A09_W912DR-15-T-0044.pdf

PDF 516 KB Posted

Attached to
Request for Janitorial Service for Multiple Locations in Pennsylvania
Solicitation number
W912DR-15-T-0044
Issued by

About this file

Solicitation W912DR-15-T-0044

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912DR-15-T-0044 26-Feb-2015

b. TELEPHONE NUMBER

410-962-0788

8. OFFER DUE DATE/LOCAL TIME

12:00 AM 12 Mar 2015

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912DR9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TAMARA C UDASCO

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

USACE, BALTIMORE

10 S. HOWARD ST.

ROOM 7000

BALTIMORE MD 21201

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: 410-962-2197 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

$18,000,000.00

NAICS:

561720

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF128

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 30 - BLOCK 14 CONTINUATION PAGE

INSTRUCTION TO OFFERORS

Quotes can be submitted via e-mail at tamara.c.udasco@usace.army.mil or via mail to U.S. Army Corps of Engineers, Contracting Division, Simplified Acquisition, ATTN: Tamara Udasco, 10 South Howard Street, 7th floor, Room 7000, Baltimore, MD 21201-2530.

All line items must be priced. Quotes providing partial pricing shall be considered non-responsive.

REQUIREMENTS FOR QUOTING ON JANITORIALS:

1. OFFEROR SHALL PROVIDE A QUOTE PER DAY, AS INDICATED ON THE QUOTE SHEET,

FOR EACH SERVICE ITEM OF THE “SCHEDULE OF JANITORIAL SERVICES AND

QUOTES”. PERCENTAGES (%) MAY NOT BE ACCEPTED.

2. OFFEROR SHALL PROVIDE A QUOTE FOR CMR REPORTING, IF YOU ARE QUOTING

$0.00 THEN YOU MUST ENTER $0.00 AS THE UNIT PRICE.

3. FAILURE TO ABIDE BY ITEMS 1-2 ABOVE WILL RESULT IN QUOTE BEING CONSIDERED

NON-RESPONSIVE AND INELIGBLE FOR AWARD.

Questions concerning this solicitation must be submitted by email no later than 5 March 2015 at 10:00AM (EST). Email: tamara.c.udasco@usace.army.mil

Site Visit - Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Each location can be located online and a site visit coordinated with the station commander. Please bring valid photo identification and a copy of a solicitation for verification purposes to the site visit.

PAST PERFORMANCE & QUESTIONS

PAST PERFORMANCE SUBMISSION: (See Attached Past Performance Questionnaire)

Submission Requirements: Past performance refers to the quality of recent project experience from the customer’s perspective. The Offeror shall arrange for the reference customer point of contact for two projects to fill out the Questionnaire and return to Tamara Udasco, Contract Specialist, e-mail at tamara.c.udasco@usace.army.mil. The questionnaires must be forwarded directly by the references. The Government will not release the questionnaire forms to the Offeror at any time, in order for the Government to solicit candid, unbiased responses and comments. Three References from previously completed jobs must be submitted and include a point of contact and phone numbers. These references must be relevant to the work which will be performed in this contract. Relevant work is defined as emergency notification services. References must be recent within the past 3 years.

Evaluation Criteria: The Government will assess the degree of success of Offeror’s recent, relevant past performance. Owners/references will be asked to comment on items such as , timeliness, management of subcontractor work, including timely payment to subs or suppliers, safety, relations between customer and contractor, level of support for such things as correcting errors. Any offeror who has demonstrated satisfactory past performance will be considered eligible for award. Any offeror who demonstrated unsatisfactory past performance will not be considered eligible for award. If the Government does not obtain past performance information for the projects identified by the offeror and cannot establish a past performance record for the offeror through other sources, or if the offeror has no past performance record and cannot tie significant, relevant experience of key personnel proposed for this project to cited experience, past performance will be evaluated neither favorably nor unfavorably

USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information

Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: Past performance refers to the quality of recent project experience from the customer’s perspective. The Offeror shall arrange for the reference customer point of contact for two projects to fill out the Questionnaire and return directly to Tamara Udasco, Contract Specialist, e-mail at tamara.c.udasco@usace.army.mil. The questionnaires must be forwarded directly by the references. The Government will not release the questionnaire forms to the Offeror at any time, in order for the Government to solicit candid, unbiased responses and comments. Two References from previously completed jobs must be submitted and include a point of contact and phone numbers. These references must be relevant to the work which will be performed in this contract. Relevant work is defined as emergency service notification. References must be recent within the past 3 years.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.

Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.

There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced E VG S M U N cost, improved maintainability or other factors that benefited the client

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

PRICING SCHEDULE

SCHEDULE OF JANITORIAL SERVICES (BASE YEAR LOCATION 1)

AND

REQUEST FOR QUOTE

(2185 & 2191 McDade Boulevard, Holmes, PA 19043)

(2564 S.F/ Tue/ Thurs)

1 APRIL 2015 – 31 MARCH 2016

Request for quotes for the janitorial services described in the Janitorial Performance Work Statement and outlined in the quote below. Janitorial Contractor shall provide necessary labor, equipment, and supplies required to perform services. All cleaning procedures and treatments shall be accomplished in accordance with the manufacturer's directions and/or listed specifications and industry standards applicable to the Professional Cleaning and Restoration Industry.

The following table of services should be used as a guide and quote form in obtaining janitorial services for recruiting facilities in compliance with above guidance:

SCHEDULE OF JANITORIAL SERVICES

Service Item Description Standard $

Dusting Upon each contracted visit (per PWS)

Dust all surfaces, including: chairs, desks, cabinets, furniture, window sills, mini-blinds, base-boards, woodwork, HVAC vents, light fixture lens, or any surface where dust may collect and is clearly visible to eye

Dry dusting may be sufficient 2 times per week, however minimum once a week a damp/ chemical treated cloth dusting is required

Per day

Vacuuming

Vacuum all carpets and hard surfaced floors, upholstered furniture, window sills, restroom facilities, entryways, common areas, and storage closets to remove all dust, debris, cob webs and visible particles including edges of carpets and baseboards and spot clean stains as needed with chemical cleaner

Vacuum with a beater brush/crevice hose type machine with a filtration system which minimizes airborne dust particles, (ideally a hepa filter vacuum)

Walk Off Mats visit (1,3 or 5 times per week)

Existing walk Off mats are an integral part of our maintenance system and should be placed at entrance, exits to prevent spread of soil and grime into facility and shall be vacuumed between replacement

Vacuum if carpeted, sweep/rinse if rubber

Per Day

Trash Removal

Empty all trash/waste baskets from all offices, commons and restrooms and remove all trash from the facility for pick up in dumpster or provided service at the facility

Provide and replace daily plastic trash can liners and wash out and scour all waste baskets once monthly for smell control

Restrooms

Disinfect all restroom fixtures with a chemical disinfectant, clean and disinfect all floors, toilets and sinks so no encrustation or water rings are present, includes common area water fountain

Clean with antibacterial disinfectant all hard surfaces, floors and fixtures and replace paper products, toilet supplies, soap etc. as needed

Common Area Vacuum carpeted areas and damp mop all All common areas must be $

Hallways Rooms

- Carpet Upon each contracted visit (1, 3 or 5 time week) ceramic tile, or vinyl tiles areas with an appropriate chemical cleaner.

cleaned to the same standards as production recruiting office space

Miscellaneous Cleaning Each contracted visit (per PWS)

Wash Windows (Once per month)

Includes removal of finger prints or smears on glass entrance doors in between window cleaning and surfaces that are highly noticeable including furniture or doors

Weather permitting (Per PWS)

Use damp cloth with cleaner to remove smears, fingerprints, etc….

Chemical clean all windows to streak-free as weather permits, includes wiping off sills inside and outside, being careful not to damage blinds and safety window films which may be present

Monthly

High Dusting/Cleaning (per PWS)

Performed annually per PWS Includes overhead piping, ceiling areas. All dust lint, litter and soil shall be removed from all surfaces. Walls shall be free of dirt, smudges and markings. Ceilings free of cobwebs and loose dirt.

Annually

Common Area

Vinyl Tile (where applicable)

Vinyl Tile floors require waxing buffed to high shine once a month

Buff and wax vinyl tiles floor ensuring that no wax buildup occurs. Must use appropriate cleaning material for vinyl flooring

Please place a check mark in the far right hand column by each item included in your quote.

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 0001 Base Year Location 1 Per the Above Service Items 12 MONTHS $___________ $___________ Listed

Please quote each item separately. Items listed, as two times per week are the normal cleaning items. If a cleaning day is missed these individual items will be deducted from the amount owed on contract for cleaning as liquidated damages. In the event of a no-show by the cleaning contractor the normal cleaning daily items may be deducted from any amounts due and owing under this contract

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 0002 Base Year Location 1 CMR Reporting 1 EACH $ __________ $ ___________ IAW – Performance Work Statement Section 14

Estimated Total Amount Base Year for Line Items 0001 & 0002 $_____________________

SCHEDULE OF JANITORIAL SERVICES (OPTION PERIOD1 LOCATION 1)

AND

REQUEST FOR QUOTE

(2185 & 2191 McDade Boulevard, Holmes, PA 19043)

(2564 S.F/ Tue/ Thurs)

1 APRIL 2016 – 31 MARCH 2017

Request for quotes for the janitorial services described in the Janitorial Performance Work Statement and outlined in the quote below. Janitorial Contractor shall provide necessary labor, equipment, and supplies required to perform services. All cleaning procedures and treatments shall be accomplished in accordance with the manufacturer's directions and/or listed specifications and industry standards applicable to the Professional Cleaning and Restoration Industry.

Service Item Description Standard $ mini-blinds, base-boards, woodwork, HVAC vents, light fixture lens, or any surface where dust may collect and is clearly visible to eye

Dry dusting may be sufficient 2 times per week, however minimum once a week a damp/ chemical treated cloth dusting is required sills, restroom facilities, entryways, common areas, and storage closets to remove all dust, debris, cob webs and visible particles including edges of carpets and baseboards and spot clean stains as needed with chemical cleaner

Vacuum with a beater brush/crevice hose type machine with a filtration system which minimizes airborne dust particles, (ideally a hepa filter vacuum) visit (1,3 or 5 times per week)

Existing walk Off mats are an integral part of our maintenance system and should be placed at entrance, exits to prevent spread of soil and grime into facility and shall be vacuumed between replacement

Vacuum if carpeted, sweep/rinse if rubber remove all trash from the facility for pick up in dumpster or provided service at the facility

Provide and replace daily plastic trash can liners and wash out and scour all waste baskets once monthly for smell control all floors, toilets and sinks so no encrustation or water rings are present, includes common area water fountain

Clean with antibacterial disinfectant all hard surfaces, floors and fixtures and replace paper products, toilet supplies, soap etc. as needed

Hallways Rooms

- Carpet Upon each contracted visit (1, 3 or 5 time week)

Vacuum carpeted areas and damp mop all ceramic tile, or vinyl tiles areas with an appropriate chemical cleaner.

All common areas must be cleaned to the same standards as production recruiting office space

Cleaning Each contracted visit (per PWS) between window cleaning and surfaces

Weather permitting (per PWS) weather permits, includes wiping off sills inside and outside, being careful not to damage blinds and safety window films which may be present

Dusting/Cleaning – (per PWS)

Performed annually per the PWS Includes overhead piping, ceiling areas. All dust lint, litter and soil shall be removed from all surfaces. Walls shall be free of dirt, smudges and markings. Ceilings free of cobwebs and loose dirt.

Vinyl Tile (where applicable)

Vinyl Tile floors require waxing buffed to high shine once a month

Buff and wax vinyl tiles floor ensuring that no wax buildup occurs. Must use appropriate cleaning material for vinyl flooring

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 1003 Option Period 1 Location 1 Per the Above Service Items 12 MONTHS $___________ $___________ Listed

Please quote each item separately. Items listed, as two times per week are the normal cleaning items. If a cleaning day is missed these individual items will be deducted from the amount owed on contract for cleaning as liquidated damages. In the event of a no-show by the cleaning contractor the normal cleaning daily items may be deducted from any amounts due and owing under this contract

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 1004 Option Period 1 Location 1 CMR Reporting 1 EACH $ __________ $ ___________

Estimated Total Amount Option Period 1 Line Items 1001 & 1002 $_____________________

SCHEDULE OF JANITORIAL SERVICES (BASE YEAR LOCATION 2)

REQUEST FOR QUOTE

(2060 County Line Road, Suite 20, Huntingdon Valley, PA 19006) (2755 S.F/ Tue/ Thurs)

Request for quotes for the janitorial services described in the Janitorial Performance Work Statement and outlined in the quote below. Janitorial Contractor shall provide necessary labor, equipment, and supplies required to perform services. All cleaning procedures and treatments shall be accomplished in accordance with the manufacturer's directions and/or listed specifications and industry standards applicable to the Professional Cleaning and Restoration Industry.

Service Item Description Standard $ mini-blinds, base-boards, woodwork, HVAC vents, light fixture lens, or any surface where dust may collect and is clearly visible to eye

Dry dusting may be sufficient 2 times per week, however minimum once a week a damp/ chemical treated cloth dusting is required sills, restroom facilities, entryways, common areas, and storage closets to remove all dust, debris, cob webs and visible particles including edges of carpets and baseboards and spot clean stains as needed with chemical cleaner

Vacuum with a beater brush/crevice hose type machine with a filtration system which minimizes airborne dust particles, (ideally a hepa filter vacuum) visit (1,3 or 5 times per week)

Existing walk Off mats are an integral part of our maintenance system and should be placed at entrance, exits to prevent spread of soil and grime into facility and shall be vacuumed between replacement

Vacuum if carpeted, sweep/rinse if rubber remove all trash from the facility for pick up in dumpster or provided service at the facility

Provide and replace daily plastic trash can liners and wash out and scour all waste baskets once monthly for smell control all floors, toilets and sinks so no encrustation or water rings are present, includes common area water fountain

Clean with antibacterial disinfectant all hard surfaces, floors and fixtures and replace paper products, toilet supplies, soap etc. as needed

- Carpet Upon each contracted

Vacuum carpeted areas and damp mop all ceramic tile, or vinyl tiles areas with an appropriate chemical cleaner.

All common areas must be cleaned to the same standards as production recruiting office space visit (1, 3 or 5 time week)

Miscellaneous Cleaning Each contracted visit (per PWS) between window cleaning and surfaces weather permits, includes wiping off sills inside and outside, being careful not to damage blinds and safety window films which may be present

(per PWS)

Performed annually per PWS Includes overhead piping, ceiling areas. All dust lint, litter and soil shall be removed from all surfaces. Walls shall be free of dirt, smudges and markings. Ceilings free of cobwebs and loose dirt.

Vinyl Tile (where applicable)

Vinyl Tile floors require waxing buffed to high shine once a month

Buff and wax vinyl tiles floor ensuring that no wax buildup occurs. Must use appropriate cleaning material for vinyl flooring

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 0003 Base Year Location 2 Per the Above Service Items 12 MONTHS $___________ $___________ Listed

Please quote each item separately. Items listed, as two times per week are the normal cleaning items. If a cleaning day is missed these individual items will be deducted from the amount owed on contract for cleaning as liquidated damages. In the event of a no-show by the cleaning contractor the normal cleaning daily items may be deducted from any amounts due and owing under this contract

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 0004 Base Year Location 2 CMR Reporting 1 EACH $ __________ $ ___________

Estimated Total Amount Base Year for Line Items 0003 & 0004 $_____________________

SCHEDULE OF JANITORIAL SERVICES (OPTION PERIOD 1 LOCATION 2)

REQUEST FOR QUOTE

(2060 County Line Road, Suite 20, Huntingdon Valley, PA 19006)

(2755 S.F/ Tue/ Thurs)

Request for quotes for the janitorial services described in the Janitorial Performance Work Statement and outlined in the quote below. Janitorial Contractor shall provide necessary labor, equipment, and supplies required to perform services. All cleaning procedures and treatments shall be accomplished in accordance with the manufacturer's directions and/or listed specifications and industry standards applicable to the Professional Cleaning and Restoration Industry.

Service Item Description Standard $ mini-blinds, base-boards, woodwork, HVAC vents, light fixture lens, or any surface where dust may collect and is clearly visible to eye

Dry dusting may be sufficient 2 times per week, however minimum once a week a damp/ chemical treated cloth dusting is required sills, restroom facilities, entryways, common areas, and storage closets to remove all dust, debris, cob webs and visible particles including edges of carpets and baseboards and spot clean stains as needed with chemical cleaner

Vacuum with a beater brush/crevice hose type machine with a filtration system which minimizes airborne dust particles, (ideally a hepa filter vacuum) visit (1,3 or 5 times per week)

Existing walk Off mats are an integral part of our maintenance system and should be placed at entrance, exits to prevent spread of soil and grime into facility and shall be vacuumed between replacement

Vacuum if carpeted, sweep/rinse if rubber remove all trash from the facility for pick up in dumpster or provided service at the facility

Provide and replace daily plastic trash can liners and wash out and scour all waste baskets once monthly for smell control all floors, toilets and sinks so no encrustation or water rings are present, includes common area water fountain

Clean with antibacterial disinfectant all hard surfaces, floors and fixtures and replace paper products, toilet supplies, soap etc. as needed

Common Area Vacuum carpeted areas and damp mop all ceramic tile, or vinyl tiles areas with an

All common areas must be cleaned to the same

Upon each contracted visit (1, 3 or 5 time week) appropriate chemical cleaner. standards as production

Cleaning between window cleaning and surfaces weather permits, includes wiping off sills inside and outside, being careful not to damage blinds and safety window films which may be present

(per PWS)

Performed annually per the PWS Includes overhead piping, ceiling areas. All dust lint, litter and soil shall be removed from all surfaces. Walls shall be free of dirt, smudges and markings. Ceilings free of cobwebs and loose dirt.

Vinyl Tile (where applicable)

Vinyl Tile floors require waxing buffed to high shine once a month

Buff and wax vinyl tiles floor ensuring that no wax buildup occurs. Must use appropriate cleaning material for vinyl flooring

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 1003 Option Period 1 Location 2 Per the Above Service Items 12 MONTHS $___________ $___________ Listed

Please quote each item separately. Items listed, as two times per week are the normal cleaning items. If a cleaning day is missed these individual items will be deducted from the amount owed on contract for cleaning as liquidated damages. In the event of a no-show by the cleaning contractor the normal cleaning daily items may be

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 1004 Option Period 1 Location 2 CMR Reporting 1 EACH $ __________ $ ___________

Estimated Total Amount Option Period 1 Line Items 1003 & 1004 $_____________________

SCHEDULE OF JANITORIAL SERVICES (BASE YEAR LOCATION 3)

REQUEST FOR QUOTES

(Roosevelt Mall, 2383 Cottman Avenue, Philadelphia, PA 19149) (2793 S.F/ Tue/ Thurs)

Request for quotes for the janitorial services described in the Janitorial Performance Work Statement and outlined in the quote below. Janitorial Contractor shall provide necessary labor, equipment, and supplies required to perform services. All cleaning procedures and treatments shall be accomplished in accordance with the manufacturer's directions and/or listed specifications and industry standards applicable to the Professional Cleaning and Restoration Industry.

Service Item Description Standard $ mini-blinds, base-boards, woodwork, HVAC vents, light fixture lens, or any surface where dust may collect and is clearly visible to eye

Dry dusting may be sufficient 2 times per week, however minimum once a week a damp/ chemical treated cloth dusting is required sills, restroom facilities, entryways, common areas, and storage closets to remove all dust, debris, cob webs and visible particles including edges of carpets and baseboards and spot clean stains as needed with chemical cleaner

Vacuum with a beater brush/crevice hose type machine with a filtration system which minimizes airborne dust particles, (ideally a hepa filter vacuum) visit (1,3 or 5 times per week)

Existing walk Off mats are an integral part of our maintenance system and should be placed at entrance, exits to prevent spread of soil and grime into facility and shall be vacuumed between replacement

Vacuum if carpeted, sweep/rinse if rubber remove all trash from the facility for pick up in dumpster or provided service at the facility

Provide and replace daily plastic trash can liners and wash out and scour all waste baskets once monthly for smell control all floors, toilets and sinks so no encrustation or water rings are present, includes common area water fountain

Clean with antibacterial disinfectant all hard surfaces, floors and fixtures and replace paper products, toilet supplies, soap etc. as needed

- Carpet Upon each contracted

Vacuum carpeted areas and damp mop all ceramic tile, or vinyl tiles areas with an appropriate chemical cleaner.

All common areas must be cleaned to the same standards as production recruiting office space

Miscellaneous Cleaning Each contracted visit (per PWS) between window cleaning and surfaces weather permits, includes wiping off sills inside and outside, being careful not to damage blinds and safety window films which may be present

(per PWS)

Performed annually per PWS Includes overhead piping, ceiling areas. All dust lint, litter and soil shall be removed from all surfaces. Walls shall be free of dirt, smudges and markings. Ceilings free of cobwebs and loose dirt.

Vinyl Tile (where applicable)

Vinyl Tile floors require waxing buffed to high shine once a month

Buff and wax vinyl tiles floor ensuring that no wax buildup occurs. Must use appropriate cleaning material for vinyl flooring

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 0005 Base Year Location 3 Per the Above Service Items 12 MONTHS $___________ $___________ Listed

Please quote each item separately. Items listed, as two times per week are the normal cleaning items. If a cleaning day is missed these individual items will be deducted from the amount owed on contract for cleaning as liquidated damages. In the event of a no-show by the cleaning contractor the normal cleaning daily items may be deducted from any amounts due and owing under this contract

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 0006 Base Year Location 3 CMR Reporting 1 EACH $ __________ $ ___________

Estimated Total Amount Base Year for Line Items 0005 & 0006 $_____________________

SCHEDULE OF JANITORIAL SERVICES (OPTION PERIOD 1 LOCATION 3)

REQUEST FOR QUOTES

(Roosevelt Mall, 2383 Cottman Avenue, Philadelphia, PA 19149)

(2793 S.F/ Tue/ Thurs)

Request for quotes for the janitorial services described in the Janitorial Performance Work Statement and outlined in the quote below. Janitorial Contractor shall provide necessary labor, equipment, and supplies required to perform services. All cleaning procedures and treatments shall be accomplished in accordance with the manufacturer's directions and/or listed specifications and industry standards applicable to the Professional Cleaning and Restoration Industry.

Service Item Description Standard $ mini-blinds, base-boards, woodwork, HVAC vents, light fixture lens, or any surface where dust may collect and is clearly visible to eye

Dry dusting may be sufficient 2 times per week, however minimum once a week a damp/ chemical treated cloth dusting is required sills, restroom facilities, entryways, common areas, and storage closets to remove all dust, debris, cob webs and visible particles including edges of carpets and baseboards and spot clean stains as needed with chemical cleaner

Vacuum with a beater brush/crevice hose type machine with a filtration system which minimizes airborne dust particles, (ideally a hepa filter vacuum) visit (1,3 or 5 times per week)

Existing walk Off mats are an integral part of our maintenance system and should be placed at entrance, exits to prevent spread of soil and grime into facility and shall be vacuumed between replacement

Vacuum if carpeted, sweep/rinse if rubber remove all trash from the facility for pick up in dumpster or provided service at the facility

Provide and replace daily plastic trash can liners and wash out and scour all waste baskets once monthly for smell control all floors, toilets and sinks so no encrustation or water rings are present, includes common area water fountain

Clean with antibacterial disinfectant all hard surfaces, floors and fixtures and replace paper products, toilet supplies, soap etc. as needed

- Carpet Upon each contracted visit (1, 3 or 5 time

Vacuum carpeted areas and damp mop all ceramic tile, or vinyl tiles areas with an appropriate chemical cleaner.

All common areas must be cleaned to the same standards as production recruiting office space

Cleaning between window cleaning and surfaces weather permits, includes wiping off sills inside and outside, being careful not to damage blinds and safety window films which may be present

(per PWS)

Performed annually per the PWS Includes overhead piping, ceiling areas. All dust lint, litter and soil shall be removed from all surfaces. Walls shall be free of dirt, smudges and markings. Ceilings free of cobwebs and loose dirt.

Vinyl Tile (where applicable)

Vinyl Tile floors require waxing buffed to high shine once a month

Buff and wax vinyl tiles floor ensuring that no wax buildup occurs. Must use appropriate cleaning material for vinyl flooring

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 1005 Option Period 1 Location 3 Per the Above Service Items 12 MONTHS $___________ $___________ Listed

Please quote each item separately. Items listed, as two times per week are the normal cleaning items. If a cleaning day is missed these individual items will be deducted from the amount owed on contract for cleaning as liquidated damages. In the event of a no-show by the cleaning contractor the normal cleaning daily items may be

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 1006 Option Period 1 Location 3 CMR Reporting 1 EACH $ __________ $ ___________

Estimated Total Amount Option Period 1 Line Items 1005 & 1006 $_____________________

SCHEDULE OF JANITORIAL SERVICES (BASE YEAR LOCATION 4)

REQUEST FOR QUOTES

(31 North York Road, Hatboro, PA 19040) (1080 S.F/ Tue/ Thurs)

Request for quotes for the janitorial services described in the Janitorial Performance Work Statement and outlined in the quote below. Janitorial Contractor shall provide necessary labor, equipment, and supplies required to perform services. All cleaning procedures and treatments shall be accomplished in accordance with the manufacturer's directions and/or listed specifications and industry standards applicable to the Professional Cleaning and Restoration Industry.

Service Item Description Standard $ mini-blinds, base-boards, woodwork, HVAC vents, light fixture lens, or any surface where dust may collect and is clearly visible to eye

Dry dusting may be sufficient 2 times per week, however minimum once a week a damp/ chemical treated cloth dusting is required sills, restroom facilities, entryways, common areas, and storage closets to remove all dust, debris, cob webs and visible particles including edges of carpets and baseboards and spot clean stains as needed with chemical cleaner

Vacuum with a beater brush/crevice hose type machine with a filtration system which minimizes airborne dust particles, (ideally a hepa filter vacuum) visit (1,3 or 5 times per week)

Existing walk Off mats are an integral part of our maintenance system and should be placed at entrance, exits to prevent spread of soil and grime into facility and shall be vacuumed between replacement

Vacuum if carpeted, sweep/rinse if rubber remove all trash from the facility for pick up in dumpster or provided service at the facility

Provide and replace daily plastic trash can liners and wash out and scour all waste baskets once monthly for smell control all floors, toilets and sinks so no encrustation or water rings are present, includes common area water fountain

Clean with antibacterial disinfectant all hard surfaces, floors and fixtures and replace paper products, toilet supplies, soap etc. as needed

- Carpet Upon each contracted

Vacuum carpeted areas and damp mop all ceramic tile, or vinyl tiles areas with an appropriate chemical cleaner.

All common areas must be cleaned to the same standards as production recruiting office space

Miscellaneous Cleaning Each contracted visit (per PWS) between window cleaning and surfaces weather permits, includes wiping off sills inside and outside, being careful not to damage blinds and safety window films which may be present

(per PWS)

Performed annually per PWS Includes overhead piping, ceiling areas. All dust lint, litter and soil shall be removed from all surfaces. Walls shall be free of dirt, smudges and markings. Ceilings free of cobwebs and loose dirt.

Vinyl Tile (where applicable)

Vinyl Tile floors require waxing buffed to high shine once a month

Buff and wax vinyl tiles floor ensuring that no wax buildup occurs. Must use appropriate cleaning material for vinyl flooring

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 0007 Base Year Location 4 Per the Above Service Items 12 MONTHS $___________ $___________ Listed

Please quote each item separately. Items listed, as two times per week are the normal cleaning items. If a cleaning day is missed these individual items will be deducted from the amount owed on contract for cleaning as liquidated damages. In the event of a no-show by the cleaning contractor the normal cleaning daily items may be deducted from any amounts due and owing under this contract

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 0008 Base Year Location 4 CMR Reporting 1 EACH $ __________ $ ___________

Estimated Total Amount Base Year for Line Items 0007 & 0008 $_____________________

SCHEDULE OF JANITORIAL SERVICES (OPTION PERIOD 1 LOCATION 4)

REQUEST FOR QUOTE

(31 North York Road, Hatboro, PA 19040)

(1080 S.F/ Tue/ Thurs)

Request for quotes for the janitorial services described in the Janitorial Performance Work Statement and outlined in the quote below. Janitorial Contractor shall provide necessary labor, equipment, and supplies required to perform services. All cleaning procedures and treatments shall be accomplished in accordance with the manufacturer's directions and/or listed specifications and industry standards applicable to the Professional Cleaning and Restoration Industry.

Service Item Description Standard $ mini-blinds, base-boards, woodwork, HVAC vents, light fixture lens, or any surface where dust may collect and is clearly visible to eye

Dry dusting may be sufficient 2 times per week, however minimum once a week a damp/ chemical treated cloth dusting is required sills, restroom facilities, entryways, common areas, and storage closets to remove all dust, debris, cob webs and visible particles including edges of carpets and baseboards and spot clean stains as needed with chemical cleaner

Vacuum with a beater brush/crevice hose type machine with a filtration system which minimizes airborne dust particles, (ideally a hepa filter vacuum) visit (1,3 or 5 times per week)

Existing walk Off mats are an integral part of our maintenance system and should be placed at entrance, exits to prevent spread of soil and grime into facility and shall be vacuumed between replacement

Vacuum if carpeted, sweep/rinse if rubber remove all trash from the facility for pick up in dumpster or provided service at the facility

Provide and replace daily plastic trash can liners and wash out and scour all waste baskets once monthly for smell control all floors, toilets and sinks so no encrustation or water rings are present, includes common area water fountain

Clean with antibacterial disinfectant all hard surfaces, floors and fixtures and replace paper products, toilet supplies, soap etc. as needed

Common Area Vacuum carpeted areas and damp mop all ceramic tile, or vinyl tiles areas with an

All common areas must be cleaned to the same

Upon each contracted visit (1, 3 or 5 time week) appropriate chemical cleaner. standards as production

Cleaning between window cleaning and surfaces weather permits, includes wiping off sills inside and outside, being careful not to damage blinds and safety window films which may be present

(per PWS)

Performed annually per the PWS Includes overhead piping, ceiling areas. All dust lint, litter and soil shall be removed from all surfaces. Walls shall be free of dirt, smudges and markings. Ceilings free of cobwebs and loose dirt.

Vinyl Tile (where applicable)

Vinyl Tile floors require waxing buffed to high shine once a month

Buff and wax vinyl tiles floor ensuring that no wax buildup occurs. Must use appropriate cleaning material for vinyl flooring

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 1007 Option Period 1 Location 4 Per the Above Service Items 12 MONTHS $___________ $___________ Listed

Please quote each item separately. Items listed, as two times per week are the normal cleaning items. If a cleaning day is missed these individual items will be deducted from the amount owed on contract for cleaning as liquidated damages. In the event of a no-show by the cleaning contractor the normal cleaning daily items may be

SUPPLIES/SERVICES EST. QUANTITY UNIT UNIT PRICE AMOUNT

Line Item 1008 Option Period 1 Location 4 CMR Reporting 1 EACH $ __________ $ ___________

Estimated Total Amount Option Period 1 Line Items 1007 & 1008 $_____________________

SCHEDULE OF JANITORIAL SERVICES (BASE YEAR LOCATION 5)

REQUEST FOR QUOTE

(1600 North Broad Street, Unit 3, Philadelphia, PA 19121) (3427 S.F/ Mon/ Wed/ Fri)

Request for quotes for the janitorial services described in the Janitorial Performance Work Statement and outlined in the quote below. Janitorial Contractor shall provide necessary labor, equipment, and supplies required to perform services. All cleaning procedures and treatments shall be accomplished in accordance with the manufacturer's directions and/or listed specifications and industry standards applicable to the Professional Cleaning and Restoration Industry.

Service Item Description Standard $ mini-blinds, base-boards, woodwork, HVAC vents, light fixture lens, or any surface where dust may collect and is clearly visible to eye

Dry dusting may be sufficient 2 times per week, however minimum once a week a damp/ chemical treated cloth dusting is required sills, restroom facilities, entryways, common areas, and storage closets to remove all dust, debris, cob webs and visible particles including edges of carpets and baseboards and spot clean stains as needed with chemical cleaner

Vacuum with a beater brush/crevice hose type machine with a filtration system which minimizes airborne dust particles, (ideally a hepa filter vacuum) visit (1,3 or 5 times per week)

Existing walk Off mats are an integral part of our maintenance system and should be placed at entrance, exits to prevent spread of soil and grime into facility and shall be vacuumed between replacement

Vacuum if carpeted, sweep/rinse if rubber remove all trash from the facility for pick up in dumpster or provided service at the facility

Provide and replace daily plastic trash can liners and wash out and scour all waste baskets once monthly for smell control all floors, toilets and sinks so no encrustation or water rings are present, includes common area water fountain

Clean with antibacterial disinfectant all hard surfaces, floors and fixtures and replace paper products, toilet supplies, soap etc. as needed

- Carpet Upon each contracted

Vacuum carpeted areas…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .