This document summarizes responses to inquiries regarding a two-step sealed bid solicitation for exterior infrastructure and security improvements. The solicitation seeks design-bid-build construction services for a concrete masonry unit building with roof, and vehicle access control points at two entrances, to be performed by a contractor holding an approved Facility Site Clearance. Amendments adjusted experience requirements and removed pre-award schedule requirements from Step One in response to inquiries. Step One of the solicitation process evaluates technical proposals without pricing to determine acceptability, with only acceptable offers advancing to Step Two, which follows normal sealed bidding. The solicitation is to be issued on September 13, 2019 by the U.S. Army Corps of Engineers, Baltimore District, with a contract to one contractor for a 720-day period of performance and firm-fixed-price contract valued between $10-25 million.

Responses to Projnet RFIs

View the file

Other files for this federal contract opportunity

Other files attached to EXTERIOR INFRASTRUCTURE & SECURITY IMPROVEMENTS (EISI), newest first.
File Type Posted
C.04.01 - Abstract of Bids - EISI (signed).pdf PDF
AMENDMENT_2_-_RFI_2_Responses_18_October_2019.pdf PDF
AMENDMENT_1_-_Solicitation_Document_W912DR19B0023.pdf PDF
ATCH_1_-_PROPOSAL_COVER_SHEET.pdf PDF
ATCH_3_-_EXPERIENCE_IN_RELEVANT_PROJECTS.pdf PDF
ATCH_5_-_CERTIFICATE_OF_CORPORATE_AUTHORITY.PDF PDF
ATCH_6_-_EFT_FORM.pdf PDF
Solicitation_Document_W912DR19B0023.pdf PDF
ATCH_4_-_STANDARD_FORM_LLL,_DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
ATCH_2_-_SOA_FORM.pdf PDF
SOA_Form.pdf PDF
DD_254_-_EISI.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: EISI RAVEN ROCK Review: EISI RAVEN ROCK (00001) (sorted by CommentID ) Displaying 18 inquiries.

Id Discipline Sheet Detail Spec

8193785 Construction Management

4.1.2 Submission

Requirements

4.1.2.1 Factor 1 - Experience in

Relevant Projects

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can you please reconsider the minimum completion value of $10 million for the relevant projects. My firm has completed several successful Vehicle Access Control Point projects for secure clients in the $5 to $10 million range, and one significant VACP for the DLA for $19 million. I believe our experience would be of value to you, however we are unable to submit if the minimum project value remains at $10 million.

On: Sep 19 2019.

Government Response. . The Government has considered the request to reconsider the minimum standards for projects to be considered relevant. Please see Amendment 1 to the solicitation. On: Oct 09

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8195586 General SF1442

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The solicitation states "This contract requires the firm to possess, at the time of the offer, at the time of award and duration of the contract, an active SECRET Facility Site Clearance". Please clarify is we need Secret Facility Site Clearance to submit the bid?

We are interested in bidding this job, will the current contracting initiate this secret security clearance, as we are aware that only contracting can initiate this process.

On: Sep 20 2019.

Government Response. . Yes, a firm bidding this work must possess an active SECRET Facility Site Clearance at time of bid, i.e. with STEP 1 bid submission. The USACE Contracting activity will not initiate the process as firms must possess at time of bid. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8200485 General N/A N/A Factor 2, 4.1.2.2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can the Government provide the drawings and specification and/or remove the requirement in Factor 2, 4.1.2.2 – Construction Approach for a Pre-Award Project Schedule? There is not enough information in the Phase 1 solicitation to provide a schedule as required in this section. The Section 01 00 00 – General Requirements do not provide the level of detail needed to develop a CMP schedule.

On: Sep 24 2019.

Government Response. . Please see Amendment 1 to the solicitation. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8201680 General N/A N/A N/A

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

1. Section 4.1.1 General of the RFP on page 11 states "The narrative must be a comprehensive, start-to-finish discussion of the significant features of this work that is the subject of this IFB. The narrative should address the assumptions and techniques to be used in this project and the various engineering disciplines involved (e.g., civil, electrical, geotechnical, environmental etc.), and any special items to be accomplished (i.e., LEED, Energy Savings, Life Safety, etc.). In no case shall words like "we will comply with the requirements of the contract," or equivalent statements, be acceptable to meet the requirements of this IFB. Failure to comply with these instructions may result

Page 1 of 5ProjNet: Logged In User

10/9/2019https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...

in the offeror's technical proposal being summarily rejected;" since this project has not been indicated as design-build and there are not any specifications or drawings to support the various engineering disciplines, please provide further instructions regarding the narratives to be provided.

On: Sep 25 2019.

Government Response. . Please see Amendment 1 to the solicitation. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8201681 General N/A N/A N/A

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

2. Section 4.1.3 Evaluation Criteria: 4.1.3.2 of the RFP on page 12 states "FACTOR 2 - CONSTRUCTION APPROACH: The Offeror's narrative will meet the minimum requirements of this solicitation if it demonstrates an acceptable approach to the project as defined in the plans and specs, takes all factors into account, and addresses the elements identified in paragraph 4.1.2.2. If the minimum requirements are met, the Offeror will receive an "Acceptable" rating;" however, the RFP documents did not include plans or specs. Please provide further documentation to support the requirements needed to respond to Factor 2 accurately.

On: Sep 25 2019.

Government Response. . Please see Amendment 1 to the solicitation. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8201682 General N/A N/A N/A

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 12 of the RFP requests the submission of a Pre-Award Project Schedule; however, the RFP documents did not include specifications and/or drawings to support an accurate draft of the project schedule. Please provide further documentation to support a thorough draft of the project schedule.

On: Sep 25 2019.

Government Response. . Please see Amendment 1 to the solicitation. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8201683 General N/A N/A N/A

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The RFP states that there is a 25-page maximum with 11x17 pages counting as 2 pages. Given that project schedules can vary in page numbers, please confirm that the entire project schedule can count as one page.

On: Sep 25 2019.

Government Response. . Please see Amendment 1 to the solicitation. Requirement to provide a project schedule has been deleted from IFB. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8201686 General N/A N/A N/A

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The RFP states that there is a 25-page maximum. Given that there will be multiple subcontractors assigned to this project, please confirm that the Key Subcontractor Commitment and Authorization Letters can be excluded from this page count.

On: Sep 25 2019.

Government Response. . Key subcontractor commitment and authorization letters can be excluded from the page count. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8201689 General N/A N/A N/A

Page 2 of 5ProjNet: Logged In User

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The RFP states that there is a 25-page maximum. Please exclude from the overall page count the following: Cover Letter, Cover Sheet, SF LLL, Certificate of Corporate Principal/Authority, Electronic Funds Transfer (EFT) Form, Teaming Agreements and Key Subcontractor Commitment and Authorization Letters.

On: Sep 25 2019.

Government Response. . The following: Cover Letter, Cover Sheet, SF LLL, Certificate of Corporate Principal/Authority, Electronic Funds Transfer (EFT) Form, Teaming Agreements and Key Subcontractor Commitment and Authorization Letters are excluded from the page count. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8203706 General 6-7 of 69 2.1 general Instructions

2.1.6 Format, Media, Contents, and List

of Tabs for the Technical Proposal

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Due to the limitation of only 25 pages please confirm that the SF1442, Security Clearance Memo, Proposal Cover Sheet (ATCH 1), Ownership Disclosure - Statement of Affiliation (ATCH 2), SF LLL and Instruction for Completion (ATCH 4), Certificate of Corporate Principal/Authority (ATCH 5), EFT Form (ATCH 6), Teaming Agreement(s), Key Sub-Contractor Commitment and Authorization Letter, and Pre-Ward Project Schedule do not count toward the page count.

On: Sep 26 2019.

Government Response. . See response to 8201689 and 8201686 On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8203711 General 1 of 69

13. Additional Solicitation

Requiremnets A

Comment Classification: UNCLASSIFIED (U)

Due to the significance of the outstanding RFIs we cannot start Factor 2. Please provide an additional 2 weeks after RFI responses are received to submit proposal.

On: Sep 26 2019.

Government Response. . The Government has considered the request for an extension to the closing date and time for submission of STEP 1 technical package. See amendment. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8203718 General 11 of 69

4.1.2 Submission

Requirements

4.1.2.1 Factor 1 - Experience in

Relevant Projects

Comment Classification: UNCLASSIFIED (U)

Factor 1 has specific relevant criteria to be met regarding ACPs and to provide 3 projects within the last 7 years means you had to be constructing these projects almost concurrently to meet the RFP requirement. This does not allow us to provide our best relevant projects. We request the time frame for completed projects be extended from 7 years to 10 years.

On: Sep 26 2019.

Government Response. . The Government has considered the request to adjust the magnitude and time frame for relevant projects. See amendment. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8203720 General 11 of 69

4.1.2 Submission

Requirements

4.1.2.1 Factor 1 - Experience in

Relevant Projects

Comment Classification: UNCLASSIFIED (U)

Can the Government change the requirement in Factor 1 for Experience in Relevant Project, minimum completion value of $10,000,000 to $ 9,000,000? Same reason I list for 2 why this RFI is no good. Ask: Factor 1 requires a minimum value of $10M for ACP specific projects. We have completed relevant VACP only projects for $2M. We

Page 3 of 5ProjNet: Logged In User assume the $10M includes both ACPs in the project. Please reconsider lowering the minimum value to $2M so that we can submit our best relevant projects.

On: Sep 26 2019.

Government Response. . The Government has considered the request to adjust the magnitude and time frame for relevant projects. See amendment. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8203725 General 12 of 69

4.1.2 Submission

Requirements

4.1.2.2 Factor 2 - Construction

Approach

Comment Classification: UNCLASSIFIED (U)

The RFP only provides a general scope of work for the project in Section 01 00 00 – General Requirements. This information does not provide any detailed project scope information to be able to accurately respond to Factor 2 items such as (1) Maintaining Security of the Site since no site plan is provided, (2) Material Delivery since no general requirement restrictions or site plan is provided, (3) Approach to Phased Construction to Keep the Existing ACP's Operational since no information is provided regarding the existing ACP and where the new ACP is going, (4) Provide Proposed Project Duration since we do not have the construction documents, and (5) Pre-Award Project Schedule since we do not have the construction documents to create the activities and durations from. These items are typically found in Step 2 of the solicitation. Please consider removing or providing the construction documents necessary to respond.

On: Sep 26 2019.

Government Response. . Please see amendment. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8204364 General 11 of 69

4.1.2 Submission

Requirements

4.1.2.1 Factor 1 - Experience in

Relevant Projects

Comment Classification: UNCLASSIFIED (U)

Can the Government confirm that PPQ's and/or CCASS/CPARS are not required for the three (3) completed projects within Experience in Relevant Projects?

On: Sep 27 2019.

Government Response. . PPQ's and/or CPARs are not required to be submitted in STEP 1. On: Oct 09

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8208789 Contracting RFP

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Factor 2 requires a discussion on phasing as well as requires a pre-award project schedule. These items are usually reserved for a Step 2 submission, especially if a contract specification is unavailable at the Step 1 stage. Is a specification available at this time? Or would the government consider removing these requirements from the Step 1 solicitation and placing them in the Step 2 response requirements? If a specification is available, would the government consider extending the proposal due date beyond the 14th of October in order to afford offerors closer to the usual 30 days from receipt of all contract document to the proposal due date?

On: Oct 01 2019.

Government Response. . Please see amendment On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8210084 General 11 of 69

4.1.2 Submission

Requirements

4.1.2.1 Factor 1 - Experience in

Relevant Projects

Comment Classification: UNCLASSIFIED (U)

Factor 1 requires a minimum value of $10M for ACP specific projects. We have completed relevant VACP only projects for $2M. We assume the $10M includes both ACPs in the project. Please reconsider lowering the minimum value to $2M so that we can submit our best relevant projects.

Page 4 of 5ProjNet: Logged In User

On: Oct 02 2019.

Government Response. . The Government has considered the request to adjust the magnitude and time frame for relevant projects. See amendment. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8210873 General 12 of 69

4.1.2 Submission

Requirements

4.1.2.2 Factor 2 - Construction

Approach

Comment Classification: UNCLASSIFIED (U)

Can the Government provide a definition and/or explanation of what is meant by "environmental closures" on this project?

On: Oct 03 2019.

Government Response. . Environmental closures will be provided in STEP 2. On: Oct 09 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY