Attachment_2-DPW-00017-6J_Drawings,_20_October_2017,_4_pages.pdf
PDF 687 KB Posted
- Attached to
- DPW-00017-6J Replace Back Up Generator B501 Federal contract opportunity
- Solicitation number
- W912D0-18-B-0005
About this file
Attachment 2-DPW-00017-6J Drawings, 20 October 2017, 4 pages
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1-DPW-00017-6J_Statement_of_Work,_12_September_2018,_13_pages.pdf | ||
| Attachment_4-DPW-00017-6J_Submittal_Register_Revised.xls | XLS spreadsheet | |
| W912D0-18-B-0005-0001_SF30.pdf | ||
| DPW-00017-6J_Questions_and_Answers.pdf | ||
| Attachment_3-Construction_Wage_Rate_Determination,_3_August_2018,_14_Pages.pdf | ||
| W912D0-18-B-0005.pdf | ||
| Attachment_4-DPW-00017-6J_Submittal_Register.xls | XLS spreadsheet | |
| Attachment_1-DPW-00017-6J_Statement_of_Work,_14_August_2018,_12_pages.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fuel
Tank
NEW Generator
(Above Ground)
B501
B506
B507
Disconnect Switch for B501 (ref)
Disconnect Switches for B506 & 507 (ref)
Not to Scale
Old Generators
Located Here
Old Generators to be removed from this hatch
Above
Ground
Access
Hatch
B
R e p l a c
K o h l e r
G e n e r a t o r
D
PW
00017-6J
C:\Project\Greely Reference\Dwgs\NewLogo.JPG
L o c a t i o n
D i a g r a m
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text Mech
AutoCAD SHX Text Jan
AutoCAD SHX Text Tlt.
AutoCAD SHX Text Stor
AutoCAD SHX Text Admin
AutoCAD SHX Text Admin
AutoCAD SHX Text Admin
AutoCAD SHX Text Admin
AutoCAD SHX Text Admin
AutoCAD SHX Text Admin
AutoCAD SHX Text Admin
AutoCAD SHX Text Admin
AutoCAD SHX Text Admin
AutoCAD SHX Text Admin
AutoCAD SHX Text Admin
AutoCAD SHX Text Admin
AutoCAD SHX Text Stor
AutoCAD SHX Text Tlt.
AutoCAD SHX Text Comm
AutoCAD SHX Text Mech
AutoCAD SHX Text Comm
AutoCAD SHX Text Mech
AutoCAD SHX Text Mech
AutoCAD SHX Text Mech
AutoCAD SHX Text Comm
AutoCAD SHX Text N
AutoCAD SHX Text
PUBLIC WORKS
AutoCAD SHX Text
FORT GREELY
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text No.
AutoCAD SHX Text
OF
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text D I R E C T O R A T E O F P U B L I C W O R K S
AutoCAD SHX Text U . S . A R M Y A L A S K A
AutoCAD SHX Text F O R T G R E E L Y , A L A S K A 9 9 7 3 1
AutoCAD SHX Text PROJECT No.:
AutoCAD SHX Text
DRAWING FILE:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text DRAWING No.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text L-1
AutoCAD SHX Text
AutoCAD SHX Text Initial Plans
AutoCAD SHX Text
20 OCT 2017
AutoCAD SHX Text
DC
AutoCAD SHX Text
20 OCT 2017
AutoCAD SHX Text Deborah Curtis p p p p p p p p
EXISTING MAIN PANEL
COND. PUMP
HOT WATER HEATER
HONEYWELL FIRE
ALARM
UTILITY
POWER
P a n e l
D
A
B
U S
Y
V
P
H
W
NO BREAK DRIVE
PANEL E
p p p
P a n e l
F
S
Y
V
P
H
W
POP
DCO
SIPRNET
New Electrical
Existing Electrical p p
P a n e l
A
S
Y
V
P
H
W
PANEL EX
SPARE
p
PANEL EM
p
VTC CONF. TABLE
p
PANEL TPP3 RM 203
AND ADJOINING
p p p
VTC CONF. TABLE
SIMPLEX DAY TANK
PANEL TPP4 RM 205
AND ADJOINING
p p
P a n e l
A
S
Y
V
P
H
W p p p p p p p p p p p p p p p
AIR HEATING UNIT 3
SEWAGE INJECTORS
PUMP #1
CHLORINE PUMP
OUTLET UNDER
PANEL A-1
HOT H2O PUMP
FUEL OIL PUMP
AIR HEATING UNIT 1
FILTER BOOSTER FAN
H20 AIR
COMPRESSOR
TEMP AIR
COMRESSOR + GFCI
RECEPTACLE
PUMP 6
WELL ROOM OUTLET
SPARE / 1ST FLOOR
HALL CEILING
WELL PUMP
PUMP 7
Notes:
1. All conduit run outside must be galvanized rigid steel conduit. All other conduit must be metallic. All conduit connecting to the generators must be flexible metallic conduit suitable for wet environments.
2. The portion of the conduits where it passes from the heated basement to the exterior of the building must be filled with a code-compliant material to prevent the circulation of warm air to the colder sections, causing condensation.
3. Underground conduit must be installed at a minimum of 18" below grade.
4. Conduits shall be provided with expansion fittings where necessary to compensate for thermal expansion and contraction per industry standards for this location.
5. The holes cut in the concrete wall must be sealed to prevent moisture, soil and fire transfer.
6. Auxiliary power line and breaker should be designed to provide the correct voltage and amps as required by the generator.
7. The existing power lines to bldg 506 & 507 will need to be located, cut and routed through their respective transfer switches. These splices shall be in accessible in-ground boxes outside of the arctic enclosure. This detail is not shown here. These boxes shall be heavy duty and suitable for wet environments.
8. Conductor and conduit sizes are calculated in this drawing for estimating purposes. Existing conductor and line sizes shall be identified and matched for installation.
400A
Automatic
Transfer
Switch
Generator
B501 EMERGENCY
POWER OFF
Generator Controls
(8) 250 kcmil
+(2) 1/0 Gnd
(2) 2.5" RMC
See Note 8
(8) 250 kcmil
+(2) 1/0 Gnd
(2) 2.5" RMC
(2) #14 AWG XHHW
1" RMC
Building Disconnect
Switch (outside)
200A
Automatic
Transfer
Switch
UTILITY
POWER
See Note 8
(4) 250 kcmil
+(1) 1/0 Gnd
(1) 2.5" EMT
Building Disconnect
Switch (outside)
BLDG 506
100A
Automatic
Transfer
Switch
UTILITY
POWER
See Note 8
(4) #1 AWG
+(1) #6 Gnd
(1) 1.5" EMT
Building Disconnect
Switch (outside)
BLDG 507
ALARM to B501
Comm room
70/3p 50/3p
Panel B
100A BUS, 208Y/120V, 3PH, 4W
20/1p
20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p
20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p
New Arctic Enclosure B501
(8) 250 kcmil
+(2) 1/0 Gnd
(2) 2.5" RMC
(8) 250 kcmil
+(2) 1/0 Gnd
(2) 2.5" EMT
(8) 250 kcmil
+(2) 1/0 Gnd
(2) 2.5" EMT
100/3p 200/3p
Panel GEN
208Y/120V, 3PH, 4W
400/3p
(4) 250 kcmil
+(1) 1/0 Gnd
(1) 2.5" EMT
(4) #1 AWG kcmil
+(1) #6 Gnd
(1) 1.5" EMT
Generator Control
Generator Control
(12) 350 kcmil
+(3) 2/0 Gnd
(3) 3" EMT
ALARM to B501
Comm room
(4) #1 AWG
+(1) #6 Gnd
(2) 1.5" EMT
875A (MIN)
Manual
Transfer Switch
875/3p connection point for external 250KW generator
D i s c o n n e c t
S w i t c h
B p l a h l e r
G e n e r a t o r
D
PW
00017-6J
C:\Project\Greely Reference\Dwgs\NewLogo.JPG
O n e
L i n e
D i a g r a m
AutoCAD SHX Text
PUBLIC WORKS
AutoCAD SHX Text
FORT GREELY
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text No.
AutoCAD SHX Text
OF
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text D I R E C T O R A T E O F P U B L I C W O R K S
AutoCAD SHX Text U . S . A R M Y A L A S K A
AutoCAD SHX Text F O R T G R E E L Y , A L A S K A 9 9 7 3 1
AutoCAD SHX Text PROJECT No.:
AutoCAD SHX Text
DRAWING FILE:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text DRAWING No.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text E-1
AutoCAD SHX Text
AutoCAD SHX Text Initial Plans
AutoCAD SHX Text
20 OCT 2017
AutoCAD SHX Text
DC
AutoCAD SHX Text
20 OCT 2017
High level shut off
Pump off
Pump on
Low level alarm
B p l a h l e r
G e n e r a t o r
D
PW
00017-6J
C:\Project\Greely Reference\Dwgs\NewLogo.JPG
F u e l
S y s t e m
P
I D
Primary shutoff
Emergency shutoff
SEQUENCE OF OPERATION:
Manual Mode;
Place system into manual mode.
Push start fill
Emergency shutoff valve opens
Primary shutoff valve opens
Pump starts
When fuel level reaches pump off, 80%, pump shuts off.
Primary shutoff valve closes.
If level rises to high level shutoff, 90%, emergency shutoff valve closes.
If flow switch shows flow, or high level emergency switch is tripped, sound critical alarm and close both valves
Auto Mode:
Place system into auto mode
When fuel level reaches pump on, 30%
Primary shutoff valve opens emergency shutoff valve opens
Pump starts
If no flow sound alarm
When fuel level reaches pump off, 80%, pump shuts off
Primary shutoff valve closes
If level rises to high level shutoff, 90%, emergency shutoff valve closes
If flow switch shows flow, or high level emergency switch is tripped, sound critical alarm and close both valves
CLP = continuos level probe
GENERAL NOTES:
Pump skid shall be in a weather proof enclosure by AST.
Control panel shall be in a convenient location.
High level critical shutoff
AutoCAD SHX Text
AutoCAD SHX Text M1
AutoCAD SHX Text
FUEL SYSTEM P&ID
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
FS
AutoCAD SHX Text
PT
AutoCAD SHX Text
FS
AutoCAD SHX Text
PT
AutoCAD SHX Text
CLP
AutoCAD SHX Text
CLP
AutoCAD SHX Text 501 Fuel Oil AST 500 Gal
AutoCAD SHX Text Gen 1 Fuel Oil Day Tank 50 Gal Tank
AutoCAD SHX Text FP-1 5-10 GPM 20 ft hd
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text
PI
AutoCAD SHX Text Fuel Supply
AutoCAD SHX Text Fuel Return
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text
PUBLIC WORKS
AutoCAD SHX Text
FORT GREELY
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text No.
AutoCAD SHX Text
OF
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text D I R E C T O R A T E O F P U B L I C W O R K S
AutoCAD SHX Text U . S . A R M Y A L A S K A
AutoCAD SHX Text F O R T G R E E L Y , A L A S K A 9 9 7 3 1
AutoCAD SHX Text PROJECT No.:
AutoCAD SHX Text
DRAWING FILE:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text DRAWING No.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text F-1
AutoCAD SHX Text
AutoCAD SHX Text Initial Plans
AutoCAD SHX Text
20 OCT 2017
AutoCAD SHX Text
DC
AutoCAD SHX Text
20 OCT 2017
p l a h l e r
G e n e r a t o r
D
PW
00017-6J
C:\Project\Greely Reference\Dwgs\NewLogo.JPG
F u e l
L i n e s
D e t a i l s
501 AST
500 Gal
Return Line
Supply Line
Fuel Pump
Skid
Supply Line
Generator Location
NOTES:
1. Flexworks Transition sump
2. Flexworks double wall flexible piping
3. Flexworks double wall coupling with interstitial access port
4. Flexworks double flexible entry boot
5. Flexworks dual layer access pipe, 4"
6. Black iron pipe, ASTM A53 grade B, sch 40
1 1
2 2
3 3
Fuel Line to Generator Day Tank
Bed material per manufactures recomendations
Backfill per manufactures recomendations
16" min
AutoCAD SHX Text
PUBLIC WORKS
AutoCAD SHX Text
FORT GREELY
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text No.
AutoCAD SHX Text
OF
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text D I R E C T O R A T E O F P U B L I C W O R K S
AutoCAD SHX Text U . S . A R M Y A L A S K A
AutoCAD SHX Text F O R T G R E E L Y , A L A S K A 9 9 7 3 1
AutoCAD SHX Text PROJECT No.:
AutoCAD SHX Text
DRAWING FILE:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text DRAWING No.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text F-2
AutoCAD SHX Text
AutoCAD SHX Text Initial Plans
AutoCAD SHX Text
20 OCT 2017
AutoCAD SHX Text
DC
AutoCAD SHX Text
20 OCT 2017
| L-1 Location Diagram |
| Sheets and Views |
| L-1 Layout may 3-Layout1 |
| E-1 One Line Diagram |
| Sheets and Views |
| E-1 Electrical One-Line ONE GENERATOR May 17-Layout1 |
| F-1 Fuel System P&ID |
| Sheets and Views |
| F-1 Fuel Line Runs one generator-F-1 |
| F-2 Fuel Lines Details |
| Sheets and Views |
| F-1 Fuel Line Runs one generator-F-2 |
File details come from the government source that posted it.