Attachment_2-DPW-00017-6J_Drawings,_20_October_2017,_4_pages.pdf

PDF 687 KB Posted

Attached to
DPW-00017-6J Replace Back Up Generator B501 Federal contract opportunity
Solicitation number
W912D0-18-B-0005
Issued by
Department of the Army Materiel Command Expeditionary Contracting Command Regional Contracting Office Alaska 413th CSB

About this file

Attachment 2-DPW-00017-6J Drawings, 20 October 2017, 4 pages

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fuel

Tank

NEW Generator

(Above Ground)

B501

B506

B507

Disconnect Switch for B501 (ref)

Disconnect Switches for B506 & 507 (ref)

Not to Scale

Old Generators

Located Here

Old Generators to be removed from this hatch

Above

Ground

Access

Hatch

B

R e p l a c

K o h l e r

G e n e r a t o r

D

PW

00017-6J

C:\Project\Greely Reference\Dwgs\NewLogo.JPG

L o c a t i o n

D i a g r a m

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text Mech

AutoCAD SHX Text Jan

AutoCAD SHX Text Tlt.

AutoCAD SHX Text Stor

AutoCAD SHX Text Admin

AutoCAD SHX Text Admin

AutoCAD SHX Text Admin

AutoCAD SHX Text Admin

AutoCAD SHX Text Admin

AutoCAD SHX Text Admin

AutoCAD SHX Text Admin

AutoCAD SHX Text Admin

AutoCAD SHX Text Admin

AutoCAD SHX Text Admin

AutoCAD SHX Text Admin

AutoCAD SHX Text Admin

AutoCAD SHX Text Stor

AutoCAD SHX Text Tlt.

AutoCAD SHX Text Comm

AutoCAD SHX Text Mech

AutoCAD SHX Text Comm

AutoCAD SHX Text Mech

AutoCAD SHX Text Mech

AutoCAD SHX Text Mech

AutoCAD SHX Text Comm

AutoCAD SHX Text N

AutoCAD SHX Text

PUBLIC WORKS

AutoCAD SHX Text

FORT GREELY

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text No.

AutoCAD SHX Text

OF

AutoCAD SHX Text

DRAWING

AutoCAD SHX Text D I R E C T O R A T E O F P U B L I C W O R K S

AutoCAD SHX Text U . S . A R M Y A L A S K A

AutoCAD SHX Text F O R T G R E E L Y , A L A S K A 9 9 7 3 1

AutoCAD SHX Text PROJECT No.:

AutoCAD SHX Text

DRAWING FILE:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

CHIEF OF ENGINEERING

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text DRAWING No.

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text L-1

AutoCAD SHX Text

AutoCAD SHX Text Initial Plans

AutoCAD SHX Text

20 OCT 2017

AutoCAD SHX Text

DC

AutoCAD SHX Text

20 OCT 2017

AutoCAD SHX Text Deborah Curtis p p p p p p p p

EXISTING MAIN PANEL

COND. PUMP

HOT WATER HEATER

HONEYWELL FIRE

ALARM

UTILITY

POWER

P a n e l

D

A

B

U S

Y

V

P

H

W

NO BREAK DRIVE

PANEL E

p p p

P a n e l

F

S

Y

V

P

H

W

POP

DCO

SIPRNET

New Electrical

Existing Electrical p p

P a n e l

A

S

Y

V

P

H

W

PANEL EX

SPARE

p

PANEL EM

p

VTC CONF. TABLE

p

PANEL TPP3 RM 203

AND ADJOINING

p p p

VTC CONF. TABLE

SIMPLEX DAY TANK

PANEL TPP4 RM 205

AND ADJOINING

p p

P a n e l

A

S

Y

V

P

H

W p p p p p p p p p p p p p p p

AIR HEATING UNIT 3

SEWAGE INJECTORS

PUMP #1

CHLORINE PUMP

OUTLET UNDER

PANEL A-1

HOT H2O PUMP

FUEL OIL PUMP

AIR HEATING UNIT 1

FILTER BOOSTER FAN

H20 AIR

COMPRESSOR

TEMP AIR

COMRESSOR + GFCI

RECEPTACLE

PUMP 6

WELL ROOM OUTLET

SPARE / 1ST FLOOR

HALL CEILING

WELL PUMP

PUMP 7

Notes:

1. All conduit run outside must be galvanized rigid steel conduit. All other conduit must be metallic. All conduit connecting to the generators must be flexible metallic conduit suitable for wet environments.

2. The portion of the conduits where it passes from the heated basement to the exterior of the building must be filled with a code-compliant material to prevent the circulation of warm air to the colder sections, causing condensation.

3. Underground conduit must be installed at a minimum of 18" below grade.

4. Conduits shall be provided with expansion fittings where necessary to compensate for thermal expansion and contraction per industry standards for this location.

5. The holes cut in the concrete wall must be sealed to prevent moisture, soil and fire transfer.

6. Auxiliary power line and breaker should be designed to provide the correct voltage and amps as required by the generator.

7. The existing power lines to bldg 506 & 507 will need to be located, cut and routed through their respective transfer switches. These splices shall be in accessible in-ground boxes outside of the arctic enclosure. This detail is not shown here. These boxes shall be heavy duty and suitable for wet environments.

8. Conductor and conduit sizes are calculated in this drawing for estimating purposes. Existing conductor and line sizes shall be identified and matched for installation.

400A

Automatic

Transfer

Switch

Generator

B501 EMERGENCY

POWER OFF

Generator Controls

(8) 250 kcmil

+(2) 1/0 Gnd

(2) 2.5" RMC

See Note 8

(8) 250 kcmil

+(2) 1/0 Gnd

(2) 2.5" RMC

(2) #14 AWG XHHW

1" RMC

Building Disconnect

Switch (outside)

200A

Automatic

Transfer

Switch

UTILITY

POWER

See Note 8

(4) 250 kcmil

+(1) 1/0 Gnd

(1) 2.5" EMT

Building Disconnect

Switch (outside)

BLDG 506

100A

Automatic

Transfer

Switch

UTILITY

POWER

See Note 8

(4) #1 AWG

+(1) #6 Gnd

(1) 1.5" EMT

Building Disconnect

Switch (outside)

BLDG 507

ALARM to B501

Comm room

70/3p 50/3p

Panel B

100A BUS, 208Y/120V, 3PH, 4W

20/1p

20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p

20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p 20/1p

New Arctic Enclosure B501

(8) 250 kcmil

+(2) 1/0 Gnd

(2) 2.5" RMC

(8) 250 kcmil

+(2) 1/0 Gnd

(2) 2.5" EMT

(8) 250 kcmil

+(2) 1/0 Gnd

(2) 2.5" EMT

100/3p 200/3p

Panel GEN

208Y/120V, 3PH, 4W

400/3p

(4) 250 kcmil

+(1) 1/0 Gnd

(1) 2.5" EMT

(4) #1 AWG kcmil

+(1) #6 Gnd

(1) 1.5" EMT

Generator Control

Generator Control

(12) 350 kcmil

+(3) 2/0 Gnd

(3) 3" EMT

ALARM to B501

Comm room

(4) #1 AWG

+(1) #6 Gnd

(2) 1.5" EMT

875A (MIN)

Manual

Transfer Switch

875/3p connection point for external 250KW generator

D i s c o n n e c t

S w i t c h

B p l a h l e r

G e n e r a t o r

D

PW

00017-6J

C:\Project\Greely Reference\Dwgs\NewLogo.JPG

O n e

L i n e

D i a g r a m

AutoCAD SHX Text

PUBLIC WORKS

AutoCAD SHX Text

FORT GREELY

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text No.

AutoCAD SHX Text

OF

AutoCAD SHX Text

DRAWING

AutoCAD SHX Text D I R E C T O R A T E O F P U B L I C W O R K S

AutoCAD SHX Text U . S . A R M Y A L A S K A

AutoCAD SHX Text F O R T G R E E L Y , A L A S K A 9 9 7 3 1

AutoCAD SHX Text PROJECT No.:

AutoCAD SHX Text

DRAWING FILE:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

CHIEF OF ENGINEERING

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text DRAWING No.

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text E-1

AutoCAD SHX Text

AutoCAD SHX Text Initial Plans

AutoCAD SHX Text

20 OCT 2017

AutoCAD SHX Text

DC

AutoCAD SHX Text

20 OCT 2017

High level shut off

Pump off

Pump on

Low level alarm

B p l a h l e r

G e n e r a t o r

D

PW

00017-6J

C:\Project\Greely Reference\Dwgs\NewLogo.JPG

F u e l

S y s t e m

P

I D

Primary shutoff

Emergency shutoff

SEQUENCE OF OPERATION:

Manual Mode;

Place system into manual mode.

Push start fill

Emergency shutoff valve opens

Primary shutoff valve opens

Pump starts

When fuel level reaches pump off, 80%, pump shuts off.

Primary shutoff valve closes.

If level rises to high level shutoff, 90%, emergency shutoff valve closes.

If flow switch shows flow, or high level emergency switch is tripped, sound critical alarm and close both valves

Auto Mode:

Place system into auto mode

When fuel level reaches pump on, 30%

Primary shutoff valve opens emergency shutoff valve opens

Pump starts

If no flow sound alarm

When fuel level reaches pump off, 80%, pump shuts off

Primary shutoff valve closes

If level rises to high level shutoff, 90%, emergency shutoff valve closes

If flow switch shows flow, or high level emergency switch is tripped, sound critical alarm and close both valves

CLP = continuos level probe

GENERAL NOTES:

Pump skid shall be in a weather proof enclosure by AST.

Control panel shall be in a convenient location.

High level critical shutoff

AutoCAD SHX Text

AutoCAD SHX Text M1

AutoCAD SHX Text

FUEL SYSTEM P&ID

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

FS

AutoCAD SHX Text

PT

AutoCAD SHX Text

FS

AutoCAD SHX Text

PT

AutoCAD SHX Text

CLP

AutoCAD SHX Text

CLP

AutoCAD SHX Text 501 Fuel Oil AST 500 Gal

AutoCAD SHX Text Gen 1 Fuel Oil Day Tank 50 Gal Tank

AutoCAD SHX Text FP-1 5-10 GPM 20 ft hd

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text

PI

AutoCAD SHX Text Fuel Supply

AutoCAD SHX Text Fuel Return

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text

PUBLIC WORKS

AutoCAD SHX Text

FORT GREELY

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text No.

AutoCAD SHX Text

OF

AutoCAD SHX Text

DRAWING

AutoCAD SHX Text D I R E C T O R A T E O F P U B L I C W O R K S

AutoCAD SHX Text U . S . A R M Y A L A S K A

AutoCAD SHX Text F O R T G R E E L Y , A L A S K A 9 9 7 3 1

AutoCAD SHX Text PROJECT No.:

AutoCAD SHX Text

DRAWING FILE:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

CHIEF OF ENGINEERING

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text DRAWING No.

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text F-1

AutoCAD SHX Text

AutoCAD SHX Text Initial Plans

AutoCAD SHX Text

20 OCT 2017

AutoCAD SHX Text

DC

AutoCAD SHX Text

20 OCT 2017

p l a h l e r

G e n e r a t o r

D

PW

00017-6J

C:\Project\Greely Reference\Dwgs\NewLogo.JPG

F u e l

L i n e s

D e t a i l s

501 AST

500 Gal

Return Line

Supply Line

Fuel Pump

Skid

Supply Line

Generator Location

NOTES:

1. Flexworks Transition sump

2. Flexworks double wall flexible piping

3. Flexworks double wall coupling with interstitial access port

4. Flexworks double flexible entry boot

5. Flexworks dual layer access pipe, 4"

6. Black iron pipe, ASTM A53 grade B, sch 40

1 1

2 2

3 3

Fuel Line to Generator Day Tank

Bed material per manufactures recomendations

Backfill per manufactures recomendations

16" min

AutoCAD SHX Text

PUBLIC WORKS

AutoCAD SHX Text

FORT GREELY

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text No.

AutoCAD SHX Text

OF

AutoCAD SHX Text

DRAWING

AutoCAD SHX Text D I R E C T O R A T E O F P U B L I C W O R K S

AutoCAD SHX Text U . S . A R M Y A L A S K A

AutoCAD SHX Text F O R T G R E E L Y , A L A S K A 9 9 7 3 1

AutoCAD SHX Text PROJECT No.:

AutoCAD SHX Text

DRAWING FILE:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

CHIEF OF ENGINEERING

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text DRAWING No.

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text F-2

AutoCAD SHX Text

AutoCAD SHX Text Initial Plans

AutoCAD SHX Text

20 OCT 2017

AutoCAD SHX Text

DC

AutoCAD SHX Text

20 OCT 2017

L-1 Location Diagram
Sheets and Views
L-1 Layout may 3-Layout1
E-1 One Line Diagram
Sheets and Views
E-1 Electrical One-Line ONE GENERATOR May 17-Layout1
F-1 Fuel System P&ID
Sheets and Views
F-1 Fuel Line Runs one generator-F-1
F-2 Fuel Lines Details
Sheets and Views
F-1 Fuel Line Runs one generator-F-2