A.07.23_Solicitation.pdf

PDF 711 KB Posted

Attached to
MCCONNELL ELECTRICAL REPAIRS
Solicitation number
W912DQ18R4010
Issued by

About this file

Repair/replacement of Medium Voltage Switchgear in and around the Flightline Maintenance Area, repair/replacement of underground electrical circuits D & E Branch and replacement of exterior lighting at various locations around McConnell along with any incidental related work.

View the file

Other files

File Type Posted
A.07.23_Amendment_0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCCONNELL ELECTRICAL REPAIRS

MCCONNELL AIR FORCE BASE

WICHITA, KANSAS

PLEASE SEE THE BELOW INFORMATION FOR FULL

SOLICITATION PACKAGE

The Solicitation Number is: W912DQ-18-R-4010 The Bidder Inquiry Key is: FYJGHD-INM3Q4

The Plan Room Key: FKJEEV-NK7JS7

Repair/replacement of Medium Voltage Sw itchgear in and around the Flightline Maintenance Area, repair/replacement of underground electrical circuits D & E Branch and replacement of exterior lighting at various locations around McConnell along w ith any incidental related w ork.

Requirement is for 100% Small Business Set-Aside.

The Request for Proposal (RFP) w ill result in the aw ard of a single Design-Bid-Build Firm Fixed Price construction contract.

The North American Industry Classif ictaiton (NACIS) code is 237130, w ith a Small Business Size Standard of $36.5 Million Dollars.

The magnitude for this project is betw een $5 Million to $10 Million.

TERESA M CABANTING (816) 389-2399

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

15-Jun-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________13 Jul 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______75 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE, KANSAS CITY +

FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST

KANSAS CITY MO 64106-2896

W912DQ

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

816-389-2030FAX:TEL: 816-389-3976 TEL: FAX:

W912DQ18R4010 95

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912DQ18R4005

Section 00 10 00 - Solicitation

BID SCHEDULE

BASE – TOTAL CLINs 0001-0003 $______________

OPTIONS – TOTAL CLINs 0004-0006 $______________

BASE + OPTIONS – TOTAL CLINs 0001-0006 $______________

Note: Any work not specifically noted shall be priced with the most closely related CLIN.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job Part A

FFP

Repair Flight Line Medium Volta:

Contractor shall provide all material, equipment and manpower for the Repair of Flight Line Medium Voltage Switchgear in accordance with the specifications.

FOB: Destination

NET AMT

0002 Job Part B

FFP

Repair Underground Electrical Circuit D and E Branch:

Contractor shall provide all material, equipment and manpower for the Repair of Underground Electrical Circuit D and E Branch in accordance with the specifications.

0003 Job Contract Manpower Reporting

FFP

Contractor Manpower Reporting is required. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/ Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mill

0004 Job OPTION Part C

FFP

Repair Exterior Lighting to LED Multiple Facilities Contractor shall provide all material, equipment and manpower for the Repair Exterior Lighting to replace all Metal Halide (MH) and/or High Pressure Sodium (HPS) lights to LED in Multiple Facilities in accordance with the specifications.

0005 Job OPTION Part D

FFP

Repair Apron and Sports Field Lighting:

Contractor shall provide all material, equipment and manpower for the Repair Apron and Sports Field Lighting to replace all Metal Halide (MH) and/or High Pressure Sodium (HPS) lights to LED in accordance with the specifications.

0006 Job OPTION Part E

FFP

Repair Housing and Parking Lot Lighting to LED:

Contractor shall provide all material, equipment and manpower for the Repair Housing and Parking Lot Lighting to replace all Metal Halide (MH) and High Pressure Sodium (HPS) lights to LED in accordance with the specifications.

CLAUSES INCORPORATED BY FULL TEXT

SCR_CT_002 FIELD OFFICE OVERHEAD (JUL 2002)(RFP)

NOTICE TO OFFERORS: you must declare below the single accounting practice that you apply to contracts to calculate field office overhead for all change orders, modifications and requests for equitable adjustment. Pursuant to Federal Acquisition Regulations (FAR) Parts 31.105(d)(3) and 31.203(d)(1), an accounting practice that varies from modification to modification is not allowable. Select one of the following:

1. TIME DISTRIBUTION BASE FOR A PER DIEM RATE

If you use this practice, see Special Clause “Field Office Overhead Per Diem Rate” _____

2. DIRECT COST DISTRIBUTION BASE FOR A PERCENTAGE MARKUP

If you use this practice, see Special Clause “Field Office Overhead Percentage Markup” _____

3. OTHER ACCOUNTING PRACTICE THAT IS ALLOWABLE _____

UNDER THE FAR AND THAT USES A SINGLE DISTRIBUTION BASE.

If you choose 3, you must describe the accounting practice in sufficient detail below to allow the contracting officer to determine what accounting practice is being utilized by your company and that it complies with the FAR.

FAILURE TO FULLY COMPLY WITH THE ABOVE REQUIREMENT OR, IF ALTERNATIVE 3 IS

DECLARED AND YOUR DESCRIPTION DOES NOT CLEARLY STATE OR DESCRIBE A CONSISTENT

ACCOUNTING PRACTICE USING A SINGLE DISTRIBUTION BASE, MAY CAUSE YOUR PROPOSAL

TO BE EVALUTED AS UNACCEPTABLE.

(End)

SCR_CT_007 MAGNITUDE OF PROJECT—CONSTRUCTION (Jul 2002)

The magnitude of this project is represented by the following estimated price range (contracting officer mark as appropriate):

Between $5,000,000 and $10,000,000

TPL_NWK_001 Points of Contact

CONTRACT

SPECIALIST:

Teresa Cabanting PHONE: 816-389-2399 E-MAIL: teresa.m.cabanting@usace.arm y.mil

PROJECT

MANAGER:

Douglas Plachy PHONE: 816-389-3274 E-MAIL: Douglas.h.plachy@usace.army.

mil

TPL_NWK_002 PROPOSALS TO BECOME PART OF THE CONTRACT

1. When an offeror submits its proposal in response to a Request For Proposals, and a staffing plan including the names and qualifications of key personnel who are proposed to work on the project is required to be submitted, those personnel who are offered will be the same personnel who will actually perform on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute personnel for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute employee. The Contracting Officer shall have the right to review the qualifications of the proposed substitute employee and to approve or disapprove his or her qualifications. If the proposed substitute employee's qualifications are disapproved by the Contracting Officer, the contractor will propose another employee who does possess equivalent qualifications.

2. When an offeror submits its proposal in response to a Request For Proposals, and the name of a specific subcontractor is a required submittal, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.

3. When an offeror submits its proposal in response to a Request For Proposals, and a schedule for the performance of the work on the project is a required submittal, the terms of the proposed schedule will become the schedule that will be utilized for completion of the project, adjusted as necessary to reflect the actual issue date of the Notice to Proceed

4. When an offeror submits its proposal in response to a Request For Proposals and that proposal contains any work, materials, methods or other type of betterment that provides an advantage to the Government that is above the minimum requirements contained in the RFP, the terms of the proposal will be the basis for evaluation and, if successful, will become the terms of the contract upon award. If a change in one of those terms is made to one that is less favorable to the Government than the one on which the award of the contract was based, a credit to the Government will be negotiated by the contractor. Only the Contracting Officer has the authority to negotiate a waiver of the terms of the contract.

Section 00 21 00 - Instructions

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-22 Limitations on Pass-Through Charges--Identification of

Subcontract Effort

OCT 2009

52.236-28 Preparation of Proposals--Construction OCT 1997

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.217-4 EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD (JUN 1988)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate the total price for the basic requirement together with any option(s) exercised at the time of award.

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The Offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

7.9 6.9

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is: McConnell Air Force Base, Wichita, KS (Sedgwick County).

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Robert Johnson, Contracting Officer USACE, Kansas City District Federal Building, RM 647 601 E. 12th Street Kansas City, MO 64106-2896

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name:

Address:

Telephone:

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/ http://farsite.hill.af.mil/

Section 00 22 00 - Supplementary Instructions

COVER SHEET FOR SOLICITATION

COVERSHEET FOR SOLICITATION NUMBER:

W912DQ-18-R-4010, ELECTRICAL REPAIR ON FLIGHT LINE AT MCCONELL AFB, KANSAS

Contractor/Offeror:

Point of Contact:

Phone Number/Email_

DCAA Contact_

Proposed cost

Proposed profit

Total Price Proposal

No Government Property shall be provided

Offeror is subject to cost accounting standards: Yes or No

The proposal is consistent with your established estimating and accounting principles and procedures and FAR Part 31, Cost Principles.

This proposal reflects our estimates and/or actual costs as of this date and conforms to the instructions in FAR 15.403-5(b) (1) and Table 15-2. By submitting this proposal, Offeror grants the Contracting Officer and authorized representative(s) the right to examine, at any time before award, those records, which include books, documents, accounting procedures and practices, and other data, regardless of type and form or whether such supporting information is specifically referenced or included in the proposal as the basis for pricing, that will permit an adequate evaluation of the proposed price.

Offeror also agrees and grants permission to the Government to unilaterally modify the contract/task order price by making a downward adjustment in direct labor, other direct costs, subcontract costs, and indirect costs furnished in the Contractor’s cost proposal based upon the findings of a post award audit. Such adjustments will be made only where the audit has found items in the proposal that were either questioned or unsupported. The adjustments will be retroactive to the date of award and will also apply to any options included in the contract/task order. The Government will provide the Contractor advance notice when such an adjustment is required and will furnish a copy of the firm’s audit and the audit of any subcontractor/consultant where the firm being audited grants permission to the Government to do so.

Signature

Name

Title

Date of execution

CERTIFICATE OF CURRENT COST OR PRICING DATA

This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 2.101 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403-4) submitted, either actually or by specific identification in writing, to the Contracting Officer or to the Contracting Officer’s Representative in support of Solicitation W912DQ-18-R-4010 for Electrical Repair on Flight Line at McConnell, Air Force Base, *** are accurate, complete, and current as of

This certification includes the cost or pricing data supporting any advance agreements and forward pricing rate agreements between the offeror and the Government that are part of the proposal.

Firm Signature Name Title Date of execution***

(End of certificate)

NEW SAM PROCEDURES

NEW!! SYSTEM FOR AWARD MANAGEMENT (SAM) PROCEDURES

SAM NOTARIZED LETTER PROCEDURES: An original, signed, and notarized letter identifying the authorized Entity Administrator for the entity associated with the Data Universal Numbering System (DUNS) number is now required before a NEW SAM.gov entity registration is activated or an EXISTING entity is updated or renewed. The notarized letters MUST BE POSTAL SERVICE MAILED (not emailed or faxed) to the "FEDERAL SERVICE DESK" and must contain the information outlined in the "instructions for domestic entities" or "instructions for international entities" located at https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update. Templates for appointing an Entity Administrator are included within the respective instructions.

CONTRACTOR MANPOWER REPORTING

Contractor Manpower Reporting

Accounting for Contractor Services:

The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: http://www.ecmra.mil/ The information to be reported is as follows:

(1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative;

(2) Contract number, including task and delivery order number;

(3) Beginning and ending dates covered by reporting period;

(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;

(5) Estimated direct labor hours (including sub-contractors);

(6) Estimated direct labor dollars paid this reporting period (including sub-contractors);

(7) Total payments (including sub-contractors);

(8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different);

(9) Estimated data collection cost;

(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);

(11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardization nomenclature provided on website);

(12) Presence of deployment or contingency contract language; and

(13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country).

As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year. If contract performance is completed before 30 September, the data can be entered upon contract completion rather than waiting for the end of the fiscal year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor’s systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.

Uses and Safeguarding of Information. Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct http://www.ecmra.mil/ labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

Subcontract Data. The contractor shall ensure that all reportable subcontract data is timely reported to this data collection web site (citing this contract/order number). At the discretion of the prime contractor, this reporting may be done directly by subcontractors to the data collection site; or by the prime contractor after consolidating and rationalizing all significant data from the subcontractors.

Reporting Flexibility. Contractors are encouraged to communicate with the Help Desk identified at the data collection web site to resolve reporting difficulties. Changes to facilitate reporting may be authorized by the contracting officer or the Help Desk (under HQDA policy direction and oversight).

Compensation costs are defined in the reporting instructions at the Army web site designated above.

Section 00 22 16 - Supplementary Instructions to Proposers

EVALUATION PROCEDURES

APPENDIX C

SECTION 00 22 11: LPTA EVALUATION FACTORS

1.0 OVERVIEW

The proposal should be prepared simply and economically, providing straightforward, concise delineation of capabilities to perform the contract. The proposal should be practical, legible, clear and coherent.

The technical proposal shall address the offeror’s proposed approach to fully perform the requirements of the Request for Proposal (RFP). Offerors are discouraged from providing information not required by the RFP.

2.0 GENERAL PROPOSAL SUBMISSION INSTRUCTIONS

All offerors shall be required to submit a proposal with the minimum content as specified herein. Proposals without the minimum content may be rejected. Proposals will be received until the date and time indicated on Standard Form 1442 at the following address:

U.S. Army Corps of Engineers, Kansas City District Federal Building, Room 647 ATTN: CECT-NWK-M/ Teresa M. Cabanting 601 East 12th Street Kansas City, Missouri 64106-2896

3.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS

A. In order to be considered for award of a contract for the requirements of this solicitation, the offeror must submit a proposal with its offer. Failure to submit a complete proposal may result in the entire offer being rejected. The proposals shall consist of two Volumes as follows:

Submit the proposal in a tabbed, three-ring binder identified by the Solicitation Number (W912DQ- 18-R-4010), project title (FY18 SRM Miscellaneous Electrical Repair Projects), name, address, and telephone number of the offeror(s). Arrange tabs as follows:

i. Volume 1, Technical Proposal (Tabs A and B):

TAB A, FACTOR 1 Corporate Experience TAB B, FACTOR 2 Past Performance

ii. Volume 2, Price Proposal, (Tab A), consists of an original signed Standard Form 1442 “Solicitation, Offer, and Award,” providing a price for all line items in the corresponding bid schedule and acknowledgment of all amendments to the solicitation.

TAB C, FACTOR 3 Price Proposal

B. Proposal Characteristics

i. Submit original and three copies of the proposal. Electronic copies shall also be provided on one CD/DVD in PDF format. The CD/DVD should be in PDF format and be *Optical Character Recognition (OCR) compatible. All text must be legible and easily read. Each Volume shall contain a table of contents and all pages of each factor shall be sequentially numbered.

The page size of the offeror’s proposal shall not exceed 8-1/2 by 11 inches. Diagrams, charts and tables shall conform to the paper size. All text shall be typed single-spaced. Font size no smaller than

10. Margins (1-inch) shall be clean and clear. If fold-out charts are unavoidable, and are to be utilized, all sheets shall be reproduced on 11 by 17 inch, and folded to 8-1/2 by 11 inch size. Submit the SF 1442, completed and signed by a person authorized by the offeror.

*OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to-speech, key data extraction and text mining.

ii. Each Volume of the proposal shall be identified by the Solicitation Number (W912DQ-18-R-4010), project title (FY18 SRM Miscellaneous Electrical Repair Projects), name, address, and telephone number of the offeror, and the following on the volume in bold letters:

VOLUME 1: TECHNICAL PROPOSAL (Original & 3 Copies) (1 CD/DVD) VOLUME 2: PRICE PROPOSAL (Original & 1 Copy) (1 CD/DVD)

iii. The Proposal’s clarity, organization and cross referencing are mandatory. No material shall be incorporated by reference. General cross-references or cross referencing guides will not be considered appropriate cross-references.

Information provided shall be written in a way to demonstrate a clear understanding of the requirements, but should not parrot the specifications. The technical proposal shall not refer the reviewer to information contained in the price proposal.

C. Additional Information to be provided in Volume 2 Pro Forma Requirements:

This information should be submitted in an envelope labeled “Pro Forma Requirements”. Provide an original and one Electronic copy shall also be provided on one CD/DVD in PDF format and be *Optical Character Recognition (OCR) compatible.

This information consists of the following:

1) The offeror will submit a cover letter containing:

a. Solicitation number.

b. Name, address, email, and telephone and fax numbers of the offeror.

c. Names, title, email, and telephone and fax numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP.

d. Name, title and signature of the person authorized to sign the proposal.

e. A statement specifying agreement with all terms, conditions and provisions included in the RFP.

f. CAGE Codes for the offeror and all teaming partners who participated in the Factor 1

– Corporate Experience projects.

2) Acknowledgement of all amendments to the RFP in accordance with the instructions on the

Standard Form 30 (amendment form).

3) The completed Section 00 45 00 of the RFP (Representations and Certifications), printed Entity

Record from the System for Award Management (SAM).

4) Bid Guarantee. See FAR 52.228-1.

5) Financial statement and bank letter that verify that sufficient funds will be available to finance the work.

6) For Joint Ventures, the information required by paragraph “Joint Ventures”.

4.0 INQUIRIES/QUESTIONS

Technical inquiries and questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org). To submit and review inquiry items, prospective offerors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective offeror once the reply is available for viewing.

***Please Note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions shall be rejected.

The Solicitation Number is: W912DQ-18-R-4010 The Bidder Inquiry Key is: FYJGHD-INM3Q4

The Plan Room Key: FKJEEV-NK7JS7

Instructions for first-time ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. Select agency USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

https://www.projnet.org/

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Instructions for future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret

Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. Select agency USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

The Bidder Inquiry System will be unavailable for new inquiries ten calendar days before proposal due date in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation if necessary.

Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.

5.0 JOINT VENTURES

Joint Ventures shall submit the following additional documentation regarding their business entities:

A. A copy of their Joint Venture agreement.

B. A detailed statement outlining the following in terms of percentages, where appropriate.

i. The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.

mailto:staff@rcesupport.com

ii. The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the Joint Venture and perform the duties necessary to complete the work.

iii. The structure of the joint venture and decision-making responsibilities of the Joint Venture parties in terms of who will control the manner and method of performance of the work.

iv. The bonding responsibilities of the Joint Venture parties.

v. Identification of the key personnel having authority to legally bind the Joint Venture to subcontracts and state who will provide or contract for the labor and materials for the Joint Venture.

vi. Identification of party maintaining the Joint Venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the Joint Venture.

vii. Identification of party furnishing the facilities, such as office supplies and telephone service.

viii. Identification of party having overall control of the Joint Venture.

Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual Joint Venture parties and identify the party, or hired as employees of the Joint Venture.

If one of the Joint Venture parties possesses corporate experience and/or past performance as a Federal Government contractor or as a Corps of Engineers contractor, that experience and/or past experience will be included as the experience and/or past experience of the Joint Venture.

6.0 SUBCONTRACTORS

If an Offeror wishes to receive credit for the work of a subcontractor, the Offeror must submit a letter of commitment to use the proposed subcontractor on the project, signed both by the subcontractor and the Offeror.

The subcontractor must have served as the prime construction contractor on the project.

The letter of commitment will be in a form substantially the same as the Sample Letter of Commitment at Attachment 1 to this Section. The commitment letter must be submitted even if the subcontractor is in some way affiliated with the Offeror (for example, the subcontractor is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary).

Include the subcontractor letters of commitment in Volume I, Factor 1, Corporate Experience.

7.0 BASIS FOR AWARD

The Government intends to select the offeror providing the Lowest Priced Technically Acceptable (LPTA) proposal meeting or exceeding the acceptability standard for non-price factor. The selection will be based on evaluation of the following evaluation factors: Corporate Experience, Past Performance, and Price.

Each of the two Non-Price factors will receive one of the following ratings: Acceptable or Unacceptable.

Offerors receiving one technically “unacceptable” rating will be deemed overall technically “unacceptable” and will not be considered for award. Offerors must receive an “acceptable” rating on both technical factors to be considered for award.

The Government reserves the right to enter into discussions. In the event that discussions are not necessary then we intend to award without discussions, to the responsible offeror whose proposal conforms to the solicitation and is determined to be the lowest price, technically acceptable (LPTA) proposal.

Use of Lowest Price Technically Acceptable Source Selection Process:

In accordance with the 2017 National Defense Authorization Act (NDAA), it shall be the policy of the Department of Defense to avoid using lowest price technically acceptable source selection criteria in circumstances that would deny the Department the benefits of cost and technical tradeoffs in the source selection process. USACE-NWK has examined the requirement for only using the LPTA process in situations that meet the following:

a. USACE-NWK is able to comprehensively and clearly describe the minimum requirements to determine acceptability of offers.

b. USACE-NWK will realize no, or minimal value from a proposal exceeding the minimum technical requirements set forth in the request for proposal.

c. The proposed technical factors will require no, or minimal, subjective judgment by the source selection authority as to the desirability of one offeror’s proposal versus a competing proposal.

d. The source selection authority has a high degree of confidence that a review of technical proposals other than the lowest offeror would not result in the identification of factors that could provide value or benefit to

USACE-NWK.

e. The contracting officer has included a justification for the use of LPTA in the contract file.

f. USACE-NWK has determined that the lowest price reflect full life-cycle costs per the minimum requirements outlined in the specifications and plans.

8.0 SOURCE SELECTION PROCESS

All offers received in response to this solicitation will be evaluated in accordance with informal source selection procedures. The principal objective of this process is to select a responsible offeror who submits the offer that is the Best Value to the Government using the LPTA process. The process is designed to ensure the impartial, equitable, and comprehensive evaluation of all technically acceptable, responsible proposals received in response to this particular solicitation.

Source Selection Team

The Source Selection Team is established as a separate organization and management chain of command whose only purpose is to accomplish the objective above. The organization consists of a Source Selection Authority (SSA) and a Source Selection Evaluation Board (SSEB). The organization is designed to ensure active ongoing involvement of appropriate contracting, technical, logistics, legal, price analysis, small business, and other functional staff management expertise.

Source Selection Procedure

The source selection procedures will begin with an initial review of proposals received in response to the Request for Proposal (RFP) and continue with a technical and price evaluation conducted by the SSEB. The SSEB shall evaluate the proposals based solely on the evaluation criteria identified below. The results of the SSEB evaluations will be presented to the SSA for decision of award.

To be considered Acceptable, each offeror shall specifically address each of the evaluation factors. Sufficient detail shall be provided, citing specific data as may be required, such that the proposal may be adequately evaluated. The proposal must show clearly that the offeror has an understanding of the work tasks required and has the capability and responsibility to accomplish the work.

The Government is not responsible for information overlooked during the evaluation which is not located in the appropriate proposal section. To ensure the evaluation credit is appropriately received for proposal material submitted, do not incorporate by reference documents not contained in the proposal. References to sections of the proposal shall be by specific paragraph number (and name, if applicable), page number, and section.

9.0 DEBRIEFING OFFERORS

Offerors may request a debriefing In accordance with FAR 15.505 preaward Debriefing of Offerors, and FAR

15.506 Post award Debriefing of Offerors.

10.0 TECHNICAL FACTORS TO BE EVALUATED

Factor Location Description

Factor 1 Vol. 1 Tab A Corporate Experience Factor 2 Vol. 1 Tab B Past Performance

TECHNICAL FACTOR

VOLUME 1, TAB A – FACTOR 1 – Corporate Experience

Submission Requirements

The offeror shall submit a project portfolio containing two example projects for this factor. If more than two projects are submitted, only the first two projects will be evaluated.

Projects included in the portfolio shall demonstrate the offeror’s relevant construction experience. Projects will only be considered to demonstrate relevant construction experience if they include repair/replacement of Medium Voltage Switchgear and/or repair/replacement of underground electrical circuits of similar size to the Construction contract described in this solicitation.

To be evaluated, a project must have been completed or be substantially complete within the last 5 years, at the time the proposal is submitted. A project will be considered substantially complete if it is 95% or more complete. If an offeror presents a project that is less than 95% complete, the proposal must include an explanation why that project should be considered substantially complete. Use the following format to provide project information:

(a) Project Title, Contract Number and Location.

(b) Total Dollar Amount

(c) Start and Completion Dates.