Amendment_0002.pdf
PDF 320 KB Posted
- Attached to
- Construction of Kitchen and Laundry Facility Federal contract opportunity
- Solicitation number
- W912CL-16-R-0010
- Issued by
- Department of the Army Cyber Command
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0010859412-0001 HAP # 25847
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update Statement of Work Part 7, Attachment/Technical Exhibit Listing; add DFARS clause 252.236-7001 Contract Draw ings and Specif ications; and include f ive additional Auto CAD draw ings as Technical Exhibits 11 - 15. All changes are noted in red.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 41
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912CL-16-R-0010
X 9B. DATED (SEE ITEM 11)
11-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2016
CODE
410TH CONTRACTING SUPPORT BRIGADE
REGIONAL CONTRACTING CENTER AMERICAS
CCEC-AMF
4130 STANLEY ROAD STE 320
JBSA FORT SAM HOUSTON TX 78234-2726
W912CL 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912CL-16-R-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
Etchepare Psychiatric Hospital - Kitchen and Laundry Construction
Pueblo Nuevo, Uruguay
PART 1
1. GENERAL. Under this contract, the Contractor shall furnish all labor, transportation, equipment, materials, and any other items necessary to construct a new kitchen and laundry in support to Etchepare Psychiatric Hospital in the town of Pueblo Nuevo in accordance with (IAW) the Statement of Work (SOW). The United States Government (USG) shall not exercise any supervision or control over the contractor performing the tasks herein. Any tasks provided under this contract are considered non-personal in nature.
1.1 Scope of Work. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to execute the terms of this SOW. The work shall comply with all applicable construction country and International Building codes. The Contractor shall obtain all required construction permits and shall conduct a site visit to verify details and the scope of work. The Contractor shall provide validated designs and specifications, and all required labor, equipment and materials to construct a new kitchen and laundry at Pueblo Nuevo, Uruguay. Work executed by the contractor shall include but is not limited to:
- Soil study;
- Site preparation;
- Utility connections;
- Validate the designs for the existing site and soil conditions;
- Construction of a new kitchen and laundry for Etchepare Psychiatric Hospital;
- Provide and install kitchen and laundry furniture and equipment (as an option);
- Required automatic sprinkler system for fire suppression
- Construction of parking lot (as an option);
- Construction of water cistern and elevated water tank;
- Required electrical, plumbing, sewer, and mechanical systems;
- Provision and installation of dedication plaque;
- Paint areas; and
- Any other related works.
Note: All provided quantities and dimensions are approximate, it is the Contractor’s responsibility to verify actual quantities and dimensions. A Licensed Structural engineer shall approve the final project design and the Contractor shall provide all final design drawings/specifications to the KO and COR prior to start of construction.
1.2 Background. The project is part of the Humanitarian Assistance Program (HAP) in support of the U.S Security Cooperation Office in Uruguay.
1.3 Objectives. The objective of this project is to construct and equip a new kitchen and laundry. The completion of this project will help the Ministry of Health and Pueblo Nuevo local authorities to quickly respond to needed Etchepare Psychiatric Hospital patients.
1.4 Required Delivery. The work shall begin within ten (10) days after the Contractor receives the Notice to Proceed (NTP), and the project shall be completed in 360 days or less from receipt of the NTP. This delivery time includes clean-up of the site area.
1.5 General Information.
1.5.1 Quality Control (QC). The Contractor shall develop and maintain an effective Quality Control Plan (QCP) to ensure services are performed IAW this SOW and applicable regulations. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which the contractor assures that the work complies with the requirement of the contract. Contractor shall deliver the QCP to the COR and the KO for approval within 30 days of contract award. The Contractor shall have five (5) working days to submit any changes for COR and KO acceptance.
1.5.2 Quality Assurance (QA). The USG shall evaluate the Contractor’s performance under this contract IAW the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the USG must do to ensure that the Contractor has performed IAW the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.5.3 Hours of Operation. Not applicable
1.5.4 Place of Performance. The work to be performed under this contract will be performed at Pueblo Nuevo, Uruguay. Coordinates for this site are S-34.26 and W-56.26. Prior to the commencement of work, access to the construction site shall be coordinated with Pueblo Nuevo Ministry of Health representatives.
1.5.5 Type of Contract. The USG anticipates award of a firm-fixed price type contract
1.5.6 Security Requirements. The Contractor and/or associated subcontractor employees shall comply with applicable site access and local security policies and procedures.
1.5.6.1 Physical Security. The contractor shall be responsible for safeguarding all construction materials and equipment.
1.5.6.2 Background Checks. At the time of award of the contract or when hiring new contract workers, the Contractor shall ensure contractor employees and subcontractor employees performing services under this contract have passed a security check conducted by the Host Nation Police Department of their residence or the State Police Department of their U.S. residence. Security checks that have been completed as part of a personnel security clearance background investigation, or a previous background check that was a condition of employment, meet this requirement. Documentation of these checks will be made available to the KO or COR upon request. The USG retains the right to exclude any employee from performance of duties under this contract if a background security checks reveals an employee is a security risk. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. If the USG determines additional background checks are required, at a minimum, and upon request from the Government, the Contractor shall provide to the KO or COR, the following information on any contractor or subcontractor employee performing services under this contract:
• Full birth name
• Married name (if applicable)
• SSN or local equivalent (ID card number)
• Date of birth
• Place of birth (city, country)
1.5.6.2.1 If a background checks on any employee or subcontractor employee performing services under this contract, whether the check was conducted as a condition of employment or as part of the contract with the USG, reveals any information from any source (including host country law enforcement) of criminal activity by Contractor employees, subcontractors, or subcontractor employees, the Contractor shall immediately notify the KO and COR of that information. The Contractor shall make notification of:
(1) Traffic violations, other than parking, will be reported to the KO or COR only if the contract is for drivers for the Government;
(2) Any suspicious activity by Contractor employees, subcontractors, or subcontractor employees the Contractor believes may pose a risk to U.S. or host nation national security or imminent risk of deadly bodily harm to any person; and
(3) Any actions taken against Contractor employees, subcontractors, or subcontractor employees pursuant to this requirement.
1.5.6.2.2 Remedies. In addition to other remedies available to the USG, the Contractor’s failure to comply with the requirements of this paragraph my result in requiring the Contractor to remove a Contractor employee or employees from the performance of the contract.
1.5.6.2.3 Subcontracts. The Contractor shall include the substance paragraph 1.5.6.2 in all subcontracts.
1.5.6.3 Vetting. The Contractor company and all associated sub-contractor companies, must have been vetted by the U.S. Embassy in the country which the contract will be performed. For the purposes of this contract, the company is considered vetted if the company is located in the country which the contract will be performed unless the company has been previously barred from performing services for the USG. If during a previous vetting process, the company was barred from performing service for the USG, the contractor is ineligible for award of a contract. If the company is located outside of the country which the contract will be performed, the company must be vetted by the U.S.
Embassy in the country of performance. Vetting will coordinate through the U.S. Embassy's DOD Security Cooperation Office in the country of performance. If during any previous vetting process in other countries, the company was barred from performing services for the USG the contractor is ineligible for award of a contract.
1.5.6.4 Anti-Terrorism (AT) Awareness Training for U.S-based Contractor Personnel Traveling Overseas. If applicable, upon award of the contract, or within 30 days of employment of new personnel performing services under this contract, the Contractor will coordinate with the supporting DoD Agency AT Officer through the COR or KO, for AOR specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. This training will be updated as required by the supporting installation AT policies. Verification of the training will be made available to the COR or KO upon request.
1.5.6.5 Advertisement and Social Media. If applicable, the Contractor shall NOT post information to public website or social media locations, personal or professional, that in any way disclose names, locations, hotel data, participants, discussions, pictures, etc. before, during or after the contract period of performance without the express consent of the Government. The use of propaganda violates DOD Commercial Use of Imagery Guidelines stated at (http://www.defenseimagery.mil/products/DODimagery/commercialuse.html). The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.
1.5.6.6 Operations Security (OPSEC) Awareness. If applicable, the Contractor, or a subcontractor, or employees of either disclose any information that disrupts or harms the Government's operations or activities, then the Government retains the right to exclude any employee from performance of duties under this contract. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. By way of example, personnel shall not sketch or take photos of government facilities or activities, unless related to service to be provided. All government paper products and removable digital storage material that is received, generated, or stored during the contract will be destroyed completely when no longer needed to preclude recognition of information.
1.5.6.7 Information Assurance (IA). If applicable, at no time will the Contractor or associated sub-contractor employees transmit government documents or information using methods that do not meet the security requirements specified in the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, "Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations" such as personal electronic mail accounts, public digital data storage sites (cloud storage), social media platforms or instant messaging. Approved government sites such as U.S. Army Aviation and Missile Research Development and Engineering Center (ARMDEC) Safe Exchange at https://safe.amrdec.army.mil/SAFE/About.aspx, or All Partners Access Network (APAN) at https://community.apan.org/, or other transmission means determined by the government must be used.
1.5.6.8 Foreign (OCONUS) Requirements. If applicable, all U.S. citizen or resident, and TCN contractor personnel not normally residing in the USSOUTHCOM AOR, must comply with the training requirements listed in the Foreign Clearance Guide (FCG). Verification of the training shall be made available to the COR or KO upon request. Additionally, they must receive personal security training that includes at a minimum:
(a) Safety and security issues facing employees within the USSOUTHCOM AOR,
(b) Identifies safety and security contingency planning activities, and
(c) Identifies ways to utilize safety and security personnel and other resources appropriately.
1.5.6.9 Theater and Country Clearance Requirements. If applicable, the Contractor shall ensure all U.S. citizen or U.S. resident contractor employees and sub-contractor employees performing services under this who are traveling in the USSOUTHCOM AOR follow the requirements identified in the electronic Foreign Clearance Guide (FCG) at https://www.fcg.pentagon.mil/fcg.cfm and must have all necessary passports, visas, and other documents required to enter, exit, or work in the USSOUTHCOM AOR; must have the appropriate DOD identity credential(s); must have the appropriate special area, country, and theater clearance as required in DOD Directive 4500.54E. Contractor personnel shall return all USG issued identification, to include the Common Access Card, to appropriate USG authorities within 5 days of the end of their travel or contractual duties.
1.5.6.10 Deoxyribonucleic Acid (DNA) Samples. If applicable, the Contractor shall collect a DNA record for all U.S. citizen contractor and sub-contractor personnel traveling to the USSOUTHCOM AOR and shall have arrangements for storage of the DNA referenced specimen through a private facility or arrange for the storage of the specimen by contacting the Armed Forces Repository of Specimen Samples for the Identification of Remains (AFRSSIR) at http://www.afmes.mil/index.cfm?pageid=afdil.afrssir.overview or phone: (302) 346-8800. In addition, U.S. citizen contractor and sub-contractor personnel shall comply with the requirements of DoDI 3020.41, Enclosure 3, para 8.b., or its successor.
1.5.6.11 Medical Travel Requirements. If applicable, the Contractor shall ensure that all Contractor employees and subcontractor employees are medically, dentally, and psychologically fit for performance of their duties. All U.S.
citizen and TCN contractor and subcontractor personnel must meet the medical screening requirements established by the USSOUTHCOM Commander in the Medical Suitability Screening Regulation (SC Reg 40-501), as well as the requirements identified in FORCE HEALTH PROTECTION (FHP) GUIDANCE FOR DEPLOYMENT in the USSOUTHCOM AOR or their successors and follow immunization and health protection guidelines outlined therein. All immunizations must be obtained prior to traveling to the USSOUTHCOM AOR. U.S. citizen and TCN contractor and subcontractor personnel traveling from a country outside of the USSOUTHCOM AOR must travel into the USSOUTHCOM AOR with a current copy of the Public Health Service Form 791, “International Certificate of Vaccination”. In addition, U.S. citizen and TCN contractor and subcontractor personnel traveling to the USSOUTHCOM AOR are required to be beneficiaries of a medical evacuation plan and service through an insurance plan provided by their employer or paid for individually.
1.5.6.12 Synchronized Pre-deployment and Operational Tracker (SPOT).
1.5.2.12.1 If applicable, upon award of this contract, or employment of new personnel, the Contractor will enter Contractor employees and subcontractor employees performing services under this contract into the SPOT database who meet one of the following conditions:
(1) All U.S. citizen and resident, and third country national (TCN) personnel who travel into the
USSOUTHCOM AOR for periods of performance anticipated to exceed 30 consecutive days.
(2) TCN, or LN personnel who reside with or work in the immediate vicinity of U.S. Armed Forces and/or
DOD Civilian personnel for periods of performance anticipated to exceed 30 consecutive days.
(3) Private security Contractors and contingency Contractor personnel authorized to carry weapons regardless of proximity to U.S. Armed Forces or DOD Civilian personnel and regardless of the length of the anticipated period of performance.
(4) Contractor and subcontractor personnel with a place of performance in the continental United States, including the USSOUTHCOM Headquarters and Joint Interagency Task Force-South (JIATF-S) Headquarters, that may, within the terms of the contract, deploy to the USSOUTHCOM AOR for periods anticipated to exceed 30 consecutive days.
1.5.6.12.2 The KO or COR will approve all employees in the SPOT database and a Letter of Authorization (LOA) is generated to the Contractor on each employee. The signed LOA is required prior to travel to, from, or within the USSOUTHCOM AOR. The LOA also will identify any additional authorizations, privileges, or Government support to which Contractor personnel are entitled under this contract. The LOA will be regenerated by the Contractor upon expiration of the LOA. Changes to the status of individual personnel relating to their in-theater arrival date and their duty location, to include closing out the trip with their proper status (e.g., mission complete, wounded, etc.) shall be annotated within the SPOT database IAW the timeliness established in the SPOT business rules. Information and standards for the SPOT system is posted on the USG Foreign Clearance Guide website at https://www.fcg.pentagon.mil/fcg.cfm for the country of employment. Access to SPOT is https://spot.dmdc.mil.
1.5.7 Combating Trafficking in Persons. The contractor shall comply with all requirements of FAR 52.222-50, Combating Trafficking in Persons.
1.5.8 Post Award Conference/Periodic Progress Meetings.
1.5.8.1 The Contractor shall attend the pre-construction conference and any post award conferences convened by the KO IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The KO and COR, with other USG personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the KO will apprise the contractor of how the USG views the contractor's performance and the contractor shall apprise the USG of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the USG.
1.5.8.2 The Project Engineer/Architect may be required to meet at least weekly with the KO and/or the COR during the first month of construction and then as required throughout the period of performance. The Contractor shall be responsible for keeping minutes of these meetings. The written minutes of these meetings shall be signed by the Project Engineer/Architect and any other individuals in attendance, and be submitted to the KO for approval.
Minutes are due ten (10) days after meeting concluded.
1.5.9 Contracting Officer Representative (COR). The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and approves progress payments on a monthly basis and notifies both the KO and Contractor of any deficiencies; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.5.10 Key Personnel. The following contractor personnel are considered key personnel by the Government: The quality control representative, the project engineer/architect, field engineer/architect, project superintendent/foreman and any other engineers leading design (plans or calculations) efforts related to the project.
1.5.10.1 Minimum qualifications for all key personnel are listed below:
The project engineer/architect shall have a bachelor’s degree in engineering/architecture and maintain a valid professional registration that is accepted by the Government of Uruguay, and at least ten (10) years of experience.
Field and design engineers/architects shall have a bachelor’s degree in engineering/architecture and maintain a valid professional registration that is accepted by the Government of Uruguay, and at least five (5) years of experience with projects of a similar type and magnitude. The project superintendent/foreman shall have at least three (3) years or three (3) projects of experience with projects of a similar type and magnitude. The Contractor’s quality control representative shall have at least five (5) years as a quality control inspector in the construction field.
The Contractor shall provide sufficient number of personnel, properly trained and qualified (i.e. civil engineer, architect, geotechnical engineer, electrical engineer, certified electricians and foremen), to perform the requirements of this contract at the worksite location. All non-laborer Contractor employees on this project shall maintain a proficiency license from the Uruguay.
The Contractor shall provide to the KO and COR the phone numbers of the Project Engineer/Architect and alternate(s), Field Engineer/Architect and Superintendent/Foreman to be available during duty and non-duty hours (to include evenings, holidays, and weekends) within fifteen (15) days of contract award.
1.5.10.1.1 Project Engineer/Architect Superintendent/Foreman.
The Contractor shall provide primary Project Engineer/Architect and/or alternates Project Engineer/Architect who shall be a licensed engineer or architect by the Government of Uruguay and responsible for the performance of all work. The name of this person and an alternate(s), who shall act on behalf of the Contractor when the Project Engineer/Architect is absent, shall be designated in writing to the KO no later than fifteen (15) days after contract award. The project engineer/architect shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The project engineer/architect or alternate shall be available during the regular workday.
The Project Engineer/Architect shall be responsible for overall management and coordination of this contract;
directing the onsite work; acquiring materials; resolving construction issues; and providing information about work progress to the KO and COR. The Project Engineer/Architect shall be highly knowledgeable of the project progress and have a good working knowledge of Spanish to be able to communicate effectively. By Good Working Knowledge the employee should be able to read/speak Spanish and understand agency regulations, operating instructions, memoranda, and related material concerning the field of work, to prepare correspondence and standardized reports, and to communicate effectively with Spanish speaking staff members and the general public, including both Spanish speaking and non-Spanish speaking persons, to include English.
1.5.10.1.2 The Field Engineer/Architect and Superintendent/Foreman shall be designated in writing to the KO no later than ten (10) days after contract award. These key personnel shall be physically present at the worksite when work is being performed at the site.
1.5.10.2 Personnel Listing.
1.5.10.2.1 After issuance of NTP, the Contractor shall have five (5) days to submit to the KO/COR a list of workers and Project Managers assigned to work on this project (Biographic Data on Personnel). Required information for each individual on the personnel list for this project shall include:
Full Name
Place and Date of Birth
Current Address
Identification number
1.5.10.2.2 Failure to provide any of the above information may be considered grounds for rejection and/or re-submittal of the personnel list.
1.5.11 Identification of Contractor Employees. Contractor’s personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.5.12 Other Direct Costs. Not applicable.
1.5.13 Data Rights. The USG has unlimited rights to all documents/materials produced under this contract. Any documents, designs, drawings, study and test outcomes, survey maps, belong to the USG and shall be turned over to the COR upon completion of the project. All documents and materials produced under this contract shall be USG owned and are the property of the USG with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.5.14 Laws and Regulations.
1.5.14.1 Compliance Required. The Contractor shall, as a minimum, and without additional expense to the USG, be responsible for complying with all Uruguayan laws, codes, ordinances, and regulations applicable to the performance of the work, including those lawful orders of any governmental authority having jurisdiction. In the event of a conflict between the contract and such laws, regulations and orders and the applicable International Building Code, the Contractor shall promptly advise the COR and KO of the conflict and of the Contractor's proposed course of resolution.
1.5.14.2 Labor, Health and Safety Laws. The Contractor shall comply with all local labor laws of Uruguay, regulations, customs and practices pertaining to labor, safety, and similar matters, to the extent that such compliance is not inconsistent with the requirements of this contract. The practices outlined in the Uruguay regulation “Normatividad Salud Ocupacional y Seguridad Industrial” are the minimum acceptable standards. The Contractor is responsible for training all personnel on fire and safety hazards. Contractor personnel in the performance of their duties shall immediately report fire hazards, safety hazards and unsafe conditions to their supervisor. In the event that a Uruguayan law or regulation does not exist for a particular event, then the U.S. version that covers that particular event will be specified in the particular section of this SOW.
The Contractor and their subcontractors shall comply with Uruguayan safety regulations and laws. Where project activities are not governed by Uruguayan regulation, the contractor shall comply with international safety and health requirements.
1.5.15 Licenses and Permits.
1.5.15.1 Contractor Licenses and Permits. The Contractor shall, at no additional cost to the USG, obtain all licenses and permits required for performance of work. Contractor shall comply with all applicable national, regional, and local Uruguayan laws, rules, and regulations. The Contractor shall submit proper documentation and evidence satisfactory to the KO demonstrating compliance with this requirement when directed by the KO.
1.5.15.2 Subcontractor Licenses and Permits. The Contractor shall inform the KO in writing that all subcontractors and others performing work at Pueblo Nuevo worksite have obtained all requisite licenses and permits. The Contractor shall submit a copy of the licenses and permits to the KO demonstrating compliance with this requirement when directed by the KO.
1.5.16 Environmental Protection.
1.5.16.1 In order to present and provide for abatement and control of any environmental pollution arising from the activities in the performance of this contract, the Contractor shall comply with all applicable pollution control and abatement policies, and all applicable provisions of the Uruguayan Codes and Ministry of Health regulations/laws.
1.5.16.2 Environmental protection action required by this section shall consist of furnishing all labor, materials, and equipment and performing all work required for the abatement and prevention of pollution during and as the result of construction operations under this contract. For the purpose of this specification, environmental pollution is defined as the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances; detrimentally impact on biological species and/or their habitat; or degrade the aesthetic and recreational value of the area.
1.5.16.3 The Contractor shall not pollute storm or sewer lines; or swales with fuels, oils, bitumen, calcium chloride, acid, construction wastes; or other harmful materials. It is the responsibility of the Contractor to investigate and comply with all applicable Uruguayan laws concerning pollution of river and streams. All work under this contract shall be performed in such a manner that objectionable conditions shall not be created in streams through or adjacent to the project areas.
1.5.16.4 Waste material is defined as any material for which no use or reuse is intended and which is to be discarded. Disposal of hazardous waste, containers or components thereof, shall be in a hazardous waste disposal site only and no other location shall be utilized for such disposal. Only hazardous waste sites which are permitted by the US Environmental Protection Agency (EPA), and/or the Government of Uruguay shall be utilized for such disposal actions. Contractor shall coordinate with Uruguayan environmental agencies for disposal/storage activities.
The Contractor shall maintain all required documentation related to hazardous material use and waste disposal IAW the Government of Uruguay regulations and requirements.
1.5.17 Personnel Safety. The Contractor shall ensure the safety of their personnel IAW Uruguayan law section Normatividad Salud Ocupacional y Seguridad Industrial. The Contractor shall immediately correct all safety deficiencies upon notification of such deficiencies by the KO/COR and shall notify the KO/COR of the corrective action taken. The Contractor shall be responsible for the safety of their workers and all visitors at each work site;
and ensure that all personnel are wearing appropriate safety gear at all times (i.e. safety glasses, helmet, harness, gloves, and safety shoes).
1.5.17.1 Accident Protection (AP) and Emergency Medical Treatment (EMT). The Contractor shall have personnel licensed by the Uruguay government to be trained and capable of dealing with minor personnel injuries. The personnel shall be qualified to provide first aid in case of emergency. The number of AP and EMT shall be sufficient to care for the number of employees at the site in the case of an emergency.
1.5.17.2 All work crews, Contractor management personnel, the KO and COR shall be provided with information pertaining to the Contractor's arrangements for emergency medical treatment no later than five (5) days after issuance of the NTP. This information shall include the following:
Local Hospital: Name Phone No.
Local Ambulance: Name Phone No.
Local Doctor: Name Phone No
1.5.18 Marking of Work Zones. The Contractor shall mark all work zones using two lines of plastic yellow security ribbon. Yellow security ribbons shall be 8cm wide and supported on stable wood stakes. Likewise, the project excavation or high accident risk zones shall be signaled with warning signs or fences as protective measurements by the Contractor.
1.5.19 Construction Operations and Storage Areas.
1.5.19.1 Confinement to Authorized Areas. The Contractor shall confine all operations (including storage of materials) to the project’s premises. USG agencies shall have access to the premises for official fire, safety, and security inspections and/or to conduct site visits as authorized by the KO.
1.5.19.2 Access to Contractor’s Storage Yard. The Contractor shall only store materials and equipment on the project premises. The specific worksite location will be coordinated with the Ministry of Health representatives during the pre-construction conference or at a later date.
1.5.20 Contractor Vehicles.
1.5.20.1 Vehicular Access. The Contractor shall, and IAW any regulations specified by the municipal and Ministry of Health authorities, use only established site entrances and roadways at the worksite locations.
1.5.20.2 Vehicle list. The Contractor shall provide a list of all vehicles used in the performance of this contract to include vehicle description, valid vehicle registration number, and identification (ID) card numbers to the KO not later than ten (10) days after issuance of NTP and update list as any changes occur. ID information will be used by the Ministry of Health and Army South to verify credentials and issue access permits. Contractor shall coordinate with the Ministry of Health to access site.
1.5.21 Unforeseen Conditions. The Contractor shall conduct aerial, surface, underground or embedded interference surveys to avoid damage to pipes, boxes, cables, utility poles, hoses, wells or other elements in the work area. The Contractor shall properly document existing conditions prior to commencement of work IAW FAR 52.236-2 by taking photos and having a clinic official and contractor field engineer/architect, or project superintendent/foreman walk the work site. Contractor shall formalize the existing conditions in a report with an official memo. This report and official memo shall be signed by the Etchepare Psychiatric Hospital POC, contractor, KO, and COR. Existing condition report shall be provided within 30 days after contract is awarded.
PART 2
2. DEFINITIONS AND ACRONYMS.
2.1 Definitions.
2.1.1 Calendar Days. Any reference in the Statement of Work to “days” refers to calendar days, rather than business days, unless otherwise specified.
2.1.2 Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.3 Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government. Only the Contracting Officer (KO) has authority to make changes to any contract resulting from the solicitation of this project, including but not limited to increases, decreases, time extensions, and changes in prices.
2.1.4 Contracting Officer's Representative (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.5 Defective Work. A task output that does not meet the standard of performance associated with the SOW.
2.1.6 Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.7 Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the SOW. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.8 Physical Security. Actions that prevent the loss or damage of Government property.
2.1.9 Quality Assurance (QA). The Government procedures to verify that tasks being performed by the Contractor are performed according to acceptable standards.
2.1.10 Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.1.11 Quality Control (QC). All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.12 Subcontractor. One that enters into a contract with a prime Contractor. The Government does not have privity of the prime’s contract with the Subcontractor.
2.1.13 Third Country National (TCN). Third country nationals are foreign nationals who are not citizens of the country where their duty station is located. For example, a German citizen deployed to a duty station in Korea is a
TCN.
2.1.14 Work Day. The number of hours per day the Contractor performs IAW the contract.
2.1.15 Work Week. Monday through Friday, unless specified otherwise.
2.1.16 Project Engineer (PE)/Architect. The person who is the technical representative for the Contractor in all phases of the project, from design to final execution. This person will be responsible for design and materials submittals and will attend meetings as required for the project. The experience required is defined in Section 1.5.13.
2.1.17 Field Engineer/Architect. The onsite technical representative overseeing the engineering aspects of the project. This person will ensure proper work execution with regards to project designs, technical standards and project schedule. This person can also establish quality control construction processes. The experience required is defined in Section 1.5.13.
2.1.18 Project Superintendent/Foreman (Maestro de Obra). Person trained in all aspects of construction management with specific knowledge of construction processes. The experience required is defined in Section 1.5.13.
2.1.19 Foreign Nationals. A Foreign National is not a U.S. Citizen. Green Card holders are also identified as Foreign Nationals. A Foreign National is categorized as either a TCN or an LN based on the person's citizenship and duty station location.
2.1.20 Local National (LNs). LNs are foreign nationals who are citizens of the country where their duty station is located.
2.1.21 Area of Responsibility. The U.S. Southern Command (USSOUTHCOM) area of responsibility (AOR) includes the geographic areas of Antigua and Barbuda, Argentina, Aruba, Barbados, Belize, Bolivia, Brazil, British Virgin Islands, Cayman Islands, Chile, Colombia, Costa Rica, Cuba, Curacao, Dominica, Dominican Republic, Ecuador, El Salvador, Falkland Islands, French Guiana, Grenada, Guadeloupe, Guatemala, Guyana, Haiti, Honduras, Jamaica, Martinique, Mayotte, Montserrat, Nicaragua, Panama, Paraguay, Peru, Saint Barthélemy, Saint Martin, Saint Kitts and Nevis, Saint Lucia, Saint Vincent and the Grenadines, Saint Maarten, Suriname, Trinidad and Tobago, Turks and Caicos Islands, Uruguay, and Venezuela.
2.2 Acronyms.
ACI American Concrete Institute AFARS Army Federal Acquisition Regulation Supplement AISC American Institute of Steel Construction ANSI American National Standards Institute AP Accident Prevention AOR Area of Responsibility AR Army Regulation ASTM American Society for Testing Materials AT Awareness Training AWS American Welding Society BTU British Thermal Unit CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) GR Government Representative CPM Critical Path Method DA Department of the Army DBA Defense Base Act DD250 Department of Defense Form 250 (Receiving Report) DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense EIA Energy Information Administration EM Engineer Manual EMT Emergency Medical Treatment FAR Federal Acquisition Regulation FN Foreign National FPCON Force Protection Condition IAW In Accordance With HID High-intensity discharge KO Contracting Officer LED Light Emitting Diode LN Local National NEC National Electrical Code NFPA National Fire Protection Association NTP Notice to Proceed OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) PERT Program Evaluation & Review Technique POC Point of Contact QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Plan SOW Statement of Work
TCN Third Country National TE Technical Exhibit TIA Telecommunications Industry Association UL Underwriters Laboratories USG United States Government USSOUTHCOM United States Southern Command
PART 3
3. GOVERNMENT FURNISHED ITEMS AND SERVICES. The Government shall not furnish services, equipment, or materials in the performance of this contract.
3.1 Services. Not applicable.
3.2 Facilities. Not applicable.
3.3 Utilities. Not applicable.
3.4 Equipment. Not applicable.
3.5 Materials. Not applicable.
PART 4
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES.
4.1 General. The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract as outlined within this SOW. All work shall be performed IAW manufacturer specifications and instructions for the products and/or materials to be used, and performed by certified personnel such as professional electrical engineers, electricians, architects, and civil engineers. The Contractor shall verify existing conditions prior to initiate soil study and construction. The Contractor shall comply with special considerations, safety program, required insurance, and Uruguay Ministry of Health regulations.
4.2 Secret Facility Clearance. Not applicable.
4.3 Materials. The Contractor shall provide cement, aggregates, reinforced steel, tiles, masonry, wall structure, electrical, plumbing, sewer, paint, stucco, windows, roof structure, doors and all related materials for the construction.
4.4 Equipment. The Contractor shall provide all required construction equipment to perform all tasks stated in this
SOW.
4.5 Responsibilities of Contractor.
4.5.1 Damage to Persons or Property. The Contractor shall be responsible for all damages to persons or properties at the worksite that occur as a result of the Contractor's own fault or negligence. The Contractor shall take proper safety and health precautions to protect the work sites, the workers, the public, and the property of others IAW FAR 52.236-13.
4.5.2 Responsibility for Work Performed. The Contractor shall be responsible for all materials delivered and work performed until final completion and acceptance of the entire project, except for any completed unit of work which may have been accepted in writing by the KO under the contract.
4.6 Contractor Records/Progress Reports. After contract award, the Contractor shall certify all completed work on a bi-weekly basis and provide a bi-weekly progress report to the COR and KO. The bi-weekly reports are due every other Tuesday, no later than 1300 hrs. (1:00 p.m. CST).
4.7 Contractor Work Schedules. Offerors shall include in their technical proposal a complete project management schedule utilizing the Critical Path Method (CPM), Program Evaluation & Review Technique (PERT) or Gantt Chart showing major construction phases (i.e. demolition, electrical, plumbing, sewer, masonry, carpentry, tiles, stucco, doors, tests, paint, cleaning, final inspection and punch list corrections). These items will become part of the contract at award. Sufficient float time shall be incorporated in the schedule to account for down days due to inclement weather. Contractor shall include QA inspections performed by QA representative at each worksite.
4.8 Repair. The Contractor shall repair any damage to the existing grounds, facilities, or property incurred during the course of the renovation at site to its original pre-existing conditions. Refer to section 4.5.1 Damage to Persons or Property for additional info.
4.9 Safety. The Contractor is responsible for the safety of workers and visitors to the work sites. The Contractor shall ensure that all personnel wear appropriate safety gear at all times in compliance with all Uruguay Occupational Safety & Health regulations and ensue all local safety regulations are followed at all times. The Contractor shall provide sanitation for workers IAW the Uruguay safety and health laws.
4.9.1 Prohibition on Asbestos and Lead Based Paints. The Contractor shall not use materials containing Asbestos or Lead Based Paints in this construction project. Upon completion of each construction project, the Contractor shall submit two copies of a Certified Letter to the COR stating that no lead based paints or materials containing asbestos were used in this project at Pueblo Nuevo. One copy of the letter shall be filed with project documents in the Resident Engineer's Office and second copy shall be submitted to the KO and COR.
4.10 Utilities Connections and Excavations.
4.10.1 The USG will not provide any utility connections. Power, sewer and water utilities are available at this site.
It is the contractor’s responsibility to request and pay for these utilities during construction. Contractor needs to coordinate with Uruguay Ministry of Health facility engineer to arrange for the connections if needed. It is the Contractor’s responsibility to provide any generators required to operate its own equipment at its own expense. The Contractor shall be responsible for providing potable water daily at the construction worksite for all employees at Contractor’s own expense. If a water tank truck is planned for this purpose, the Contractor shall be responsible for providing registration information that must be included with the Contractor’s equipment listing
4.10.2 The Contractor shall be responsible for coordinating excavation with local utility companies and shall take every precaution to avoid damage to underground utilities. The Contractor shall be responsible for any damages they incur to the underground utilities and shall repair any construction damages at the project worksite at own expense.