Amendment 02
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 17-B-1005.pdf | ||
| amendment_CD101_Drawings.pdf | ||
| A.07.24_Amendment.pdf | ||
| A.07.20_site_visit_list.pdf | ||
| MRLS_R471-460_Gatewell_325 01_Specs.PDF | ||
| MRLS_R471-460_Gatewell_325 01_Plans_RTA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Update to Specifications based on bidder inquiry.
Date, Time, and Location of bid opening Changed to 9 September 2016, at 1:00 P.M. Local time Kansas City, Room 501
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ-16-B-1005
X 9B. DATED (SEE ITEM 11)
04-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Sep-2016
CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ-16-B-1005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
The following items are applicable to this modification:
AMENDMENT 02
The SOLICITATION is amended as follows:
NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.
1. SPECIFICATIONS: Narrative Changes
a. Section 01 30 00
Replace the existing paragraph with the following:
1.13.1 Working Hours
Working hours for this project will be limited to Monday through Friday, 7:30 a.m. to 4:30 p.m., except as follows: Work will not be permitted on weekends and Federal holidays. In unusual circumstances, such as when utility turn-off is required for an extended period of time, authorization for weekend or holiday work may be requested from the Contracting Officer;
these instances must be coordinated well in advance, in writing. Short duration work which will disrupt normal operations or traffic flow must be scheduled at least 14 working days in advance with the Contracting officer and may require schedule changes to ensure that safety is maintained.
Working hours for this project will be limited to Monday through Friday, between the hours of 6:00 a.m. to 6:00 p.m., except as follows: Work will not be permitted on weekends and Federal holidays. In unusual circumstances, such as when utility turn-off is required for an extended period of time, authorization for weekend or holiday work may be requested from the Contracting Officer;
these instances must be coordinated well in advance, in writing. Short duration work which will disrupt normal operations or traffic flow must be scheduled at least 14 working days in advance with the Contracting officer and may require schedule changes to ensure that safety is maintained.
EM 385-1-1 shall take precedent over any other work hour duration requirements.
b. Section 03 31 01.00
Replace the existing paragraph with the following:
2.1.2.3 Quality
Fine aggregates shall conform to the aggregate quality requirements of ASTM C 33, except as modified herein. Coarse aggregates shall conform to the aggregate quality requirements of ASTM C 33/33M, Class 5S, except as modified herein. Aggregate particles shall be sound and durable and free from objectionable coatings. Coarse aggregate shall not contain more than 0.5 percent by weight of white tripolitic chert that has a specific gravity, saturated surface dry, of less that 2.40.
Tripolitic chert is the white porous siliceous from of weather chert found in nodules and beds within some limestone sources. The total amount of all types of chert shall not exceed 3 percent by weight. To keep chert from exceeding these specified maximum limits, it may be necessary to employ selective quarrying to utilize the lesser cherty portions of the limestone deposit and to remove cherty particles by processing, loading and handpicking from the quarried material before and during final processing into finished aggregate sizes. Aggregates shall have a specific gravity, saturated surface dry of not less than 2.60, and an absorption of not more than 2.0 percent, as determined by ASTM C127 and ASTM C128. The aggregates shall be tested in accordance with ASTM C1260 and shall have an expansion of less than 0.1 percent at 16 days.
Fine aggregates shall conform to the aggregate quality requirements of ASTM C 33, except as modified herein. Coarse aggregates shall conform to the aggregate quality requirements of ASTM C 33/33M, Class 5S, except as modified herein. Aggregate particles shall be sound and durable and free from objectionable coatings. Coarse aggregate shall not contain more than 0.5 percent by weight of white tripolitic chert that has a specific gravity, saturated surface dry, of less than 2.40.
Tripolitic chert is the white porous siliceous from of weather chert found in nodules and beds within some limestone sources. The total amount of all types of chert shall not exceed 3 percent by weight. To keep chert from exceeding these specified maximum limits, it may be necessary to employ selective quarrying to utilize the lesser cherty portions of the limestone deposit and to remove cherty particles by processing, loading and handpicking from the quarried material before and during final processing into finished aggregate sizes. Aggregates shall have a specific gravity, saturated surface dry of not less than 2.60, and an absorption of not more than 2.0 percent, as determined by ASTM C127 and ASTM C128.
Add the following paragraphs
2.1.2.6 Aggregate Expansion
Provide fine and coarse aggregates with expansions less than 0.08 percent at 28 days after casting when testing in accordance with ASTM C1260. Aggregates shall be tested individually and in combination which matches the Contractor's proposed mix design proportioning. All test results of the separate and combined aggregate testing shall have a measured expansion less than 0.08 percent after 28 days of immersion in a 1N NaOH solution. Should the test data indicate an expansion of 0.08 percent or greater, reject the aggregate(s) or perform additional testing using ASTM C1567 and using the proposed mix design. In this case, include the mix design low alkali portland cement and one of the following supplementary cementitious materials:
a. Utilize the Contractor's proposed low alkali Portland cement, Class F fly ash, and silica fume in combination with each aggregate and the combined aggregate. Determine the proportions of cementitious materials that will meet all the requirements of these specifications and that will lower the expansion to less than 0.08 percent after 28 days of immersion in a 1N NaOH solution.
Mixture proportioning shall be based on the highest percentage of fly ash, and/or silica fume required to mitigate ASR-reactivity. Regardless, use of fly ash is limited to a maximum of 35 percent of the total cementitious materials. If the testing demonstrates that fly ash in a proportion greater than 35 percent is required, then replace the fly ash or use GGBFslag cement.
b. Utilize the Contractor's proposed low alkali Portland cement, ground granulated blast furnace (GGBF) slag, and silica fume in combination with each aggregate and the combined aggregate.
Determine the proportions of cementitious materials that will meet all the requirements of these specifications and that will lower the expansion to less than 0.08 percent after 28 days of immersion in a 1N NaOH solution. Mixture proportioning shall be based on the highest percentage of (GGBF) slag and silica fume required to mitigate ASR-reactivity. Regardless, use of (GGBF) slag is limited to a maximum of 60 percent of the total cementitious materials. If the testing demonstrates that (GGBF) slag in a proportion greater than 60 percent is required, then a combination of fly ash and GGBFslag cement may be required.
c. If the above does not lower the expansion to less than 0.08 percent after 28 days of immersion in a 1N NaOH solution, the Contractor shall evaluate an alternate combination of cement, fly ash, GGBFslag, and silica fume to identify an alternate combination of cementitious materials effective in controlling the alkali-aggregate reactivity. Submit certified laboratory test reports for the fine aggregate, coarse aggregate, and the combined aggregate. The results of testing shall be submitted to the Contracting Officer for evaluation and acceptance. Use of Lithium admixtures is specifically prohibited.
c. Section 33 40 00
Replace the existing paragraph with the following:
2.1.1 Concrete Pipe
Manufactured in accordance with and conforming to ASTM C76, Class IV and pipe wall Class B or C.
Manufactured in accordance with and conforming to ASTM C76, Class IV and pipe wall Class C.
2.3 RESILIENT CONNECTORS
Delete Paragraph
Replace the existing paragraph with the following:
3.5.3 Determination of Density
Testing is the responsibility of the Contractor and performed at no additional cost to the Government. Testing shall be performed by an approved commercial testing laboratory or by the Contractor subject to approval. Tests shall be performed in sufficient number to ensure that specified density is being obtained. Laboratory tests for moisture-density relations shall be made in accordance with ASTM D1557 except that mechanical tampers may be used provided the results are correlated with those obtained with the specified hand tamper. Field density tests shall be determined in accordance with ASTM D2167 or ASTM D6938. When ASTM D6938 is used, the calibration curves shall be checked and adjusted, if necessary, using the sand cone method as described in paragraph Calibration of the referenced publications. ASTM D6938 results in a wet unit weight of soil and ASTM D6938 shall be used to determine the moisture content of the soil. The calibration curves furnished with the moisture gauges shall be checked along with density calibration checks as described in ASTM D6938. Test results shall be furnished the Contracting Officer. The calibration checks of both the density and moisture gauges shall be made at the beginning of a job on each different type of material encountered and at intervals as directed.
Testing is the responsibility of the Contractor and performed at no additional cost to the Government. Testing shall be performed by an approved commercial testing laboratory or by the Contractor subject to approval. Tests shall be performed in sufficient number to ensure that specified density is being obtained. Laboratory tests for moisture-density relations shall be made in accordance with ASTM D698 except that mechanical tampers may be used provided the results are correlated with those obtained with the specified hand tamper. Field density tests shall be determined in accordance with ASTM D2167 or ASTM D6938. When ASTM D6938 is used, the calibration curves shall be checked and adjusted, if necessary, using the sand cone method as described in paragraph Calibration of the referenced publications. ASTM D6938 results in a wet unit weight of soil and ASTM D6938 shall be used to determine the moisture content of the soil. The calibration curves furnished with the moisture gauges shall be checked along with density calibration checks as described in ASTM D6938. Test results shall be furnished the
Contracting Officer. The calibration checks of both the density and moisture gauges shall be made at the beginning of a job on each different type of material encountered and at intervals as directed.
3.6.2 Deflection Testing
Delete Paragraph
3.8 SCALES AND WEIGH HOUSE
Delete Paragraph
d. Section 35 41 00
2.1 HAUL ROAD MATERIALS
Haul Roads may shall be constructed in accordance with the materials specified on the construction drawings.
2.2.6 Flowable Fill Used for Pipe Bedding
Replace all references to Flowable Fill in this paragraph and sub-paragraphs to CLSM (controlled low strength material).
Replace the existing paragraph with the following:
3.17.6.1 Replacement of Unstable Material
Replace unstable material removed from the bottom of the trench or excavation with ASTM C 33 fine aggregate placed in layers not exceeding 6 inch loose thickness.
Replace unstable material removed from the bottom of the trench or excavation with lean concrete except underneath the landward 60.9 feet of the levee section where ASTM C 33 fine aggregate may be used. The fine aggregate is to be placed in layers not exceeding 6 inch loose thickness.
Replace the existing paragraph with the following:
3.17.6.2 Pipe Bedding and Initial Backfill
Provide bedding of the type and thickness shown. Place initial backfill material and compact it with approved tampers to a height as shown. Bring up the backfill evenly on both sides of the pipe for the full length of the pipe. Take care to ensure thorough compaction of the fill under the haunches of the pipe.
Provide bedding of the type and thickness shown.
Replace the existing paragraph with the following:
3.18.3.2 Pipe Bedding and Initial Backfill
b. Material Testing
(1) Moisture Density Relationships (cohesive) and Min/Max Index Density (cohesionless). The moisture-density relations for each different classification of cohesive material utilized shall be determined in accordance with ASTM D 698. Prior to placing any fill material containing cohesive material, a minimum of 1 (5) five-point compaction tests shall be performed on representative samples of the material to be used as fill.
Minimum and Maximum Index Density of each different classification of cohesionless material utilized shall be determined in accordance with ASTM D 4253 and ASTM D 4254. During fill placement a minimum of one additional moisture-density or Min/Max Index Density test shall be performed for every 2500 cubic yard placed. Additional tests will be required each time a new material is encountered. The moisture-density curves and index density information will be compiled to form a family of curves which will be utilized to estimate optimum properties to be used with field density test.
Moisture Density Relationships. The moisture-density relations for each different classification of material utilized shall be determined in accordance with ASTM D 698.
Prior to placing any fill material, a minimum of 1 (5) five-point compaction tests shall be performed on representative samples of the material to be used as fill. During fill placement a minimum of one additional moisture-density test shall be performed for every 2500 cubic yard placed. Additional tests will be required each time a new material is encountered. The moisture-density curves and index density information will be compiled to form a family of curves which will be utilized to estimate optimum properties to be used with field density test.
d. Section 32 31 26 Wire Fences and Gates is added. A copy accompanies this amendment.
2. DRAWINGS:
No drawings are being amended.
3. All other terms and conditions remain unchanged and in full force.
MRLS R471-460 STA. 325+01 Gatewell and Culvert Replacement Elwood, Kansas
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 31 26
WIRE FENCES AND GATES
04/08
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.4 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 FENCE FABRIC
2.1.1 Barbed Wire
2.2 GATES
2.3 POSTS
2.3.1 Wood Posts
2.4 CONCRETE
2.5 PADLOCKS
PART 3 EXECUTION
3.1 INSTALLATION
3.2 EXCAVATION
3.3 POST INSTALLATION
3.4 BARBED WIRE
3.5 GATE ASSEMBLY
-- End of Section Table of Contents --
32 31 26 - 1
SECTION 32 31 26
WIRE FENCES AND GATES
04/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)
AWPA U1 (2015) Use Category System: User Specification for Treated Wood
ASTM INTERNATIONAL (ASTM)
ASTM A121 (2013) Standard Specification for Metallic-Coated Carbon Steel Barbed Wire
ASTM A153/A153M (2016) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A780/A780M (2009; R 2015) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM C94/C94M (2016) Standard Specification for Ready-Mixed Concrete
ASTM F1083 (2016) Standard Specification for Pipe, Steel, Hot-Dipped Zinc Coated (Galvanized) Welded, for Fence Structures
ASTM F1184 (2016) Industrial and Commercial Horizontal Slide Gates
ASTM F883 (2013) Padlocks
ASTM F900 (2011) Industrial and Commercial Swing Gates
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
32 31 26 - 2
Installation Drawings Fence Installation Location of Gate, Corner, End, and Pull Posts Gate Assembly Gate Hardware and Accessories
SD-03 Product Data
Manufacturer's Instructions Gate Assembly Gate Hardware and Accessories
SD-04 Samples
Posts; G, RO Barbed Wire; G, RO Gate Posts; G, RO Gate Hardware and Accessories; G, RO Padlocks; G, RO
1.3 QUALITY ASSURANCE
Provide manufacturer's instructions that detail proper assembly and materials in the design for fence, gate assembly, gate hardware and accessories. Submit Installation drawings clearly indicating Fence Installation Location of gate, corner, end, and pull posts; Gate Assembly, Gate Hardware, catalog data and Accessories.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver materials to site in an undamaged condition. Store materials off the ground to provide protection against oxidation caused by ground contact. Prior to shipment, submit the following samples for review and approval:
Posts Barbed Wire Gate Posts Gate Hardware and Accessories Padlocks
PART 2 PRODUCTS
2.1 FENCE FABRIC
Provide fence fabric conforming to the following:
2.1.1 Barbed Wire
ASTM A121 zinc-coated, Type Z, Class 3 or aluminum-coated, Type A, with
12.5 gauge wire with 14 gauge, round, 4-point barbs spaced no more than 5 inches apart.
2.2 GATES
Provide gate type and swing shown conforming to ASTM F900 and/or ASTM F1184, ASTM A153/A153M. Gate frames shall conform to strength and coating requirements of ASTM F1083 for Group IA, steel pipe, with external coating Type A, nominal pipe size (NPS) 1-1/2. Gate leaves more than 8 feet wide
32 31 26 - 3 shall have either intermediate members and diagonal truss rods or tubular members as necessary to provide rigid construction, free from sag or twist. Gate leaves less than 8 feet wide shall have truss rods or intermediate braces. Provide intermediate braces on all gate frames with an electro-mechanical lock. Attach gate fabric to the gate frame by method standard with the manufacturer. Welding is not permitted. Furnish latches, hinges, stops, keepers, rollers, and other hardware items as required for the operation of the gate. Arrange latches for padlocking so that the padlock will be accessible from both sides of the gate. Provide stops for holding the gates in the open position.
2.3 POSTS
2.3.1 Wood Posts
Provide wood posts cut from sound and solid trees free from short or reverse bends in more than one plane. Make tops convex rounded or inclined. Provide posts free of ring shake, season cracks more than 1/4 inch wide, splits in the end, and unsound knots. Provide posts of size and shape indicated. Treat posts in accordance with AWPA U1 as applicable.
2.4 CONCRETE
ASTM C94/C94M, using 3/4 inch maximum size aggregate, and having minimum compressive strength of 3000 psi at 28 days. Provide grout consisting of one part portland cement to three parts clean, well-graded sand and the minimum amount of water to produce a workable mix.
2.5 PADLOCKS
Provide padlocks conforming to ASTM F883, TYPE P01, size 1-3/4 inch.
PART 3 EXECUTION
3.1 INSTALLATION
Install fence to the lines and grades indicated. Clear the area on either side of the fence line to the extent indicated. Space line posts equidistant at intervals not exceeding 10 feet. Set terminal (corner, gate, and pull) posts at abrupt changes in vertical and horizontal alignment. Provide continuous fabric between terminal posts; however, runs between terminal posts shall not exceed 500 feet. Any damage to galvanized surfaces, including welding, shall be repaired with paint containing zinc dust in accordance with ASTM A780/A780M.
3.2 EXCAVATION
Clear loose material from all post holes. Spread waste material where directed. Eliminate ground surface irregularities along the fence line to the extent necessary to maintain a 2 inch clearance between the bottom of the fabric and finish grade.
3.3 POST INSTALLATION
For wood posts (Farm Style Fence), excavate to depth indicated and brace post until backfill is completed. Place backfill in layers of 9 inches or less, moistened to optimum condition, and compacted with hand tampers or other approved method. Set posts plumb and in proper alignment. Drive metal posts or set in concrete as indicated.
32 31 26 - 4
3.4 BARBED WIRE
Install wire on the side of the post indicated. Pull wire taut to provide a smooth uniform appearance, free from sag. Fasten wire to line posts at approximately 15 inch intervals unless indicated otherwise.
3.5 GATE ASSEMBLY
For farm style fencing, provide standard metal gate assemblies with frame and fittings necessary for complete installation or wood gates as shown.
-- End of Section --
32 31 26 - 5