Amendment 0001.pdf
PDF 37 KB Posted
- Attached to
- Maintenance Dredging, Lake Montauk Harbor, N. Y.
- Solicitation number
- W912DS11B0009
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract 11-B-0009.pdf | ||
| Amendment 0002.pdf | ||
| W912DS-11-B-0009 Plans.pdf | ||
| W912DS-11-B-0009 Technical Specifications.pdf | ||
| 11-B-0009.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE11586776
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
a. Extend bid due date to 8 September 2011 at 2:00PM EST.
b. Revise w age determination General Decision Number: NY20080013
NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: in the space provided on the SF 1442, by separate letter, or by telegram by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Sep-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-11-B-0009
X 9B. DATED (SEE ITEM 11)
02-Aug-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Sep-2011
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-11-B-0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
WAGE DETERMINATION AMEND 01
Davis-Bacon Act wage decision NY13, modification dated 29 July 2011 , affecting Maintenance Dredging of Lake Montauk, NY follows below and supersedes only previously furnished subject decision for this(ese) project(s). If bids for a project were opened prior to this modification date, the wage rate change does not apply.
Please remember that in negotiated procurements, the wage rates in effect on the date of contract award (not at proposal due date or FPR date) are the ones to be incorporated in the contract..
Also note the "10-day rule": For contracts entered into pursuant to competitive bidding procedures, 29 CFR 1.6(c)(3)(i) requires contracting agencies to accept modifications to wage determinations, notice of which is published in the Federal Register less than 10 days before bid opening, unless the agency finds that there is not sufficient time to notify bidders of the change. A report of the finding must be included in the contract file and submitted to the Wage-Hour Administrator of DOL upon request Solicitations affected by the 90-day rule are not listed above: "90-day" rule:
29 CFR 1. 6 ( c ) (3)(iv), as set forth in FAR 22.404- 6(b)(6) provides that if a contract to which a general wage determination has been applied is not awarded within 90 days after opening, any modification to that wage determination published prior to contract award shall be effective unless the agency obtains an extension of this 90-day period from the Administrator, US Department of Labor.
General Decision Number: NY100013 07/29/2011 NY13
Superseded General Decision Number: NY20080013
State: New York NC 7/29/11
Construction Types: Building, Heavy, Highway and Residential
Counties: Nassau and Suffolk Counties in New York.
BUILDING CONSTRUCTION PROJECTS, RESIDENTIAL CONSTRUCTION PROJECTS (including single family homes and apartments up to and including 4 stories), HEAVY
CONSTRUCTION PROJECTS, HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 03/12/2010 1 04/16/2010
2 04/23/2010 3 07/23/2010 4 08/06/2010 5 08/27/2010 6 10/15/2010 7 11/05/2010 8 11/12/2010 9 11/19/2010 10 12/03/2010 11 02/25/2011 12 03/25/2011 13 04/08/2011 14 04/22/2011 15 05/06/2011 16 05/20/2011 17 06/03/2011 18 06/17/2011 19 07/01/2011 20 07/22/2011 21 07/29/2011
* ASBE0012-001 07/04/2011
Rates Fringes
Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.....................$ 60.03 25.89
HAZARDOUS MATERIAL HANDLER.......$ 30.00 9.10
BOIL0005-001 01/01/2011
Rates Fringes
BOILERMAKER......................$ 47.32 19.43
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve
BRNY0001-001 07/01/2010
Rates Fringes
BRICKLAYER.......................$ 51.00 21.44
MASON - STONE....................$ 57.61 23.86
CARP0007-016 07/01/2009
Rates Fringes
Carpenters:
Building....................$ 37.21 30.23 Heavy & Highway.............$ 37.21 30.23 Residential.................$ 33.48 30.23
CARP0740-001 07/01/2010
Rates Fringes
MILLWRIGHT.......................$ 46.19 44.93
CARP1456-009 07/01/2008
Rates Fringes
Carpenters:
DIVERS TENDERS..............$ 39.18 38.06
DIVERS......................$ 54.63 38.06
DOCKBUILDERS................$ 43.61 38.06
PILEDRIVERMAN...............$ 43.61 38.06
CARP1536-001 07/01/2003
Rates Fringes
Carpenters:
TIMBERMEN...................$ 34.47 26.05
ELEC0025-001 04/30/2011
Rates Fringes
ELECTRICIAN......................$ 46.85 16%+$16.67
ELEC0025-002 04/30/2011
Rates Fringes
Electricians:
Maintenance Unit............$ 38.45 12%+$15.24 Telephone Unit..............$ 34.76 16%+$15.68 Wiring for single or multiple family dwellings and apartments up to and including 2 stories.........$ 27.78 11.5%+$12.10
ELEC1049-002 04/06/2008
Rates Fringes
Line Construction:
Substation and Switching structures pipe type cable installation and maintenance jobs or projects; Railroad electrical distribution/ transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment;
Groundman..................$ 24.83 17.91 Heavy Equipment Operator...$ 33.10 17.91 Lineman & Cable Splicer....$ 41.38 17.91 Material Man...............$ 36.00 17.91
ELEV0001-002 03/17/2011
Rates Fringes
ELEVATOR MECHANIC
Elevator Constructor........$ 53.27 24.855+a+b Modernization and Repair....$ 42.31 24.705+a+b
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Good Friday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;
an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.
ENGI0138-001 06/01/2011
BUILDING CONSTRUCTION
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 50.78 28.84+a GROUP 2.....................$ 48.20 28.84+a GROUP 3.....................$ 46.48 28.84+a GROUP 4.....................$ 43.01 28.84+a GROUP 5.....................$ 41.27 28.84+a
NOTES:
Hazmat premiums:
Level A 3.50 Level B 2.50 Level C 1.50 Level D 1.00
Oiler on truck cranes with boom length of 100 ft. or more .25
FOOTNOTE:
a. Paid Holidays: New Year's Day, Lincoln's Birthday, Washington's Birthday or President's Day (in lieu of Lincoln's or Washington's Birthday), Good Friday, Memorial Day, Indpendence Day, Labor Day, Veteran's Day, Thanksgiving Day, Christmas Day or days celebrated as such.
Any holiday that falls on a Saturday will be celebrated on Friday.
POWER EQUIPMENT OPERATOR CASSIFICATIONS
GROUP 1: Asphalt spreader, backhoe crawler capacity over cater- piller 225 and lomatsu 300, Boiler (thermoplastic), Cherry picker, over 50 tons, CMI or maxim spreader, concrete pump (with oiler), crane (crawler truck), crane (on barge), crane (stone setting), crane (structural steel), crane (with clam shell), derrick, dragline, dredge, gradall, grader, hoist (3 drum), loading machine (bucket) cap of 10 yds or over micro-trap, with compressor (negative air machine), milling machine, large pile driver, power winch, Stone setting/structural steel, power winch (truck mounted/stone steel) powerhouse, road paver scoop, carry-all, scraper in tandem shovel, sideboom tractor, sideboom tractor (used in tank work), stone spreader (self propelled tank work), zamboni (ice machine)
GROUP 2: Backhoe, boom truck, bulldozer, cherypicker, conveyor (multi), dinky locomotive, forklift, hoist, 2 drum, loading machine, loading machine (front end) mechanicl compactors, (machine drawn), mulch machine (machine-fed), power winch, other than stone/structural steel, power winch (truck mounted other than stone steel) pump (hydraulic, with boring machine), roller, (asphalt), scoop (carry-all scraper), tower crane (maintenance man), trenching machine
GROUP 3: Comrpessor (structural steel), Compressor (2 or more in battery), concrete finishing mchine, concrete spreader, conveyor, curb machine (asphalt or concrete), curing machine, fireman, hoist (1 drum), micro-trap, (self contained, negative air machine), pump (4 inches or over), pump (hydraulic), pump (jet), pump (sumbersible), pump (well point), pulvi-mixer, ridge cutter, roller (dirt), striping machine, vac-all, welding and burning, welding machine (pile work), welding machine (structural steel)
GROUP 4: Compressor, compressor (on crane), compressor (pile work), compressor (stone setting), concrete breaker, concrete saw or cutter, forklift (walk behind, power operated), generator-pile work, generator, hydra hammer, mechanical compactors (hand operated), oiler (truck crane), pin puller, portable heaters, powerbroom, power buggies, pump (double action diaphgrgm), pump (gypsum), trench machine (hand), welding machine
GROUP 5: Batching plant (on site of job), generator (small), mixer (with skip), mixer (2 small with or without skip), mixer (2 bag or over, with or without skip), mulch machine, oiler, pump (centrifugal, up to 3 inches), root cutter, stump chipper, tower crane (oiler), tractor (caterpillar or wheel vibrator)
ENGI0138-002 06/01/2011
HEAVY & HIGHWAY
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 53.48 29.09+a GROUP 2.....................$ 49.99 29.09+a GROUP 3.....................$ 48.23 29.09+a GROUP 4.....................$ 44.67 29.09+a GROUP 5.....................$ 42.93 29.09+a GROUP 6.....................$ 32.32 11.60+a
NOTES:
Hazmat premiums:
Level A 3.50 Level B 2.50 Level C 1.50
Truck and Crawler Cranes long boom premiums:
boom lengths (including jib) 100-149 ft .50 boom lenghts (including jib) 150-249 ft .75 boom lenghts (including jib) 250-349 ft 1.00 boom lengths (including jib) 350 ft 1.50
Cranes using clamshell buckets .25 Front end loader 10 yds and above .25 Oiler on truck cranes with boom length of 100 ft. or more .25
FOOTNOTE:
a. Paid Holidays: New Years Day, Lincoln's Birthday, Washington's Birthday or Presidents Day (in lieu of Lincoln's or Washington's Birthday, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day or days celebrated as such. Any holiday that falls on Saturday will be celebrated on Friday.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt spreader, backhoe crawler (capacity over caterpiller 225 and komatsu 300), boiler (thermoplastic), boring machine (post hole), cgherry picker (over 50 ton), CMI or maxim spreader, concrete pump, with oiler, crane (crawler truck), crane (on barge), crane (stone setting) crane (structural steel), crane (with clam shell), derrick, dragline, dredge, gradall, grader, hoist (3 drums), loading machine (bucket) capacity of 10 yards or over, micro-trap (with compressor-negative air machine), milling machine (large), piledriver, power winch (stone setting structural steel), power winch (truck mounted/stone steel), power-house, road paver, scoop, carry all (scraper in tandem), shovel, sideboom tractor, sideboom tractor (used in tank work), stone spreader (self-propelled), tank work, tower crane
GROUP 2: Bulldozer, Backhoe, Boom Truck, Boring machine/augur, Cherrypicker, Conveyor (multi), Dinky Locomotive, Forklift, Hoist (2 drum), Loading Machine, Loading Machine (front end), Mechanical Compactor (machine drawn), Mulch Machine (machine- fed), Power Winch (other than stone/structural steel), Power Winch (truck mounted/other than stone steel), Pump Hydraulic (with boring machine), Roller (asphalt), Scoop (carry-all, scraper), Tower Crane (maintenance man), Trenching Machine, Vermeer Cutter, Work Boat
GROUP 3: Curb Machine (asphalt or concrete), Maintenance Engineer (small equipment), Maintenance engineer (well-point) Mechanic (fieldman), Micro-Trap (self contained, negative air machine), Milling Machine (small), Pulvi-mixer, Pump (4 inches or over), Pump Hydraulic, Pump Jet, Pump Submersible, Pump (well point), Roller Dirt, Vac-All, Welding and burning, Compressor (structural steel), Compressor (2 or more battery), Concrete Finishing Machine, Concrete Spreader, Conveyor, Curing Machine, Fireman, Hoist (one drum), Ridge Cutter, Striping Machine, Welding Machine (pile work), Welding Machine (structural Steel).
GROUP 4: Compressor, Compressor on crane, Compressor (pile work), Compressor (stone setting), Concrete Breaker, Concrete Saw or Cutter, Fork Lift (walk behind, power operated), Generator- Pile Work, Generator, Hydra Hammer, Mechanical Compoactors (hand operated), Oiler (truck crane), Pin Puller, Portable Heaters, Powerbroom, Power buggies, Power Grinders, Pump (double action diaphragm), Pump gypsum, Pump (single action 1 to 3 inches), Trench Machine hand, Welding Machine
GROUP 5: Batching Plant (on site of job), Generator (small), Grinder, Mixer (with skip), Mixer (2 small with or without skip), Mixer (2 bag or over, with or without skip), Mulch Machine, Oiler, Pump (centrifugal, up to 3 inches), Root
Cutter, Stump Chipper, Tower Crane (oiler), Track Tamper (2 engineers, each), Tractor (caterpillar or wheel), Vibrator, Work boat (deckhand), GROUP 6: Well drillers
IRON0046-003 07/01/2010
Rates Fringes
IRONWORKER
METALLIC LATHERS............$ 39.00 47.36
IRON0197-001 07/01/2009
Rates Fringes
IRONWORKER
STONE DERRICKMAN............$ 40.50 38.32
IRON0361-001 01/01/2011
Rates Fringes
IRONWORKER (STRUCTURAL)..........$ 43.30 30.88
IRON0580-001 01/01/2009
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 39.85 39.67
LABO0066-001 07/01/2009
BUILDING
Rates Fringes
Laborers:
Laborers....................$ 29.50 24.59 Plasterers Tenders..........$ 29.50 24.59
LABO0078-001 12/01/2009
Rates Fringes
LABORERS
BUILDING CONSTRUCTION
ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &
HAZARDOUS WASTE LABORERS
(Hazardous Waste, Hazardous Materials, Biochemical and Mold
Remediation, HVAC, Duct Cleaning, Re-spray Fireproofing, etc).........$ 31.50 12.45
LABO1298-001 06/01/2009
HEAVY & HIGHWAY
Rates Fringes
Laborers:
Asphalt Rakers; Formsetters.$ 33.89 20.90+A Asphalt Shovelers, Roller Boys & Tampers..............$ 32.94 20.90+A Regular Laborers............$ 30.05 20.90+A
A. FOOTNOTES:
Laborers working in a hazardous material hot zone shall receive an additional 20% premium.
Where the contract provides for night work outside the regular hours of work, the employees shall be paid at straight time plus a 25% night work premium for the 8 hours worked during the night.
Firewatch work performed after regular hours shall be paid an additional 10% premium. Second and Third Shift work will be paid at a 10% premium.
Contractor requesting laborers certified for hazardous material work and/or employed on hazardous material shall be required to pay an additional 10% premium.
PAIN0009-002 05/01/2010
Rates Fringes
Painters:
GLAZIERS....................$ 39.00 32.24
Painters, Drywall Finishers.$ 34.50 19.84 Spray, Scaffold, Sandblasting................$ 37.50 19.84
PAIN0806-010 10/01/2009
Rates Fringes
Painters:
Stuctural Steel and Bridge..$ 45.50 28.76
PAIN1974-002 07/01/2009
Painters:
DRYWALL TAPERS/POINTERS.....$ 41.32 20.81
PLAS0262-003 08/01/2010
Rates Fringes
PLASTERER........................$ 39.53 25.55
PLAS0780-001 06/01/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 49.50 35.57
PLUM0200-001 05/01/2011
Rates Fringes
PLUMBER
BUILDING CONSTRUCTION:......$ 50.48 17.66
RESIDENTIAL CONSTRUCTION:...$ 30.01 9.10
PLUM0638-001 07/01/2011
Rates Fringes
PLUMBER
SERVICE FITTERS.............$ 26.30 2.55
SPRINKLER FITTERS,
STEAMFITTERS................$ 56.06 68.08
Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.
ROOF0154-001 10/01/2010
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 38.00 26.81
SHEE0028-002 07/29/2010
SHEET METAL WORKER
BUILDING CONSTRUCTION.......$ 48.15 36.03
RESIDENTIAL CONSTRUCTION....$ 27.22 16.48
TEAM0282-002 07/01/2009
Rates Fringes
Truck drivers:
Asphalt.....................$ 35.40 29.2025+a+b Euclids & turnapulls........$ 35.50 29.2025+a+b High Rise...................$ 42.21 29.2025+a+b
FOOTNOTES:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day and Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.
b.VACATION: For each 15 days worked with the contract year an employee will receive one day vacation with pay, maximum vacation of 3 weeks per year. In addition, an employee who qualifies for two weeks (10 days) vacation or more with pay and who has been continuously employed by his employer for six years before the close of any contract year, shall be entitled to one extra day vacation; seven years before the close of any contract year, shall be entitled to two extra days vacation; eight years before the close of any contract year, shall be entitled to three extra day vacation; nine years before the close of any contract year, shall be entitled to four extra day vaction; ten years before the close of any contract year or over shall be entitled to three weeks paid vacation with pay, but in no event shall any employee be entitled to more than three weeks vacation pay per year.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.)
should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .