Attachment_-_Price_Breakdown_Worksheet_-_Materials_List.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Construction of Kitchen and Laundry Facility Federal contract opportunity
Solicitation number
W912CL-16-R-0010
Issued by
Department of the Army Cyber Command

About this file

Attachment - Price Breakdown Worksheet - Materials List

View the file

Other files for this federal contract opportunity

Other files attached to Construction of Kitchen and Laundry Facility, newest first.
File Type Posted
Amendment_0005.pdf PDF
Conformed_Copy _W912CL-16-R-0010-0005.pdf PDF
TE-16_Memoria_Electricia-Lavadero_y_Cocina.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
TE-14_Electrical_Schematics.dwg DWG drawing
TE-11_Plumbing.dwg DWG drawing
TE-13_Exterior_Electrical_Connection.dwg DWG drawing
Amendment_0002.pdf PDF
TE-12_Exterior_Lights.dwg DWG drawing
TE-15_Electrical_Plans.dwg DWG drawing
Site_Visit_Attendee_List.pdf PDF
Amendment_0001.pdf PDF
TE-9_Dressing_Rooms.dwg DWG drawing
Auto_CAD_Design_Information.pdf PDF
TE-7_Elevations.dwg DWG drawing
TE-1_Kitchen_ _Laundry_Designs.pdf PDF
TE-5_Structural_Plans.dwg DWG drawing
TE-8_Site_Plan.dwg DWG drawing
W912CL-16-R-0010.pdf PDF
TE-10_Sign_Plaque_Seal.ppt PPT presentation
TE-4_Wall_Details.dwg DWG drawing
TE-6_Doors_ISOPanel.dwg DWG drawing
TE-3_Doors.dwg DWG drawing
TE-2_Rails.dwg DWG drawing
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Materials List

URY HAP 25847: CONSTRUCTION OF KITCHEN-LAUNDRY - URUGUAY
ItemDescriptionUnitQuantityUnit CostTotal Cost
1PRELIMINARY. Includes bonds, construction permits, transportation of materials, equipment, personnel, and tools.LS1$ - 0
2TEMPORARY INSTALLATIONS. Temporary office, water, power, and commo.LS1$ - 0
3SURVEY, DESIGN, AND TESTS. To include project site survey, project designs validation and certification, and required structural, electrical, plumbing, and mechanical tests.
3.1SurveyLS1$ - 0
3.2DesignLS1$ - 0
3.3TestsLS1$ - 0
4REQUIRED STUDIES. To include soil, electrical loads, and water demand studies.
4.1Soil studyLS1$ - 0
4.2Electrical loadLS1$ - 0
4.3Water demandsLS1$ - 0
5SITE PREPARATION. Include earth movement, grading, utilities infrastructure installation and drainage.SM3,000$ - 0
6KITCHEN-LAUNDRY CONSTRUCTION
6.1CONCRETE STRUCTURES
6.1.1Beam for reinforced wall footersCM50$ - 0
6.1.2Column footersCM20$ - 0
6.1.3Column footersCM15$ - 0
6.1.4Beam footerCM20$ - 0
6.1.5LintelsCM12$ - 0
6.1.6Slabs and rampsCM45$ - 0
6.1.7Water tank reinforced concrete structureCM4$ - 0
6.2STRUCTURAL CONCRETE BLOCKSSM400$ - 0
6.3ROOF. Reinforced with steel rebars and sealed, and sloped to prevent leaks. Drainage and gutters (to include end cap, downspout, elbows, and splash block).SM350$ - 0
6.4PLASTERSM356$ - 0
6.5DOOR WITH FRAME
6.5.1Door C1EA7$ - 0
6.5.2Door C2EA7$ - 0
6.5.3Door C3EA1$ - 0
6.5.4Door C4EA1$ - 0
6.5.5Door C5EA2$ - 0
6.5.6Door I01EA4$ - 0
6.5.7Door H1EA2$ - 0
6.5.8Door A5, Exterior Aluminum w/glassEA3$ - 0
6.5.9Door A9, Exterior Aluminum w/glassEA2$ - 0
6.5.10Door A10, Exterior Aluminum w/glassEA1$ - 0
6.5.11Door A11, Exterior Aluminum w/GrillEA3$ - 0
6.5.12Door A12, Exterior AluminumEA1$ - 0
6.5.13Door A13, Exterior AluminumEA2$ - 0
6.5.14Door A14, Exterior AluminumEA1$ - 0
6.5.15Door A16, Exterior Aluminum w/GlassEA1$ - 0
6.5.16Door A20, Exterior Aluminum w/GlassEA1$ - 0
6.5.17Door A23, Exterior AluminumEA1$ - 0
6.5.18Door Dressing RoomsEA14$ - 0
6.6WINDOWS
6.6.1Type A1 - Sliding AluminumEA7$ - 0
6.6.2Type A2 - Framed GlassEA3$ - 0
6.6.3Type A3-Ventillation Grill (0.6 m x 3.20 m)EA1$ - 0
6.6.4Type A4- Sliding AluminumEA4$ - 0
6.6.5Type A6 - Sliding AluminumEA3$ - 0
6.6.6Type A7 - Sliding AluminumEA6$ - 0
6.6.7Type A8 - Sliding AluminumEA8$ - 0
6.6.8Type A15 - Sliding AluminumEA4$ - 0
6.6.9Type A18 - Framed GlassEA4$ - 0
6.6.10Type A19 - Framed GlassEA1$ - 0
6.6.11Type A21 - Framed GlassEA2$ - 0
6.6.12Insect screenSM31$ - 0
6.7STEEL
6.7.1Security bar for windowsSM70$ - 0
6.7.2Handrail for handicap ramp and water tank. Also include water tower steel stairs.LS4$ - 0
6.8ELECTRIC SYSTEM
6.8.1Main control panel to include automatic transfer switchLS1$ - 0
6.8.2Distribution panelsLS4$ - 0
6.8.3Receptacle Ground Fault Circuit Interrupter (GFCI) with plateEA20$ - 0
6.8.4Receptacles with plateEA120$ - 0
6.8.5Switches with plateLS35$ - 0
6.8.6Register boxEA6$ - 0
6.8.7Conductors/WiringLS4$ - 0
6.8.8Exterior Lights with lamps outside the building. 2-main entrance, 2-front (corners), 2-back, 1 at each side. For the storage, 2 for front of the building. Energy efficient LED.EA10$ - 0
6.8.9Perimeter exterior lights with lamps. Energy efficient LED. Include 10 meters reinforced pole, dual lamps, brackets, and accessories.EA12$ - 0
6.8.10Interior lights with lamps. Energy efficient LED. Include ceiling and wall lights.EA40$ - 0
6.8.11Ceiling mounted fansEA10$ - 0
6.8.12Smoke detectorEA10$ - 0
6.8.13BellEA5$ - 0
6.8.14Air Conditioner and heating units 12000 BTU/hrEA6$ - 0
6.8.15Air Conditioner and heating units 24000 BTU/hrEA4$ - 0
6.8.16Emergency lightEA10$ - 0
6.8.17Hand-dryerEA2$ - 0
6.8.18VentEA7$ - 0
6.8.19Exit signEA6$ - 0
6.8.20Diesel generator with main fuel, sub-base fuel tanks, and retaining/leak containment pool. Include transfer switch and connection accessories.LS1$ - 0
6.8.21Grounding and lighting protection systems. Include clinic, storages, generator, and elevated water tower.EA1$ - 0
6.8.22Electric meter with input and output electrical accessoriesEA1$ - 0
6.8.23Electrical conduit, connection, and transformer. Include all conduits, fitting, bands, and accessories requires to run wires according to electrical code. It also includes a transformer.LS1$ - 0
6.9SHACK FOR GENERATOR AND FUEL TANKJOB1$ - 0
6.10UNDERGROUND UTILITIESLS1$ - 0
6.11PLUMBING ACCESSORIES
6.11.1White low tank toilet with seat and lid (water saver). Italian quality.EA7$ - 0
6.11.2NOT USED$ - 0
6.11.3NOT USED$ - 0
6.11.4Italian quality dual sinkEA2$ - 0
Italian quality dual sinkEA2$ - 0
6.11.5Paper toilet holderEA7$ - 0
6.11.6Soap holderEA10$ - 0
6.11.7Small towel holder bar at sinkEA10$ - 0
6.11.8Hook at sinkEA2$ - 0
6.11.9Faucet sinkEA4$ - 0
6.11.10Goose neck faucet kitchen sinkEA8$ - 0
6.11.11Faucet utilities (outside clinic, janitor, and storage)EA4$ - 0
6.11.12Double Bowl Kitchen SinkEA3$ - 0
6.11.13Single Bowl Kitchen SinkEA3$ - 0
6.11.14Drain point with PVC pipeEA8$ - 0
6.11.15Vent with PVC 2 inches pipeEA16$ - 0
6.11.164 inches PVC pipeM50$ - 0
6.11.172 inches PVC pipeM25$ - 0
6.11.18Threaded clean out 4 inches diameterEA8$ - 0
6.11.19Drain for kitchen sink 2 inches diameterEA4$ - 0
6.11.20Cold water point with PVC pipeEA8$ - 0
6.11.21Distribution network 1/2 inch PVC pipeM20$ - 0
6.11.22Distribution network 3/4 inch PVC pipeM10$ - 0
6.11.23Potable PVC 2 inches pipeM50$ - 0
6.11.24Double bow concrete utility sinkEA4$ - 0
6.11.25Janitor utility room sinkEA1$ - 0
6.11.26Handicap grab barsEA2$ - 0
6.11.27Installation of potable water pipes, drain pipes, and fittings. Include installation and materials.LS1$ - 0
6.11.28Mirrors with wooden frameLS1$ - 0
6.12TILES
6.12.1Floor tiles plus "zócalo". Anti-skid tiles shall be providedSM341$ - 0
6.12.2Wall tiles (Type "azulejo")M266$ - 0
6.13LOCKS AND HARDWARE
6.13.1Key dead lock exterior doors (building, storage, generator, water tower)EA12$ - 0
6.13.2Key knob lock interior doors (building)EA22$ - 0
6.13.3Silencer (exterior doors)EA16$ - 0
6.13.4Handle main entranceEA2$ - 0
6.13.5Commercial type heavy duty handle all other doorsEA16$ - 0
6.13.6Door stopperEA54$ - 0
6.13.7HingesEA162$ - 0
6.13.8Weather stripsEA16$ - 0
6.14PAINT
6.14.1Masonry primer (one coat)SM3,802$ - 0
6.14.2Exterior & Interior masonry paint (two coats)SM7,603$ - 0
6.14.3Anticorrosive paintSM10$ - 0
6.14.4Varnish for cabinets and doors. Two coatsSM110$ - 0
7.0SPECIAL ITEMS AND SYSTEMS
7.1Sewer connection, connection fittings and pipes, and all other accessories.LS1$ - 0
7.2SidewalksCM15$ - 0
7.3Water storage tank, tower, pump, connection fittings and pipes, cistern, and all other accessories.LS1$ - 0
7.4WasherEA3$ - 0
7.5DryerEA3$ - 0
7.6BinEA8$ - 0
7.7Folding tableEA4$ - 0
7.8Drop ceilingLS1$ - 0
7.9IroningEA2$ - 0
8.0SIGNSLS1$ - 0
8.1Room and area signsLS1$ - 0
8.2Kitchen and Laundry signLS1$ - 0
9.0CABINETS
9.1Wall hardwood cabinets. Include provision and installation, two shelves each, hardware, hinges, and door knobs.LS1$ - 0
9.2Base hardwood cabinets. For kitchen and bathroom sinks.LS1$ - 0
10.0TELEPHONE SYSTEMLS1$ - 0
11.0FIRE ALARM SYSTEMLS1$ - 0
12.0AUTOMATIC SPRINKLER SYSTEMSM1,330$ - 0
13.0PLAQUE, SEAL, and SIGN
13.1Dedication PlaqueEA1$ - 0
13.2ARSOUTH SealEA1$ - 0
13.3Project SignEA1$ - 0
14.0OPTION 1. FURNITURE, APPLIANCE, AND EQUIPMENT
14.1Stove with gas tank and gas tank shackEA1$ - 0
14.2MicrowaveEA2$ - 0
14.3RefrigeratorEA1$ - 0
14.4Walk-in refrigeratorEA4$ - 0
14.5Dining table with 4 chairsEA1$ - 0
14.6Office chairsEA4$ - 0
14.7Waiting room chairsEA4$ - 0
14.8Administrative deskEA7$ - 0
14.9LockersEA14$ - 0
14.10Fire extinguishersEA10$ - 0
15OPTION 2. PARKING. Include base, concrete surface 152 mm thick), parking stopper, marking spaces, handicap spaceSM1,000$ - 0
16TRAININGEA1$ - 0
17FINAL CLEAN UPLS1$ - 0
Sub-TotalEstimated project cost$ - 0
18OTHER$ - 0
18.1LaborLS1$ - 0$ - 0
18.2UtilitiesLS1$ - 0$ - 0
18.3TaxesLS1$ - 0$ - 0
18.4TransportationLS1$ - 0$ - 0
18.5Contingency and profitLS1$ - 0$ - 0

TOTAL PROJECT COST $ - 0

Performance period 360 days

Notes:
Quantities presented in this table are approximates and it is the contractor's responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing items. This table is only a guide for the contractor and it is not intended to be final.