A.07.14_Question_ _Answers_(Misc).docx

DOCX document 12 KB Posted

Attached to
Three Sided Information Panel at Perry Lake
Solicitation number
W912DQ-16-R-1012
Issued by

About this file

Responses to Questions.

View the file

Other files

File Type Posted
Map_of_Boat_Ramps_2.pdf PDF
Map_of_Boat_Ramps_1.pdf PDF
A.07.23_Picture_6.pdf PDF
A.07.23_Picture_3.pdf PDF
A.07.23_Picture_5.pdf PDF
A.07.23_Experience_Form.pdf PDF
A.0.7.23_Solicitation(Draft_Removed).pdf PDF
A.07.23_Picture_4.pdf PDF
A.07.23_Picture_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answer For The Three Sided Information Panel

Can you please tell me the length of the walkways for the ADA ramp sidewalk and the concrete fill requirement?

It looks like there will only be two sites that will require an actual sidewalk, the rest will just be the pads. We are estimating between 35 and 40 ft. of sidewalk will need to be poured between those two locations. The other sites have existing sidewalks that the pad can be tied into. As far as depth is concerned we feel a 4 inch sidewalk and pad would be sufficient. There is no special requirement for the concrete fill.