Wage_Rates_9-11-17.pdf
PDF 270 KB Posted
- Attached to
- Road Maintenance
- Solicitation number
- W912DQ-17-B-10XX
About this file
Updated Wage Rates
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912DQ17B1019U00002.pdf | ||
| W912DQ17B1019_Mod_0001.pdf | ||
| OD_Road_Work_Maps_2017.pdf | ||
| Section_-_01_10_00_-_OD_Road_Package_2017_(FINAL_7.14.17).pdf | ||
| W912DQ-17-B-1019.pdf | ||
| A.01.38_SOW.pdf | ||
| W912DQ-17-B-1019.pdf | ||
| A.01.38_Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: KS170004 08/18/2017 KS4
Superseded General Decision Number: KS20160004
State: Kansas
Construction Type: Highway
Counties: Douglas, Leavenworth and Shawnee Counties in Kansas.
HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 02/03/2017 2 04/14/2017 3 04/21/2017 4 04/28/2017 5 05/19/2017 6 06/30/2017 7 07/14/2017 8 08/11/2017 9 08/18/2017
CARP0311‐007 05/01/2014
DOUGLAS COUNTY
Rates Fringes
CARPENTER........................$ 24.08 14.49
Piledriver.......................$ 24.08 14.49
CARP1445‐001 04/01/2010
SHAWNEE COUNTY
Rates Fringes
CARPENTER........................$ 24.54 8.81
Piledriver.......................$ 23.91 8.81
CARP4088‐005 05/01/2014
LEAVENWORTH COUNTY
Rates Fringes
Carpenter and Piledriver.........$ 36.05 14.95
ELEC0053‐003 08/30/2015
LEAVENWORTH COUNTY (North of Fairmont, Stranger, and Tonganoxie Townships)
Line Construction (RAILROAD
AND CROSS COUNTRY)
TRANSMISSION LINES:
GROUNDMAN POWDERMAN........$ 27.84 33%+5.00
GROUNDMAN..................$ 25.98 33%+5.00
LINEMAN OPERATOR...........$ 37.25 33%+5.00
LINEMAN....................$ 40.31 33%+5.00
POLE TREATING GROUNDMAN....$ 25.98 33%+5.00
POLE TREATING SPECIALIST...$ 44.34 33%+5.00
POLE TREATING TRUCK DRIVER.$ 27.84 33%+5.00
Line Construction:
GROUNDMEN POWDERMEN.........$ 26.84 34.5%+5.00
GROUNDMEN...................$ 26.67 29.5%+5.00
LINEMEN OPERATOR............$ 38.37 29.5%+5.00
LINEMEN.....................$ 41.52 29.5%+5.00
ELEC0124‐004 08/31/2015
LEAVENWORTH COUNTY (Delaware, High Prairie and Kickapoo Townships, City of Leavenworth and Ft. Leavenworth Military Reservation)
ELECTRICIAN......................$ 36.69 20.62
ELEC0226‐006 09/01/2016
DOUGLAS, SHAWNEE, and the remainder of LEAVENWORTH COUNTY
Rates Fringes
ELECTRICIAN......................$ 30.35 14.46
ELEC0304‐002 07/02/2017
LEAVENWORTH COUNTY (Except that portion north of Fairmont, Stranger, and Tonganoxie Townships) DOUGLAS, AND SHAWNEE
COUNTIES
Line Construction:
CABLE SPLICERS..............$ 43.05 18.83
GROUNDMEN...................$ 24.38 10.97
LINE TRUCK AND EQUIPMENT
OPERATORS...................$ 33.80 16.14
LINEMEN.....................$ 41.00 18.24
POWDERMEN...................$ 32.93 6.10+29%
Traffic signal technician........$ 38.69 5.7+29%
ENGI0101‐003 04/01/2016
DOUGLAS COUNTIES:
Power equipment operators:
GROUP 1.....................$ 23.74 12.63
GROUP 2.....................$ 23.49 12.63
GROUP 3.....................$ 23.24 12.63
GROUP 4.....................$ 22.89 12.63
GROUP 4A....................$ 23.14 12.63
GROUP 1: Asphalt paver and spreader, Backhoe, Boring machine, Blades, all types, Clamshell, Concrete mixer paver operator, Concrete plant operator (automatic); Crane, Truck crane, Pitman crane, Hydro crane or any machine with power swing, Derrick or derrick trucks; Dragline operator, Dredge operator, Dozer, Ditching machine, Euclid loader, Hoist, 2 active drums, Loader, all types, Mechanic or welder, Mixermobile, Multi‐unit scraper, Piledriver operator, Power shovel operator, Quad track, Scoop operator, all types, Sideboom cat, Cheery picker, Skimmer scoop operator, Push cat operators.
GROUP 2: Asphalt plant operator, Elevating grader operator.
GROUP 3: A‐frame truck, Asphalt roller operator, Asphalt plant boiler fireman, Backfiller operator, Barber green loader, Boiler, other than asphalt, Bull float operator, Churn drill operator, Compressor operator (l), Concrete central plant operator, Concrete mixer operator, skip, Concrete pump operator, Crusher operator, Distributor operator, Finish machine operator, concrete, Fireman, other than asphalt, Flex plane operator, Fork lift, Form grader operator, Greaser, Hoist, 1 drum, Jeep ditching machine, Pavement Breaker, self‐propelled (of the hydra hammer or similar type), pump operator, 4 inches or over, two, pump operator, other than Dredge screening and wash plant operator, Small machine operator, Spreader box operator, self propelled, Tractor operator, over 50 h.p., Self‐propelled roller operator, other than asphalt siphons and jets, Subgrading machine operator, Tank car heater operator, combination booster and boilers, Towboat operator, Vibrating machine operator, not hand.
GROUP 4: Concrete gang saw, Self‐propelled (con‐cut), Conveyor operator, Harrow, disc. seeder, Oiler, Tractor operator, 50 h.p. or less without attachments.
GROUP 4A: Oiler, Motor crane. HOURLY
PREMIUMS: Following classifications shall receive ($.25) above Group I rate: Clamshells ‐ 3 yd. capacity or over, Crane or rigs, 80 ft. of boom or over (including jib), Draglines, 3 yd. capacity or over, Piledrivers 80 ft of boom or over (including jib), Shovels and backhoes, 3 yd.
capacity or over.
ENGI0101‐006 04/01/2017
LEAVENWORTH COUNTY
Rates Fringes
Power equipment operators:
(ALL OTHER WORK)
GROUP 1.....................$ 36.17 16.84
Power equipment operators:
GROUP 2.....................$ 35.13 16.84
GROUP 3
OILERS.....................$ 30.66 16.84
OILERS DRIVER (ALL TYPES)...$ 34.01 16.84
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1 ‐ Asphalt roller operator, finish, asphalt paver and spreader, asphalt plant operator, concrete plant operator, la tourneau rooter (all tiller types), concrete mixer paver, slip form paver operator (CMI, Rex, Gomeco or equal), finishing machine operator, auto grader or trimmer or sub‐grader, side discharge spreader, concrete pump operator, backhoe, blade operator (all types), bulldozer operator, high loader ‐ fork lift ‐ skid loader (all types), quad track, scraper operator (all types), push cat, ditching machine, boilers‐2, booster pump on dredge, dredge engineman, dredge operator, tow boat operator, hoisting engineer (2 active drums), crane operator, derrick or derrick trucks, drag line operator, pile driver operator, pitman crane or boom truck (all types), shovel operator, truck crane, clamshell operator, drilling or boring machine (rotary ‐ self propelled), boring machine (truck or crane mounted), skimmer scoop operator, mucking machine operator, sideboom cats, locomotive operator (standard gage), drillcat with compressor mounted (self‐contained) or similar type self propelled rotary drill (not air tract), mechanics and welders (field and plants)
GROUP 2 ‐ A‐Frame truck operator, articulated dump truck, hoisting engine (one drum), roller operator (wtih or without blades), boilers (l), distributor operator, fireman gig, tank car heater operator (combination boiler and booster), chip spreader, back filler operator, farm tractor (all attachments), multiple compactor, concrete mixer operator, skip loader, elevating grader operator, pavement breaker, self propelled hydra‐hammer (or similar type), power shield, churn drill operator, concrete saws (self propelled), conveyor operator, float operator, form grader operator, screening and washing plant, siphons and jets, vibrating machine operator (not hand held), crusher operator, conveyor operator, paymill operator, maintenance operator, welding machine, compressor, pumps, self‐propelled street broom or sweeper, stump cutting machine, straw blower
HOURLY PREMIUMS
FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($1.00) ABOVE GROUP I
RATE: Clamshells ‐ 3 yd. capacity or over ‐ crane or rigs 80 ft. of boom or over (including jib) ‐ draglines, 3 yd.
capacity or over ‐ piledrivers 80 ft. of boom or over (including jib) ‐ shovels & backhoes, 3 yd. capacity or over.
ENGI9101‐001 04/01/2015
SHAWNEE COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 22.60 12.27
GROUP 2.....................$ 22.35 12.27
GROUP 3.....................$ 22.10 12.27
GROUP 4.....................$ 21.75 12.27
GROUP 4A....................$ 22.00 12.27
GROUP 1: Asphalt paver and spreader, Backhoe, Boring machine, Blades, all types, Clamshell, Concrete mixer paver operator, Concrete plant operator (automatic); Crane, Truck crane, Pitman crane, Hydro crane or any machine with power swing, Derrick or derrick trucks; Dragline operator, Dredge operator, Dozer, Ditching machine, Euclid loader, Hoist, 2 active drums, Loader, all types, Mechanic or welder, Mixermobile, Multi‐unit scraper, Piledriver operator, Power shovel operator, Quad track, Scoop operator, all types, Sideboom cat, Cheery picker, Skimmer scoop operator, Push cat operators.
GROUP 2: Asphalt plant operator, Elevating grader operator.
GROUP 3: A‐frame truck, Asphalt roller operator, Asphalt plant boiler fireman, Backfiller operator, Barber green loader, Boiler, other than asphalt, Bull float operator, Churn drill operator, Compressor operator (l), Concrete central plant operator, Concrete mixer operator, skip, Concrete pump operator, Crusher operator, Distributor operator, Finish machine operator, concrete, Fireman, other than asphalt, Flex plane operator, Fork lift, Form grader operator, Greaser, Hoist, 1 drum, Jeep ditching machine, Pavement Breaker, self‐propelled (of the hydra hammer or similar type), pump operator, 4" or over, two, pump operator, other than Dredge screening and wash plant operator, Small machine operator, Spreader box operator, self‐propelled, Tractor operator, over 50 h.p., Self‐propelled roller operator, other than asphalt siphons and jets, Subgrading machine operator, Tank car heater operator, Combination booster and boilers, Towboat operator, Vibrating machine operator, not hand.
GROUP 4: Concrete gang saw, Self‐propelled (con‐cut), Conveyor operator, Harrow, disc. seeder, Oiler, Tractor operator, 50 h.p. or less without attachments.
GROUP 4A: Oiler, Motor crane.
HOURLY PREMIUMS: Following classifications shall receive ($.25) above Group I rate: Clamshells ‐ 3 yd. capacity or over, Crane or rigs, 80 ft. of boom or over (including jib), Draglines, 3 yd. capacity or over, Piledrivers 80 ft of boom or over (including jib), Shovels and backhoes, 3
yd. capacity or over.
* IRON0010‐002 04/01/2017
LEAVENWORTH COUNTY
Rates Fringes
Ironworkers:.....................$ 32.65 28.85
* IRON0010‐005 04/01/2017
DOUGLAS, AND SHAWNEE COUNTIES
Rates Fringes
Ironworkers:.....................$ 32.65 28.85
LABO1290‐008 04/01/2015
DOUGLAS AND SHAWNEE COUNTIES
Rates Fringes
Asbestos Abatement/Hazardous Waste Preparation, removal and encapsulation of hazardous materials from non‐ mechanical systems..........$ 15.90 7.98
LABO1290‐019 04/01/2017
LEAVENWORTH COUNTY
Rates Fringes
Laborers:
GROUP 1.....................$ 29.58 15.23
GROUP 2.....................$ 30.79 15.23
GROUP 1: Board mat weavers & cable tiers, georgia buggy
(manually operated), mixerman‐no skip lift, salamander tenders, track men, tractor swamper, truck dumper, wire mesh setter, water pump up to 4 inches, and all other general laborers including flagman.
GROUP 2: Air tool operators, cement handlers (bulk), chain saw, georgia buggy (mechanically operated), grademan, hot mastic kettleman, crusher feeder, joint man, jute man, mason tender, material batch hopper and scale man, mixer man, pier hole man (working 11 feet deep), pipelayer ‐ drainage (concrete and/or corrugated metal), signal man (crane), truck dumper ‐ dry batch, vibrator operator, wagon and churn drill operator, asphalt raker, barco tamper, concrete saw, creosote material ‐ handling and applying, nozzle burner (cutting torch and burning bar), conduit pipe, water and gas distribution lines, tile and duct line setter, form setter and liner on concrete paving, powderman, sandblasting and gunite nozzleman, sanitary sewer pipe layer, steel plate structure erectors, screed man.
LABO1290‐021 04/01/2017
Rates Fringes
Laborers:
DOUGLAS AND SHAWNEE
COUNTIES
GROUP 1....................$ 17.97 9.43
GROUP 2....................$ 18.22 9.43
GROUP 1: Board mat weavers & cable tiers, georgia buggy (manually operated), mixerman‐no skip lift, salamander tenders, track men, tractor swamper, truck dumper, wire mesh setter, water pump up to 4 inches, and all other general laborers including flagman.
GROUP 2: Air tool operators, cement handlers (bulk), chain saw, georgia buggy (mechanically operated), grademan, hot mastic kettleman, crusher feeder, joint man, jute man, mason tender, material batch hopper and scale man, mixer man, pier hole man (working 11 feet deep), pipelayer ‐ drainage (concrete and/or corrugated metal), signal man (crane), truck dumper ‐ dry batch, vibrator operator, wagon and churn drill operator, asphalt raker, barco tamper, concrete saw, creosote material ‐ handling and applying, nozzle burner (cutting torch and burning bar), conduit pipe, water and gas distribution lines, tile and duct line setter, form setter and liner on concrete paving, powderman, sandblasting and gunite nozzleman, sanitary sewer pipe layer, steel plate structure erectors, screed man.
PLAS0044‐002 04/01/2006
Rates Fringes
Cement Masons:...................$ 27.45 10.10
PLAS0518‐003 04/01/2017
LEAVENWORTH COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 31.50 16.77
PLUM0441‐007 06/01/2017
DOUGLAS COUNTY
Rates Fringes
PLUMBER/PIPEFITTER
Industrial and Commercial Projects....................$ 35.83 16.26 Light Commercial Projects:
(heating, cooling and plumbing on construction projects bid for $50,000 or less, but does not include industrial, hospitals, colleges, and university projects)........$ 21.19 14.04
PLUM0441‐012 06/01/2017
SHAWNEE COUNTY
Pipefitters (Including HVAC work)............................$ 35.83 16.26 Plumbers (Excluding HVAC work)...$ 35.83 16.26
PLUM0533‐003 06/01/2017
LEAVENWORTH COUNTY
Rates Fringes
PIPEFITTER.......................$ 44.48 21.15
TEAM0541‐005 04/01/2017
LEAVENWORTH COUNTY:
Rates Fringes
Truck drivers:
GROUP 1.....................$ 32.06 14.85
GROUP 2.....................$ 31.49 14.85
GROUP 3.....................$ 30.97 14.85
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Mechanics and welders, A‐frame low boy ‐ boom truck driver.
GROUP 2: Material trucks, Tandem two teams, Semi‐trailers, Winch trucks‐fork trucks, Distributor drivers and operators, Agitator and transit mix, Tank wagon drivers, Single axle, Tank wagon drivers, Tandem or semi‐trailer, Isley wagons, dump trucks, Excavator, 5 cu. yds., and over, Dumpsters, Half‐tracks, Speedace, Euclids and other similar excavating equipment, One team, Station wagons, Pickup truck, Material trucks, single axle, Tank wagon drivers, single axle.
GROUP 3: Oilers and Greasers.
TEAM0541‐008 03/25/2000
Rates Fringes
Traffic control service driver...$ 14.15 2.44+a
a. PAID HOLIDAYS: New Year's Day, Decoration Day, July 4th, Labor Day, Thanksgiving Day, Christmas Day, Employee's birthday and 2 personal days.
TEAM0696‐001 04/01/2016
DOUGLAS, AND SHAWNEE COUNTIES
Rates Fringes
Truck drivers:
GROUP 1.....................$ 15.73 9.41
GROUP 2.....................$ 16.03 9.41
GROUP 3.....................$ 16.18 9.41
GROUP 1: Pickups, Panel trucks, Station wagons, Flat beds, Dump and batch trucks, single axle
GROUP 2: Tandem trucks, Warehousemen or partsmen, Mechanic helpers and servicemen
GROUP 3: Lowboys, Semi‐trailers, all Transit mixer truck (single or tandem Axle), A‐frame and winch trucks when used as such, Euclid, end and bottom dump, Tournarockers, Atheys, Dumpsters and similar off‐road equipment and mechanics on such equipment
WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health‐related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health‐related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198‐005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non‐union rates. Example: SULA2012‐007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG‐OH‐0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: KS170009 08/18/2017 KS9
Superseded General Decision Number: KS20160009
State: Kansas
Counties: Johnson, Miami and Wyandotte Counties in Kansas.
of $10.20 for calendar year 2017 applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional
1 02/03/2017 2 03/31/2017 3 04/14/2017 4 04/21/2017 5 05/19/2017 6 06/30/2017 7 07/14/2017 8 08/11/2017 9 08/18/2017
BOIL0083‐001 01/01/2017
Rates Fringes
BOILERMAKER......................$ 36.56 28.11
BRKS0015‐002 04/01/2016
Rates Fringes
Bricklayer, Stonemason...........$ 34.35 18.67
CARP4088‐006 05/01/2014
JOHNSON AND WYANDOTTE COUNTIES
Rates Fringes
CARPENTER........................$ 36.05 14.95
CARP4088‐007 05/01/2014
MIAMI COUNTY
CARPENTER........................$ 33.88 14.95
ELEC0053‐001 09/04/2016
JOHNSON (EAST OF MONTICELLO, OLATHE, AND SPRING HILL TOWNSHIPS)
AND WYANDOTTE COUNTIES
TELEPHONE AND TELEGRAPH
WORK INCLUDING CATV WORK:
CABLE SPLICERS; AIR
PRESSURE TECHNICIANS;
CENTRAL OFFICE EQUIPMENT
MAN........................$ 23.31 17.5%+6.70
EQUIPMENT OPERATOR
(TRENCHERS AND ALL OTHER
EQUIPMENT).................$ 22.13 17.5%+6.66
GROUNDMAN ‐ WINCH DRIVER...$ 16.76 20.5%+5.00
GROUNDMAN..................$ 13.49 17.5%+6.40
TELEPHONE LINEMAN AND
INSTALLER REPAIRMAN; CATV
TERMINATOR; EQUIPMENT
OPERATOR (1/4 YD. BACKHOE
AND LARGER AND D‐4
CRAWLERS AND LARGER).......$ 23.31 17.5%+6.70
ELEC0053‐002 08/30/2015
JOHNSON COUNTY (EAST OF MONTICELLO, OLATHE, AND SPRING HILL
TOWNSHIPS) AND WYANDOTTE COUNTIES
LINE CONSTRUCTION:
GROUNDMAN POWDERMAN........$ 27.84 33%+5.00
GROUNDMAN..................$ 26.76 29.5%+5.00
LINEMAN OPERATOR...........$ 38.37 29.5%+5.00
LINEMAN....................$ 41.52 29.5%+5.00
POLE TREATING:
POLE TREATING GROUNDMAN....$ 25.98 33%+5.00
POLE TREATING SPECIALIST...$ 44.34 33%+5.00
POLE TREATING TRUCK DRIVER.$ 25.23 34.5%+5.00
TRANSMISSION LINES:
(RAILROAD AND CROSS
COUNTRY)
GROUNDMAN, POWDERMAN.......$ 27.84 33%+5.00
GROUNDMAN..................$ 25.98 33%+5.00
LINEMAN OPERATOR...........$ 37.25 33%+5.00
LINEMAN....................$ 40.31 33%+5.00
ELEC0124‐005 08/31/2015
Rates Fringes
Communication Technician.........$ 34.16 20.37 Electricians, Including Low Voltage..........................$ 34.16 20.37
ELEC0304‐001 07/02/2017
JOHNSON (Except that portion East of Monticello, Olathe, and Spring Hill Townships); MIAMI COUNTY
Cable Splicer....................$ 43.05 18.83 Groundman........................$ 24.38 10.97 Line truck and equipment operators........................$ 33.80 16.14 Linemen..........................$ 41.00 18.24 Traffic signal technician........$ 39.95 6.10+29%
ENGI0101‐009 04/01/2016
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 35.82 15.99
GROUP 2.....................$ 34.78 15.99
OILERS/DRIVERS (ALL TYPES)..$ 30.31 15.99
OILERS......................$ 29.72 15.99
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1 ‐ Asphalt roller operator, finish; asphalt paver and spreader; asphalt plant operator; concrete plant operator;
la tourneau rooter (all tiller types); concrete mixer paver; slip form paver operator (CMI, Rex, Gomeco or equal); finishing machine operator; auto grader or trimmer or sub‐grader; side discharge spreader; concrete pump operator; back hoe; blade operator (all types); bulldozer operator; high loader ‐ fork lift ‐ skid loader (all types); quad track; scraper operators (all types); push cat; ditching machine; boilers ‐ 2; booster pump on dredge;
dredge engineman, dredge operator; tow boat operator;
hoisting engineer (2 active drums); crane operator; derrick or derrick trucks; drag line operator; pile drive operator;
pitman crane or boom truck (all types); shovel operator;
truck crane; clamshell operator; drilling or boring machine (rotary ‐ self propelled); boring machine (truck or crane mounted); skimmer scoop operator; mucking machine operator;
sideboom cats; locomotive operator (standard gage);
drillcat with compressor mounted (self‐contained) or similar type self propelled rotary drill (not air tract);
mechanics and welders (field andplants); wood and log chippers (all types); greaser
GROUP 2 ‐ A‐Frame truck operator, articulated dump truck;
hoisting engine (one drum); roller operator (with or without blades); boilers (1); distributor operator; fireman rig; tank car heater operator (combination boiler and booster); chip spreader; back filler operator; farm tractor (all attachments); multiple compactor; concrete mixer operator, skip loader; elevating grader operator; pavement breaker, self‐propelled hydra‐hammer (or similar type);
power shield; churn drill operator; concrete saws (self propelled); conveyor operator; float operator; form grader operator; screening and washing plant; siphons and jets;
vibrating machine operator (not hand held); crusher operator; conveyor operator; paymill operator; maintenance operator; welding machine; compressor, pumps;
self‐propelled street broom or sweeper; stump cutting machine; straw blower.
FOOTNOTE:
HOURLY PREMIUMS
FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($1.00) ABOVE GROUP 1
RATE: Clamshells ‐ 3 yd. capacity or over ‐ crane or rigs, 80 ft. of boom or over (including jib) ‐ draglines, 3 yd.capacity or over ‐ piledrivers 80 ft. of boom or over (including jib) ‐ shovels & backhoes, 3 yd. capacity or over.
* IRON0010‐003 04/01/2017
Rates Fringes
Ironworkers:
JOHNSON, WYANDOTTE COUNTIES.$ 32.65 28.85
MIAMI COUNTY
(All other work)...........$ 24.50 21.78 (Only to include major bridge crossings over a body of water, power plants, new major dam or lock projects, major missile site alterations and new television tower projects)..................$ 29.65 28.85
LABO1290‐006 04/01/2017
MIAMI COUNTY
Rates Fringes
Laborers:
GROUP 1.....................$ 29.58 15.23
GROUP 2.....................$ 30.79 15.23
LABORERS CLASSIFICATIONS
GROUP 1: General laborer ‐ Carpenter Tenders, Salamander Tenders, Loading Trucks under bins, Hoppers and Conveyors, Track Men and all other General Laborers, Air Tool Operator, Cement Handler (Bulk or Sack), Chain or Concrete Saw, Deck Hands, Dump Man or earth fill, Georgie Buggies Man, Material Batch Hopper Man, Scale Man, Material Mixer Man,(except on Manholes), Coffer Dams, Abatments and Pier
Hole Men working below ground, Riprap Pavers Rock, Black or Brick Signal Man, Scaffolds over ten feet not self supported from ground up, Skipmanor concrete, paving, Wire Mash Setters or concrete paving, Pipelayer on all work in connection with Sewer, Water, Gas.Gasoline, Oil, Drainage Pipe, Conduit Pipe, Tile and Duct Lines and all other pipelines whether pressurized or non‐pressurized, regardless of type of material, Power Tool Operator, all work in connection with Hydraulic or General Dredging Operatons, Form Setter Helpers Pudlers (paving only), Crusher Feeder, Men handling creosote ties on creosote materials, Men working with and handling epoxy material or materials (where special protection is required), Topper of Standing Trees, Batter Board Man on Pipe and Ditch work, Feeder Man on Wood Pulvarizer Board and Willow Mat Weavers and Cable Tiers on River Work, all Laborers working on underground tunnels where compressed air is not used.
GROUP 2: Spreader or Screed Man on Asphalt Machine, Asphalt Raker, Grade Checker, Mill Setter, Concrete Specialist, Vibrator Man, Concrete Saw over 5 hp., Laser Beam Man, Barco Tamper, Jackson or any other similar Tamp, Wagon Driller, Churn Drills, Air Track Drills and all other similar Drills, Cutting Torch Man, Form Setters, Liners and Stringline Men on Concrete Paving, curb, Gutters and etc., Hot Mastic Kettleman, Hot Tar Applicator, Hand Blade Operators, Manhole Builders Helpers and Mortar Men on Brick or Block Manholes, Sand Blasting and Gunnite Nozzle Men, Rubbing Concrete, Air Tool Operator in Tunnels, Head Pipe Layer on Sewer work, Manhole Builder (Brick or Block), Dynamite and Powder Men, Welder, Hazardous Waste Work.
LABO1290‐007 04/01/2017
JOHNSON AND WYANDOTTE COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 29.58 15.23
GROUP 2.....................$ 30.79 15.23
LABORERS CLASSIFICATIONS
GROUP 1: General laborer ‐ Carpenter Tenders, Salamander Tenders, Loading Trucks under bins, Hoppers and Conveyors, Track Men and all other General Laborers, Air Tool Operator, Cement Handler (Bulk or Sack), Chain or Concrete Saw, Deck Hands, Dump Man or earth fill, Georgie Buggies Man, Material Batch Hopper Man, Scale Man, Material Mixer Man,(except on Manholes), Coffer Dams, Abatments and Pier Hole Men working below ground, Riprap Pavers Rock, Black or Brick Signal Man, Scaffolds over ten feet not self supported from ground up, Skipmanor concrete, paving, Wire Mash Setters or concrete paving, Pipelayer on all work in connection with Sewer, Water, Gas.Gasoline, Oil, Drainage Pipe, Conduit Pipe, Tile and Duct Lines and all other pipelines whether pressurized or non‐pressurized, regardless of type of material, Power Tool Operator, all work in connection with Hydraulic or General Dredging Operatons, Form Setter Helpers Pudlers (paving only), Crusher Feeder, Men handling creosote ties on creosote materials, Men working with and handling epoxy material or materials (where special protection is required), Topper of Standing Trees, Batter Board Man on Pipe and Ditch work, Feeder Man on Wood Pulvarizer Board and Willow Mat Weavers and Cable Tiers on River Work, all Laborers working on underground tunnels where compressed air is not used.
GROUP 2: Spreader or Screed Man on Asphalt Machine, Asphalt Raker, Grade Checker, Mill Setter, Concrete Specialist, Vibrator Man, Concrete Saw over 5 hp., Laser Beam Man, Barco Tamper, Jackson or any other similar Tamp, Wagon Driller, Churn Drills, Air Track Drills and all other similar Drills, Cutting Torch Man, Form Setters, Liners and Stringline Men on Concrete Paving, curb, Gutters and etc., Hot Mastic Kettleman, Hot Tar Applicator, Hand Blade Operators, Manhole Builders Helpers and Mortar Men on Brick or Block Manholes, Sand Blasting and Gunnite Nozzle Men, Rubbing Concrete, Air Tool Operator in Tunnels, Head Pipe Layer on Sewer work, Manhole Builder (Brick or Block), Dynamite and Powder Men, Welder, Hazardous Waste Work.
PAIN0003‐002 04/01/2017
Painters:
Brush & roller..............$ 29.34 16.96 Paperhangers................$ 29.84 16.96 Sandblast ‐ base............$ 31.96 16.96 Sandblast: bridge, stage, erected steel, and storage bin and tank................$ 31.96 16.96 Spray storage bin and tanks; Spray elevated tanks; Stageman ‐ spray;
Bridge ‐ spray; Steelman ‐ spray.......................$ 31.96 16.96 Spray.......................$ 30.46 16.96 Stepplejack ‐ spray or sandblast...................$ 35.53 16.96 Stepplejack.................$ 35.53 16.96 Storage bin and tanks, elevated takns, stageman, beltman, bridge‐ man, steelman; elevator shaft.......................$ 31.96 16.96
12.90
PLAS0518‐012 04/01/2017
JOHNSON AND WYANDOTTE COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 31.50 16.77
PLUM0008‐005 06/01/2017
Rates Fringes
PLUMBER
Johnson and Wyandotte.......$ 43.80 21.14 Miami.......................$ 43.80 21.14
PLUM0533‐002 06/01/2017
PIPEFITTER.......................$ 44.48 21.15
SFKS0669‐001 04/01/2017
Rates Fringes
SPRINKLER FITTER.................$ 33.17 15.84
SHEE0002‐004 07/01/2012
Rates Fringes
Sheet metal worker...............$ 38.39 17.73
TEAM0541‐004 04/01/2017
Rates Fringes
Truck drivers:
GROUP 1.....................$ 32.06 14.85
GROUP 2.....................$ 31.49 14.85
GROUP 3.....................$ 30.97 14.85
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Mechanics and welders‐field; A‐frame low boy ‐ boom truck driver.
GROUP 2: Articulated dump truck; insley wagons: dump trucks, excavating, 5 cu. yds. and over, dumpsters, half‐tracks, speedace, euclids and similar excavating equipment material trucks; tandem two teams; semi‐trailers, winch trucks‐fork trucks; distributor drivers and operators; agitator and transit mix; tank wagon drivers, tandem or semi.; one team;
station wagons; pickup truck; material trucks, single axle;
tank wagon drivers, single axle
GROUP 3: Oilers, greasers‐field
TEAM0541‐008 03/25/2000
Traffic control service driver...$ 14.15 2.44+a
a. PAID HOLIDAYS: New Year's Day, Decoration Day, July 4th, Labor Day, Thanksgiving Day, Christmas Day, Employee's birthday and 2 personal days.
WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health‐related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health‐related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198‐005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non‐union rates. Example: SULA2012‐007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG‐OH‐0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: KS170020 01/06/2017 KS20
Superseded General Decision Number: KS20160020
State: Kansas
Counties: Butler, Doniphan, Franklin, Geary, Harvey, Jackson, Jefferson, Linn, Osage, Pottawatomie, Riley, Sedgwick, Sumner and Wabaunsee Counties in Kansas.
of $10.20 for calendar year 2017 applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
SUKS2013‐002 08/02/2013
Rates Fringes
CARPENTER (ROUGH)
Butler, Harvey, Sedgwick, Sumner......................$ 13.75 0.00 Doniphan, Franklin, Geary, Jackson, Jefferson, Linn, Osage, Pottawatomie, Riley, Wabaunsee............$ 13.73 0.00
CARPENTER
Butler, Harvey, Sumner......$ 15.44 0.00 Doniphan, Franklin, Jackson, Jefferson, Linn, Osage, Wabaunsee............$ 17.04 0.00
Geary, Pottawatomie, Riley..$ 18.29 4.70 Segdwick....................$ 15.45 0.00
CONCRETE FINISHER................$ 15.31 0.00
ELECTRICIAN
Butler, Harvey, Sumner......$ 24.07 9.32 Doniphan, Franklin, Geary, Jackson, Jefferson, Linn, Osage, Pottawatomie, Riley, Wabaunsee............$ 21.89 6.58 Sedgwick....................$ 24.36 8.18
IRONWORKER, REINFORCING
Butler, Harvey, Sumner......$ 14.80 0.00 Doniphan, Franklin, Geary, Jackson, Jefferson, Linn, Osage, Pottawatomie, Riley, Sedgwick, Wabaunsee..$ 15.48 0.00
IRONWORKER, STRUCTURAL...........$ 26.56 0.00
LABORER (ASPHALT RAKER)
Butler......................$ 12.26 0.00 Doniphan, Franklin, Geary, Jackson, Jefferson, Linn, Osage, Pottawatomie, Riley, Wabaunsee............$ 12.08 0.00 Harvey, Sedgwick, Sumner....$ 11.16 0.00
LABORER (COMMON or GENERAL) Butler......................$ 12.27 0.00 Doniphan....................$ 17.06 0.00 Franklin....................$ 15.81 0.00 Geary.......................$ 11.43 0.00 Harvey......................$ 12.43 0.00 Jackson.....................$ 17.61 0.00 Jefferson...................$ 15.92 6.93 Linn........................$ 15.59 0.00 Osage.......................$ 15.24 0.00 Pottawatomie................$ 11.78 0.00 Riley.......................$ 12.99 0.00 Sedgwick....................$ 12.48 0.00 Sumner......................$ 11.83 0.00
Wabaunsee...................$ 14.03 0.00
LABORER (FLAGGER)
Butler......................$ 11.87 0.00 Doniphan, Franklin, Jackson, Jefferson, Linn, Osage, Wabaunsee............$ 10.00 0.00 Geary, Pottawatomie.........$ 10.84 0.00 Harvey, Sedgwick, Sumner....$ 11.07 0.00 Riley.......................$ 10.75 0.00
POWER EQUIPMENT OPERATOR:
(ASPHALT PAVER SCREED)
Butler......................$ 14.87 2.64 Doniphan, Franklin, Jackson, Jefferson, Linn, Osage, Wabaunsee............$ 14.35 0.00 Geary, Pottawatomie, Riley..$ 13.90 0.00 Harvey......................$ 14.62 0.00 Sedgwick, Sumner............$ 14.16 0.00
POWER EQUIPMENT OPERATOR:
(ASPHALT PAVING MACHINE)
Butler......................$ 14.26 2.52 Doniphan, Franklin, Linn....$ 19.36 0.00 Geary, Pottawatomie.........$ 17.51 0.00 Harvey, Sedgwick, Sumner....$ 14.18 0.00 Jackson, Jefferson, Wabaunsee...................$ 16.44 0.00 Osage.......................$ 15.77 0.00 Riley.......................$ 17.50 0.00
POWER EQUIPMENT OPERATOR:
(BACKHOE)
Butler......................$ 15.89 0.00 Doniphan, Franklin, Linn....$ 18.34 8.07 Geary, Pottawatomie, Riley..$ 16.16 1.99 Harvey, Sedgwick, Sumner....$ 15.73 0.00 Jackson, Jefferson, Wabaunsee...................$ 18.50 9.83 Osage.......................$ 17.63 0.00
POWER EQUIPMENT OPERATOR:
(BULLDOZER)
Butler, Harvey, Sedgwick, Sumner......................$ 19.27 0.00 Doniphan, Franklin, Linn....$ 16.51 5.39 Geary, Pottawatomie, Riley..$ 17.78 0.00 Jackson, Jefferson, Osage, Wabaunsee...................$ 16.20 5.41
POWER EQUIPMENT OPERATOR:
(CONCRETE SAW)...................$ 13.18 0.00
POWER EQUIPMENT OPERATOR:
(CRANE)
Butler, Harvey, Sumner......$ 19.03 0.00 Doniphan, Franklin, Jackson, Jefferson, Linn, Osage, Wabaunsee............$ 20.34 0.00 Geary, Pottawatomie, Riley..$ 22.41 4.86 Sedgwick....................$ 18.61 0.00
POWER EQUIPMENT OPERATOR:
(DISTRIBUTOR‐BITUMINOUS)
Butler......................$ 14.79 0.00 Doniphan, Franklin, Jackson, Jefferson, Linn, Osage, Wabaunsee............$ 16.21 0.00 Geary, Pottawatomie, Riley..$ 14.50 0.00 Harvey, Sumner..............$ 14.55 0.00 Sedgwick....................$ 14.76 0.00
POWER EQUIPMENT OPERATOR:
(EXCAVATOR)
Butler......................$ 15.39 0.00 Doniphan, Franklin, Linn....$ 16.77 0.00 Geary, Pottawatomie.........$ 17.64 4.31 Harvey, Sumner..............$ 15.84 0.00 Jackson, Jefferson, Osage, Wabaunsee...................$ 17.61 9.30 Riley.......................$ 16.41 2.27 Sedgwick....................$ 16.90 0.00
POWER EQUIPMENT OPERATOR:
(FRONT END LOADER)
Butler......................$ 15.41 0.00 Doniphan, Franklin, Linn....$ 17.57 4.13
Geary, Pottawatomie, Riley..$ 12.50 0.00 Harvey, Sumner..............$ 14.97 0.00 Jackson, Jefferson, Osage, Wabaunsee...................$ 17.73 4.26 Sedgwick....................$ 15.19 0.00
POWER EQUIPMENT OPERATOR:
(MATERIAL TRANSFER VEHICLE)
Butler, Harvey, Sedgwick, Sumner......................$ 13.45 0.00 Doniphan, Franklin, Geary, Jackson, Jefferson, Linn, Osage, Pottawatomie, Riley, Wabaunsee............$ 14.65 0.00
POWER EQUIPMENT OPERATOR:
(MECHANIC)
Butler, Harvey, Segwick, Sumner......................$ 19.24 0.00
POWER EQUIPMENT OPERATOR:
(MOTOR GRADER/FINISH)
Butler......................$ 17.50 0.00
POWER EQUIPMENT OPERATOR:
(MOTOR GRADER/ROUGH).............$ 17.22 2.31
POWER EQUIPMENT OPERATOR:
(MOTOR SCRAPER)
Butler......................$ 13.31 0.00 Doniphan, Franklin, Geary, Harvey, Jackson, Jefferson, Linn, Osage, Pottawatomie, Riley, Sedgwick, Sumner, Wabaunsee.$ 15.50 0.00
POWER EQUIPMENT OPERATOR:
(ROADBED REMIXER)................$ 14.30 0.00
POWER EQUIPMENT OPERATOR:
(ROLLER/COMPACTOR)
Butler......................$ 13.63 2.45 Doniphan, Franklin, Linn....$ 16.39 2.94 Geary, Jackson, Jefferson, Pottawatomie, Wabaunsee.....$ 13.65 0.00 Harvey......................$ 13.22 0.00 Osage.......................$ 14.05 0.00 Riley.......................$ 14.01 0.00 Sedgwick....................$ 12.70 0.00 Sumner......................$ 13.48 0.00
POWER EQUIPMENT OPERATOR:
(ROTARY BROOM)
Butler......................$ 11.96 0.00 Doniphan, Franklin, Jackson, Jefferson, Linn, Osage, Wabaunsee............$ 14.88 0.00 Geary, Pottawatomie, Riley..$ 12.47 0.00 Harvey, Sedgwick, Sumner....$ 11.85 0.00
POWER EQUIPMENT OPERATOR:
(ROTOMILL)
GROUNDMAN
Butler.....................$ 12.74 0.00 Harvey, Sedgwick, Sumner...$ 12.64 0.00
OPERATOR
Butler.....................$ 14.88 0.00 Doniphan, Franklin, Geary, Harvey, Jackson, Jefferson, Linn, Osage, Pottawatomie, Riley, Sedgwick, Sumner, Wabaunsee..................$ 19.28 0.00
POWER EQUIPMENT OPERATOR:
(SKIDSTEER LOADER)
Butler......................$ 14.22 0.00 Doniphan....................$ 18.27 6.22 Franklin, Linn..............$ 18.95 3.20 Geary.......................$ 15.04 0.00 Harvey, Sedgwick, Sumner....$ 14.69 0.00 Jackson, Jefferson, Osage, Wabaunsee...................$ 17.32 10.43 Pottawatomie................$ 14.47 0.00 Riley.......................$ 15.20 0.00
POWER EQUIPMENT OPERATOR:
(TRACTOR)
Butler......................$ 13.31 0.00 Doniphan, Jackson, Jefferson, Linn, Osage, Wabaunsee...................$ 14.78 0.00 Franklin....................$ 15.21 0.00 Geary, Pottawatomie, Riley..$ 13.43 0.00 Harvey......................$ 12.92 0.00 Sedgwick....................$ 13.19 0.00 Sumner......................$ 12.39 0.00
Traffic control service driver...$ 11.00 0.00
TRAFFIC SIGNALIZATION:
Traffic Signal Installation
(GROUNDMAN)
Butler, Harvey, Sedgwick, Sumner......................$ 13.02 0.00
TRAFFIC SIGNALIZATION:
Traffic Signal Installation
(LINEMAN)
Butler, Harvey, Sumner......$ 22.47 3.17 Sedgwick....................$ 22.15 3.22
TRUCK DRIVER (HEAVY
DUTY/OFF‐ROAD)...................$ 12.86 0.00
TRUCK DRIVER (SINGLE AXLE)
Butler......................$ 13.87 0.00 Doniphan, Franklin, Linn....$ 17.50 0.00 Geary, Pottawatomie, Riley..$ 14.17 0.00 Harvey......................$ 15.38 0.00 Jackson, Jefferson, Osage, Wabaunsee...................$ 14.02 0.00 Sedgwick....................$ 16.73 0.00 Sumner......................$ 14.91 0.00
TRUCK DRIVER (TANDEM)
Butler, Harvey, Sedgwick....$ 13.64 0.00 Doniphan, Franklin, Linn....$ 14.60 0.00 Geary, Pottawatomie.........$ 14.03 0.00 Jackson, Jefferson, Osage, Wabaunsee...................$ 14.87 0.00 Riley.......................$ 13.98 0.00
Sumner......................$ 12.79 0.00
TRUCK DRIVER (TRIPLE AXLE and
SEMI)
Butler......................$ 14.06 1.87 Doniphan, Franklin, Linn....$ 18.19 3.31 Geary, Pottawatomie.........$ 14.94 0.00 Harvey......................$ 14.15 0.00 Jackson, Jefferson, Wabaunsee...................$ 17.61 0.00 Osage.......................$ 18.34 0.00 Riley.......................$ 14.78 0.00 Sedgwick,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .