GRUBU maint workshop

GRUBU SMALL BOAT MAINTENANCE ENGINE WORKHOP
ItemDescriptionUnitQuantityUnit CostPartial Cost
01DESIGN AND TESTS$ - 0
01.01Design validation to include as-builtLS1.00$ - 0
01.02Required electrical, plumbing, and sewer testsLS1.00$ - 0
02SITE PREPARATION$ - 0
02.01Excavation and trenches for utilities (i.e. electrical, plumbing, sewer) connectionsm30.00$ - 0
03PARTITION WALL$ - 0
03.01Concrete masonry unit blocks (CMU)sm122.40$ - 0
03.02Plaster CMU wallssm244.80$ - 0
04ELECTRICAL$ - 0
04.01Outlet for roof lightingEa8.00$ - 0
04.02Switch with plateEa5.00$ - 0
04.03Receptacle GFCI duplex with plate, whiteEa7.00$ - 0
04.04Receptacle duplex with plate, whiteEa11.00$ - 0
04.05Water heaterEa0.00$ - 0
04.0620-amp circuit breakerEa2.00$ - 0
04.0730-amp circuit breakerEa1.00$ - 0
04.08Light Emitting Diode (LED) flourecent lights with cover (4 tubes)Ea8.00$ - 0
04.09Conduitslm20.00$ - 0
04.10LED directional lamp (cabinets) 24 inches long (4 lights minimun)Ea9.00$ - 0
04.11Hight-adjustable portable floodlightsEa2.00$ - 0
04.12Emergency lightEa2.00$ - 0
04.13Grounding and lighting protection systemLS1.00$ - 0
04.14Electrical wire, breaker, load centerLS1.00$ - 0
04.15Transformer and connectionsLS1.00$ - 0
05PLUMBING AND SEWER$ - 0
05.01Part wash sinkEa1.00$ - 0
05.02Grease trapEa1.00$ - 0
05.03Cure bath sink with fastening plate and bumperLS1.00$ - 0
05.04Faucet for part wash sinkEa1.00$ - 0
05.05Drain point with PVC pipeEa1.00$ - 0
05.06Vent with PVC 2 inches pipe for sinksEa4.00$ - 0
05.074 inches PVC pipem2.00$ - 0
05.082 inches PVC pipem18.00$ - 0
05.09Drain for sink 2 inches diameterEa3.00$ - 0
05.10Cold water point with PVC pipeEa1.00$ - 0
05.11Distribution network 1/2 inch PVC pipem20.00$ - 0
05.12Distribution network 3/4 inch PVC pipem10.00$ - 0
05.13Potable PVC 2 inches pipem10.00$ - 0
06FLOORS$ - 0
06.01Cleaning and degreasesm72.00$ - 0
06.02Floor coatingsm72.00$ - 0
06.03Concrete thin layer for imperfectionssm72.00$ - 0
07WORKBENCHES AND CABINETS$ - 0
07.01Stand along workbenchEa4.00$ - 0
07.02LockerEa2.00$ - 0
07.03Tool drawer (3 drawer)Ea2.00$ - 0
07.04Wall cabinetEa9.00$ - 0
07.05Solid wood worktop to fit tool cabinet, base cabinets, and workbenchesm28.75$ - 0
07.06Base cabinet (2 doors - 2 shelves per section)LS1.00$ - 0
08ROLLUP DOOR$ - 0
08.01Rollup door with frame and accessoriesEa2.00$ - 0
08.02Operation motor 1/2 horse powerEa2.00$ - 0
09PAINT$ - 0
09.01Paint for ceiling (2 coats)sm72.00$ - 0
09.02Paint for exterior walls (2 coats)sm144.00$ - 0
10MISCELLANEOUS ITEMS$ - 0
10.01Eye washEa1.00$ - 0
10.02Industrial cooling fanEa1.00$ - 0
10.03Ventilation and carbon monoxide controlLS1.00$ - 0
10.04Drop ceiling - mild steel expanded sheet decksm72.00$ - 0
10.05Engine wheeled standEa2.00$ - 0
10.06Final clean upsm72.00$ - 0

DIRECT COST $ - 0

11OTHER$ - 0
11.01LaborLS1.00$ - 0
11.02UtilitiesLS1.00$ - 0
11.03TaxesLS1.00$ - 0
11.04TransportationLS1.00$ - 0
11.05Contingency and profitLS1.00$ - 0

TOTAL PROJECT COST $ - 0

1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.

GRUBU F-P Bay

GRUBU FIBERGLASS/PAINT BAY
ItemDescriptionUnitQuantityUnit CostPartial Cost
01DESIGN AND TESTS$ - 0
01.01Design to include as-builtLS1.00$ - 0
01.02Required electrical, plumbing, and sewer testsLS1.00$ - 0
02SITE PREPARATION$ - 0
02.01Excavation and trenches for utilities (i.e. electrical, plumbing, sewer) connectionsm30.00$ - 0
03PARTITION WALL$ - 0
03.01Concrete masonry unit blocks (CMU)sm122.40$ - 0
03.02Plaster CMU wallssm244.80$ - 0
04ELECTRICAL$ - 0
04.01Outlet for roof lightingEa2.00$ - 0
04.02Switch with plateEa4.00$ - 0
04.03Receptacle GFCI duplex with plate, whiteEa7.00$ - 0
04.04Receptacle duplex with plate, whiteEa9.00$ - 0
04.05Water heaterEa0.00$ - 0
04.0620-amp circuit breakerEa1.00$ - 0
04.0730-amp circuit breakerEa1.00$ - 0
04.08Light Emitting Diode (LED) flourecent lights with cover (4 tubes)Ea2.00$ - 0
04.09Conduitslm20.00$ - 0
04.10LED directional lamp (cabinets) 24 inches long (4 lights minimun)Ea12.00$ - 0
04.11Hight-adjustable portable floodlightsEa1.00$ - 0
04.12Emergency lightEa1.00$ - 0
04.13Grounding and lighting protection systemLS1.00$ - 0
04.14Electrical wire, breaker, load centerLS1.00$ - 0
05PLUMBING AND SEWER$ - 0
05.01Part wash sinkEa1.00$ - 0
05.02Grease trapEa1.00$ - 0
05.03Faucet for part wash sinkEa1.00$ - 0
05.04Drain point with PVC pipeEa1.00$ - 0
05.05Vent with PVC 2 inches pipeEa1.00$ - 0
05.064 inches PVC pipem20.00$ - 0
05.072 inches PVC pipem20.00$ - 0
05.08Drain for sink 2 inches diameterEa2.00$ - 0
05.09Cold water point with PVC pipeEa1.00$ - 0
05.10Distribution network 1/2 inch PVC pipem8.00$ - 0
05.11Distribution network 3/4 inch PVC pipem10.00$ - 0
05.12Potable PVC 2 inches pipem10.00$ - 0
06FLOORS$ - 0
06.01Cleaning and degreasesm30.00$ - 0
06.02Floor coatingsm30.00$ - 0
06.03Concrete thin layersm60.00$ - 0
07WORKBENCHES AND CABINETS$ - 0
07.01Stand along workbenchEa2.00$ - 0
07.02LockerEa4.00$ - 0
07.03Tool drawer (3 drawer)Ea2.00$ - 0
07.04Wall cabinetEa12.00$ - 0
07.05Solid wood worktop (72 inches long) to fit tool and base cabinetsEa8.75$ - 0
07.06Base cabinet (2 doors - 2 shelves per section)LS1.00$ - 0
08ROLLUP DOOR$ - 0
08.01Rollup door with frame and accessoriesEa1.00$ - 0
08.02Operation motor 1/2 horse powerEa1.00$ - 0
09PAINT$ - 0
09.01Paint for ceiling (2 coats)sm36.00$ - 0
09.02Paint for exterior walls (2 coats)sm144.00$ - 0
10MISCELLANEOUS ITEMS$ - 0
10.01Eye washEa1.00$ - 0
10.02Industrial cooling fanEa1.00$ - 0
10.03Ventilation and vacuum/extractorLS1.00$ - 0
10.04Roofsm72.00$ - 0
10.05Engine wheeled standEa2.00$ - 0
10.06Final clean upsm72.00$ - 0

DIRECT COST $ - 0

11OTHER$ - 0
11.01LaborLS1.00$ - 0
11.02UtilitiesLS1.00$ - 0
11.03TaxesLS1.00$ - 0
11.04TransportationLS1.00$ - 0
11.05Contingency and profitLS1.00$ - 0
TOTAL PROJECT COST$ - 0
1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.

GRUBU Classrooms

GRUBU CLASSROOMS
ItemDescriptionUnitQuantityUnit CostPartial Cost
01DESIGN AND TESTS$ - 0
01.01Design to include as-builtLS1.00$ - 0
01.02Required electrical, plumbing, and sewer testsLS1.00$ - 0
02SITE PREPARATION$ - 0
02.01Excavation and trenches for utilities (i.e. electrical, plumbing, sewer) connectionsm30.00$ - 0
03PARTITION WALL$ - 0
03.01Concrete masonry unit blocks (CMU)sm122.40$ - 0
03.02Plaster CMU wallssm244.80$ - 0
04ELECTRICAL$ - 0
04.01Outlet for roof lightingEa18.00$ - 0
04.02Switch with plateEa6.00$ - 0
04.03Receptacle duplex with plate, whiteEa10.00$ - 0
04.04Water heaterEa0.00$ - 0
04.05Conduitslm10.00$ - 0
04.06Ceiling fan 56 inches 4 non-metal blades, whiteEa4.00$ - 0
04.07Emergency light two for stairsEa4.00$ - 0
04.08Exit signEa2.00$ - 0
04.09Grounding and lighting protection systemLS1.00$ - 0
04.10Ceiling projectorEa2.00$ - 0
04.11Electrical wire, breaker, load centerLS1.00$ - 0
05FLOORS$ - 0
05.01Concrete for floor levelingsm72.00$ - 0
05.02Ceramic tiling floorsm72.00$ - 0
05.03Ceramic zocalolm48.00$ - 0
06DOORS AND WINDOWS$ - 0
06.01Hinges 3-1/2 inches X 3-1/2 inchesEa6.00$ - 0
06.02Door lock and handle stainless steelEa2.00$ - 0
06.03Steel door with steel frameEa2.00$ - 0
06.04Existing window repairsm6.00$ - 0
06.05Double glass pane, energy efficient sliding windowsm6.00$ - 0
06.06Window tintEa12.00$ - 0
06.07Window curtainEa12.00$ - 0
06.08Accordeon or sectional wall (noise cancelling)LS1.00$ - 0
07PAINT$ - 0
07.01Paint for ceiling (2 coats)sm72.00$ - 0
07.02Paint for exterior walls (2 coats)sm144.00$ - 0
08DROP CEILING$ - 0
08.01Drop ceilingsm72.00$ - 0
09ACCESS STAIR$ - 0
09.01Hand-railLS1.00$ - 0
09.02Mild steel expanded sheet deck for steps and transition zonesLS1.00$ - 0
09.03Structural frameLS1.00$ - 0
10MISCELLANEOUS ITEMS$ - 0
10.01Eraser boardEa2.00$ - 0
10.02Black boardEa2.00$ - 0
10.03Erasers, chalks, and markers setEa8.00$ - 0
10.04Student deskEa28.00$ - 0
10.05Student chairEa28.00$ - 0
10.06Instructor deskEa2.00$ - 0
10.07Instructor chairEa2.00$ - 0
10.08Rollup projector screeEa2.00$ - 0
10.09Drop ceilingsm72.00$ - 0
10.10Final clean upsm72.00$ - 0

DIRECT COST $ - 0

11OTHER$ - 0
11.01LaborLS1.00$ - 0
11.02UtilitiesLS1.00$ - 0
11.03TaxesLS1.00$ - 0
11.04TransportationLS1.00$ - 0
11.05Industrial cooling fanLS1.00$ - 0
11.06Contingency and profitLS1.00$ - 0
11.07Drop ceiling - mild steel expanded sheet

TOTAL PROJECT COST $ - 0

1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.

GRUBU Restroom

GRUBU RESTROOM
ItemDescriptionUnitQuantityUnit CostPartial Cost
01DESIGN AND TESTS$ - 0
01.01Design to include as-builtLS1.00$ - 0
01.02Required electrical, plumbing, and sewer testsLS1.00$ - 0
02SITE PREPARATION$ - 0
02.01Excavation and trenches for utilities (i.e. electrical, plumbing, sewer) connectionsm30.00$ - 0
03PARTITION WALL$ - 0
03.01Concrete masonry unit blocks (CMU)sm122.40$ - 0
03.02Plaster CMU wallssm244.80$ - 0
04ELECTRICAL$ - 0
04.01Outlet for roof lightingEa2.00$ - 0
04.02Switch with plateEa4.00$ - 0
04.03Receptacle Ground Fault Circuit Interrupter (GFCI) with plate, whiteEa2.00$ - 0
04.04Receptacle double with plate, whiteEa2.00$ - 0
04.05Light Emitting Diode (LED) flourecent lights with cover (4 tubes)Ea2.00$ - 0
04.06Conduitslm20.00$ - 0
04.07Water heater 80Ea1.00$ - 0
04.08Emergency lightEa2.00$ - 0
04.09Grounding and lighting protection systemLS1.00$ - 0
04.10Hand-dryerEa2.00$ - 0
04.11VentEa2.00$ - 0
04.12Electrical wire, breaker, load centerLS1.00$ - 0
05PLUMBING AND SEWER$ - 0
05.01White low tank toilet with seat and lid (water saver)Ea5.00$ - 0
05.02White urinal (water saver)Ea2.00$ - 0
05.03SinkEa6.00$ - 0
05.04Paper toilet holderEa5.00$ - 0
05.05Hygenic shower at toilet (bidet)Ea5.00$ - 0
05.06Soap holderEa4.00$ - 0
05.07Small towel holder bar at sinkEa2.00$ - 0
05.08Hook at sinkEa2.00$ - 0
05.09Faucets (for hot and cold water)Ea6.00$ - 0
05.10Vanity for sinkEa2.00$ - 0
05.11Marble/granite countertop with splash (15 MM)sm1.44$ - 0
05.12Drain point with PVC pipeEa2.00$ - 0
05.13Vent with PVC 2 inches pipeEa11.00$ - 0
05.144 inches PVC pipem20.00$ - 0
05.152 inches PVC pipem10.00$ - 0
05.16Bronze threaded clean out 4 inches diameterEa2.00$ - 0
05.17Drain for sink 2 inches diameterEa2.00$ - 0
05.18Cold water point with PVC pipeEa13.00$ - 0
05.19Hot water point with PVC pipeEa6.00$ - 0
05.20Distribution network 1/2 inch PVC pipem20.00$ - 0
05.21Distribution network 3/4 inch PVC pipem10.00$ - 0
05.22Potable PVC 2 inches pipem10.00$ - 0
06FLOORS$ - 0
06.01Concrete for floor levelingsm36.00$ - 0
06.02Ceramic tiling floorsm36.00$ - 0
06.03Ceramic zocalom28.75$ - 0
06.04Ceramic wall tilesm48.00$ - 0
07DOORS AND WINDOWS$ - 0
07.01Hinges 3-1/2 inches X 3-1/2 inchesEa6.00$ - 0
07.02Door lock and handle stainless steelEa2.00$ - 0
07.03Steel door with steel frameEa2.00$ - 0
07.04Double glass pane, energy efficient sliding windowEa2.00$ - 0
08PAINT$ - 0
08.01Paint for ceiling (2 coats)sm72.00$ - 0
08.02Paint for exterior walls (2 coats)sm144.00$ - 0
09MISCELLANEOUS ITEMS$ - 0
09.01Mirror (1 m X .5 m)sm1.00$ - 0
09.02Partition walls for toiletsLS1.00$ - 0
09.03Drop ceilingsm72.00$ - 0
09.04Final clean upsm72.00$ - 0

DIRECT COST $ - 0

11OTHER$ - 0
11.01LaborLS1.00$ - 0
11.02UtilitiesLS1.00$ - 0
11.03TaxesLS1.00$ - 0
11.04TransportationLS1.00$ - 0
11.05Contingency and profitLS1.00$ - 0
TOTAL PROJECT COST$ - 0
1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.

Sheet1

File details come from the government source that posted it. Updated .