GRUBU maint workshop
| GRUBU SMALL BOAT MAINTENANCE ENGINE WORKHOP | | | | | |
| Item | Description | Unit | Quantity | Unit Cost | Partial Cost |
| 01 | DESIGN AND TESTS | | | | $ - 0 |
| 01.01 | Design validation to include as-built | LS | 1.00 | | $ - 0 |
| 01.02 | Required electrical, plumbing, and sewer tests | LS | 1.00 | | $ - 0 |
| 02 | SITE PREPARATION | | | $ - 0 |
| 02.01 | Excavation and trenches for utilities (i.e. electrical, plumbing, sewer) connection | sm | 30.00 | $ - 0 |
| 03 | PARTITION WALL | | | $ - 0 |
| 03.01 | Concrete masonry unit blocks (CMU) | sm | 122.40 | $ - 0 |
| 03.02 | Plaster CMU walls | sm | 244.80 | $ - 0 |
| 04 | ELECTRICAL | | | $ - 0 |
| 04.01 | Outlet for roof lighting | Ea | 8.00 | $ - 0 |
| 04.02 | Switch with plate | Ea | 5.00 | $ - 0 |
| 04.03 | Receptacle GFCI duplex with plate, white | Ea | 7.00 | $ - 0 |
| 04.04 | Receptacle duplex with plate, white | Ea | 11.00 | $ - 0 |
| 04.05 | Water heater | Ea | 0.00 | $ - 0 |
| 04.06 | 20-amp circuit breaker | Ea | 2.00 | $ - 0 |
| 04.07 | 30-amp circuit breaker | Ea | 1.00 | $ - 0 |
| 04.08 | Light Emitting Diode (LED) flourecent lights with cover (4 tubes) | Ea | 8.00 | $ - 0 |
| 04.09 | Conduits | lm | 20.00 | $ - 0 |
| 04.10 | LED directional lamp (cabinets) 24 inches long (4 lights minimun) | Ea | 9.00 | $ - 0 |
| 04.11 | Hight-adjustable portable floodlights | Ea | 2.00 | $ - 0 |
| 04.12 | Emergency light | Ea | 2.00 | $ - 0 |
| 04.13 | Grounding and lighting protection system | LS | 1.00 | $ - 0 |
| 04.14 | Electrical wire, breaker, load center | LS | 1.00 | $ - 0 |
| 04.15 | Transformer and connections | LS | 1.00 | $ - 0 |
| 05 | PLUMBING AND SEWER | | | $ - 0 |
| 05.01 | Part wash sink | Ea | 1.00 | $ - 0 |
| 05.02 | Grease trap | Ea | 1.00 | $ - 0 |
| 05.03 | Cure bath sink with fastening plate and bumper | LS | 1.00 | $ - 0 |
| 05.04 | Faucet for part wash sink | Ea | 1.00 | $ - 0 |
| 05.05 | Drain point with PVC pipe | Ea | 1.00 | $ - 0 |
| 05.06 | Vent with PVC 2 inches pipe for sinks | Ea | 4.00 | $ - 0 |
| 05.07 | 4 inches PVC pipe | m | 2.00 | $ - 0 |
| 05.08 | 2 inches PVC pipe | m | 18.00 | $ - 0 |
| 05.09 | Drain for sink 2 inches diameter | Ea | 3.00 | $ - 0 |
| 05.10 | Cold water point with PVC pipe | Ea | 1.00 | $ - 0 |
| 05.11 | Distribution network 1/2 inch PVC pipe | m | 20.00 | $ - 0 |
| 05.12 | Distribution network 3/4 inch PVC pipe | m | 10.00 | $ - 0 |
| 05.13 | Potable PVC 2 inches pipe | m | 10.00 | $ - 0 |
| 06 | FLOORS | | | $ - 0 |
| 06.01 | Cleaning and degrease | sm | 72.00 | $ - 0 |
| 06.02 | Floor coating | sm | 72.00 | $ - 0 |
| 06.03 | Concrete thin layer for imperfections | sm | 72.00 | $ - 0 |
| 07 | WORKBENCHES AND CABINETS | | | $ - 0 |
| 07.01 | Stand along workbench | Ea | 4.00 | $ - 0 |
| 07.02 | Locker | Ea | 2.00 | $ - 0 |
| 07.03 | Tool drawer (3 drawer) | Ea | 2.00 | $ - 0 |
| 07.04 | Wall cabinet | Ea | 9.00 | $ - 0 |
| 07.05 | Solid wood worktop to fit tool cabinet, base cabinets, and workbenches | m2 | 8.75 | $ - 0 |
| 07.06 | Base cabinet (2 doors - 2 shelves per section) | LS | 1.00 | $ - 0 |
| 08 | ROLLUP DOOR | | | $ - 0 |
| 08.01 | Rollup door with frame and accessories | Ea | 2.00 | $ - 0 |
| 08.02 | Operation motor 1/2 horse power | Ea | 2.00 | $ - 0 |
| 09 | PAINT | | | $ - 0 |
| 09.01 | Paint for ceiling (2 coats) | sm | 72.00 | $ - 0 |
| 09.02 | Paint for exterior walls (2 coats) | sm | 144.00 | $ - 0 |
| 10 | MISCELLANEOUS ITEMS | | | $ - 0 |
| 10.01 | Eye wash | Ea | 1.00 | $ - 0 |
| 10.02 | Industrial cooling fan | Ea | 1.00 | $ - 0 |
| 10.03 | Ventilation and carbon monoxide control | LS | 1.00 | $ - 0 |
| 10.04 | Drop ceiling - mild steel expanded sheet deck | sm | 72.00 | $ - 0 |
| 10.05 | Engine wheeled stand | Ea | 2.00 | $ - 0 |
| 10.06 | Final clean up | sm | 72.00 | $ - 0 |
DIRECT COST $ - 0
| 11 | OTHER | | | $ - 0 |
| 11.01 | Labor | LS | 1.00 | $ - 0 |
| 11.02 | Utilities | LS | 1.00 | $ - 0 |
| 11.03 | Taxes | LS | 1.00 | $ - 0 |
| 11.04 | Transportation | LS | 1.00 | $ - 0 |
| 11.05 | Contingency and profit | LS | 1.00 | $ - 0 |
TOTAL PROJECT COST $ - 0
1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.
GRUBU F-P Bay
| GRUBU FIBERGLASS/PAINT BAY | | | | | |
| Item | Description | Unit | Quantity | Unit Cost | Partial Cost |
| 01 | DESIGN AND TESTS | | | | $ - 0 |
| 01.01 | Design to include as-built | LS | 1.00 | | $ - 0 |
| 01.02 | Required electrical, plumbing, and sewer tests | LS | 1.00 | | $ - 0 |
| 02 | SITE PREPARATION | | | $ - 0 |
| 02.01 | Excavation and trenches for utilities (i.e. electrical, plumbing, sewer) connection | sm | 30.00 | $ - 0 |
| 03 | PARTITION WALL | | | $ - 0 |
| 03.01 | Concrete masonry unit blocks (CMU) | sm | 122.40 | $ - 0 |
| 03.02 | Plaster CMU walls | sm | 244.80 | $ - 0 |
| 04 | ELECTRICAL | | | $ - 0 |
| 04.01 | Outlet for roof lighting | Ea | 2.00 | $ - 0 |
| 04.02 | Switch with plate | Ea | 4.00 | $ - 0 |
| 04.03 | Receptacle GFCI duplex with plate, white | Ea | 7.00 | $ - 0 |
| 04.04 | Receptacle duplex with plate, white | Ea | 9.00 | $ - 0 |
| 04.05 | Water heater | Ea | 0.00 | $ - 0 |
| 04.06 | 20-amp circuit breaker | Ea | 1.00 | $ - 0 |
| 04.07 | 30-amp circuit breaker | Ea | 1.00 | $ - 0 |
| 04.08 | Light Emitting Diode (LED) flourecent lights with cover (4 tubes) | Ea | 2.00 | $ - 0 |
| 04.09 | Conduits | lm | 20.00 | $ - 0 |
| 04.10 | LED directional lamp (cabinets) 24 inches long (4 lights minimun) | Ea | 12.00 | $ - 0 |
| 04.11 | Hight-adjustable portable floodlights | Ea | 1.00 | $ - 0 |
| 04.12 | Emergency light | Ea | 1.00 | $ - 0 |
| 04.13 | Grounding and lighting protection system | LS | 1.00 | $ - 0 |
| 04.14 | Electrical wire, breaker, load center | LS | 1.00 | $ - 0 |
| 05 | PLUMBING AND SEWER | | | $ - 0 |
| 05.01 | Part wash sink | Ea | 1.00 | $ - 0 |
| 05.02 | Grease trap | Ea | 1.00 | $ - 0 |
| 05.03 | Faucet for part wash sink | Ea | 1.00 | $ - 0 |
| 05.04 | Drain point with PVC pipe | Ea | 1.00 | $ - 0 |
| 05.05 | Vent with PVC 2 inches pipe | Ea | 1.00 | $ - 0 |
| 05.06 | 4 inches PVC pipe | m | 20.00 | $ - 0 |
| 05.07 | 2 inches PVC pipe | m | 20.00 | $ - 0 |
| 05.08 | Drain for sink 2 inches diameter | Ea | 2.00 | $ - 0 |
| 05.09 | Cold water point with PVC pipe | Ea | 1.00 | $ - 0 |
| 05.10 | Distribution network 1/2 inch PVC pipe | m | 8.00 | $ - 0 |
| 05.11 | Distribution network 3/4 inch PVC pipe | m | 10.00 | $ - 0 |
| 05.12 | Potable PVC 2 inches pipe | m | 10.00 | $ - 0 |
| 06 | FLOORS | | | $ - 0 |
| 06.01 | Cleaning and degrease | sm | 30.00 | $ - 0 |
| 06.02 | Floor coating | sm | 30.00 | $ - 0 |
| 06.03 | Concrete thin layer | sm | 60.00 | $ - 0 |
| 07 | WORKBENCHES AND CABINETS | | | $ - 0 |
| 07.01 | Stand along workbench | Ea | 2.00 | $ - 0 |
| 07.02 | Locker | Ea | 4.00 | $ - 0 |
| 07.03 | Tool drawer (3 drawer) | Ea | 2.00 | $ - 0 |
| 07.04 | Wall cabinet | Ea | 12.00 | $ - 0 |
| 07.05 | Solid wood worktop (72 inches long) to fit tool and base cabinets | Ea | 8.75 | $ - 0 |
| 07.06 | Base cabinet (2 doors - 2 shelves per section) | LS | 1.00 | $ - 0 |
| 08 | ROLLUP DOOR | | | $ - 0 |
| 08.01 | Rollup door with frame and accessories | Ea | 1.00 | $ - 0 |
| 08.02 | Operation motor 1/2 horse power | Ea | 1.00 | $ - 0 |
| 09 | PAINT | | | $ - 0 |
| 09.01 | Paint for ceiling (2 coats) | sm | 36.00 | $ - 0 |
| 09.02 | Paint for exterior walls (2 coats) | sm | 144.00 | $ - 0 |
| 10 | MISCELLANEOUS ITEMS | | | $ - 0 |
| 10.01 | Eye wash | Ea | 1.00 | $ - 0 |
| 10.02 | Industrial cooling fan | Ea | 1.00 | $ - 0 |
| 10.03 | Ventilation and vacuum/extractor | LS | 1.00 | $ - 0 |
| 10.04 | Roof | sm | 72.00 | $ - 0 |
| 10.05 | Engine wheeled stand | Ea | 2.00 | $ - 0 |
| 10.06 | Final clean up | sm | 72.00 | $ - 0 |
DIRECT COST $ - 0
| 11 | OTHER | | | $ - 0 |
| 11.01 | Labor | LS | 1.00 | $ - 0 |
| 11.02 | Utilities | LS | 1.00 | $ - 0 |
| 11.03 | Taxes | LS | 1.00 | $ - 0 |
| 11.04 | Transportation | LS | 1.00 | $ - 0 |
| 11.05 | Contingency and profit | LS | 1.00 | $ - 0 |
| TOTAL PROJECT COST | $ - 0 |
| 1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final. | |
GRUBU Classrooms
| GRUBU CLASSROOMS | | | | | |
| Item | Description | Unit | Quantity | Unit Cost | Partial Cost |
| 01 | DESIGN AND TESTS | | | | $ - 0 |
| 01.01 | Design to include as-built | LS | 1.00 | | $ - 0 |
| 01.02 | Required electrical, plumbing, and sewer tests | LS | 1.00 | | $ - 0 |
| 02 | SITE PREPARATION | | | $ - 0 |
| 02.01 | Excavation and trenches for utilities (i.e. electrical, plumbing, sewer) connection | sm | 30.00 | $ - 0 |
| 03 | PARTITION WALL | | | $ - 0 |
| 03.01 | Concrete masonry unit blocks (CMU) | sm | 122.40 | $ - 0 |
| 03.02 | Plaster CMU walls | sm | 244.80 | $ - 0 |
| 04 | ELECTRICAL | | | $ - 0 |
| 04.01 | Outlet for roof lighting | Ea | 18.00 | $ - 0 |
| 04.02 | Switch with plate | Ea | 6.00 | $ - 0 |
| 04.03 | Receptacle duplex with plate, white | Ea | 10.00 | $ - 0 |
| 04.04 | Water heater | Ea | 0.00 | $ - 0 |
| 04.05 | Conduits | lm | 10.00 | $ - 0 |
| 04.06 | Ceiling fan 56 inches 4 non-metal blades, white | Ea | 4.00 | $ - 0 |
| 04.07 | Emergency light two for stairs | Ea | 4.00 | $ - 0 |
| 04.08 | Exit sign | Ea | 2.00 | $ - 0 |
| 04.09 | Grounding and lighting protection system | LS | 1.00 | $ - 0 |
| 04.10 | Ceiling projector | Ea | 2.00 | $ - 0 |
| 04.11 | Electrical wire, breaker, load center | LS | 1.00 | $ - 0 |
| 05 | FLOORS | | | $ - 0 |
| 05.01 | Concrete for floor leveling | sm | 72.00 | $ - 0 |
| 05.02 | Ceramic tiling floor | sm | 72.00 | $ - 0 |
| 05.03 | Ceramic zocalo | lm | 48.00 | $ - 0 |
| 06 | DOORS AND WINDOWS | | | $ - 0 |
| 06.01 | Hinges 3-1/2 inches X 3-1/2 inches | Ea | 6.00 | $ - 0 |
| 06.02 | Door lock and handle stainless steel | Ea | 2.00 | $ - 0 |
| 06.03 | Steel door with steel frame | Ea | 2.00 | $ - 0 |
| 06.04 | Existing window repair | sm | 6.00 | $ - 0 |
| 06.05 | Double glass pane, energy efficient sliding window | sm | 6.00 | $ - 0 |
| 06.06 | Window tint | Ea | 12.00 | $ - 0 |
| 06.07 | Window curtain | Ea | 12.00 | $ - 0 |
| 06.08 | Accordeon or sectional wall (noise cancelling) | LS | 1.00 | $ - 0 |
| 07 | PAINT | | | $ - 0 |
| 07.01 | Paint for ceiling (2 coats) | sm | 72.00 | $ - 0 |
| 07.02 | Paint for exterior walls (2 coats) | sm | 144.00 | $ - 0 |
| 08 | DROP CEILING | | | $ - 0 |
| 08.01 | Drop ceiling | sm | 72.00 | $ - 0 |
| 09 | ACCESS STAIR | | | $ - 0 |
| 09.01 | Hand-rail | LS | 1.00 | $ - 0 |
| 09.02 | Mild steel expanded sheet deck for steps and transition zones | LS | 1.00 | $ - 0 |
| 09.03 | Structural frame | LS | 1.00 | $ - 0 |
| 10 | MISCELLANEOUS ITEMS | | | $ - 0 |
| 10.01 | Eraser board | Ea | 2.00 | $ - 0 |
| 10.02 | Black board | Ea | 2.00 | $ - 0 |
| 10.03 | Erasers, chalks, and markers set | Ea | 8.00 | $ - 0 |
| 10.04 | Student desk | Ea | 28.00 | $ - 0 |
| 10.05 | Student chair | Ea | 28.00 | $ - 0 |
| 10.06 | Instructor desk | Ea | 2.00 | $ - 0 |
| 10.07 | Instructor chair | Ea | 2.00 | $ - 0 |
| 10.08 | Rollup projector scree | Ea | 2.00 | $ - 0 |
| 10.09 | Drop ceiling | sm | 72.00 | $ - 0 |
| 10.10 | Final clean up | sm | 72.00 | $ - 0 |
DIRECT COST $ - 0
| 11 | OTHER | | | $ - 0 |
| 11.01 | Labor | LS | 1.00 | $ - 0 |
| 11.02 | Utilities | LS | 1.00 | $ - 0 |
| 11.03 | Taxes | LS | 1.00 | $ - 0 |
| 11.04 | Transportation | LS | 1.00 | $ - 0 |
| 11.05 | Industrial cooling fan | LS | 1.00 | $ - 0 |
| 11.06 | Contingency and profit | LS | 1.00 | $ - 0 |
| 11.07 | Drop ceiling - mild steel expanded sheet | | | |
TOTAL PROJECT COST $ - 0
1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.
GRUBU Restroom
| GRUBU RESTROOM | | | | | |
| Item | Description | Unit | Quantity | Unit Cost | Partial Cost |
| 01 | DESIGN AND TESTS | | | | $ - 0 |
| 01.01 | Design to include as-built | LS | 1.00 | | $ - 0 |
| 01.02 | Required electrical, plumbing, and sewer tests | LS | 1.00 | | $ - 0 |
| 02 | SITE PREPARATION | | | $ - 0 |
| 02.01 | Excavation and trenches for utilities (i.e. electrical, plumbing, sewer) connection | sm | 30.00 | $ - 0 |
| 03 | PARTITION WALL | | | $ - 0 |
| 03.01 | Concrete masonry unit blocks (CMU) | sm | 122.40 | $ - 0 |
| 03.02 | Plaster CMU walls | sm | 244.80 | $ - 0 |
| 04 | ELECTRICAL | | | $ - 0 |
| 04.01 | Outlet for roof lighting | Ea | 2.00 | $ - 0 |
| 04.02 | Switch with plate | Ea | 4.00 | $ - 0 |
| 04.03 | Receptacle Ground Fault Circuit Interrupter (GFCI) with plate, white | Ea | 2.00 | $ - 0 |
| 04.04 | Receptacle double with plate, white | Ea | 2.00 | $ - 0 |
| 04.05 | Light Emitting Diode (LED) flourecent lights with cover (4 tubes) | Ea | 2.00 | $ - 0 |
| 04.06 | Conduits | lm | 20.00 | $ - 0 |
| 04.07 | Water heater 80 | Ea | 1.00 | $ - 0 |
| 04.08 | Emergency light | Ea | 2.00 | $ - 0 |
| 04.09 | Grounding and lighting protection system | LS | 1.00 | $ - 0 |
| 04.10 | Hand-dryer | Ea | 2.00 | $ - 0 |
| 04.11 | Vent | Ea | 2.00 | $ - 0 |
| 04.12 | Electrical wire, breaker, load center | LS | 1.00 | $ - 0 |
| 05 | PLUMBING AND SEWER | | | $ - 0 |
| 05.01 | White low tank toilet with seat and lid (water saver) | Ea | 5.00 | $ - 0 |
| 05.02 | White urinal (water saver) | Ea | 2.00 | $ - 0 |
| 05.03 | Sink | Ea | 6.00 | $ - 0 |
| 05.04 | Paper toilet holder | Ea | 5.00 | $ - 0 |
| 05.05 | Hygenic shower at toilet (bidet) | Ea | 5.00 | $ - 0 |
| 05.06 | Soap holder | Ea | 4.00 | $ - 0 |
| 05.07 | Small towel holder bar at sink | Ea | 2.00 | $ - 0 |
| 05.08 | Hook at sink | Ea | 2.00 | $ - 0 |
| 05.09 | Faucets (for hot and cold water) | Ea | 6.00 | $ - 0 |
| 05.10 | Vanity for sink | Ea | 2.00 | $ - 0 |
| 05.11 | Marble/granite countertop with splash (15 MM) | sm | 1.44 | $ - 0 |
| 05.12 | Drain point with PVC pipe | Ea | 2.00 | $ - 0 |
| 05.13 | Vent with PVC 2 inches pipe | Ea | 11.00 | $ - 0 |
| 05.14 | 4 inches PVC pipe | m | 20.00 | $ - 0 |
| 05.15 | 2 inches PVC pipe | m | 10.00 | $ - 0 |
| 05.16 | Bronze threaded clean out 4 inches diameter | Ea | 2.00 | $ - 0 |
| 05.17 | Drain for sink 2 inches diameter | Ea | 2.00 | $ - 0 |
| 05.18 | Cold water point with PVC pipe | Ea | 13.00 | $ - 0 |
| 05.19 | Hot water point with PVC pipe | Ea | 6.00 | $ - 0 |
| 05.20 | Distribution network 1/2 inch PVC pipe | m | 20.00 | $ - 0 |
| 05.21 | Distribution network 3/4 inch PVC pipe | m | 10.00 | $ - 0 |
| 05.22 | Potable PVC 2 inches pipe | m | 10.00 | $ - 0 |
| 06 | FLOORS | | | $ - 0 |
| 06.01 | Concrete for floor leveling | sm | 36.00 | $ - 0 |
| 06.02 | Ceramic tiling floor | sm | 36.00 | $ - 0 |
| 06.03 | Ceramic zocalo | m2 | 8.75 | $ - 0 |
| 06.04 | Ceramic wall tile | sm | 48.00 | $ - 0 |
| 07 | DOORS AND WINDOWS | | | $ - 0 |
| 07.01 | Hinges 3-1/2 inches X 3-1/2 inches | Ea | 6.00 | $ - 0 |
| 07.02 | Door lock and handle stainless steel | Ea | 2.00 | $ - 0 |
| 07.03 | Steel door with steel frame | Ea | 2.00 | $ - 0 |
| 07.04 | Double glass pane, energy efficient sliding window | Ea | 2.00 | $ - 0 |
| 08 | PAINT | | | $ - 0 |
| 08.01 | Paint for ceiling (2 coats) | sm | 72.00 | $ - 0 |
| 08.02 | Paint for exterior walls (2 coats) | sm | 144.00 | $ - 0 |
| 09 | MISCELLANEOUS ITEMS | | | $ - 0 |
| 09.01 | Mirror (1 m X .5 m) | sm | 1.00 | $ - 0 |
| 09.02 | Partition walls for toilets | LS | 1.00 | $ - 0 |
| 09.03 | Drop ceiling | sm | 72.00 | $ - 0 |
| 09.04 | Final clean up | sm | 72.00 | $ - 0 |
DIRECT COST $ - 0
| 11 | OTHER | | | $ - 0 |
| 11.01 | Labor | LS | 1.00 | $ - 0 |
| 11.02 | Utilities | LS | 1.00 | $ - 0 |
| 11.03 | Taxes | LS | 1.00 | $ - 0 |
| 11.04 | Transportation | LS | 1.00 | $ - 0 |
| 11.05 | Contingency and profit | LS | 1.00 | $ - 0 |
| TOTAL PROJECT COST | $ - 0 |
| 1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final. | | |