This document contains a bid inquiry report and related federal contract opportunity. The bid inquiry report summarizes 22 questions and answers regarding a Two-Step Invitation for Bid (IFB) process for exterior infrastructure and security improvements at a federal facility. The IFB seeks design-bid-build construction services including building a concrete masonry unit building, two vehicle access control points, security fencing, and other site work. The period of performance is 720 calendar days. Offerors must have an approved Facility Site Clearance at time of offer, award, and performance. The contract will be a firm-fixed-price awarded after a two-step process evaluating technical proposals and prices. Step One of the solicitation was planned for September 13, 2019 with Step Two provided later via amendment only to acceptable offerors. The North American Industry Classification System code is 236220 and the project magnitude is between $10-25 million. The agency is the U.S. Army Corps of Engineers, Baltimore District.
RFI responses are compiled from Round 1 and Round 2. The latest questions and responses are at the bottom.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04.01 - Abstract of Bids - EISI (signed).pdf | ||
| Amendment_1_-_Response_to_RFIs.pdf | ||
| AMENDMENT_1_-_Solicitation_Document_W912DR19B0023.pdf | ||
| ATCH_1_-_PROPOSAL_COVER_SHEET.pdf | ||
| ATCH_3_-_EXPERIENCE_IN_RELEVANT_PROJECTS.pdf | ||
| ATCH_6_-_EFT_FORM.pdf | ||
| Solicitation_Document_W912DR19B0023.pdf | ||
| ATCH_4_-_STANDARD_FORM_LLL,_DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf | ||
| ATCH_2_-_SOA_FORM.pdf | ||
| ATCH_5_-_CERTIFICATE_OF_CORPORATE_AUTHORITY.PDF | ||
| DD_254_-_EISI.pdf | ||
| SOA_Form.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: EISI RAVEN ROCK Review: EISI RAVEN ROCK (00001) (sorted by CommentID ) Displaying 22 inquiries.
Id Discipline Sheet Detail Spec
8193785 Construction Management
4.1.2 Submission
Requirements
4.1.2.1 Factor 1 - Experience in
Relevant Projects
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can you please reconsider the minimum completion value of $10 million for the relevant projects. My firm has completed several successful Vehicle Access Control Point projects for secure clients in the $5 to $10 million range, and one significant VACP for the DLA for $19 million. I believe our experience would be of value to you, however we are unable to submit if the minimum project value remains at $10 million.
On: Sep 19 2019.
Government Response. . The Government has considered the request to reconsider the minimum standards for projects to be considered relevant. Please see Amendment 1 to the solicitation. On: Oct 09
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8195586 General SF1442
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The solicitation states "This contract requires the firm to possess, at the time of the offer, at the time of award and duration of the contract, an active SECRET Facility Site Clearance". Please clarify is we need Secret Facility Site Clearance to submit the bid?
We are interested in bidding this job, will the current contracting initiate this secret security clearance, as we are aware that only contracting can initiate this process.
On: Sep 20 2019.
Government Response. . Yes, a firm bidding this work must possess an active SECRET Facility Site Clearance at time of bid, i.e. with STEP 1 bid submission. The USACE Contracting activity will not initiate the process as firms must possess at time of bid. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8200485 General N/A N/A Factor 2, 4.1.2.2
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can the Government provide the drawings and specification and/or remove the requirement in Factor 2, 4.1.2.2 – Construction Approach for a Pre-Award Project Schedule? There is not enough information in the Phase 1 solicitation to provide a schedule as required in this section. The Section 01 00 00 – General Requirements do not provide the level of detail needed to develop a CMP schedule.
On: Sep 24 2019.
Government Response. . Please see Amendment 1 to the solicitation. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8201680 General N/A N/A N/A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
1. Section 4.1.1 General of the RFP on page 11 states "The narrative must be a comprehensive, start-to-finish discussion of the significant features of this work that is the subject of this IFB. The narrative should address the assumptions and techniques to be used in this project and the various engineering disciplines involved (e.g., civil, electrical, geotechnical, environmental etc.), and any special items to be accomplished (i.e., LEED, Energy Savings, Life Safety, etc.). In no case shall words like "we will comply with the requirements of the contract," or equivalent statements, be acceptable to meet the requirements of this IFB. Failure to comply with these instructions may result
Page 1 of 6ProjNet: Logged In User
10/18/2019https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReport...
in the offeror's technical proposal being summarily rejected;" since this project has not been indicated as design-build and there are not any specifications or drawings to support the various engineering disciplines, please provide further instructions regarding the narratives to be provided.
On: Sep 25 2019.
Government Response. . Please see Amendment 1 to the solicitation. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8201681 General N/A N/A N/A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
2. Section 4.1.3 Evaluation Criteria: 4.1.3.2 of the RFP on page 12 states "FACTOR 2 - CONSTRUCTION APPROACH: The Offeror's narrative will meet the minimum requirements of this solicitation if it demonstrates an acceptable approach to the project as defined in the plans and specs, takes all factors into account, and addresses the elements identified in paragraph 4.1.2.2. If the minimum requirements are met, the Offeror will receive an "Acceptable" rating;" however, the RFP documents did not include plans or specs. Please provide further documentation to support the requirements needed to respond to Factor 2 accurately.
On: Sep 25 2019.
Government Response. . Please see Amendment 1 to the solicitation. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8201682 General N/A N/A N/A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 12 of the RFP requests the submission of a Pre-Award Project Schedule; however, the RFP documents did not include specifications and/or drawings to support an accurate draft of the project schedule. Please provide further documentation to support a thorough draft of the project schedule.
On: Sep 25 2019.
Government Response. . Please see Amendment 1 to the solicitation. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8201683 General N/A N/A N/A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The RFP states that there is a 25-page maximum with 11x17 pages counting as 2 pages. Given that project schedules can vary in page numbers, please confirm that the entire project schedule can count as one page.
On: Sep 25 2019.
Government Response. . Please see Amendment 1 to the solicitation. Requirement to provide a project schedule has been deleted from IFB. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8201686 General N/A N/A N/A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The RFP states that there is a 25-page maximum. Given that there will be multiple subcontractors assigned to this project, please confirm that the Key Subcontractor Commitment and Authorization Letters can be excluded from this page count.
On: Sep 25 2019.
Government Response. . Key subcontractor commitment and authorization letters can be excluded from the page count. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8201689 General N/A N/A N/A
Page 2 of 6ProjNet: Logged In User
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The RFP states that there is a 25-page maximum. Please exclude from the overall page count the following: Cover Letter, Cover Sheet, SF LLL, Certificate of Corporate Principal/Authority, Electronic Funds Transfer (EFT) Form, Teaming Agreements and Key Subcontractor Commitment and Authorization Letters.
On: Sep 25 2019.
Government Response. . The following: Cover Letter, Cover Sheet, SF LLL, Certificate of Corporate Principal/Authority, Electronic Funds Transfer (EFT) Form, Teaming Agreements and Key Subcontractor Commitment and Authorization Letters are excluded from the page count. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8203706 General 6-7 of 69 2.1 general Instructions
2.1.6 Format, Media, Contents, and
List of Tabs for the Technical Proposal
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Due to the limitation of only 25 pages please confirm that the SF1442, Security Clearance Memo, Proposal Cover Sheet (ATCH 1), Ownership Disclosure - Statement of Affiliation (ATCH 2), SF LLL and Instruction for Completion (ATCH 4), Certificate of Corporate Principal/Authority (ATCH 5), EFT Form (ATCH 6), Teaming Agreement(s), Key Sub-Contractor Commitment and Authorization Letter, and Pre-Ward Project Schedule do not count toward the page count.
On: Sep 26 2019.
Government Response. . See response to 8201689 and 8201686 On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8203711 General 1 of 69
13. Additional Solicitation
Requiremnets A
Comment Classification: UNCLASSIFIED (U)
Due to the significance of the outstanding RFIs we cannot start Factor 2. Please provide an additional 2 weeks after RFI responses are received to submit proposal.
On: Sep 26 2019.
Government Response. . The Government has considered the request for an extension to the closing date and time for submission of STEP 1 technical package. See amendment. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8203718 General 11 of 69
4.1.2 Submission
Requirements
4.1.2.1 Factor 1 - Experience in
Relevant Projects
Comment Classification: UNCLASSIFIED (U)
Factor 1 has specific relevant criteria to be met regarding ACPs and to provide 3 projects within the last 7 years means you had to be constructing these projects almost concurrently to meet the RFP requirement. This does not allow us to provide our best relevant projects. We request the time frame for completed projects be extended from 7 years to 10 years.
On: Sep 26 2019.
Government Response. . The Government has considered the request to adjust the magnitude and time frame for relevant projects. See amendment. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8203720 General 11 of 69
4.1.2 Submission
Requirements
4.1.2.1 Factor 1 - Experience in
Relevant Projects
Comment Classification: UNCLASSIFIED (U)
Can the Government change the requirement in Factor 1 for Experience in Relevant Project, minimum completion value of $10,000,000 to $ 9,000,000? Same reason I list for 2 why this RFI is no good. Ask: Factor 1 requires a
Page 3 of 6ProjNet: Logged In User minimum value of $10M for ACP specific projects. We have completed relevant VACP only projects for $2M. We assume the $10M includes both ACPs in the project. Please reconsider lowering the minimum value to $2M so that we can submit our best relevant projects.
On: Sep 26 2019.
Government Response. . The Government has considered the request to adjust the magnitude and time frame for relevant projects. See amendment. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8203725 General 12 of 69
4.1.2 Submission
Requirements
4.1.2.2 Factor 2 - Construction
Approach
Comment Classification: UNCLASSIFIED (U)
The RFP only provides a general scope of work for the project in Section 01 00 00 – General Requirements. This information does not provide any detailed project scope information to be able to accurately respond to Factor 2 items such as (1) Maintaining Security of the Site since no site plan is provided, (2) Material Delivery since no general requirement restrictions or site plan is provided, (3) Approach to Phased Construction to Keep the Existing ACP's Operational since no information is provided regarding the existing ACP and where the new ACP is going, (4) Provide Proposed Project Duration since we do not have the construction documents, and (5) Pre-Award Project Schedule since we do not have the construction documents to create the activities and durations from. These items are typically found in Step 2 of the solicitation. Please consider removing or providing the construction documents necessary to respond.
On: Sep 26 2019.
Government Response. . Please see amendment. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8204364 General 11 of 69
4.1.2 Submission
Requirements
4.1.2.1 Factor 1 - Experience in
Relevant Projects
Comment Classification: UNCLASSIFIED (U)
Can the Government confirm that PPQ's and/or CCASS/CPARS are not required for the three (3) completed projects within Experience in Relevant Projects?
On: Sep 27 2019.
Government Response. . PPQ's and/or CPARs are not required to be submitted in STEP 1. On: Oct 09
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8208789 Contracting RFP
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Factor 2 requires a discussion on phasing as well as requires a pre-award project schedule. These items are usually reserved for a Step 2 submission, especially if a contract specification is unavailable at the Step 1 stage. Is a specification available at this time? Or would the government consider removing these requirements from the Step 1 solicitation and placing them in the Step 2 response requirements? If a specification is available, would the government consider extending the proposal due date beyond the 14th of October in order to afford offerors closer to the usual 30 days from receipt of all contract document to the proposal due date?
On: Oct 01 2019.
Government Response. . Please see amendment On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8210084 General 11 of 69
4.1.2 Submission
Requirements
4.1.2.1 Factor 1 - Experience in
Relevant Projects
Comment Classification: UNCLASSIFIED (U)
Page 4 of 6ProjNet: Logged In User
Factor 1 requires a minimum value of $10M for ACP specific projects. We have completed relevant VACP only projects for $2M. We assume the $10M includes both ACPs in the project. Please reconsider lowering the minimum value to $2M so that we can submit our best relevant projects.
On: Oct 02 2019.
Government Response. . The Government has considered the request to adjust the magnitude and time frame for relevant projects. See amendment. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8210873 General 12 of 69
4.1.2 Submission
Requirements
4.1.2.2 Factor 2 - Construction
Approach
Comment Classification: UNCLASSIFIED (U)
Can the Government provide a definition and/or explanation of what is meant by "environmental closures" on this project?
On: Oct 03 2019.
Government Response. . Environmental closures will be provided in STEP 2. On: Oct 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8218574 Construction Management
Page 14 of
4.1.2.2. Factor 2
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm that the Construction Approach required in the original IFB as Factor 2 is no longer a submission requirement for Step 1.
On: Oct 10 2019.
Government Response. . That is correct. On: Oct 18 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8218577 Other Page 8 of 70 Binder 1 Technical Proposal
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 8 of the IFB document is missing Tab C. Please confirm that there are no Tab C requirements.
On: Oct 10 2019.
Government Response. . No Tab C Requirements. On: Oct 18 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8218586 Security Pages 12-13 of 70
4.1.2.2. Factor 2
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify which documents/what narratives are required in Tab B: Security Clearance Memo and which documents/what narratives are required in Factor 2: Security Clearance. These sections appear to have overlapping requirements.
On: Oct 10 2019.
Government Response. . The Factor 2 Security Clearance is to be answered in Tab B: Security Clearance Memo. On: Oct 18 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8220148 Building Design &
Engineering detail detail sheet
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
According to the instructions for layout, there is no Tab C. Is this intentional, or a typo?
Page 5 of 6ProjNet: Logged In User
On: Oct 11 2019.
Government Response. . There is no Tab C. On: Oct 18 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Report Complete
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
Page 6 of 6ProjNet: Logged In User
File details come from the government source that posted it. Updated .