMIZE DISTURBANCE OF THE
BEARING SUBGRADE. FINISH ALL FOOTING EXCAVATIONS BY HAND.
7. DO NOT EXTEND THE GENERAL EXCAVATION ACROSS THE SITE DEEPER THAN 1'-0" BELOW THE FIRST FLOOR SUBGRADE ELEVATION. PERFORM THE EXCAVATIONS FOR SPREAD FOOTINGS ON AN
INDIVIDUAL, LOCALIZED BASIS DOWN FROM THE FIRST FLOOR SUBGRADE ELEVATION.
8. PROVIDE POSITIVE PROTECTION FOR ALL EXCAVATION SLOPES AGAINST INSTABILITY AND
DETERIORATION DUE TO RAIN, WIND, SNOW OR ICE.
9. RETAIN THE PERIMETER OF THE GENERAL EXCAVATION WITH A SOIL RETENTION SYSTEM AS NECESSARY. THE DESIGN, INSTALLATION, MAINTENANCE AND REMOVAL OF THE SYSTEM IS THE
RESPONSIBILITY OF THE CONTRACTOR. PROVIDE ALL MEASURES AND PRECAUTIONS NECESSARY
TO MINIMIZE SETTLEMENT OF EXISTING OR NEW CONSTRUCTION INSIDE OR OUTSIDE OF THE
PROJECT LIMITS. REPAIR ANY DAMAGE TO NEW OR EXISTING CONSTRUCTION INSIDE OR OUTSIDE PROJECT LIMITS CAUSED BY CONSTRUCTION TECHNIQUES OR MOVEMENTS OF THE SOIL RETENTION
SYSTEM.
10. ALLOW THE CONTRACTOR'S GEOTECHNICAL ENGINEER TO INSPECT ALL FINISHED EXCAVATIONS AND
BEARING SUBGRADES BEFORE PLACING CONCRETE. DO NOT PLACE CONCRETE IN ANY
EXCAVATION CONTAINING FREE WATER, FROST, ICE OR FROZEN GROUND. PROVIDE ALL MEASURES NECESSARY TO PREVENT EXCESSIVE WATER OR FROST / ICE FROM PENETRATING ANY FOOTING OR
SLAB SUBGRADE, BOTH BEFORE AND AFTER CONCRETE PLACEMENT AND UNTIL SUCH SUBGRADES
ARE FULLY PROTECTED BY THE PERMANENT BUILDING STRUCTURE.
11. USE SIDE FORMS FOR ALL FOOTINGS. CLEAN REINFORCEMENT IMMEDIATELY PRIOR TO PLACING
CONCRETE. PLACE THE CONCRETE FOR EACH FOOTING IN ONE CONTINUOUS POUR.
12. BACKFILL AGAINST FOUNDATION WALLS BELOW GRADE SO THAT THE DIFFERENCE IN THE FILL LEVEL ON OPPOSITE SIDES OF THE WALL DOES NOT EXCEED 1'-0" AT ANY TIME. COMPACT TO 95 PERCENT MODIFIED PROCTOR DENSITY. BRACE ALL FOUNDATION WALLS DURING THE OPERATION OF BACKFILLING AND COMPACTION. LEAVE BRACING IN POSITION UNTIL PERMANENT RESTRAINTS
BECOME EFFECTIVE.
13. THE EXPOSED SUBGRADE SOILS MAY BE SENSITIVE TO DISTURBANCE AND STRENGTH
DEGRADATION WHEN HIGH MOISTURE CONTENTS ARE PRESENT. MINIMIZE CONSTRUCTION TRAFFIC
OVER EXPOSED SUBGRADES. DO NOT POND WATER ON THE SUBGRADES. CONTROL SURFACE AND
GROUND WATER BY PROPER SITE GRADING, PERIMETER CUTOFF TRENCHES, AND SUMP AND
PUMP METHODS OF DEWATERING. CONSTRUCT ALL CUTOFF TRENCHES AND SUMPS OUTSIDE THE
INFLUENCE OF PROPOSED FOUNDATIONS.
14. SUBGRADE BELOW SLABS ON GROUND SHALL BE REVIEWED BY THE CONTRACTOR'S GEOTECHNICAL
ENGINEER PRIOR TO SLAB PLACEMENT.
15. PROTECT SLAB SUBGRADE AND VAPOR RETARDER FROM PRECIPITATION AND EXCESSIVE
TEMPERATURES PRIOR TO SLAB PLACEMENT. SUBBASE SHALL BE DRY AND NOT FROZEN AT THE
TIME OF SLAB PLACEMENT. IF SUBGRADE FREEZES AFTER PREPARATION, CONTRACTOR SHALL
THAW, RECOMPACT, AND RETEST SUBGRADE PRIOR TO SLAB PLACEMENT.
16. CENTER FOOTINGS UNDER WALLS, PIERS, AND COLUMNS UNLESS NOTED OTHERWISE.
17. PROVIDE FULL HEIGHT DOVETAIL SLOT INSERTS @ 16" OC HORIZONTALLY IN CONCRETE WALLS
FACED WITH MASONRY/STONE.
FOUNDATION NOTES
1. REFER TO DIVISION 6 SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO THOSE LISTED
BELOW.
2. ALL STRUCTURAL TIMBER MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE
APPLICABLE EDITIONS OF THE AITC "TIMBER CONSTRUCTION STANDARDS," AND THE AF&PA
"NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION."
3. SHEATHING FOR ROOF, WALL, AND FLOOR SHALL BE APA RATED, EXPOSURE 1 PANELS MARKED
PS-2. RING SHANKED NAILS SHALL BE USED ON ALL ROOF AND FLOOR SHEATHING.
4. THE SHEATHING APPLIED TO LOAD-BEARING STUDS PROVIDES THE CONTINUOUS LATERAL
BRACING NECESSARY. CONTRACTOR SHALL PROVIDE TEMPORARY LATERAL BRACING UNTIL
SHEATHING IS INSTALLED.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL STORAGE AND ERECTION PROCEDURES
AND SEQUENCES TO PREVENT ANY ADVERSE EFFECTS ON THE SPECIFIED PHYSICAL
PROPERTIES OF THE MEMBERS.
6. THERE SHALL BE NO FIELD CUTTING OF STRUCTURAL MEMBERS FOR THE WORK OF OTHER
TRADES WITHOUT THE PRIOR REVIEW OF THE ARCHITECT/ENGINEER.
7. ALL BEARING WALLS SHALL HAVE DOUBLE TOP PLATES. PLATE SPLICES SHALL BE STAGGERED
AND SHALL OCCUR OVER STUDS.
8. MULTIPLE-PLY MEMBERS SHALL BE CONNECTED WITH 4 ROWS OF 1/2"Ø THROUGH-BOLTS @
12" OC STAGGERED.
9. WOOD FRAMING EXPOSED TO THE WEATHER OR IN CONTACT WITH MASONRY OR CONCRETE
SHALL BE PRESSURE TREATED.
10. ALL CONNECTION HARDWARE SHALL BE TYPE 316 STAINLESS STEEL AS MANUFACTURED BY
THE SIMPSON STRONG-TIE OR EQUIVALENT. USE MANUFACTURER'S FURNISHED NAILS OR BOLTS.
TIMBER NOTES
1. DO NOT CHANGE SIZE NOR SPACING OF STRUCTURAL ELEMENTS.
2. NOTES AND DETAILS SHOWN ARE TYPICAL; SIMILAR CONDITIONS APPLY TO SIMILAR CONDITIONS
UNLESS NOTED OTHERWISE.
3. THE DRAWINGS DO NOT INCLUDE ANY COMPONENTS NECESSARY FOR CONSTRUCTION SAFETY.
CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION SAFETY.
4. ALL ELEVATIONS ARE REFERENCED TO DATUM ELEVATION AS FOLLOWS:
WARNER HOUSE = 112.26' (SET AT THRESHOLD OF PIAZZA EXTERIOR DOOR, ROOM 105)
EDUCATION CENTER = 114.14'
MISCELLANEOUS NOTES
1. REFER TO DIVISION 3 SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO THOSE LISTED BELOW.
2. A QUALITY CONTROL PROGRAM OF FIELD TESTING AND INSPECTION WILL BE PERFORMED ON ALL STRUCTURAL CONCRETE WORK IN ACCORDANCE WITH THE SPECIFICATIONS. SCHEDULE WORK AND
PROVIDE ACCESS TO ALLOW THE TESTING REQUIREMENTS TO BE COMPLETED.
3. SUBMIT ENGINEERED CONCRETE MIX DESIGNS, INCLUDING REQUIRED BACKUP DATA, FOR EACH
TYPE OF CONCRETE PROPOSED FOR USE TO THE ARCHITECT/ENGINEER FOR REVIEW. ALLOW
ADEQUATE TIME FOR REVIEW PRIOR TO PERFORMING CONCRETE WORK.
4. DETAIL, FABRICATE, LABEL, SUPPORT AND PLACE ALL CONCRETE REINFORCEMENT IN ACCORDANCE WITH THE APPLICABLE EDITION OF ACI 315 "DETAILS AND DETAILING OF CONCRETE REINFORCEMENT."
5. SUBMIT DETAILED SHOP DRAWINGS INDICATING REINFORCEMENT SIZE, SPACING AND PLACEMENT
TO THE ARCHITECT/ENGINEER FOR REVIEW PRIOR TO FABRICATION. INCLUDE DETAILS AND
LOCATIONS OF ALL CURBS, CONSTRUCTION JOINTS, SLAB DEPRESSIONS, SLEEVES, OPENINGS, ETC.
6. REFER TO THE FOUNDATION NOTES FOR REQUIREMENTS PARTICULAR TO FOUNDATION AND
SLAB-ON-GROUND WORK. LOCATE JOINTS, IF PROVIDED, AT POINTS OF MINIMUM STRESS.
7. CLEAN AND MOISTEN ALL CONSTRUCTION JOINTS IMMEDIATELY PRIOR TO PLACING FRESH
CONCRETE.
8. PROVIDE DOWELS, WHERE REQUIRED, TO MATCH MAIN REINFORCING SIZE AND SPACING.
9. DO NOT USE CALCIUM CHLORIDE IN ANY CONCRETE.
10. HORIZONTAL JOINTS IN CONCRETE POURS ARE NOT PERMITTED.
11. ALLOW THE CONTRACTOR'S TESTING AGENCY TO REVIEW THE REINFORCING PLACEMENT PRIOR
TO PLACING ANY CONCRETE. PROVIDE ADEQUATE ADVANCE NOTICE.
12. REFER TO THE ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR
CURBS, PADS, DEPRESSIONS, WALL/SLAB OPENINGS, SPECIAL FLOOR FINISHES, ETC.
13. PROVIDE ONLY THOSE OPENINGS INDICATED ON THE REVIEWED SHOP DRAWINGS. PIPING,
CONDUIT, AND OTHER PENETRATIONS THROUGH WALLS AND SLABS SHALL BE SLEEVED; DO NOT
CORE DRILL.
14. CONCRETE COVER FOR REINFORCEMENT SHALL BE AS FOLLOWS UNLESS NOTED OTHERWISE:
COVER
FOOTINGS POURED AGAINST EARTH: 3"
SURFACES EXPOSED TO WEATHER OR EARTH:
#5 AND SMALLER BARS: 1-1/2"
SURFACES NOT EXPOSED TO WEATHER OR EARTH:
SLABS AND WALLS 3/4"
BETWEEN BARS AND EMBEDDED ITEMS:
ELEMENTS EXPOSED TO WEATHER OR EARTH: 1-1/2"
ELEMENTS NOT EXPOSED TO WEATHER OR EARTH: 3/4"
15. REFER TO SPECIFICATIONS FOR PLACING CONCRETE IN HOT WEATHER AND IN COLD WEATHER.
16. PLACE ALL SLABS-ON-GROUND IN A LINEAR PATTERN BETWEEN CONSTRUCTION JOINTS. ALLOW
A MINIMUM OF 24 HOURS BETWEEN ADJACENT POURS. SAWCUT SLABS TO ONE-QUARTER OF
SLAB DEPTH MINIMUM IN THE PATTERN SHOWN ON PLANS. START SAWCUTTING AS SOON AS
THE SAW WILL NOT RAVEL EDGES OR DISLODGE AGGREGATE, BUT IN NO CASE MORE THAN
12 HOURS AFTER THE SLAB IS PLACED.
17. PROVIDE 100 FEET OF #4 BAR IN 20-FOOT LENGTHS TO BE FIELD CUT AND PLACED IN FIELD AS
LOCATED BY ENGINEER.
CONCRETE NOTES
BUILDING CODE
NEW YORK STATE EXISTING BUILDING CODE, 2010 EDITION
INTERNATIONAL BUILDING CODE, 2006 EDITION
UNIFIED FACILITIES CRITERIA, GENERAL BUILDING REQUIREMENTS (UFC 1-200-01)
UNIFIED FACILITIES CRITERIA, STRUCTURAL LOAD DATA (UFC 3-301-01)
UNIFIED FACILITIES CRITERIA, SEISMIC DESIGN FOR BUILDINGS (UFC 3-310-04).
LIVE LOAD
ROOF: SEE ROOF SNOW LOAD
STAIRS AND EXITS: 100 psf ASSEMBLY AREAS AND LOBBIES: 100 psf
SNOW LOAD
GROUND SNOW LOAD, Pg 30 psf FLAT ROOF SNOW LOAD, Pf 19 psf SNOW EXPOSURE FACTOR, Ce 1.0 SNOW LOAD IMPORTANCE FACTOR, Is 1.0 THERMAL FACTOR, Ct 1.1
DRIFTED AND UNBALANCED SNOW PER ASCE 7
WIND LOAD
BASIC WIND SPEED (3 SECOND GUST) 100 mph
BUILDING CATEGORY II
WIND IMPORTANCE FACTOR, Iw 1.0
WIND EXPOSURE C
INTERNAL PRESSURE COEFFICIENT, Gcpi +/- 0.18
COMPONENTS AND CLADDING, P
ROOF SURFACE (ZONE 1) +21.2/-23.1 psf ROOF EDGE (ZONE 2) +21.2/-27.0 psf ROOF CORNER (ZONE 3) +21.2/-27.0 psf WALL SURFACE (ZONE 4) +23.1/-25.1 psf WALL CORNER (ZONE 5) +23.1/-30.9 psf
EARTHQUAKE LOAD
SITE CLASS B
SEISMIC USE GROUP I
SEISMIC IMPORTANCE FACTOR, Ie 1.0 SPECTRAL RESPONSE ACCELERATION, Ss 0.310 g SPECTRAL RESPONSE ACCELERATION, S1 0.070 g SPECTRAL RESPONSE COEFFICIENT, Sds 0.207 g SPECTRAL RESPONSE COEFFICIENT, Sd1 0.047 g
SEISMIC DESIGN CATEGORY B
EDUCATION CENTER
BASIC SEISMIC-FORCE-RESISTING SYSTEM - EXISTING UNREINFORCED MASONRY SHEAR WALLS
DESIGN BASE SHEAR 54 KIPS
SEISMIC RESPONSE COEFFICIENT, Cs 0.1355
RESPONSE MODIFICATION FACTOR, R 1 1/2
ANALYSIS PROCEDURE - EQUIVALENT LATERAL FORCE
FOUNDATIONS
SOIL BEARING PRESSURE: 3 KSF (ON UNDISTURBED MATERIAL OR COMPACTED STRUCTURAL FILL)
ROCK BEARING PRESSURE: 20 KSF (ENTIRELY ON BEDROCK)
THE FOUNDATIONS HAVE BEEN DESIGNED TO THE REQUIREMENTS SET FORTH IN THE
GEOTECHNICAL REPORT PREPARED BY DENTE ENGINEERING, DATED JUNE 18, 2010.
S001
5 DESIGN CRITERIA
NO SCALE
S001
4 MATERIAL CRITERIA
NO SCALE
S001
3 STRUCTURAL GENERAL NOTES
NO SCALE
1. REFER TO DIVISION 4 SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO THOSE LISTED
BELOW.
2. PROVIDE MATERIALS AND WORKMANSHIP IN ACCORDANCE WITH THE APPLICABLE EDITIONS OF ACI 530 "BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES" AND ACI 530.1 "SPECIFICATIONS FOR
MASONRY STRUCTURES."
3. PROVIDE MASONRY MATERIALS OF THE TYPE AND STRENGTH SPECIFIED BELOW:
A. HOLLOW CONCRETE MASONRY UNITS: CONFORM TO ASTM C90, GRADE N. PROVIDE
UNITS WITH A MINIMUM NET AREA COMPRESSIVE STRENGTH OF 1900 PSI.
B. PROVIDE GROUT FOR REINFORCED MASONRY IN ACCORDANCE WITH ASTM C476 WITH A
MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 2000 PSI.
C. PROVIDE TYPE N MORTAR FOR REINFORCED MASONRY IN ACCORDANCE WITH ASTM C270.
4. PROVIDE CONTINUOUS 9 GAUGE LADDER-TYPE HORIZONTAL JOINT REINFORCING AT EVERY COURSE.
PROVIDE STAINLESS STEEL JOINT REINFORCEMENT IN EXTERIOR FACE OF WALL.
5. USE PREFABRICATED "L" AND "T" HORIZONTAL JOINT REINFORCEMENT AT ALL WALL INTERSECTIONS.
6. PROTECT CONCRETE MASONRY UNITS FROM ABSORBING MOISTURE AND WATER WHILE AT THE PLANT, DURING SHIPMENT, AND AT THE SITE DURING CONSTRUCTION.
7. LAY ALL MASONRY UNITS WITH FULL MORTAR COVERAGE AT HEAD AND BED JOINTS OF FACE SHELLS
AND AT WEBS.
8. SUBMIT PROPOSED METHOD OF GROUTING MASONRY WALLS. GROUTING SHALL BE IN ACCORDANCE WITH NCMA TEK 3-2 "GROUTING CONCRETE MASONRY WALLS." STOP GROUT 2" BELOW TOP OF BLOCK
AT EACH POUR TO PROVIDE INTERLOCK WITH NEXT POUR.
9. ALIGN VERTICAL CELLS TO BE FILLED WITH GROUT TO PROVIDE A CONTINUOUS, UNOBSTRUCTED
OPENING OF THE DIMENSIONS SHOWN ON THE DRAWINGS. PROVIDE A MINIMUM 3 INCH CLEAR
OPENING IN ALL CELLS THAT CONTAIN REINFORCEMENT. USE CLEAN OUT HOLES WHERE NECESSARY
TO OBTAIN UNOBSTRUCTED VERTICAL CELLS.
10. GROUT SOLID ALL CELLS. CONSOLIDATE GROUT IN PLACE BY VIBRATION TO INSURE COMPLETE FILLING
OF THE CELLS.
11. PROVIDE ADEQUATE TEMPORARY BRACING DURING CONSTRUCTION TO WITHSTAND ALL LATERAL
LOADS AND THE PRESSURES OF THE FLUID GROUT.
12. TAKE NECESSARY PRECAUTIONS FOR MIXING AND PLACING MORTAR AND GROUT IN EITHER HOT
OR COLD WEATHER AS NOTED IN THE SPECIFICATIONS.
13. USE MASONRY SAWS TO CUT AND FIT ALL MASONRY, INCLUDING THAT PORTION REQUIRED TO
ACCOMMODATE THE WORK OF OTHER TRADES.
14. INSTALL ANCHORS, WALL PLUGS, ACCESSORIES AND OTHER ITEMS THAT ARE REQUIRED TO BE BUILT INTO THE WORK AS THE MASONRY WORK PROGRESSES. REFER TO ARCHITECTURAL DRAWINGS FOR
ADDITIONAL DETAILS.
15. PROVIDE ONE #4 BAR AROUND ALL OPENINGS IN THE MASONRY CONSTRUCTION. EXTEND HORIZONTAL BARS A MINIMUM OF 24 INCHES BEYOND THE CORNER OF THE OPENING. EXTEND VERTICAL BARS TO
THE TOP AND BOTTOM OF THE WALL.
MASONRY NOTES
1. IN THE EVENT ANY ORDNANCE RELATED ITEMS ARE DISCOVERED, THE CONTRACTOR SHALL STOP
WORK IMMEDIATELY AND CONTACT THE WEST POINT MILITARY POLICE.
ORDNANCE NOTES
1. IF THE CONTRACTOR SHOULD FIND ANY HISTORICAL / ARCHAEOLOGICAL ITEMS DURING
CONSTRUCTION, THE CONTRACTOR SHALL FOLLOW "USMA CRM STANDARD OPERATING PROCEDURE
16-1 FOR THE PROTECTION OF ARCHAEOLOGICAL OR HISTORIC ARTIFACTS." THE USMA WILL PROVIDE
A COPY OF THIS DOCUMENT TO ALL CONTRACTORS ON-SITE.
ARCHAEOLOGY NOTES
1. PERFORATED PVC PIPE: ASTM D2729.
2. FILTER FABRIC: POLYPROPELYNE, POLYESTER, OR A COMBINATION OF BOTH, WITH A FLOW
RATE RANGE BETWEEN 110 AND 330 GALLONS PER MINUTE PER SQUARE FOOT WHEN
TESTED ACCORDING TO ASTM D4491. STRUCTURE TYPE: NONWOVEN, NEEDLE-PUNCHED
CONTINUOUS FILAMENT. SURVIVABILITY: AASHTO M288, CLASS 2.
3. ENCASE PIPE WITH SOCK-STYLE GEOTEXTILE FILTER FABRIC BEFORE INSTALLING PIPE.
CONNECT SOCK SECTIONS WITH ADHESIVE OR TAPE.
4. INSTALL PIPE BEGINNING AT LOW POINTS OF SYSTEM, TRUE TO GRADES AND ALIGNMENT
INDICATED, WITH UNBROKEN CONTINUITY OF INVERT. BED PIPING WITH FULL BEARING IN
FILTERING MATERIAL. INSTALL GASKETS, SEALS, SLEEVES, AND COUPLINGS ACCORDING
TO MANUFACTURER'S WRITTEN INSTRUCTION AND OTHER REQUIREMENTS INDICATED.
5. JOIN PIPE SECTIONS IN ACCORDANCE WITH ASTM D3212. JOIN SECTION MADE OF
DIFFERENT MATERIALS AND/OR DIMENSIONS WITH SPECIAL COUPLINGS MADE FOR THIS
APPLICATION. USE COUPLINGS THAT ARE COMPATIBLE WITH AND FIT MATERIALS AND
DIMENSIONS OF BOTH PIPES.
7. INSTALL CLEANOUTS FROM PIPE TO GRADE. LOCATE AS INDICATED ON DRAWINGS.
INSTALL FITTINGS SO CLEANOUTS OPEN IN DIRECTION OF FLOW OF PIPE.
8. USE 4" DIAMETER PIPE FOR RISER EXTENSIONS TO CLEANOUT. SET CLEANOUT FRAMES
AND COVERS IN A CAST-IN-PLACE CONCRETE ANCHOR, 12"x12"x4" DEEP. SET TOP OF
CLEANOUT 1" ABOVE GRADE.
9. INSTALL DETECTABLE GREEN WARNING TAPE DIRECTLY OVER PIPE.
10. CLEAR INTERIOR OF INSTALLED PIPE AND STRUCTURES OF SOIL AND FOREIGN MATERIALS
AS WORK PROGRESSES. MAINTAIN SWAB OR DRAG IN PIPE AND PULL PAST EACH JOINT
AS IT IS COMPLETED. PLACE PLUGS IN ENDS OF UNCOMPLETED PIPE AT END OF EACH
DAY OR WHEN WORK STOPS.
PERFORATED PVC DRAIN NOTES
NO SCALES011
1 DRAWING GROUP ORGANIZATION
NO SCALES011
2 GENERAL ORGANIZATION
S011
D
ES
IG
N
C R
IT
ER
IA
A
N D
G
EN
ER
AL
N O
TE
S
8/ 5/
:1
9:
P M
N O
S C
A
LE
.1
9.
fil en am
A rc hi te ct ur e
E ng in ee rin g ey pa e.
co m
N an oF ab
E as t
Fu lle r R oa d
- 1 st
F lo or A lb an y, N
Y
Te le ph on e:
.7
.3
Fa x:
.7
.3
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M
AR
K D
ES
C
R
IP
TI
O
N A
PP
R
D
AT
E
SHEET OF
U . S
. A
RM
Y C
O
RP
S O
F
EN
G
IN
EE
RS
N
EW
Y O
R K
D
IS
TR
IC
T
C O
N S
TI
TU
TI
O
N
IS
LA
N
D
ED
U C
AT
IO
N C
EN
TE
R
PR
O
JE
C T
G O
SH
O
W P
R O
JE
C
T
.0
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
M
Z C
KD
B
Y:
M
B
D
ES
IG
N
E D
B Y:
TO
D
AT
E:
S
IZ
E
S U
BM
IT
TE
D
B Y:
G O
SH
O
W A
R C
H
IT
EC
TS
P
LO
T
SC
AL
E:
C O
N
TR
A C
T N
O
A N
S I D
W
2D S-
-D
-0
SHEET
IDENTIFICATION
W es t 2 8t h St re et
, 5 F l / N ew Y or k, N Y
P
.2
.3
/ F
.2
.7
P
LO
T D
AT
E:
C re sc en t R oa d
- C lif to n Pa rk , N
Y
M .J
. E ng in ee rin g an d
La nd
S ur ve yi ng , P
.C
S311
S311
4" SLAB-ON-GROUND;REINF w/ #4 @ 16" OCT/SLAB ELEV = 114.14'
4" SLAB-ON-GROUND;REINF w/ #4 @ 16" OCT/SLAB ELEV = 115.89'
4" SLAB-ON-GROUND;REINF w/ #4 @ 16" OCT/SLAB ELEV = 114.14'
1/
2"
GRAVEL TROUGH
37' - 10" ±
8" 8" 8"
0"
SEE NOTE 6
6" 12" 6"
REPOINT ALL
EXPOSED SURFACES,
TYP ALL WALLS
REMOVE & RECONSTRUCT
BRICK FACING AT TOP OF
WALL; REF 1/S512, TYP.22' - 3" ±
S311
2 1/2"
1'
- 3
8" 6"
1'
- 4
6"
S311
SLAB JOINT ATMIDPOINT; SEE 5/S311
SLAB JOINT AT QUARTER
POINTS, TYP; SEE 5/S311
SLAB JOINT AT QUARTER
POINTS, TYP; SEE 5/S311
S512
2'
- 0
3 '
- 5 "4'- 0"
0 1 /2"
1'
- 0
CO
L
2' - 6" 8' - 0"
8' - 0" 8' - 0"
8' - 0"
(-3'-6")
2'
- 0
4'
- 0
SEE
NOTE 6
SEE NOTE 6
COL
COL
COL
COL
COL
4' - 0" 2' - 0"
SEE
NOTE 6
(-1'-6")
SLAB JOINT
SLAB JOINT
1/
2"
4' - 0" 2' - 0"
SEE NOTE 6
1/
2"
4' - 0" 2' - 0"
(-3'-6")
1' - 0" 1' - 0"
3' - 2 1/2"
6'
- 5
DRAINAGE BASIN;
SEE SITE/CIVIL DWGS
CO
CO
HP INVERT = (-2'-0")
CO
DRAIN TO DAYLIGHT
RESET EXIST STONE THRESHOLD;
REFER TO ARCH DWGS
CO
CO
HP INVERT = (-2'-0")
9" 1'
- 0
5'
- 4
1'
- 0
1' - 0" 3' - 2"
1' - 0" 5' - 8 1/2"
20' - 6" ±
9"
1'
- 1
0 1 /2"
S513
S5
12 5 S512
2S513
1S513
DRAINAGE INLET; REFER
TO SITE/CIVIL DRAWINGS
FOR INFORMATION.
S311
ARCHAEOLOGY GENERAL NOTE:
IF THE CONTRACTOR SHOULD FIND ANY HISTORICAL /
ARCHAEOLOGICAL ITEMS DURING CONSTRUCTION, THE CONTRACTOR
SHALL FOLLOW "USMA CRM STANDARD OPERATING PROCEDURE 16-1
FOR THE PROTECTION OF ARCHAEOLOGICAL OR HISTORIC
ARTIFACTS." THE USMA WILL PROVIDE A COPY OF THIS DOCUMENT TO
ALL CONTRACTORS ON-SITE.
ORDNANCE GENERAL NOTE:
IN THE EVENT ANY ORDNANCE RELATED ITEMS ARE
DISCOVERED, THE CONTRACTOR SHALL STOP WORK
IMMEDIATELY AND CONTACT THE WEST POINT MILITARY POLICE.
6x6 POST EXPOSED, TYP (NOTE 8)
6x
E
XP
OS
ED
GLASS WALL BELOW;
SEE ARCH DWGS
HEADER AT WINDOW,
REF 2/S512 TYP
HEADER AT WINDOW;
REF 2/S512, TYP
6x
E
XP
OS
EDHEADER AT DOOR;
REF 2/S512, TYP
6x
E
XP
OS
ED
6x
E
XP
OS
ED
6x
E
XP
OS
ED
6x
E
XP
OS
ED
6x
E
XP
OS
ED
6x
E
XP
OS
ED
6x
E
XP
OS
ED
EXIST STONE MASONRY WALL TO
REMAIN, REPOINT ALL EXPOSED
SURFACES, TYP ALL WALLS
6x12 EXPOSED (CANT) 6x12 EXPOSED
6x12 EXPOSED 6x12 EXPOSED (CANT)
2x10 @ 16" OC
2x10 @ 16" OC
S511
S511
S511
S511
S511 EDGE OF ROOF
S511
S511
S511
S511
S511
HEADER AT
DEMOUNTABLE WALL,
REF 2/S512 SIM
3x
E
XP
OS
ED
(N
OT
E 7)
SIM
HEADER AT DOOR;
REF 2/S512, TYP
S511
SIM
3x
E
XP
OS
ED
(N
OT
E 7)
S311
EDUCATION CENTER NOTES:
1. ALL ELEVATIONS REFERENCED FROM DATUM ELEVATION 0'-0" = 114.14'
2. TOP OF FOOTING ELEVATION IS (-3'-6") UNLESS OTHERWISE NOTED THUS (--).
3. TYPICAL WALL FRAMING IS SPRUCE-PINE FIR #2 OR BETTER 2x6 STUDS @ 16" OC w/ 1/2"
EXTERIOR GRADE PLYWOOD SHEATHING ON EXTERIOR FACE.
4. INDICATES SPAN OF 3/4" APA RATED 40/20 SHEATHING, EXPOSURE 1 PANELS
MARKED PS-2. ATTATCH TO SUPPORTING STRUCTURE WITH 8d COMMON NAILS AT 12" OC AT
SUPPORTING EDGES AND INTERMEDIATE SUPPORTS. EDGE NAILING AT ADJACENT PANELS
SHALL BE STAGGERED. PROVIDE PANEL EDGE CLIPS MIDWAY BETWEEN EACH SUPPORT.
5. INDICATES SPAN OF 2" TONGUE AND GROOVE DECKING. ATTACH TO SUPPORTING
STRUCTURE w/ 10g x 3" WOOD SCREWS AT 4" OC.
6. STEP FOOTINGS AS NECESSARY TO MATCH BOTTOM OF EXISTING FOOTINGS. VERIFY
ELEVATIONS IN FIELD.
7. 3x10 SHALL MATCH SPECIES AND GRADE OF OTHER HEAVY TIMBER FRAMING.
8. SPLICE 6x12 BEAMS ATOP POST, TYP.
9. INDICATES DIRECTION OF FLOW OF 6"Ø PERFORATED PVC FOOTING DRAIN.
1/4" = 1'-0"S111
1 EDUCATION CENTER FOUNDATION PLAN
N
N
1/4" = 1'-0"S111
2 EDUCATION CENTER ROOF FRAMING PLAN
C :\U se rs
\e pr itt in g\ D es kt op \A
C C
I-0 3-
A -W
A R
N E
R _L oc al
L P
.rv t
6/
/2
2:
:3
P
M
/4
'-0
S111
.1
9.
FO
U
N D
AT
IO
N A
N D
R O
O F
FR
AM
IN
G
P
LA
N S fil e na m
A rc hi te ct ur e
E ng in ee rin g ey pa e.
co m
N an oF ab
E as t
Fu lle r R oa d
- 1 st
F lo or A lb an y, N
Y
Te le ph on e:
.7
.3
Fa x:
.7
.3
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M
AR
K D
ES
C
R
IP
TI
O
N A
PP
R
D
AT
E
SHEET OF
U . S
. A
RM
Y C
O
RP
S O
F
EN
G
IN
EE
RS
N
EW
Y O
R K
D
IS
TR
IC
T
C O
N S
TI
TU
TI
O
N
IS
LA
N
D
ED
U C
AT
IO
N C
EN
TE
R
PR
O
JE
C T
G O
SH
O
W P
R O
JE
C
T
.0
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
M
Z C
KD
B
Y:
M
B
D
ES
IG
N
E D
B Y:
TO
D
AT
E:
S
IZ
E
S U
BM
IT
TE
D
B Y:
G O
SH
O
W A
R C
H
IT
EC
TS
P
LO
T
SC
AL
E:
C O
N
TR
A C
T N
O
A N
S I D
W
2D S-
-D
-0
SHEET
IDENTIFICATION
W es t 2 8t h St re et
, 5 F l / N ew Y or k, N Y
P
.2
.3
/ F
.2
.7
P
LO
T D
AT
E:
C re sc en t R oa d
- C lif to n Pa rk , N
Y
M .J
. E ng in ee rin g an d
La nd
S ur ve yi ng , P
.C
3'-0" x 1'-0" DEEP CONT CONC FTG w/ (4)#4 BARS CONT
2" INSULATION; SEE ARCH DWGS
#4 DOWELS @ 12" OC
1' - 3"
T/WALL
+1'-0"
6x6 WOOD POSTw/ SIMPSON ABU66 w/ 5/8"Ø x 8" EMBED ADHESIVE ANCHOR & (8)10d
NAILS INTO POST
T/FTG
-3'-6"
GRAVEL TROUGH
T/SHELF
-0'-6"
6" NOM STONE VENEER w/ FULLY
MORTARED COLLAR JOINT
A A
1' - 4" 6"
#4 @ 12" OC
6"Ø PERFORATED
PVC DRAIN
4"
BLUESTONE SILL; SEE ARCH DWGS
4"Ø PERFORATED PVC DRAIN
w/ OUTLETS AT THIRD POINTS
NOTE: ANCHOR STONE VENEER & 6" CMU TO CONCRETE WALL w/ SS DOVETAIL
ANCHORS @ 16" OC EACH WAY (NOT SHOWN FOR CLARITY)
6" CMU GROUTED SOLID;
REINF w/ #4@16" OC
6" PERFORATED
PVC DRAIN
8"
8"
2'-0" x 1'-0" DEEP CONT CONC FTG w/ (3)#4 BARS CONT
T/WALL
+4'-10"
T/FTG
-1'-6"
#4 DOWEL @ 12" OC
(ALTERNATE HOOKS)
#4 @ 12" OC; LAP
2'-0" w/ DOWELS
#4 @ 12" OC
2" RIGID INSULATION;
SEE ARCH DWGS
1/2"Ø THREADED ROD
@ 4'-0" OC; PROVIDE ADDITIONAL
RODS AT CORNERS AND AT EACH
SIDE OF JOINT IN SILL PLATE
1'-3"
T/WALL
+1'-0"
T/FTG
-3'-6"
#4 @ 12" OC
2'-0"x1'-0" DEEP CONT CONC FTG w/ (3)#4 BARS CONT
6" NOM STONE VENEER w/ FULLY
MORTARED COLLAR JOINT
T/SHELF
-0'-8"
12" LADDER-TYPE JOINT
REINF AT EVERY JOINT
#4 DOWELS @ 12" OC
6"Ø PERFORATED PVC DRAIN
2'
- 0
2" INSULATION; SEE ARCH DWGS
6" CMU GROUTED SOLID,
REINF w/ #4 @ 16" OC
SEE 1/S311 FOR ADDITIONAL INFO
2x6 STUD WALL
ARCHAEOLOGY GENERAL NOTE:
IF THE CONTRACTOR SHOULD FIND ANY HISTORICAL /
ARCHAEOLOGICAL ITEMS DURING CONSTRUCTION, THE CONTRACTOR
SHALL FOLLOW "USMA CRM STANDARD OPERATING PROCEDURE 16-1
FOR THE PROTECTION OF ARCHAEOLOGICAL OR HISTORIC
ARTIFACTS." THE USMA WILL PROVIDE A COPY OF THIS DOCUMENT TO
ALL CONTRACTORS ON-SITE.
2'-0" x 1'-0" DEEP CONT CONC FTG w/ (3)#4 BARS CONT
T/FTG
-3'-6"
T/WALL
2'-0"
T/SHELF
-0'-8"
#4 DOWELS @ 12" OC
1/2"Ø THREADED ROD @ 4'-0" OC;
DRILL & GROUT 12" INTO WALL
12" 6" #4 @ 12" OC
2" INSULATION;
SEE ARCH DWGS
6" CMU GROUTED SOLID,
REINF w/ #4 @ 16" OC
#4 CONT
6"Ø PERFORATED PVC DRAIN
6" NOM STONE VENEER w/ FULLY
MORTARED COLLAR JOINT
12" LADDER-TYPE JOINT
REINF AT EVERY JOINT
2x6 STUD WALL
2'
- 0
SECTION A-A
BLUESTONE SILL,
SEE ARCH DWGS
6x6 WOOD POST
1'-0"
CONTRACTION JOINT (SJ)
1/8" WIDE SAWN
OR PREFORMED JT
1/8" RADIUS
MAXIMUM
APPLY CURING
COMPOUND TO EDGE
IMMEDIATELY AFTER
FORM IS REMOVED
CONSTRUCTION JOINT (CJ)
3/4"Øx14" SMOOTH DOWEL w/ BASKET @ 16" OC
MATCH CONTRACTION
JOINT PROFILE
EDGE JOINT (EJ)
31/2" WIDE
JOINT FILLER,
FULL DEPTH
WALL
2 ' - 0 "
T/
T
T/
T
6" 1' - 0"
2'-0" x 1'-0" DEEP CONT CONC FTG w/ (3)#4 BARS CONT
#4 @ 12" OC, EACH FACE
6"Ø PERFORATED PVC DRAIN
T/FTG
-1'-11"
6" NOM STONE VENEER w/ FULLY
MORTARED COLLAR JOINT
T/WALL
+1'-6"
#4 @ 12" OC, EACH FACE
#4 CONT
6" CMU GROUTED SOLID,
REINF w/ #4 @ 16" OCGRANITE PAVERS;
SEE ARCH DWGS
4" UNREINFORCED
CONC MUD SLAB
ORDNANCE GENERAL NOTE:
IN THE EVENT ANY ORDNANCE RELATED ITEMS ARE
DISCOVERED, THE CONTRACTOR SHALL STOP WORK
IMMEDIATELY AND CONTACT THE WEST POINT MILITARY POLICE.
2'- 0"
MA
X
MIN
0"
PROVIDE DOWELS TO
MATCH WALL REINF
PROVIDE REINF TO
MATCH FOOTING REINF
PROVIDE ADDIT HORIZ BAR AT
EA FACE OF WALL,REINF TO
MATCH WALL HORIZ REINF
2' - 0"
MIN
2S
2' - 0"
CLR
3"
CL
R3"
2' - 0"
S 0'
- 1
1.5S
2' - 0" 2' - 0"
SLAB ON GROUND; ROUGHEN
SURFACE @ STAIR.
SEE ARCH. DWGS. FOR
DIMENSIONS OF STAIR RISE/RUN
#4 NOSING BAR @ EACH STEP
#4 @ 16" OC EA WAY
6"
CONTRACTOR'S OPTION TO
FILL VOID w/ CONCRETE
1/2" = 1'-0"S311
2 FOUNDATION SECTION
1/2" = 1'-0"S311
4 FOUNDATION SECTION
1/2" = 1'-0"S311
3 FOUNDATION SECTION
1/2" = 1'-0"S311
1 FOUNDATION SECTION
1/2" = 1'-0"S311
5 SLAB-ON-GROUND JOINT DETAILS
1/2" = 1'-0"S311
6 SECTION AT LANDING
C :\U se rs
\e pr itt in g\ D es kt op \A
C C
I-0 3-
A -W
A R
N E
R _L oc al
L P
.rv t
6/
/2
2:
:3
P
M
/2
'-0
S311
.1
9.
FO
U
N D
AT
IO
N S
EC
TI
O N
S A
N D
D E
TA
IL
S fil e na m e
1/2" = 1'-0"S311
7 TYP STEPPED FOUNDATION WALL
3/4" = 1'-0"S311
8 INTERIOR STAIR DETAIL
A rc hi te ct ur e
E ng in ee rin g ey pa e.
co m
N an oF ab
E as t
Fu lle r R oa d
- 1 st
F lo or A lb an y, N
Y
Te le ph on e:
.7
.3
Fa x:
.7
.3
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M
AR
K D
ES
C
R
IP
TI
O
N A
PP
R
D
AT
E
SHEET OF
U . S
. A
RM
Y C
O
RP
S O
F
EN
G
IN
EE
RS
N
EW
Y O
R K
D
IS
TR
IC
T
C O
N S
TI
TU
TI
O
N
IS
LA
N
D
ED
U C
AT
IO
N C
EN
TE
R
PR
O
JE
C T
G O
SH
O
W P
R O
JE
C
T
.0
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
M
Z C
KD
B
Y:
M
B
D
ES
IG
N
E D
B Y:
TO
D
AT
E:
S
IZ
E
S U
BM
IT
TE
D
B Y:
G O
SH
O
W A
R C
H
IT
EC
TS
P
LO
T
SC
AL
E:
C O
N
TR
A C
T N
O
A N
S I D
W
2D S-
-D
-0
SHEET
IDENTIFICATION
W es t 2 8t h St re et
, 5 F l / N ew Y or k, N Y
P
.2
.3
/ F
.2
.7
P
LO
T D
AT
E:
C re sc en t R oa d
- C lif to n Pa rk , N
Y
M .J
. E ng in ee rin g an d
La nd
S ur ve yi ng , P
.C
2x12 "LADDER" CONNECT TO 6x12 w/
(2) 1/4" x 3" LAG SCREWS @ 16" OC;
SEE DETAIL A-A
SIMPSON OHU610-SDS3 HANGER w/ (6) 1/4"Ø x 3" SDS SCREWS INTO JOIST &
(14) 1/4"Ø x 3" SDS SCREWS INTO BEAM;
TRIM END OF 6x12 AS NECESSARY SIMPSON HL55PC (w/ OPTIONAL
GUSSET PL) w/ (4) 1/2"Ø BOLTS INTO
COLUMN & (4) 1/2"Ø BOLTS INTO BEAM
AT EACH FACE OF COLUMN
INSULATION; SEE ARCH DWGS
T/BEAM = 7'-11 1/2"
2x4 WOOD SPACER; SEE ARCH DWGS
1' - 0"
8 1/2"
2x6 (CUT AS REQ'D); CONNECT TO LADDER w/ (2) 10g x 3" SCREWS @ 16" OC 2x4 @ 16" OC
2x6 SUBFASCIA
6'-9"
CONT 2x12
1/4"Ø x 3" LAG
SCREW, TYP
2x12 @ 16" OC
DETAIL A-A
GROUT SOLID 8" CMU
2x6 (CUT) SUBFASCIA
FACE BRICK, TYP
#4 @ 16" OC, DRILL AND
GROUT 12" INTO EXIST WALL
REMOVE LOOSE AND/OR DETERIORATED
PORTIONS OF WALL
INSULATION;
SEE ARCH DWGS
2x4 WOOD SPACER; SEE ARCH DWGS
#4 CONT (ALONG SLOPE OF ROOF, TYP)
CONT DOUBLE PT 2x6 w/ 1/2"Ø
THREADED ROD @ 16" OC 3
1'-3" 2x6 (CUT TO 3.7") x 2'-6" @ 16" OC w/ SIMPSON GA1 w/ (4)10d NAILS (2 PER
OUTLOOKER, ALTERNATE SIDES)
#4 @ 16" OC; DRILL
AND GROUT 12" INTO
EXIST WALL, TYP
REMOVE LOOSE AND/OR
DETERIORATED
PORTIONS OF WALL
FACE BRICK, TYP
INSULATION; SEE
ARCH DWGS
CONT DOUBLE 2x12 w/ (2)3/8"Ø x 6" LAG SCREWS
INTO EACH BEAM
ROOF RAFTER w/ SIMPSON LUS210 w/ (10)10d NAILS INTO LEDGER AND (6)10d X 1 1/2 NAILS
INTO RAFTER
SIMPSON H1 w/ (6) 8d x 1 1/2" NAILS INTO RAFTER & (4) 8d
NAILS INTO BEAM
#4 CONT, TYP
PT 2x6 SHIM
12'-9"
1/2"Ø THREADED
ROD @ 16" OC
1'-3"
TAPERED PT SILL PLATE
FACE BRICK, TYP
#4 @ 16" OC; DRILL & GROUT
12" INTO EXIST WALL
INSULATION; SEE ARCH DWGS
SIMPSON H1 w/ (6) 8d x 1 1/2" NAILS INTO RAFTER & (4) 8d
NAILS INTO BEAM
PT SILL, TYP
1/2"Ø THREADED ROD @
16" OC; DRILL & GROUT 12"
INTO EXIST WALL
CORRUGATED TIE
@ 16" OC, TYP
13'-1"
FULL BLOCKING
REMOVE LOOSE AND
DETERIORATED PORTIONS OF WALL
12" LADDER-TYPE JOINT
REINF @ EVERY JOINT
CONT #4, TYP
1/2"Ø THREADED ROD @ 16" OC
1'-3"
2x6 (CUT TO 3.7") x 2'-6" @ 16" OC w/ SIMPSON GA1 w/ (4)10d NAILS (2 PER
OUTLOOKER, ALTERNATE SIDES)
4"
8"
CONT DOUBLE PT 2x6 w/ 1/2"Ø
THREADED ROD @ 16" OC
CONT #4 (FOLLOW SLOPE
OF EXIST WALL), TYP
#4 @ 16" OC; DRILL & GROUT
12" INTO EXIST WALL, TYP
VARIES
CONT #4 (FOLLOW SLOPE
OF EXIST WALL), TYP
VARIES
MAX
1/2" INSULATION; SEE ARCH DWGS
2x6 (CUT) SUBFASCIA
PT BLOCKING AS REQ'D, TYP
2x4 WOOD SPACER;
SEE ARCH DWGS
1x4 NAILER; SEE ARCH DWGS
MAX
1/2"
3x10 (SAME GRADE & SPECIES AS ADJACENT 6x10) w/ (2) 1/2"Ø x 4", EMBED
ADHESIVE ANCHORS @ 2'-0".
RECESS ANCHOR HEADS &
PROVIDE WOOD PLUGS
2x6 STUD WALL w/
DOUBLE TOP PLATE
2x4 (CUT) SUBFASCIA
2x4 WOOD SPACER;
SEE ARCH DWGS
OUTRIGGER; SEE 3/S511
FOR ADDITIONAL
INFORMATION
2" WOOD DECKING
INSULATION;
SEE ARCH DWGS
2x4 WOOD SPACER @ 16" OC;
SEE ARCH DWGS
T/PLATE = 7'-4"
TAPERED FULL HEIGHT BLOCKINGSIMPSON H1 w/ (6) 8d x 1 1/2
NAILS INTO RAFTER AND
(4) 8d NAILS INTO BEAM
8" 8 1/2"
SEE 1/S511 FOR FASCIA
BEVELED CONT BLOCK
INSULATION;SEE ARCH DWGS ROOF RAFTER w/ HU210 w/ (8) 1/4" x 1 3/4" TITEN SCREWS INTO LEDGER AND (4)10d x 1 1/2 NAILS
INTO RAFTER
CONT DOUBLE 2x12 w/ (2) 3/8"Ø x 6"
LAG SCREWS AT EACH RAFTER
13'-1"
FULL HEIGHT BLOCKING
TAPERED PT SILL
FACE BRICK
REMOVE LOOSE AND/OR
DETERIORATED PORTIONS
OF WALL
1/2"Ø THREADED ROD @
16" OC; DRILL & GROUT
12" INTO EXIST WALL
PT SHIM
#4 @ 16" OC; DRILL & GROUT
12" INTO EXIST WALL
CONT #4, TYP
8"
CONT #4, TYP
EXIST MASONRY WALL BEYOND
FACE BRICK, TYP
L3 1/2x3 1/2x5/16; BEAR
8" AT EACH END
REMOVE LOOSE AND/OR
DETERIORATED PORTIONS OF WALL
CMU LINTEL, TYP
GROUT CMU & VOID SOLID
1" = 1'-0"S511
1 VISITORS CENTER ROOF DETAIL
1" = 1'-0"S511
3 ROOF DETAIL AT MECH ROOM EXISTING MASONRY WALL
1" = 1'-0"S511
7 ROOF DETAIL AT EXISTING MASONRY WALL & NEW ADDITION
1" = 1'-0"S511
4 ROOF DETAIL AT HIGH OVERHANG
1" = 1'-0"S511
8 ROOF DETAIL AT EXISTING CENTER MASONRY WALL
1" = 1'-0"S511
9 TYPICAL ROOF EDGE DETAIL
1" = 1'-0"S511
2 STUD WALL ROOF DETAIL
1" = 1'-0"S511
5 ROOF DETAIL AT HIGH OVERHANG 2
1" = 1'-0"S511
6 LINTEL DETAIL AT EXISTING MASONRY WALL
C :\U se rs
\e pr itt in g\ D es kt op \A
C C
I-0 3-
A -W
A R
N E
R _L oc al
L P
.rv t
6/
/2
2:
:3
P
M
/4
'-0
S511
.1
9.
FR
AM
IN
G
S
EC
TI
O
N S
A N
D D
E
TA
IL
S fil en am
A rc hi te ct ur e
E ng in ee rin g ey pa e.
co m
N an oF ab
E as t
Fu lle r R oa d
- 1 st
F lo or A lb an y, N
Y
Te le ph on e:
.7
.3
Fa x:
.7
.3
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M
AR
K D
ES
C
R
IP
TI
O
N A
PP
R
D
AT
E
SHEET OF
U . S
. A
RM
Y C
O
RP
S O
F
EN
G
IN
EE
RS
N
EW
Y O
R K
D
IS
TR
IC
T
C O
N S
TI
TU
TI
O
N
IS
LA
N
D
ED
U C
AT
IO
N C
EN
TE
R
PR
O
JE
C T
G O
SH
O
W P
R O
JE
C
T
.0
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
M
Z C
KD
B
Y:
M
B
D
ES
IG
N
E D
B Y:
TO
D
AT
E:
S
IZ
E
S U
BM
IT
TE
D
B Y:
G O
SH
O
W A
R C
H
IT
EC
TS
P
LO
T
SC
AL
E:
C O
N
TR
A C
T N
O
A N
S I D
W
2D S-
-D
-0
SHEET
IDENTIFICATION
W es t 2 8t h St re et
, 5 F l / N ew Y or k, N Y
P
.2
.3
/ F
.2
.7
P
LO
T D
AT
E:
C re sc en t R oa d
- C lif to n Pa rk , N
Y
M .J
. E ng in ee rin g an d
La nd
S ur ve yi ng , P
.C
FULLY MORTARED COLLAR JOINT
EXIST STONE
MASONRY WALL
REMOVE AND RESET
BRICK FACING
DUR-O-WALL DA5431 SS VENEER TIE @ 16" OC
EACH WAY, w/ SIMPSON 1/2"Ø x 1'-4" TITEN
SCREW (EMBED IN EXIST MORTAR JOINT)
1/2" PLATE w/ (3) SETS OF (2) 1/2"Ø x 2'-0" LONG THREADED RODS SET
IN NON-EPOXY GROUT
FILL VOID w/ GROUT TO
ENSURE FULL BEARING
GROUT COLLAR
JOINTS SOLID
2 ROWS OF 8" CMU,
GROUTED SOLID
BRICK VENEER,
EACH SIDE
EXISTING STONE
MASONRY WALL
6"
1" 4"
6"
1/2" PLATE w/ (2) ANCHORS
REMOVE REMNANTS
OF EXISTING WOOD
LINTELS AND FILL VOID
w/ MASONRY, T YP
° 70°
VERTICAL
OPENING; SEE ARCH
(3)2x6 HEADER w/ PLYWOOD SHIMS
(WIDTH TO MATCH WALL STUD) AT
DOORS & WINDOWS. (3)2x8
HEADER AT DEMOUNTABLE WALL
NOTE:
PROVIDE SINGLE JACK STUD
AND DOUBLE KING STUD AT
EACH END OF HEADER.
2X6 STUD WALL
3/4" = 1'-0"S512
1 FACE BRICK DETAIL
1 1/2" = 1'-0"S512
3 SECTION AT EXISTING CENTER MASONRY WALL
1/2" = 1'-0"S512
4 EAST ELEVATION OF EXISTING CENTER MASONRY WALL
1" = 1'-0"S512
2 TYPICAL HEADER DETAIL
1/2" = 1'-0"S512
5 SOUTH ELEVATION OF EXISTING NORTH MASONRY WALL
C :\U se rs
\e pr itt in g\ D es kt op \A
C C
I-0 3-
A -W
A R
N E
R _L oc al
L P
.rv t
6/
/2
2:
:3
P
M v ar ie s
S512
.1
9.
FR
AM
IN
G
S
EC
TI
O
N S
A N
D D
E
TA
IL
S fil en am e
REBUILD TOP OF WALL (HEIGHT=2'0")
TO MATCH EXISTING.
A rc hi te ct ur e
E ng in ee rin g ey pa e.
co m
N an oF ab
E as t
Fu lle r R oa d
- 1 st
F lo or A lb an y, N
Y
Te le ph on e:
.7
.3
Fa x:
.7
.3
US Army Corps of Engineers
New York District
D
2 3
C
4 5
A
B
M
AR
K D
ES
C
R
IP
TI
O
N A
PP
R
D
AT
E
SHEET OF
U . S
. A
RM
Y C
O
RP
S O
F
EN
G
IN
EE
RS
N
EW
Y O
R K
D
IS
TR
IC
T
C O
N S
TI
TU
TI
O
N
IS
LA
N
D
ED
U C
AT
IO
N C
EN
TE
R
PR
O
JE
C T
G O
SH
O
W P
R O
JE
C
T
.0
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
M
Z C
KD
B
Y:
M
B
D
ES
IG
N
E D
B Y:
TO
D
AT
E:
S
IZ
E
S U
BM
IT
TE
D
B Y:
G O
SH
O
W A
R C
H
IT
EC
TS
P
LO
T
SC
AL
E:
C O
N
TR
A C
T N
O
A N
S I D
W
2D S-
-D
-0
SHEET
IDENTIFICATION
W es t 2 8t h St re et
, 5 F l / N ew Y or k, N Y
P
.2
.3
/ F
.2
.7
P
LO
T D
AT
E:
C re sc en t R oa d
- C lif to n Pa rk , N
Y
M .J
. E ng in ee rin g an d
La nd
S ur ve yi ng , P
.C
REBUILD OUTER FACE OF
WALL TO MATCH EXISTING.
REMOVE ENTIRE
MORTAR CAP
1/2" = 1'-0"S513
1 INTERIOR ELEVATION OF EXISTING EAST MASONRY WALL
1/2" = 1'-0"S513
2 EXTERIOR ELEVATION OF EXISTING EAST MASONRY WALL
1/2" = 1'-0"S513
3 NORTH ELEVATION OF EXISTING NORTH MASONRY WALL
C :\U se rs
\e pr itt in g\ D es kt op \A
C C
I-0 3-
A -W
A R
N E
R _L oc al
L P
.rv t
6/
/2
2:
:3
P
M N
O S
C A
LE
S513
.1
9.
PH
O
TO
G
R
AP
H S
O F
E
XI
ST
IN
G C
O N
D
IT
IO
N
S fil en am e
REBUILD FULL THICKNESS OF WALL AT
PASSAGEWAY TO MATCH EXISTING.
REBUILD INNER FACE OF WALL TO
MATCH EXISTING.
REBUILD BRICK FACE, SEE ALSO 1/S512
FOR ADDITIONAL INFORMATION.
LAVATORY
LAV
LB
LIGHTING
LOW POINT
LTG
LP
LF LINEAR FEET
LENGTH, LONG
LBS, POUND(S)
PLMB
PLYWD
POLY
POWER
PSF
PSI
PTD
PVC
PWR
QT
QTY
PLUMBING
PLYWOOD
POLYISOCYANURATE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PAINT(ED)
POLYVINYL CHLORIDE
QUARRY TILE
QUANTITY
RADIUS
ROOM
RAD
RCP
RD
REFG
REFL
REINF
REQD
RL
RM
SECTION
SIMILAR
RO
SC
SCHED
SECT
SF
SIM
REFLECTED CEILING PLAN
ROOF DRAIN
REFRIGERATOR
REFLECTED
REINFORCE(D,MENT)
REQUIRED
RAIN LEADER
ROUGH OPENING
SOLID CORE
SCHEDULE(D)
SQUARE FOOT
SQUARE
STEEL
SPEC
SQ
SS
STD
STL
STOR
STRUC
SUSP
T&G
TEL
TEMP
SPECIFICATION(S)
STAINLESS STEEL
STANDARD
STORAGE
STRUCTURAL
SUSPENDED
TONGUE AND GROOVE
TELEPHONE
TEMPERATURE
R RISER
TOP OF
TYPICAL
THRU
TO
TOS
TYP
UTILITY
UH
UL
UON
UTIL
VB
VCT
THROUGH
TOP OF SLAB
UNIT HEATER
UNDERWRITE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .