This abstract of bids summarizes ten offers received in response to solicitation number W912DR23B0002 for the construction of a Munitions Load Crew Training Facility at Joint Base Andrews in Maryland. The project scope includes new construction of an 8,279 square foot hangar and support facilities, along with sitework, utilities, HVAC systems, fire protection, and compliance with DoD antiterrorism requirements. Offered pricing ranges from $6.6 to $11.7 million for the base bid and from $7 to $11.7 million when including optional bid items. The apparent low bidders are Property & Environmental Management, Inc. at $6.6 million base bid and $7 million total, and F.L. Pinto Companies at $7.7 million base bid and $8.7 million total. The government estimate is $8.2 million base bid and $8.6 million total. Ten contractors submitted bids, all accompanied by the required 20% bid bonds and acknowledging all four amendments to the solicitation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3. DATE OPENED PAGE

7/6/2023 1 of 4

4. ISSUING OFFICE Name and title of Certifying Official (Type) Gary Faykes - Contracting Officer

I CERTIFY that I have opened, read, and recorded on this abstract all offers Signature Date Signed received in response to this solicitation.

Contracting Officer: GARY A. FAYKES

5. PROJECT TITLE

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F.)

A. HIRED LABOR

B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)

X C. REASONABLE CONTRACT C. Amendment Acknowledged (Including Profit)

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED

No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT

All costs in connection with construction of the Munitions Load Training Facility at Joint Base Andrews to points five feet outside the building line, complete as shown on drawings and specified, exclusive of any optional bid items below.

1 JOB LS 4,993,329.83$ LS 4,877,245.00$ LS 6,631,062.00$

All costs in connection with construction of the Munitions Load Training Facility at Joint Base Andrews from points five feet outside the building lines including site work, utilities, and landscaping, complete as shown on drawings and specified, exclusive of any optional bid items below.

1 JOB LS 952,490.33$ LS 2,045,439.00$ LS 825,113.00$

0003 Payment to Terrapin Services for Utility work 1 JOB LS 742,775.00$ LS 742,775.00$ LS 742,775.00$

TOTAL ESTIMATED BASE BID AMOUNT 6,688,595.16$ 7,665,459.00$ 8,198,951.00$

(Option 1) All costs in connection with the construction of premanufactured metal canopies, complete as shown on drawings and specified.

1 JOB LS 3,343.79$ LS 10,804.00$ LS 19,688.00$

(Option 2) All cost in connection with the construction of faux louvers above the South windows and doors, as shown on drawings and specified.

1 JOB LS 7,996.89$ LS 9,895.00$ LS 6,420.00$

(Option 3) All costs in connection with the construction of translucent wall panels in lieu of insulated metal panels on the Hangar High Bay, complete as shown on drawings and specified.

1 JOB LS 40,266.71$ LS 33,374.00$ LS 55,313.00$

(Option 4) All cost in connection with the construction of continuous cast stone cap and 2-brick soldier courses at the exterior of the building, complete as shown on drawings and specified.

1 JOB LS 8,272.03$ LS 42,323.00$ LS 48,926.00$

(Option 5) All costs in connection with the construction of a standing seam metal roof in lieu of a PVC Roof at the Hangar Bay, complete as shown on drawings and specified.

1 JOB LS 64,305.36$ LS 353,295.00$ LS 80,892.00$

(Option 6) All costs in connection with the construction of the bird control netting and spikes in the Hangar Bay, complete as shown on drawings and specified.

1 JOB LS 5,912.60$ LS 23,445.00$ LS 27,841.00$

(Option 7) All costs in connection with construction of classroom cabinetry and associated fixtures, complete as shown on drawings and specified.

1 JOB LS 23,029.29$ LS 26,670.00$ LS 10,486.00$

(Option 8) All costs in connection with construction of CMU and brick equipment yard wall with cast stone cap, steel gate, and chain-link fence top in lieu of vinyl coated chain-link fence equipment enclosure, complete as shown on drawings and specified.

1 JOB LS 23,917.85$ LS 273,274.00$ LS 87,440.00$

(Option 9) All costs in connection with interior painting of the Hangar Bay walls, roof deck, and structure, complete as shown on drawings and specified.

1 JOB LS 30,631.66$ LS 96,792.00$ LS 29,489.00$

(Option 10) All costs in connection with construction of fuel resistive resinous flooring system in lieu of sealed concrete in the Hangar Bay, complete as shown on drawings and specified.

1 JOB LS 87,151.00$ LS 124,274.00$ LS 29,425.00$

(Option 12) All costs in connection with providing seven (7) 12”W x 18”D x 72”H double tier personnel lockers and window blinds for Window Types A, B, and C, as well as door 103B, complete as shown on drawings and specified.

1 JOB LS 11,483.77$ LS 6,812.00$ LS 8,107.00$

(Option 13) All costs in connection with construction of 6” diameter, 42” high steel concrete filled bollards on the east side of the building, complete as shown on drawings and specified.

1 JOB LS 12,258.49$ LS 16,530.00$ LS 6,046.00$

TOTAL ESTIMATED OPTIONAL AND BASE

BID AMOUNT

7,007,164.60$ LS 8,682,947.00$ 8,609,024.00$

Correct total amount should be

$8,609,023.00

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

C. Amendment Acknowledged

Property & Environmental Management, Inc.

6161 Busch Blvd., Suite 255

Columbus, OH 43229

No. 2

BALTIMORE, MD 21201

ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER

Yes

Bid Bond 20%

5/17/2023W912DR23B0002

Munitions Load Crew Training Facility Joint Base Andrews, Maryland

No. 1

BALTIMORE DISTRICT, CORPS OF ENIGNEERS

2 HOPKINS PLAZA

9. OFFERS

Bid Bond 20%

F.L. Pinto Companies, LLC dba PWC Companies 8201 Greensboro Drive, Suite 445

McLean, VA 22102

Yes

6. NUMBER OF AMENDMENTS ISSUED: Four (4)

7-6-2023

1. SOLICITATION NUMBER PAGE

ABSTRACT OF OFFERS W912DR23B0002 2 of 4

CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on

CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional

Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED

7A. B. C. D.

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs in connection with construction of the Munitions Load Training Facility at Joint Base Andrews to points five feet outside the building line, complete as shown on drawings and specified, exclusive of any optional bid items below.

1 JOB LS 8,100,000.00$ LS 8,032,000.00$ LS 7,800,000.00$ LS 8,895,825.00$

All costs in connection with construction of the Munitions Load Training Facility at Joint Base Andrews from points five feet outside the building lines including site work, utilities, and landscaping, complete as shown on drawings and specified, exclusive of any optional bid items below.

1 JOB LS 1,130,000.00$ LS 1,265,000.00$ LS 1,100,000.00$ LS 879,592.00$

0003 Payment to Terrapin Services for Utility work 1 JOB LS 742,775.00$ LS 742,775.00$ LS 742,775.00$ LS 742,775.00$

TOTAL ESTIMATED BASE BID AMOUNT 9,972,775.00$ 10,039,775.00$ 9,642,775.00$ 10,518,192.00$

(Option 1) All costs in connection with the construction of premanufactured metal canopies, complete as shown on drawings and specified.

1 JOB LS 24,620.00$ LS 25,000.00$ LS 19,500.00$ LS 25,180.00$

(Option 2) All cost in connection with the construction of faux louvers above the South windows and doors, as shown on drawings and specified.

1 JOB LS 11,750.00$ LS 7,500.00$ LS 7,500.00$ LS 15,201.00$

(Option 3) All costs in connection with the construction of translucent wall panels in lieu of insulated metal panels on the Hangar High Bay, complete as shown on drawings and specified.

1 JOB LS 48,500.00$ LS 75,000.00$ LS 90,000.00$ LS 77,434.00$

(Option 4) All cost in connection with the construction of continuous cast stone cap and 2-brick soldier courses at the exterior of the building, complete as shown on drawings and specified.

1 JOB LS 58,000.00$ LS 33,000.00$ LS 65,000.00$ LS 66,046.00$

(Option 5) All costs in connection with the construction of a standing seam metal roof in lieu of a PVC Roof at the Hangar Bay, complete as shown on drawings and specified.

1 JOB LS 940,000.00$ LS 123,000.00$ LS 90,000.00$ LS 89,477.00$

(Option 6) All costs in connection with the construction of the bird control netting and spikes in the Hangar Bay, complete as shown on drawings and specified.

1 JOB LS 30,000.00$ LS 27,000.00$ LS 70,000.00$ LS 36,321.00$

(Option 7) All costs in connection with construction of classroom cabinetry and associated fixtures, complete as shown on drawings and specified.

1 JOB LS 9,000.00$ LS 15,000.00$ LS 40,000.00$ LS 13,678.00$

(Option 8) All costs in connection with construction of CMU and brick equipment yard wall with cast stone cap, steel gate, and chain-link fence top in lieu of vinyl coated chain-link fence equipment enclosure, complete as shown on drawings and specified.

1 JOB LS 115,000.00$ LS 135,000.00$ LS 120,000.00$ LS 92,379.00$

(Option 9) All costs in connection with interior painting of the Hangar Bay walls, roof deck, and structure, complete as shown on drawings and specified.

1 JOB LS 62,350.00$ LS 50,000.00$ LS 105,000.00$ LS 46,414.00$

(Option 10) All costs in connection with construction of fuel resistive resinous flooring system in lieu of sealed concrete in the Hangar Bay, complete as shown on drawings and specified.

1 JOB LS 22,000.00$ LS 116,000.00$ LS 50,000.00$ LS 40,207.00$

(Option 12) All costs in connection with providing seven (7) 12”W x 18”D x 72”H double tier personnel lockers and window blinds for Window Types A, B, and C, as well as door 103B, complete as shown on drawings and specified.

1 JOB LS 11,900.00$ LS 19,000.00$ LS 8,500.00$ LS 12,472.00$

(Option 13) All costs in connection with construction of 6” diameter, 42” high steel concrete filled bollards on the east side of the building, complete as shown on drawings and specified.

1 JOB LS 16,000.00$ LS 13,500.00$ LS 11,200.00$ LS 16,505.00$

TOTAL ESTIMATED OPTIONAL AND BASE

BID AMOUNT

11,321,895.00$ 10,678,775.00$ 10,319,475.00$ 11,049,506.00$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1OPTIONAL FORM 1419 (11-88)

OFFERS (Continued)

Bid Bond 20%

Joint Base Andrews, Maryland Munitions Load Crew Training Facility

Yes Yes Yes

No.6No. 3 No. 4

Ritz Construction, Inc.

550 Highland Street #215D

Frederick, MD 21701

Terra Site Constructors, LLC 900Shenandoah Shores Road, Suite 100

Front Royal, VA 22630

Tuckman-Barbee Construction Co., Inc.

16000 Trade Zone Avenue #102

Upper Marlboro, MD 20774

Benaka, Inc.

7 Lawrence Street

New Brunswick, NJ 08901

Bid Bond 20%Bid Bond 20% Bid Bond 20%

No. 5

Yes

ABSTRACT OF OFFERS W912DR23B0002 3 of 4

CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on

CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional

Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED

7A. B. C. D.

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs in connection with construction of the Munitions Load Training Facility at Joint Base Andrews to points five feet outside the building line, complete as shown on drawings and specified, exclusive of any optional bid items below.

1 JOB LS 9,790,430.00$ LS 7,271,647.00$ LS 8,075,908.00$ LS 8,699,036.00$

All costs in connection with construction of the Munitions Load Training Facility at Joint Base Andrews from points five feet outside the building lines including site work, utilities, and landscaping, complete as shown on drawings and specified, exclusive of any optional bid items below.

1 JOB LS 633,070.00$ LS 1,406,611.00$ LS 1,672,942.00$ LS 1,689,157.00$

0003 Payment to Terrapin Services for Utility work 1 JOB LS 742,775.00$ LS 742,775.00$ LS 742,775.00$ LS 742,775.00$

TOTAL ESTIMATED BASE BID AMOUNT 11,166,280.00$ 9,421,033.00$ 10,491,625.00$ 11,130,968.00$

(Option 1) All costs in connection with the construction of premanufactured metal canopies, complete as shown on drawings and specified.

1 JOB LS 24,160.00$ LS 19,453.00$ LS 20,061.00$ LS 13,833.00$

(Option 2) All cost in connection with the construction of faux louvers above the South windows and doors, as shown on drawings and specified.

1 JOB LS 7,880.00$ LS 10,706.00$ LS 6,542.00$ LS 6,425.00$

(Option 3) All costs in connection with the construction of translucent wall panels in lieu of insulated metal panels on the Hangar High Bay, complete as shown on drawings and specified.

1 JOB LS 85,900.00$ LS 65,951.00$ LS 65,415.00$ LS 174,325.00$

(Option 4) All cost in connection with the construction of continuous cast stone cap and 2-brick soldier courses at the exterior of the building, complete as shown on drawings and specified.

1 JOB LS 36,760.00$ LS 30,777.00$ LS 30,527.00$ LS 31,645.00$

(Option 5) All costs in connection with the construction of a standing seam metal roof in lieu of a PVC Roof at the Hangar Bay, complete as shown on drawings and specified.

1 JOB LS 99,260.00$ LS 340,066.00$ LS 264,094.00$ LS 23,734.00$

(Option 6) All costs in connection with the construction of the bird control netting and spikes in the Hangar Bay, complete as shown on drawings and specified.

1 JOB LS 10,500.00$ LS 15,661.00$ LS 68,141.00$ LS 70,636.00$

(Option 7) All costs in connection with construction of classroom cabinetry and associated fixtures, complete as shown on drawings and specified.

1 JOB LS 11,690.00$ LS 8,804.00$ LS 63,758.00$ LS 14,755.00$

(Option 8) All costs in connection with construction of CMU and brick equipment yard wall with cast stone cap, steel gate, and chain-link fence top in lieu of vinyl coated chain-link fence equipment enclosure, complete as shown on drawings and specified.

1 JOB LS 149,910.00$ LS 84,638.00$ LS 91,841.00$ LS 96,009.00$

(Option 9) All costs in connection with interior painting of the Hangar Bay walls, roof deck, and structure, complete as shown on drawings and specified.

1 JOB LS 12,330.00$ LS 19,291.00$ LS 107,493.00$ LS 80,694.00$

(Option 10) All costs in connection with construction of fuel resistive resinous flooring system in lieu of sealed concrete in the Hangar Bay, complete as shown on drawings and specified.

1 JOB LS 52,520.00$ LS 47,334.00$ LS 50,044.00$ LS 29,753.00$

(Option 12) All costs in connection with providing seven (7) 12”W x 18”D x 72”H double tier personnel lockers and window blinds for Window Types A, B, and C, as well as door 103B, complete as shown on drawings and specified.

1 JOB LS 10,500.00$ LS 7,815.00$ LS 6,156.00$ LS 6,583.00$

(Option 13) All costs in connection with construction of 6” diameter, 42” high steel concrete filled bollards on the east side of the building, complete as shown on drawings and specified.

1 JOB LS 12,330.00$ LS 3,655.00$ LS 10,437.00$ LS 12,045.00$

TOTAL ESTIMATED OPTIONAL AND BASE

BID AMOUNT

11,680,020.00$ 10,075,184.00$ 11,276,132.00$ 11,691,405.00$

Base bid correct amount should be $11,166,275.00

Correct total amount should be $11,276,134.00

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236OPTIONAL FORM 1419 (11-88)

OFFERS (Continued)

Bid Bond 20%

Joint Base Andrews, Maryland Munitions Load Crew Training Facility

Yes Yes Yes

No.10No. 7 No. 8

Doyon Technical Services, LLC 3450 South 344th Way, Suite 100

Federal Way, WA 98001

Copper River Infrastructure Services, LLC 1577 C Street, Suite 300 Anchorage, AK 99501

Hasen Global, LLC 2900 Photo Avenue

Fort Worth, TX 76107

Goldbelt Operations Support Services, LLC

13900 Lincoln Park Drive, Ste. 140 Herndon, VA 20171

Bid Bond 20%Bid Bond 20% Bid Bond 20%

No. 9

Yes

ABSTRACT OF OFFERS W912DR23B0002 4 of 4

CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on

CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional

Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED

7A. B. C. D.

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs in connection with construction of the Munitions Load Training Facility at Joint Base Andrews to points five feet outside the building line, complete as shown on drawings and specified, exclusive of any optional bid items below.

1 JOB LS 7,761,206.00$

All costs in connection with construction of the Munitions Load Training Facility at Joint Base Andrews from points five feet outside the building lines including site work, utilities, and landscaping, complete as shown on drawings and specified, exclusive of any optional bid items below.

1 JOB LS 731,810.00$

0003 Payment to Terrapin Services for Utility work 1 JOB LS 742,775.00$

TOTAL ESTIMATED BASE BID AMOUNT 9,235,791.00$

(Option 1) All costs in connection with the construction of premanufactured metal canopies, complete as shown on drawings and specified.

1 JOB LS 22,014.00$

(Option 2) All cost in connection with the construction of faux louvers above the South windows and doors, as shown on drawings and specified.

1 JOB LS 18,211.00$

(Option 3) All costs in connection with the construction of translucent wall panels in lieu of insulated metal panels on the Hangar High Bay, complete as shown on drawings and specified.

1 JOB LS 90,978.00$

(Option 4) All cost in connection with the construction of continuous cast stone cap and 2-brick soldier courses at the exterior of the building, complete as shown on drawings and specified.

1 JOB LS 80,112.00$

(Option 5) All costs in connection with the construction of a standing seam metal roof in lieu of a PVC Roof at the Hangar Bay, complete as shown on drawings and specified.

1 JOB LS 443,884.00$

(Option 6) All costs in connection with the construction of the bird control netting and spikes in the Hangar Bay, complete as shown on drawings and specified.

1 JOB LS 81,548.00$

(Option 7) All costs in connection with construction of classroom cabinetry and associated fixtures, complete as shown on drawings and specified.

1 JOB LS 22,922.00$

(Option 8) All costs in connection with construction of CMU and brick equipment yard wall with cast stone cap, steel gate, and chain-link fence top in lieu of vinyl coated chain-link fence equipment enclosure, complete as shown on drawings and specified.

1 JOB LS 95,700.00$

(Option 9) All costs in connection with interior painting of the Hangar Bay walls, roof deck, and structure, complete as shown on drawings and specified.

1 JOB LS 140,354.00$

(Option 10) All costs in connection with construction of fuel resistive resinous flooring system in lieu of sealed concrete in the Hangar Bay, complete as shown on drawings and specified.

1 JOB LS 66,598.00$

(Option 12) All costs in connection with providing seven (7) 12”W x 18”D x 72”H double tier personnel lockers and window blinds for Window Types A, B, and C, as well as door 103B, complete as shown on drawings and specified.

1 JOB LS 19,350.00$

(Option 13) All costs in connection with construction of 6” diameter, 42” high steel concrete filled bollards on the east side of the building, complete as shown on drawings and specified.

1 JOB LS 10,436.00$

TOTAL ESTIMATED OPTIONAL AND BASE

BID AMOUNT

10,352,110.00$

Correct total should be $10,327,898

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1OPTIONAL FORM 1419 (11-88)

OFFERS (Continued)

Bid Bond 20%

Joint Base Andrews, Maryland Munitions Load Crew Training Facility

Yes

No. 14No. 11 No. 12

Kekolu Contracting, LLC 9375 Cheapeake Street, Suite 209

La Plata, MD 20646

No. 13

2023-07-06T14:33:39-0400
FAYKES.GARY.A.1086691600