W912CN-17-Q-0008.pdf
PDF 514 KB Posted
- Solicitation number
- W912CN-17-Q-0008
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912CN-17-Q-0008_0001.pdf | ||
| 16-Q-0008_Pricing_Sheet.xlsx | XLSX spreadsheet | |
| Q_ _A.pdf | ||
| Attachment_1_Work_Experience.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912CN-17-Q-0008 25-Oct-2016
b. TELEPHONE NUMBER
808.656.0986
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 28 Nov 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912CN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ANNABELLE F. MILLER
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
EXPEDITIONARY CONTRACTING COMMAND
413TH CSB, RCO-HAWAII,
742 SANTOS DUMONT AVENUE
BLDG 108, 3RD FLOOR (WAAF)
SCHOFIELD BARRACKS HI 96857-5026
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE WX3JN3 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
US ARMY GARRISON HI DIR OF PUB WKS DPW
BYRON ODA
BLDG 104 947 WRIGHT AVE WAAF SERVICE CO
SCHOFIELD BARRACKS HI 96857-5013
TEL: 8086563211 FAX: 8086567771
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
20.5M
NAICS:
811219
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
X
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF133
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912CN-17-Q-0008
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at WAAF Bldg 106 IAW the Performance Work Statement and TE# 1.
Requiring Activity: DPW FOB: Destination
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 108/109 IAW the Performance Work Statement and TE# 1.
Requiring Activity: USARPAC
UNIT UNIT PRICE ESTIMATED AMOUNT
0003 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 145 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0004 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at SB Bldg 580 IAW the Performance Work Statement and TE# 1.
Requiring Activity: 25th ID
UNIT UNIT PRICE ESTIMATED AMOUNT
0005 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at SB Bldg 1095 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0006 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at SB Bldg 1502 IAW the Performance Work Statement and TE# 1.
Requiring Activity: 30th Sig Bn
UNIT UNIT PRICE ESTIMATED AMOUNT
0007 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 222 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0008 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 222 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 520 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0010 24 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of six (6) generators (20 - 50 KVA) at various locations IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0011 24 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of six (6) generators (100 - 218 KVA) at various locations IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0012 8 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of two (2) generators (438 - 650 KVA) at various locations IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0013 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator (2563 KVA) at Bldg 1580 East Range IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0014 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at FS Bldg 109/108 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0015 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at FS Bldg 145 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0016 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at SB Bldg 1096 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0017 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) automatic transfer switch (ATS) at SB Bldg 1096 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0018 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at SB Bldg 1502 IAW the Performance Work Statement and TE# 1.
Requiring Activity: 30th Signal Battalion
UNIT UNIT PRICE ESTIMATED AMOUNT
0019 4 Each PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at FS Bldg 520 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0020 1 Job PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Unscheduled Repair Work IAW Para 1.2 - Para 1.2.5 of the Performance Work Statement. Contractor shall obtain prior approval from the Contracting Officer before starting repair work. Rates will be based on "composite labor" rate and Battery Pricing Sheet.
NOTE: SEE ADDENDUM TO FAR 52.212-1 Instructions to Offerors - Commercial Items for information to be submitted.
UNIT UNIT PRICE ESTIMATED AMOUNT
0021 1 Each Contractor Manpower Reporting
FFP
Contractor Manpower Reporting (CMR) IAW the Performance Work Statement.
UNIT UNIT PRICE ESTIMATED AMOUNT
1001 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at WAAF Bldg 106 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1002 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 108/109 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1003 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 145 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1004 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at SB Bldg 580 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1005 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at SB Bldg 1095 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1006 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at SB Bldg 1502 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1007 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 222 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1008 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 222 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1009 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 520 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1010 24 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of six (6) generators (20 - 50 KVA) at various locations IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1011 24 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of six (6) generators (100 - 218 KVA) at various locations IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1012 8 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of two (2) generators (438 - 650 KVA) at various locations IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1013 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator (2563 KVA) at Bldg 1580 East Range IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1014 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at FS Bldg 109/108 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1015 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at FS Bldg 145 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1016 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at SB Bldg 1096 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1017 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) automatic transfer switch (ATS) at SB Bldg 1096 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1018 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at SB Bldg 1502 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1019 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at FS Bldg 520 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1020 1 Job OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Unscheduled Repair Work IAW Para 1.2 - Para 1.2.5 of the Performance Work Statement. Contractor shall obtain prior approval from the Contracting Officer before starting repair work. Rates will be based on "composite labor" rate and Battery Pricing Sheet.
NOTE: SEE ADDENDUM TO FAR 52.212-1 Instructions to Offerors -
UNIT UNIT PRICE ESTIMATED AMOUNT
1021 1 Each OPTION Contractor Manpower Reporting
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2001 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at WAAF Bldg 106 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2002 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 108/109 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2003 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 145 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2004 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at SB Bldg 580 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2005 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at SB Bldg 1095 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2006 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at SB Bldg 1502 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2007 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 222 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2008 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 222 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2009 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of uninterruptible power supply (UPS) at FS Bldg 520 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2010 24 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of six (6) generators (20 - 50 KVA) at various locations IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2011 24 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of six (6) generators (100 - 218 KVA) at various locations IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2012 8 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of two (2) generators (438 - 650 KVA) at various locations IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2013 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator (2563 KVA) at Bldg 1580 East Range IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2014 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at FS Bldg 109/108 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2015 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at FS Bldg 145 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2016 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at SB Bldg 1096 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2017 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) automatic transfer switch (ATS) at SB Bldg 1096 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2018 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at SB Bldg 1502 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2019 4 Each OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Quarterly preventive maintenance of one (1) generator at FS Bldg 520 IAW the Performance Work Statement and TE# 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2020 1 Job OPTION PSC J061 Maint & Rep of Power Dist Eqpt
FFP
Unscheduled Repair Work IAW Para 1.2 - Para 1.2.5 of the Performance Work Statement. Contractor shall obtain prior approval from the Contracting Officer before starting repair work. Rates will be based on "composite labor" rate and Battery Pricing Sheet.
NOTE: SEE ADDENDUM TO FAR 52.212-1 Instructions to Offerors -
UNIT UNIT PRICE ESTIMATED AMOUNT
2021 1 Each OPTION Contractor Manpower Reporting
FFP
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
FOR
PREVENTIVE MAINTENANCE AND REPAIR OF UNINTERRUPTIBLE POWER SUPPLY (UPS)
SYSTEMS, BATTERY BANKS, GENERATORS, & AUTOMATIC TRANSFER SWITCH (ATS)
1. DESCRIPTION OF SERVICES. The contractor shall provide labor, equipment, tools, parts, materials, vehicles, transportation and all other resources necessary to perform quarterly preventive or as required maintenance and repairs on Uninterruptible Power Supply (UPS) systems, battery banks, generators, and automatic transfer switch (ATS) located at various sites on Schofield Barracks, Wheeler Army Airfield and Fort Shafter, Island of Oahu, Hawaii. See Technical Exhibit #1 for location of buildings and model numbers of units.
1.1 Quarterly Preventive Maintenance (PM)
1.1.1 Contractor shall perform quarterly preventive maintenance and repairs on the UPS, battery banks, generator, and ATS on Fridays, Saturdays and Sundays between the hours of 7:30 a.m. to 4:00 p.m. Contractor is responsible for all repair work (to include labor and materials) associated with the PM services.
1.1.2 Contractor shall submit to the Contracting Officer Representative (COR) for approval a PM schedule and PM checklist within ten (10) working days after contract award.
1.1.3 Contractor shall provide backup power source when conducting maintenance.
1.1.4 Contractor shall perform quarterly preventive maintenance on UPS, generators and ATS to include on-site minor repairs with timely removal of worn out parts, checking fluid levels, battery inspection, load bank testing, replacing battery (if available on hand), verifying control panel readings and indicators, perform repairs and replacement of parts, identify other repairs and/or replacements needed, and changing of air filters, all else done by manufacturer recommendations.
1.1.5 Contractor shall check ATS connections, inspect or test for evidence of overheating and excessive contact erosion, remove any dust and dirt, and replace contacts when required. The maintenance procedure and frequency should follow those recommended by the manufacturer.
1.1.6 Within five working days after performing the PM service, contractor shall submit the completed checklist along with a detailed PM report (Technical Exhibit #2) to the COR with the following minimum information:
Date of PM Description of services performed Detailed results of each battery reading Problems encountered, if any Repairs needed or scheduled for next PM, estimated hours and cost
1.2 Unscheduled Repair Work. Contractor shall perform unscheduled repair work, when required. Labor cost shall be based on the composite labor rate incorporated in this contract under CLIN 0020 and corresponding option CLINs. Batteries shall be priced IAW the Firm Fixed Price incorporated in the contract.
1.2.1 For emergency repairs, the COR will telephonically notify the Contractor when emergency repair services are required and provide the nature of the problem with other relevant information. Contractor shall respond to an emergency service call within two (2) hours and restore the systems to their fully operational capability within two (2) working days of notification. Contractor shall notify the COR within two (2) working days if repairs are not completed. Contractor shall annotate on the work order request (Technical Exhibit #3) a cost estimate to COR of labor hours and replacement parts. Perform emergency repair only upon approval by the Contracting Officer.
1.2.2 For repairs required outside of the regular preventive maintenance, the COR shall provide the work order request (Technical Exhibit #3) by email or fax to the contractor, who shall acknowledge receipt by email or fax within one (1) business day. Contractor shall respond within two (2) business days to provide an assessment and estimate to repair. Contractor shall annotate on the work order request a cost estimate to COR of labor hours and replacement parts. Respond to a service call and perform on-site repair work during normal duty hours within four (4) hours upon receipt of approval/notification by the COR and submit notice of completion.
Contractor shall restore systems to their full operational capability within two (2) working days after notification.
Notify the COR telephonically if repairs are not completed within the specified time.
1.2.3 Parts. Contractor shall use new and of equal quality to the manufacturer’s original parts. The Contractor shall warranty all parts for a minimum of 30 days. When purchasing new batteries, the manufacturer’s date shall be no more than three (3) months old. Contractor shall inspect/test each new battery before installation. Batteries shall be priced IAW the Firm Fixed Price incorporated in the contract under CLIN 0020 and corresponding option CLINs for the corresponding battery model used. Other minor expenditures for parts will be based on the actual cost to the contractor supported by receipts. Contractor shall obtain contracting officer approval prior to purchase of parts.
1.2.4 The Contractor shall provide the name(s) of point(s) of contact with a local or toll-free telephone number(s) who can receive work request calls from the Government 24 hours a day, 7 days a week.
1.2.5 Within two (2) working days after completion of work, contractor shall submit to the COR a detailed, completed work order request with the following information:
Date and time arrived on-site for service Date and time service was completed Corrective action taken Itemized listing of parts and their cost used to restore service Signature of a Government Representative
2. Performance Requirements Summary. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective PWS Para
Performance Threshold
Preventive Maintenance 1.1- 1.1.5 90% of the scheduled PM service is performed on time.
Unscheduled Repair Work 1.2-1.2.5 100% of work requests meet the response time as specified.
3.0 The Government will furnish electricity and water from existing outlets.
4.0 SPECIAL PROVISIONS
4.1 Quality Control. The contractor shall develop and maintain a quality program to ensure preventive maintenance services are performed in accordance with commonly accepted commercial practices and in accordance with Original Equipment Manufacturer (OEM) specifications. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. At a minimum, the contractor shall develop quality control procedures addressing the areas identified in Para 2, Performance Requirements Summary.
4.2 Performance Assessment. The government will evaluate contractor’s performance to ensure the requirements in the Performance Requirements Summary are met.
4.3 Additions/Deletions. The Government reserves the right to add/delete equipment to this contract. The Government will notify the contractor in writing prior to any additions/deletions.
4.4 Hours of Operation
4.4.1 Normal Duty Hours. 7:30 a.m. to 4:00 p.m. Monday through Friday, excluding Federal holidays.
4.4.2 Normal Preventive Maintenance Hours. 7:30 a.m. to 4:00 p.m., Friday, Saturday and Sunday.
4.3.3 Emergency Work. Sunday through Saturday at any given time due to mission critical facilities.
4.4. Authorized Individuals (AI). The Government will provide to the contractor at the post-award conference a listing of personnel authorized to request maintenance work.
4.5 Authorized Individuals (AI). The Government will provide to the contractor at the post-award conference a listing of personnel authorized to request maintenance work.
4.5.1 Identification of Contractor Employees.
4.5.2 The contractor shall provide each employee with identification (ID) badge made of nonmetallic material, easily readable and including employee’s name, contractor’s name, functional area of assignment, and recent color photograph of the employee.
4.5.3 Display of ID Badges. Contractor personnel shall wear the ID badge at all times when performing work under this contract at a Government site, including while attending Government meetings and conferences that may take place outside the Government facility. Unless otherwise specified in the contract, each contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit such placement.
5. CONTRACTOR MANPOWER REPORTING (CMR)
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the preventive maintenance of UPS, generators and ATS via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/, and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website.
6. SECURITY AND SAFETY.
6.1 IWATCH. IWATCH within the Army is a nation-wide modern version of a neighborhood watch program focused on the threat of terrorist activity. It is an antiterrorism awareness program that the contractor’s workforce, while on Army installations, must all be familiar with to promote and enhance reporting suspicious activity or behavior. The program has two elements: passive and active. The passive element is an individual’s situational awareness of his or her surroundings. The active element of iWATCH involves individuals taking action to report suspicious behavior or activities to law enforcement for more investigation. Contractor personnel, to include subcontractors, performing on or within an Army controlled facility, area or on an Army installation are required to brief and train their personnel on the iWatch program for that area, facility or installation. Training standards will be provided by the COR within five (5) calendar days of contract award. Contractor personnel shall be trained within five (5) days of award or within five (5) 5 days of a hiring action. Contractors are to report training to the COR within seven (7) days of contract award or a hiring action.
6.2 Anti-terrorism (AT) and Operational Security (OPSEC). See FAR Clause 52.242.5001.
6.3 Access to Army Installations - Personnel and Vehicles. See FAR Clause 52.242-5000.
7.0 TECHNICAL EXHIBITS
TE # 1 Inventory of UPS/Generators/ATS Systems and Location of Units
TE# 2 Preventive Maintenance Report
TE# 3 Work Order Request
TECHNICAL EXHIBIT #1
TECHNICAL EXHIBIT # 1
Inventory, Location and Estimated Repair Time
Uninterruptible Power Supply (UPS), Generators, Automatic Transfer Switch (ATS)
UNINTERRUPTIBLE POWER SUPPLY (UPS)
Item Location Description CLIN
Requiring Activity – DPW (1) 1 Wheeler Army Airfield
Bldg 106 UPS: MGE Galaxy 3000 Model # 72-17000-10, A08-10046 80 KVA, 20 batteries
Requiring Activity – USARPAC (2)
2 Fort Shafter Bldg 109/Bldg 108
UPS: Powerware Model #9315-160
ETZ3244ZBA05, 130KVA
Battery Banks: UPS12-200FR, 80 batteries
3 Fort Shafter Bldg. 145
UPS: Powerware 225 9315-225 Model # EW456ZXX01 225 KVA, 80 batteries
Requiring Activity – 25th ID (2) 4 Schofield Barracks
Bldg 580
UPS: Powerware Model #9315-160
ER114ZBA05, 160KVA
Battery Banks: UPS 12-370FR, 80 batteries
5 Schofield Barracks Bldg 1095
UPS: Smart-UPS VT ISX
SN: PS0748141033, 30 KVA
Requiring Activity – 30th Signal Battalion (4) 6 Schofield Barracks
Bldg 1502 UPS: Powerware Model # 9315-500
EB425ZX404, 400 KW, 480 V, 500 KVA
Battery Banks: UPS12370OFR, 120 batteries
7 Fort Shafter Bldg 222
UPS: Powerware Model #9315-300
EW0ZXX02, 300KVA
Battery Banks: UPS12-270FR, 120 batteries
8 Fort Shafter Bldg 222
UPS + G9
Powerware Model #9315; 208KVA
9 Fort Shafter Bldg 520
UPS: Toshiba Model #4200FA XT 80 KVA
SN: T42B3F300XAMXN
Battery Banks: 26 batteries
GENERATORS AND AUTOMATIC TRANSFER SWITCH (ATS)
Requiring Activity – DPW (15)
1 Fort Shafter Bldg 118
Generator: Cummins
SN: DNAF-5664099
20 KVA
20 – 50 KVA
2 Helemano Military Reservation Generator: Kohler
SN: SGM322G3W
37.5 KVA
3 Wheeler Army Airfield
Bldg 200 Fire Department Generator: CAT
SN: NCB00441
50 KVA
4 Wheeler Army Airfield
Bldg 207 Generator: Kohler
SN: SGM3244TG
38 KVA
5 Schofield Barracks
Bldg 140 Fire Station Generator: CAT
SN: 0022ENCB00442
25 KVA / 20 KW
6 Schofield Barracks
Kastner Fire Station Generator: Generac
SN: RD03024GDSE
37.5 KVA / 30 W
7 Aliamanu Military Reservation
Tanks S1 & S2 Generator: CAT
SN: CAT00C66JN6D01938
187.5 KVA
100 – 218 KVA
8 Helemano Military Reservation
Bldg. 301, Water Pumping Station Generator: Kato
SN: WA500824
218 KVA / 175 KW
9 Wheeler Army Airfield
Bldg 1301 ONAN/Cummins
SN: A890197784
100 KVA
10 Schofield Barracks
Bldg 2625, DPW Shops Cummins
SN: M111379785
178 KVA / 143 KW
11 East Range
Pump 4
CAT
SN: CAT00C66LN6D01654
150 KVA
12 East Range
Pump 6
CAT
SN: CAT00C44HD4B01662
125 KVA / 100 KW
13 Schofield Barracks
Bldg SB 1160 Generator: Cummins
SN: H080203326
438 KVA
438 – 650 KVA
14 Schofield Barracks
Bldg 2071 Generator: Cummins
SN: E892176838
650 KVA
438 – 650 KVA
15 East Range
Bldg. 1580, Water Plant Generator: Kohler
SN: 7312844
GENERATORS AND AUTOMATIC TRANSFER SWITCH (ATS)
2563 KVA / 2050 KW 2563 KVA
Requiring Activity – USARPAC (2)
16 Fort Shafter Bldg 109/Bldg 108
Generator: Caterpillar Diesel Model #125483361111
SN: 86642; 125 KW; 156.25 KVA
17 Fort Shafter Bldg 145
Generator: Caterpillar Diesel Model # 3512
SN: 24703047; 480/277 V, 1100 KVA
Requiring Activity – 25th ID (2) 18 Schofield Barracks
Bldg 1096 Generator: Caterpillar Diesel Model # 3306
DI
SN: 85Z03240, 175 KVA/200 KW
19 Schofield Barracks Bldg 1096
ATS: 400A Russelectric, Inc.
Model # RMTD-4003CE SN: 13731-1
Requiring Activity – 30th Signal Battalion (2) 20 Schofield Barracks
Bldg 1502 Generator: Caterpillar Diesel Model # 3208
SN: 3EN00643; 900 KW; 1125 KVA
21 Fort Shafter Bldg 520
Generator: CAT Generator
SN: 254991; 250 KW; 312 KVA
SUMMARY
Requiring Activity No. of UPS No. of Generators/ATS
DPW 1 15
20-50 KVA 6
100 – 150 KVA 6
438 – 650 KVA 2
2563 KVA 1
USARPAC 2 2
25th ID 2 2 30th Signal Battalion 4 2
Total
TECHNICAL EXHIBIT #2
PREVENTIVE MAINTENANCE AND REPAIR OF UNINTERRUPTIBLE POWER SUPPLY (UPS)
SYSTEMS, BATTERY BANKS, GENERATORS, & AUTOMATIC TRANSFER SWITCH (ATS)
TECHNICAL EXHIBIT # 2
Preventive Maintenance Report
Contractor’s Name: __________________________________________ Date: _____________________
Bldg. No.: ___________ Address: _______________________ Location: _____________________
Equipment Serviced: ___________________________________________________________________________
Start Time: _______________________________ End Time: ________________________________
Service Performed: Overall Condition; Problems:
Repairs and Replacements Needed (Include estimated hours and cost):
Contractor Signature: Date:
Government Representative/COR Date:
TECHNICAL EXHIBIT #3
TECHNICAL EXHIBIT #3
UPS/Generator/ATS Work Request
1. From: Contracting Officer Representative/ To: Contractor Request for Diagnosis Authorizing Individual (COR/AI) Name: Phone: Email/Fax:
Location:
Project Title: PM UPS/Generator/ATS Contract Number: W912CN-XX-X-XXXX
Problem:
Notes/Comments:
COR Signature: Date and Time Notified:
Work Request Number:
2. From: Contractor To: COR Diagonsis Report Contractor Name:
POC: Phone: Email/Fax:
Detail Diagnosis:_______________________________________________________________
Contractor Signature: Date and Time Diagnosis Completed:
3. From Contractor To: COR Repair And Cost Estimate Estimated Man Hours: Estimated Cost of Materials:
Estimated Time to Complete Job:
Estimated Total Cost of Job:
Notes/Comments:_______________________________________________________________
Contractor Signature: Date and Time Estimate Submitted:
4. From COR/AI To: Contractor Repair Approval
Signature:
Date and Time:
5. From Contractor To: COR/AI Repair Completion
Contractor Signature:
6. From: COR/AI To: Contractor Repair Inspected Notes/Comments:______________________________________________________________________________________
COR Signature:
ADDENDUM TO FAR 52.212-1
ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS
Par (h) is amended to read: Single Award. The Government intends to award a single contract resulting from this solicitation.
ADDITIONAL INSTRUCTIONS AND INFORMATION:
1. Quote Submission Instructions.
a. The solicitation will be posted to the Federal Business Opportunities (FBO) website at https://www.fbo.gov. Once posted, it is the responsibility of the contractor to monitor the website until the closing date for any issued amendments. Quotes shall be submitted electronically on the FBO website or via e-mail to the Contract Specialist identified below. Faxed quotes will not be accepted.
Annabelle F. Miller annabelle.f.miller.civ@mail.mil
b. Quotes must be received by the contracting office on or before the solicitation closing date and time stated under Block 8 of the SF1449 Solicitation/Contract/Order for Commercial Items. Local time is Hawaii Standard Time (HST). It is the responsibility of the contractor to ensure quotes are received and acknowledged by the Contract Specialist on or before the closing date.
c. Minimum Quote Acceptance Period. The quote acceptance period is amended to 90 days. By submittal of a quote, the contractor agrees to hold the prices in its quote firm for 90 calendar days.
d. The Government may reject any or all responses if such actions are in the public interest and/or waive informalities and minor irregularities in the submitted quotes. The Government reserves the right to cancel this Request for Quote (RFQ) and make no award. By responding to this RFQ and submitting a quote in response to the RFQ, the Contractor understands that the Government shall not be liable for any costs incurred by the Contractor in response to this RFQ.
2. Solicitation Questions. Questions regarding this solicitation shall be submitted in writing via e-mail to the CPT Mario D. Claytor at mario.d.claytor.mil@mail.mil and Albert Manlutac at albert.manlutac.civ@mail.milat annabellle.f.miller.civ@mail.mil and Albert B. Manlutac at albert.b.manlutac.civ@mail.mil within two (2) days after the site visit. The Government reserves the right not to respond to questions concerning this solicitation received after the date and time specified for receipt of questions. A summary of questions received and Government responses will be provided by amendment and posted to the FBO website.
3. Site Visit.
a. A site visit will be conducted on 8 November 2016, at 9:00am HST starting at Wheeler Army Airfield.
Attendees will meet at the following location:
Regional Contracting Office - Hawaii Bldg. 108, 3rd Floor 742 Santos Dumont Ave Wheeler Army Airfield
b. Offerors are required to adhere to Military Regulations to gain access to the facility. Attendees are responsible for gaining access. Attendees will need to provide proof of insurance and registration of vehicles and have a valid photo ID and/or photo driver’s license. Attendees will be required to provide their own transportation.
c. Offerors interested in attending the site visit shall limit their participation to two (2) representatives per company. Attendee information to include company name, address, representative's name, telephone number and email address shall be provided via email to CPT Mario Claytor at mario.d.claytor.mil@mail.mil and Albert B.
Manlutac at albert.manlutac.civ@mail.mil no later than 1600 PM HST on 4 Nov 16.
d. Any discussion, remarks and explanations that may be made by any Government representative during the site visit will not change the terms and conditions of the solicitation, unless the solicitation is amended in writing.
e. The Government reserves the right to disallow or limit the use of still or video camera.
4. Quote/Content Requirements. Interested parties shall complete and submit the items identified below with their quote.
a. Tab A Technical: Staffing matrix and narrative as described in Para B(2)(a) of the Addendum to FAR 52.212-2 Evaluation – Commercial Items.
b. Tab B Technical: Completed Work Experience Information per Attachment 1 as described in Para (B)(2)(b) of the Addendum to FAR 52.212-2 Evaluation – Commercial Items.
c. Tab C RFQ Standard Form 1449 Solicitation/Contract/Order for Commercial Items with Blocks 12, 17a, 30a, 30b, and 30c completed and signed by an authorized representative/official of the company/firm. Include acknowledgement of amendments, if any.
d. Tab D RFQ SF 1449 – Continuation Sheet Supplies and Services/Pricing and Pricing Spreadsheet.
Submit pricing for all contract line items (CLINs).
e. Tab E Pricing Sheet per Attachment 2. This consists of the following:
Pricing Summary Base Pricing Option 1 Pricing Option 2 Pricing Additional Price Information
(i) Labor price per hour for Unscheduled Repair. Provide a composite rate per hour for CLIN 0020 and corresponding Option CLINs. This rate will not be included in the price evaluation but will be incorporated in the contract award. If unscheduled repairs are required during contract performance, contractor will use this composite rate for work order estimates. This rate will be Firm Fixed Price.
(ii) Replacement Battery Price. Provide price for the different models of equipment.
This price will not be included in the price evaluation but will be incorporated in the contract award under CLIN 0020 and corresponding option CLINs. If batteries need to be replaced during contract performance, contractor will use this price. This will be Firm Fixed Price.
f. Tab F The contractor shall complete only paragraph (b) of FAR 52.212-3 if annual representations and certifications were completed electronically via the System for Award Management (SAM), and submit paragraph
(b) with the quotation, if applicable. If the contractor has not completed the annual representations and certifications electronically, paragraphs (c) through (r) of FAR 52.212-3 shall be completed and submitted with the quotation.
g. Tab G Responsibility Determination Narrative: For purposes of conducting responsibility determination, submit a narrative addressing the following. The responsibility determination will only be conducted on the apparent successful contractor.
(1) Adequacy of financial resources to perform the contract, or the ability to obtain them;
(2) Ability to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
(3) Adequacy of the company/firm’s performance record. Provide at least two (2) references (name, telephone no, email address, a brief description of project/contract completed).
(4) Description of how the company/firm maintains integrity and business ethics.
(5) Adequacy of the company/firm’s organization, experience, and technical skills, or the ability to obtain them (including, as appropriate, such elements as quality assurance measures and safety programs applicable to materials to be delivered and services to be performed by the prospective contractor and subcontractors).
(6) Adequacy of the necessary vehicles and equipment, or ability to obtain them.
h. Tab H Women Owned Small Business Documentation Requirements. FAR 19.1503 Women-Owned Small Business Program. Provide documents submitted to the WOSB Program Repository verifying your firm’s eligibility under the WOSB program.
(1) If your firm is eligible under the WOSB program and has been certified by an SBA approved third party certifier (which includes SBA certification under the 8(a) program), provide the following eligibility requirement documents:
i. The third-party certification.
ii. SBA's WOSB Program Certification Form (SBA Form 2413 for WOSB concerns eligible under the WOSB Program and SBA Form 2414 for EDWOSB concerns).
iii. The joint venture agreement, if applicable.
(2) If your firm is eligible under the WOSB program and has not been certified by an SBA approved third party certifier or by SBA under the 8(a) program), provide the following eligibility requirement documents:
i. The U.S. birth certificate, naturalization documentation, or unexpired U.S. passport for each woman owner.
ii. The joint venture agreement, if applicable.
iii. For limited liability companies, Articles of organization (also referred to as certificate of organization or articles of formation) and any amendments, and the operating agreement and any amendments.
iv. For corporations, articles of incorporation and any amendments, by-laws and any amendments, all issued stock certificates, including the front and back copies, signed in accord with the by-laws, stock ledger, and voting agreements, if any.
v. For partnerships, the partnership agreement and any amendments.
vi. For sole proprietorships, corporations, limited liability companies and partnerships if applicable, the assumed/fictitious name certificate(s).
vii. SBA's WOSB Program Certification form (SBA Form 2413 for WOSB concerns eligible under the WOSB Program and SBA Form 2414 for EDWOSB concerns).
ADDENDUM TO FAR 52.212-2
ADDENDUM TO FAR 52.212-2 EVALUATION – COMMERCIAL ITEMS
A. BASIS OF AWARD
1. This source selection is conducted in accordance with Federal Acquisition Regulation (FAR) Part 12 Acquisition of Commercial Items and FAR Part 13.5 Simplified Procedures for Certain Commercial Items, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). The Government anticipates awarding a Firm Fixed Price (FFP) requirements type contract resulting from the solicitation and reserves the right to not award a contract at all depending on the quality of offers received and availability of funds.
2. Award will be made to a single offeror who is deemed responsible IAW FAR 9.104, whose offer conforms to the solicitation, meets the Government’s requirements and offers the best value to the Government from a lowest price technically acceptable (LPTA) standpoint. Appropriate consideration shall be given to two (2) evaluation factors: Technical Acceptability and Price.
3. The Government reserves the right to determine which offers show the required capability IAW the evaluation factors. The Government also reserves the right to eliminate from further consideration those offers which are considered unacceptable and not capable of being made acceptable without major rewrite or revision.
4. The Government intends to award without discussions. Therefore, the Vendor’s initial offer should contain the Offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. In the event discussions become necessary, the Contracting Officer may determine that the number of offers that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of offers to the greatest number that will permit an efficient competition among the most highly rated offers.
5. Trade-offs between cost/price and non-cost/price factors are not permitted. Unreasonably high, unbalanced, inaccurate or incomplete price offers may be the grounds for eliminating an offer from competition.
B. EVALUATION FACTORS
1. Factor I - Technical Acceptability. Quotes will be rated on an “Acceptable”, or “Unacceptable” basis. In order to be considered for award, a quote must have an “Acceptable” rating for each of the technical sub-factors and an overall “Acceptable” technical rating. Any “Unacceptable” rating on any of the sub-factors will result in an overall technical rating of “Unacceptable”.
2. The following sub-factors shall be used to determine technical acceptability. Non-submission of any of these elements shall render the offer technically unacceptable and shall not be considered for award. All of the sub-factors shall be clearly addressed in the quote. The two technical sub-factors are as follows:
a. Sub-Factor 1 Technical Capability
The quote will be evaluated to determine how well the Offeror's quote demonstrates an overall understanding of the requirements and demonstrate the ability to successfully complete the proposed tasks and technical requirements within the required frequency schedules.
To be determined acceptable, the contractor shall provide a staffing matrix that identifies adequate and qualified personnel to perform the requirement, to include hours assigned, labor categories (including management) and number of personnel in each labor category and total man-hours for each labor category.
Contractor shall provide a narrative explanation of how the proposed personnel will successfully complete the requirements in the PWS.
b. Sub-Factor 2 Relevant Work Experience
The quote will be evaluated to determine if the offeror has relevant work experience performed within the last three (3) years for same or similar work with regards to scope and magnitude performed. In order to be considered technically acceptable, the contractor shall have at least one relevant work experience as described above. Contractor shall complete the Work Experience Information per Attachment 1 for each work experience submitted. Include information on the types and models of UPS, generators and ATS for which preventive maintenance and repairs were performed.
3. Factor II - Price. Price will not be assigned an adjectival rating. The Government expects competitive quotes to be submitted for this procurement and will use competition to determine price reasonableness. However, the Government may utilize any or a combination of methods identified in FAR 13.106-3 to determine price reasonableness.
C. EVALUATION APPROACH
All offers shall be subject to evaluation by a team of Government evaluators. Each factor and sub-factor shall be evaluated using the following assessment approaches:
1. Technical Evaluation Approach. Quotes will be rated on an “Acceptable” or “Unacceptable” basis. All technical sub-factors will receive an “Acceptable” or “Unacceptable” rating.
Rating Description Acceptable Quote clearly meets the minimum requirements of the solicitation Unacceptable Quote does not clearly meet the minimum requirements of the solicitation
2. Price Evaluation Approach.
a. Total evaluated price shall be the basis for evaluating price for contract award decision purposes.
Total evaluated price shall be determined by adding the offered prices on the CLINs stated in the solicitation (base and option years). In the event the unit price(s) and extended price(s) are ambiguous, the Government shall use the indicated unit price(s) for evaluation and award purposes. Offerors shall submit prices for all CLINs and for all performance periods. Failure to submit a price for any CLIN/sub-CLIN shall result in the offer being considered unacceptable.
b. Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. As part of the price evaluation, the Government will evaluate the Option to Extend Services under FAR Clause 52.217-8 by adding one-half of the offeror’s final option period price to the offeror’s total price.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .