W912DQ19R4008
US Army Corps of Engineers Kansas City District Building Strong
DLA Y Yard Storm Sewer & Paving Fort Riley, Kansas
PN: 473048
8A Competitive restricted to SBA Region VII Kansas, Missouri, Iowa & Nebraska
Solicitation & Construction Specifications
January 2019
This page was intentionally left blank for duplex printing.
TC-1
DEPARTMENT OF THE ARMY
Kansas City District, Corps of Engineers
647 Federal Building Kansas City, Missouri 64106
SPECIFICATIONS FOR CONSTRUCTION OF
DLA Y YARD STORM SEWER AND PAVING
FORT RILEY, KANSAS
TABLE OF CONTENTS
COVER
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
Section Title
00 10 00 SOLICITATION
00 21 00 INSTRUCTIONS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 GENERAL CONDITIONS
00 73 00 SUPPLEMENTARY CONDITIONS
DIVISION 1 – GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 16.01 23 PROGRESS CHART
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCE FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 10.00 23 GEOSPATIAL DELIVERABLES CREATED AS PART OF MILITARY
CONSTRUCTION PROJECTS
01 78 23 OPERATIONS AND MAINTENANCE DATA
DIVISIONS 2 – EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISIONS 03 – CAST-IN-PLACE CONCRETE
W912DQ-18-R-00XX
TABLE OF CONTENTS
(Continued)
TC-2
03 30 00.00 10 CAST-IN-PLACE CONCRETE
DIVISIONS 31 – EARTHWORK
31 00 00 EARTHWORK
DIVISIONS 32 – EXTER IOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS
32 11 10 DRAINAGE LAYER
32 11 16.01 SUBBASE COURSE/SEPARATION LAYER
32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 13 BBITUMINOUSE TACK COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.03 CONCRETE PAVEMENTS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 24.00 10 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISIONS 33 – UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
DLA Yard Pavement and Storm Sew er Repalcement at Fort Riley, KS
The United States Army Corps of Engineers requires repalcement of sew er lines and sew er structures and asphalt repavement at the DLA
Yard on Fort Riley, KS.
This requirement is an 8(a) Competitive basis restricted to SBA Region VII Kansas, Missouri, Iow a and Nebraska.
The Request for Proposal (RFP) w ill result in the aw ard of a single Design-Bid-Build Firm-Fixed Price Construction Contract.
The North American Industry Classif ication (NAICS) Code is 237110 w ith a small business size standard of #36.5 Million Dollars.
The magnitude of this project is betw een $1 Million to $5 Million Dollars.
CAROL W HODGES 816-389-3732
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
29-Jan-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________28 Feb 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE, KANSAS CITY +
FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST
KANSAS CITY MO 64106-2896
W912DQ
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
816-389-2030FAX:TEL: 816-389-3976 TEL: FAX:
W912DQ19R4008 75
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Replace Concrete Pad and Fence
FFP
Includes all costs related to demolish existing concrete parking area and mow strip in accordance with the contract documents.
FOB: Destination
NET AMT
0002 1 Job Replace Aggregate Lot with Asphalt
FFP
Includes all costs related to pave the yard area with asphalt in accordance with the contract documents
0003 1 Job Storm Sewer System
FFP
Includes all costs related to install a new storm drainage system in accordance with the contract documents
0004 1 Job Contractor Manpower Reporting
FFP
Contractor Manpower Reporting is required. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Army via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/ Reporting inputs will be for the labor executed during the period of performance during each
Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at: http://www.ecmra.mil.
0005 1 Job OPTION Replace Aggregate Lot with Concrete- Opt
FFP
Includes all costs related to pave the yard area with concrete minus the cost to pave with asphalt in accordance with the contract documents.
CLAUSES INCORPORATED BY FULL TEXT
SCR_CT_002 FIELD OFFICE OVERHEAD (JUL 2002)(RFP)
NOTICE TO OFFERORS: you must declare below the single accounting practice that you apply to contracts to calculate field office overhead for all change orders, modifications and requests for equitable adjustment. Pursuant to
Federal Acquisition Regulations (FAR) Parts 31.105(d)(3) and 31.203(d)(1), an accounting practice that varies from modification to modification is not allowable. Select one of the following:
1. TIME DISTRIBUTION BASE FOR A PER DIEM RATE
If you use this practice, see Special Clause “Field Office
Overhead Per Diem Rate” _____
2. DIRECT COST DISTRIBUTION BASE FOR A PERCENTAGE MARKUP
If you use this practice, see Special Clause “Field Office
Overhead Percentage Markup” _____
3. OTHER ACCOUNTING PRACTICE THAT IS ALLOWABLE _____
UNDER THE FAR AND THAT USES A SINGLE DISTRIBUTION BASE.
If you choose 3, you must describe the accounting practice in sufficient detail below to allow the contracting officer to determine what accounting practice is being utilized by your company and that it complies with the FAR.
FAILURE TO FULLY COMPLY WITH THE ABOVE REQUIREMENT OR, IF ALTERNATIVE 3 IS
DECLARED AND YOUR DESCRIPTION DOES NOT CLEARLY STATE OR DESCRIBE A CONSISTENT
ACCOUNTING PRACTICE USING A SINGLE DISTRIBUTION BASE, MAY CAUSE YOUR PROPOSAL
TO BE EVALUTED AS UNACCEPTABLE.
(End)
SCR_CT_007 MAGNITUDE OF PROJECT—CONSTRUCTION (Jul 2002)
The magnitude of this project is represented by the following estimated price range (contracting officer mark as appropriate):
X Between $1,000,000 and $5,000,000
TPL_NWK_001 Points of Contact
CONTRACT
SPECIALIST:
Carol Hodges PHONE: 816-389-3732 E-MAIL: Carol.w.Hodges@usace.army.
mil
PROJECT
MANAGER:
Mark Rush PHONE: 816-389-3077 E-MAIL: Mark.a.Rush@usace.army.mil
TPL_NWK_002 PROPOSALS TO BECOME PART OF THE CONTRACT
1. When an offeror submits its proposal in response to a Request For Proposals, and a staffing plan including the names and qualifications of key personnel who are proposed to work on the project is required to be submitted, those personnel who are offered will be the same personnel who will actually perform on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute personnel for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the
Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute employee. The Contracting Officer shall have the right to review the qualifications of the proposed substitute employee and to approve or disapprove his or her qualifications. If the proposed substitute employee's qualifications are disapproved by the Contracting Officer, the contractor will propose another employee who does possess equivalent qualifications.
2. When an offeror submits its proposal in response to a Request For Proposals, and the name of a specific subcontractor is a required submittal, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.
3. When an offeror submits its proposal in response to a Request For Proposals, and a schedule for the performance of the work on the project is a required submittal, the terms of the proposed schedule will become the schedule that will be utilized for completion of the project, adjusted as necessary to reflect the actual issue date of the Notice to
Proceed mailto:Carol.w.Hodges@usace.army.mil mailto:Carol.w.Hodges@usace.army.mil
4. When an offeror submits its proposal in response to a Request For Proposals and that proposal contains any work, materials, methods or other type of betterment that provides an advantage to the Government that is above the minimum requirements contained in the RFP, the terms of the proposal will be the basis for evaluation and, if successful, will become the terms of the contract upon award. If a change in one of those terms is made to one that is less favorable to the Government than the one on which the award of the contract was based, a credit to the
Government will be negotiated by the contractor. Only the Contracting Officer has the authority to negotiate a waiver of the terms of the contract.
Section 00 21 00 - Instructions
PROPOSAL SUBMISSION
APPENDIX C
RFP SECTION 00 21 00: PROPOSAL SUBMISSION REQUIREMENTS,
EVALUATION FACTORS, AND BASIS OF AWARD
1.0 GENERAL PROPOSAL INFORMATION
The proposal should be prepared simply and economically, providing straightforward, concise delineation of capabilities to perform the contract. The proposal should be practical, legible, clear and coherent.
The technical proposal shall address the offeror’s proposed approach to fully perform the requirements of the Request for Proposal (RFP). Offerors are discouraged from providing information not required by the RFP.
2.0 GENERAL PROPOSAL SUBMISSION INSTRUCTIONS
All offerors shall be required to submit a proposal with the minimum content as specified herein.
Proposals without the minimum content may be rejected. Proposals will be received until the date and time indicated on Standard Form 1442 at the following address:
U.S. Army Corps of Engineers, Kansas City District
Federal Building Room 647
ATTN: CECT-NWK-M/Carol Hodges
601 East 12th Street
Kansas City, Missouri 64106-2896
3.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS
1. In order to be considered for award of a contract for the requirements of this solicitation, the offeror must submit a proposal with its offer. Failure to submit a complete proposal may result in the entire offer being rejected. The proposals shall be submitted in Volumes as follows:
Submit the proposal in a tabbed, three-ring binder identified by the Solicitation Number
(W912DQ19R4008), project title (DLA Y Yard, Fort Riley, Kansas), name, address, and telephone number of the offeror(s). Arrange tabs as follows:
(1) Volume 1, Technical Proposal (Tabs A and B):
TAB A, FACTOR 1 Corporate Experience
TAB B, FACTOR 2 Performance Confidence
(2) Volume 2, Price Proposal, (Tab A), consists of an original signed Standard Form 1442
“Solicitation, Offer, and Award,” providing a price for all line items in the corresponding bid schedule and acknowledgment of all amendments to the solicitation.
2. Proposal Characteristics
a) Submit original and three copies of the proposal. Electronic copies shall also be provided on one CD/DVD in PDF format. The CD/DVD should be in PDF format and be *Optical
Character Recognition (OCR) compatible. All text must be legible and easily read. Each
Volume shall contain a table of contents and all pages of each factor shall be sequentially numbered.
The page size of the offeror’s proposal shall not exceed 8-1/2 by 11 inches. Diagrams, charts and tables shall conform to the paper size. All text shall be typed single-spaced.
Font size no smaller than 10. Margins (1-inch) shall be clean and clear (headers and page numbers may be in the margins). If fold-out charts are unavoidable, and are to be utilized, all sheets shall be reproduced on 11 by 17 inch, and folded to 8-1/2 by 11 inch size. Submit the SF 1442, completed and signed by a person authorized by the offeror.
*OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to-speech, key data extraction and text mining.
b) Each Volume of the proposal shall be identified by the Solicitation Number
W912DQ19R4008, project title DLA Y Yard, Fort Riley, Kansas, name, address, and telephone number of the offeror, and the following on the volume in bold letters:
VOLUME 1: TECHNICAL PROPOSAL (Original & 3 Copies) (1 CD/DVD)
VOLUME 2: PRICE PROPOSAL (Original & 1 Copy) (1 CD/DVD)
c) The Proposal’s clarity, organization and cross referencing are mandatory. No material shall be incorporated by reference. General cross-references or cross referencing guides will not be considered appropriate cross-references.
3. Additional Information to be provided:
Pro Forma Requirements to be provided in Volume 2: This information should be submitted in an envelope labeled “Pro Forma Requirements”. Electronic copies shall also be provided on one CD/DVD in PDF format and be *Optical Character Recognition (OCR) compatible.
This information consists of the following:
1) The offeror will submit a cover letter containing:
a. Solicitation number.
b. Name, address, email, and telephone and fax numbers of the offeror.
c. Names, title, email, and telephone and fax numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP.
d. Name, title and signature of the person authorized to sign the proposal.
e. A statement specifying agreement with all terms, conditions and provisions included in the RFP.
f. CAGE Codes for the offeror and all teaming partners who participated in the Factor 1
– Corporate Experience projects.
2) The completed Section 00 45 00 of the RFP (Representations and Certifications), printed
Entity Record from the System for Award Management (SAM).
3) Bid Guarantee. See FAR 52.228-1.
4) Financial statement and bank letter that verify that sufficient assets/funds are available to finance the work.
5) For Joint Ventures, the information required by paragraph “Joint Ventures”.
4.0 INQUIRIES/QUESTIONS
Technical inquiries and questions relating to this solicitation shall be submitted via Bidder Inquiry in
ProjNet at (https://www.projnet.org). To submit and review inquiry items, prospective offerors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective offeror once the reply is available for viewing.
***Please Note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions shall be rejected.
The Solicitation Number is: W912DQ19R4008
The Bidder Inquiry Key is: J499V7-W973GH
The Plan Room Key: 5GIJX5-29W9XS
Instructions for first-time ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. Select agency USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Instructions for future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. Select agency USACE.
https://www.projnet.org/
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret
Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
The Bidder Inquiry System will be unavailable for new inquiries 10 days prior to the date proposals are due at 4 p.m. CST in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation if necessary.
Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry
System for answers to questions prior to submission of a new inquiry.
The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.
5.0 JOINT VENTURES
Joint Ventures shall submit the following additional documentation regarding their business entities:
1) A certified copy of their Joint Venture agreement.
2) A detailed statement outlining the following in terms of percentages, where appropriate.
a. The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.
b. The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the
Joint Venture and perform the duties necessary to complete the work.
c. The structure of the joint venture and decision-making responsibilities of the Joint
Venture parties in terms of who will control the manner and method of performance of the work.
d. The bonding responsibilities of the Joint Venture parties.
e. Identification of the key personnel having authority to legally bind the Joint Venture to subcontracts and state who will provide or contract for the labor and materials for the
Joint Venture.
f. Identification of party maintaining the Joint Venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the Joint Venture.
mailto:staff@rcesupport.com
g. Identification of party furnishing the facilities, such as office supplies and telephone service.
h. Identification of party having overall control of the Joint Venture.
Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual Joint Venture parties and identify the party, or hired as employees of the
Joint Venture.
If one of the Joint Venture parties possesses experience and/or past performance as a Federal
Government contractor or as a Corps of Engineers contractor, that experience and/or past experience will be included as the experience and/or past experience of the Joint Venture.
6.0 OBTAINING A D.U.N.S. NUMBER
Data Universal Numbering System (DUNS) Number. The Data Universal Numbering System
(DUNS) Number is a unique nine-character identification number provided by the commercial company Dun & Bradstreet (D&B). Call D&B at 1-866-705-5711 or access their website if you do not have a DUNS number. The site addresses are http://ccr.dnb.com/ccr/pages/CCRSearch.jsp OR http://www.dnb.com/us/. The process to request a DUNS number via phone takes about 10 minutes and is free of charge. Internet request are fulfilled within 24 hours. You must have a different nine-digit DUNS number for each physical location or different address in your company as well as each legal division that may be co-located.
7.0 SUBCONTRACTORS/TEAMING PARTNER
If an Offeror wishes to receive credit for the work of a subcontractor or teaming partner, the
Offeror must submit a letter of commitment to use the proposed subcontractor on the project, signed both by the subcontractor and the Offeror.
The letter of commitment will be in a form substantially the same as the Sample Letter of
Commitment at Attachment 1 to this Section. The commitment letter must be submitted even if the subcontractor/teaming partner is in some way affiliated with the Offeror (for example, the subcontractor/teaming partner is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary). Include the subcontractor letters of commitment in Volume 1, Factor 1, Corporate Experience.
http://ccr.dnb.com/ccr/pages/CCRSearch.jsp
BASIS FOR AWARD
The Government intends to select for award the single responsible offeror whose proposal conforms to the solicitation, that proposes a price that is fair and reasonable, and that provides the lowest priced, technically acceptable (LPTA) proposal. The selection will be based on evaluation of the following evaluation factors: Corporate Experience, Performance Confidence, and Price.
Each of the two Non-Price factors will receive one of the following ratings: Acceptable or
Unacceptable. Offerors receiving one technically “unacceptable” rating will be deemed overall technically “unacceptable” and will not be considered for award. Offerors must receive an
“acceptable” rating on both technical factors to be considered for award.
The Government reserves the right to enter into discussions. In the event that discussions are not necessary then we intend to award without discussions, to the responsible offeror whose proposal conforms to the solicitation and is determined to be the lowest price, technically acceptable (LPTA) proposal.
8.0 SOURCE SELECTION PROCESS
All offers received in response to this solicitation will be evaluated in accordance with informal source selection procedures. The principal objective of this process is to select a responsible offeror who submits the offer that is the Best Value to the Government using the LPTA process. The process is designed to ensure the impartial, equitable, and comprehensive evaluation of all technically acceptable, responsible proposals received in response to this particular solicitation.
Source Selection Team
The Source Selection Team is established as a separate organization and management chain of command whose only purpose is to accomplish the objective above. The organization consists of a
Source Selection Authority (SSA) and a Source Selection Evaluation Board (SSEB). The organization is designed to ensure active ongoing involvement of appropriate contracting, technical, logistics, legal, price analysis, small business, and other functional staff management expertise.
Source Selection Procedure
The source selection procedures will begin with an initial review of proposals received in response to the Request for Proposal (RFP) and continue with a technical and price evaluation conducted by the
SSEB. The SSEB shall evaluate the proposals based solely on the evaluation criteria identified below. The results of the SSEB evaluations will be presented to the SSA for decision of award.
To be considered Acceptable, each offeror shall specifically address each of the evaluation factors.
Sufficient detail shall be provided, citing specific data as may be required, such that the proposal may be adequately evaluated. The proposal must show clearly that the offeror has an understanding of the work tasks required and has the capability and responsibility to accomplish the work.
The Government is not responsible for information overlooked during the evaluation which is not located in the appropriate proposal section. To ensure the evaluation credit is appropriately received for proposal material submitted, do not incorporate by reference documents not contained in the proposal. References to sections of the proposal shall be by specific paragraph number (and name, if applicable), page number, and section.
10.0 DEBRIEFING OFFERORS
Offerors may request a debriefing In accordance with FAR 15.505 Preaward Debriefing of Offerors, and FAR 15.506 Postaward Debriefing of Offerors.
11.0 TECHNICAL FACTORS TO BE EVALUATED
Factor Location Description
Factor 1 Vol. 1 Tab A Corporate Experience
Factor 2 Vol. 1 Tab B Performance Confidence
TECHNICAL FACTOR
VOLUME 1, TAB A – FACTOR 1 – Corporate Experience
Submission Requirements
The offeror shall submit a project portfolio containing up to Five (5) example projects, maximum of two (2) pages for each project, for this factor. If more than Five projects are submitted, only the first
Five (5) projects will be evaluated.
Multiple Award Task Order Contracts (MATOCs) or any other type of task-order contracts that provide for the issuance of orders for the performance of tasks will not be considered projects for the purposes of this evaluation; only individual task orders issued under such contracts will be evaluated as projects.
Projects included in the portfolio shall demonstrate the offeror’s relevant US Government contracts, military, or commercial construction experience. Projects will only be considered to demonstrate relevant construction experience if they are similar in size, scope, and complexity to the DLA Y
Yard, Fort Riley, Kansas contract described in this solicitation.
To be evaluated, a project must have been completed or be substantially complete at the time the proposal is submitted. To be considered as a project for review, the project must have been completed in the last five years. A project will be considered substantially complete if it is 95% or more complete. If an offeror presents a project that is less than 95% complete, the proposal must include an explanation why that project should be considered substantially complete. Use the following format to provide project information:
(a) Project Title, Contract Number and Location.
(b) Project Contract Type (for example, Indefinite-Delivery, Indefinite-Quantity;
Design/Build, Firm Fixed Price, Cost Plus; Construction Manager at Risk, etc.)
(c) Total Dollar Amount
(d) Start and Completion Dates. If project is not complete, indicate percentage of completion and anticipated completion date.
(e) Role of Firm (Describe type of work performed and percentage of work, as applicable.)
(f) Brief Description of Project. Identify how the project relates to this solicitation.
(g) Key personnel/staff and their role on the project
(h) Customer’s Primary Point of Contact (name, relationship to project, agency/firm, phone number, and e-mail address). The Government may contact and interview project references.
Reference information will not be revealed to other parties.
If the offeror represents the combining of two or more companies, state if the example project represents a joint venture of the listed parties.
Evaluation Criteria
Acceptable: a proposal will be rated Acceptable if it meets all of the following requirements:
1. Three or more project which have been completed in the last 5 years exceeding 2.5 million that demonstrates the offeror’s experience in replacing Portland Concrete.
2. One project which has been completed in the last 5 years, demonstrates the offeror’s experience in installing 2,000 linear square feet of HDPE (High Density Polyethylene Pipe) and/or CMP (Corrugated Metal Pipe).
3. One project which has been completed in the last 5 years, performed for a state Highway
Department, or for U.S. Government Agencies (Department of Defense, Department of
Transportation, Department of Homeland Security, U.S. Postal Service, etc.).
Unacceptable: a proposal will be rated Unacceptable if it does not meet any one of the three requirements listed in the description of the Acceptable rating.
VOLUME 1, TAB B – FACTOR 2 - Performance Confidence.
Submission Requirements
For each of the projects submitted under Factor 1, to ensure the agency has all relevant past performance information, the offeror also should submit copies of Federal/DoD/Navy/Army performance reviews that are likely already in the agency’s databases or likely within the agency’s arm’s reach, i.e., Contractor’s copy of CCASS or CPARS evaluations. To improve accuracy of database searches, the offeror will also provide the CAGE Codes for the prime contractor and all teaming partners, i.e. design firms, key subcontractors, Joint Venture Partners, whose experience is being relied on in Factor 1.
Adjectival Rating Description
Acceptable Example projects meet all of the requirements described in the Evaluation
Criteria above for Factor 1.
Unacceptable Example projects do not meet any one of the requirements described in the
Evaluation Criteria above for Factor 1.
If a final CPARS has been executed a PPQ is not requested or required. Otherwise, the offeror shall provide a Past Performance Questionnaire (Form PPQ-0) included in the solicitation to a representative of the owner that can provide the owner’s opinion of the offeror’s past performance for relevant projects. If the client requests, questionnaires may be submitted directly to the
Government’s point of contact, Carol Hodges via email at Carol.W.Hodges@usace.army.mil prior to proposal closing date. The offeror is responsible for ensuring that the completed questionnaires are submitted by the closing date. If you have questions regarding the attached questionnaire, or require assistance, please contact the Contract Specialist at (816) 389-3730.
Offerors should organize all Past Performance Information based on the Factor 1 Projects, which normally have project titles and are numbered 1-5, so that reviewers can match the owner’s opinion with the corresponding Factor 1 Project. The Project Number and Project Name should be placed in the top left hand corner of each page of the Past Performance Data corresponding to that project submitted by the offeror. There is no page limit for this factor.
The Government will evaluate the responses from the customers from which Past Performance
Questionnaires have been received. The Government may contact and interview the owner’s representative on the PPQ-0, and reserves the right to interview other individuals acting for the owner’s representative, if the owner’s representative is not available. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Past performance information may be obtained from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System
(PPIRS), Construction Contractor Appraisal Support System (CCASS), Federal Awardee
Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System
(eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee
Determining Officials; and the Defense Contract Management Agency.
At no time during this process, nor during the debriefing, nor after award, will the names of the individuals providing reference information about an offeror’s past performance be revealed to the offerors or to any other party. If discussions are held, offerors may be afforded the opportunity to respond to adverse comments made by references in accordance with guidelines identified in FAR
Part 15.3. In this case, comments will be extracted and provided to the offeror. Copies of the questionnaires will not be furnished to the offeror and will remain confidential.
Evaluation Criteria:
PERFORMANCE CONFIDENCE ASSESSMENT
The past performance evaluation will result in an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offeror’s record of relevant and recent past performance information that pertain to the products and/or services outlined in the solicitation requirements.
In reviewing each past performance effort by the offeror, the SST will first evaluate whether the recent effort is relevant to the work required by this solicitation. The relevancy determination will be based on the Factor 1 Evaluation Criteria above. Each past performance effort will be assigned one of the levels of relevancy shown in Table 2:
Table 2. Performance Confidence Relevancy Ratings
In conducting the performance confidence assessment, the offeror shall be assigned one of the ratings in Table 3.
NOTE: If an offeror has no relevant past performance or no information on past performance is available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror shall be determined to have unknown (or “neutral”) past performance. A neutral rating shall be considered “acceptable.”
Relevant Past Performance effort met that have at least experience in replacing
Portland Concrete , and installing High Density Polyethylene Pipe or
Corrugated Metal Pipe.
Not Relevant Past Performance effort did not meet experience in replacing Portland
Concrete, and installing High Density Polyethylene Pipe or Corrugated
Metal Pipe.
Table 3. Past Performance Evaluation Ratings
Acceptable Based on the offeror’s performance record, the
Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below.)
Unacceptable Based on the offeror’s performance record, the
Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
SAMPLE TRANSMITTAL LETTER
AND
PAST PERFORMANCE QUESTIONNAIRE
TO: ________________________ Date:
We have listed your firm as a reference for work we have performed for you as listed below. Our firm has submitted a proposal under a project advertised by the U.S. Army Corps of
Engineers, Kansas City District. In accordance with Federal Acquisition Regulations (FAR), an evaluation of our firm’s past performance will be completed by the Corps of Engineers. Your candid response to the attached questionnaire will assist the evaluation team in this process.
We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Space is provided for comments. Please respond in time for us to include the questionnaire with our proposal, which is due on . Only one response from each office is required. If at all possible, we suggest that you individually answer this questionnaire and then coordinate your responses with that of , to forge a consensus on one overall response from your organization. Please return completed questionnaires to the following:
If you would prefer to respond directly to USACE, your completed questionnaire may be sent to the following address:
U.S. Army Engineer District, Kansas City
ATTN: CECT-NWK-M/Carol Hodges
F e d e r a l Building Room 647
601 East 12 Street
Kansas City, Missouri 64106-2896
The questionnaires can also be e-mailed to Carol.W.Hodges@usace.army.mil th
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information
Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information
Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY
BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR
PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS.
CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC
INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the
Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the
Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the
Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per
DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than
Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the
Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not
Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)? E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems?
If yes, please explain below.
Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
12.0 PRICE FACTOR
VOLUME 2, TAB A – FACTOR 3 – PRICE
Submission Requirements:
Offerors shall submit the Price Proposal Schedule which consists of the original signed Standard
Form 1442 “Solicitation, Offer, and Award,” providing a price for all line items in the corresponding bid schedule and acknowledging all amendments…