DPW-00017-6J_Questions_and_Answers.pdf

PDF 76 KB Posted

Attached to
DPW-00017-6J Replace Back Up Generator B501 Federal contract opportunity
Solicitation number
W912D0-18-B-0005
Issued by
Department of the Army Materiel Command Expeditionary Contracting Command Regional Contracting Office Alaska 413th CSB

About this file

DPW-00017-6J Questions and Answers

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912D0‐18‐B‐0005 DPW‐00017‐6J Replace Back Up Generator B501 Questions and Answers

6 September 2018

1. The Statement of Work, in Section 1.9, calls out the various codes and UFC’s to be used in this project. The first two are Structural and Electrical Engineering. Is it the intent of this section that the contractor produce stamped drawings by a registered engineer for this project, or simply that the performance criteria be met?

Answer: Simply that the performance criteria are met.

2. In the Statement of Work, section 2.4 calls out EFI&T, or Engineer, Furnish, Install and Test.

Again, will the customer require that this engineering is performed by a registered engineer?

Answer: No registered engineer is required.

3. Are existing fuel lines to be demolished and removed underground as well as in the basement to the generators?

Answer: Yes, the existing fuel lines to the existing generators to be demolished need to be removed from underground and as well as in the basement, so attached SOW that adds 2.10.7.