About this file
This is a Request for Proposal (RFP) for the procurement of Firing Mechanisms (NSN: 1010-01-679-5089, Part Number: 12901960) for the M224 60MM lightweight mortar system. The solicitation is issued by the U.S. Army Contracting Command - Detroit Arsenal and is designated as a 100% Total Small Business Set-Aside under FAR Part 15. The contract will be a single-award, firm fixed-price (FFP) contract for a one-time buy with a 100% option, resulting in a total potential quantity of 498 firing mechanisms (249 units in the base contract, 249 units in the option). The base contract delivery requirement is 300 calendar days after award, or 150 days if First Article Testing (FAT) is waived. The option quantities follow the same delivery timeline. Award is anticipated by June 3, 2026, with a solicitation closing date of April 6, 2026, at 3:30 PM Eastern Time. Proposals must be submitted electronically via email to the Contract Specialist, Kaley Weeden, at kaley.h.weeden.civ@army.mil.
The Technical Data Package (TDP) is export-controlled (Distribution D) and requires requesters to have current DD Form 2345 certification from the U.S./Canada Joint Certification Program (JCP) to access via SAM.gov. Evaluation will be based primarily on price (significantly more important) and delivery schedule. Offerors must provide unit prices for all contract line items and may propose alternative delivery schedules for the base and option quantities, provided delivery dates are equal to or sooner than the required schedule. The RFP includes extensive requirements for First Article Testing, phosphate coating procedures (both light and heavy), acceptance inspection equipment, radioactive wipe testing for tritium and nickel-63 components, configuration management documentation (ECPs, RFVs, and NORs), and compliance with MIL-STD standards and DFARS clauses. Offerors must submit a pre-production meeting within 30 days of award and may request a FAT waiver using the provided worksheet. All deliverables must be inspected and accepted at origin for the production quantities and at destination for the First Article Test Report.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Firing Mechanism QA_W912CH-25-R-0139.xlsx | XLSX spreadsheet | |
| W912CH25R0139-0003.pdf | ||
| W912CH25R0139-0002.pdf | ||
| W912CH25R0139-0001.pdf | ||
| Attachment 0001 - Additional Guidelines for Controlled Unclassified Information.pdf | ||
| Attachment 0004 - FAT Waiver Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W912CH-25-R-0139
X
2026MAR05
2026APR0603:30pm
DOA4
2026MAR05 SEE SCHEDULE
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
KALEY H. WEEDEN
(571)588-9285
CCTA-APN-C
KALEY.H.WEEDEN.CIV@ARMY.MIL
1 84
X 1
X 4 X 16
X 21 X 23 X 29
X 35
X 37
X 42
X 61
X 62
X 73
X 81
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: KALEY H. WEEDEN
Buyer Office Symbol/Telephone Number: CCTA-APN-C/(571)588-9285
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Mortar, lt. wt, 60MM, M224, w/mount
*** End of Narrative A0000 ***
A.1 DESCRIPTION OF THE ACTION
A.1.1 This requirement is being solicitated as a 100% Total Small Business Set-Aside under FAR Part 15. The following item is being solicited: NSN: 1010-01-679-5089, Firing Mechanism
A.1.2 This solicitation is intended to result in a single-award, one-time buy with 100% option.
A.2 Electronic Contracting
A.2.1 All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website
(https://www. SAM.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, are embedded in the solicitation as separate attachments or links.
A.2.2 Please pay close attention to the Issued By block location on the cover page of the solicitation closing date/time. The solicitation closing date/time is based on the local time of the location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting any proposal, modification or revision/amendment, so as to be received by the Government office designated in the solicitation by the time specified.
A.2.3 It is the responsibility of the offeror to ensure any proposal, modification, or revision/amendment is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208(b), if any proposal, modification, or revision/amendment was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal, modification, or revision/amendment is defined to mean ALL volumes or parts required in the solicitation and included in the electronic submission.
Note: Any proposal, modification, or revision/amendment size and content may impact the time it takes for submission. Therefore, offerors are strongly cautioned that adequate time should be allowed when submitting any proposal, modification, or revision/amendment
A.2.4 Solicitations may remain posted on www.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, offerors will no longer be able to submit electronic responses.
A.2.5 Any award issued as a result of this solicitation will be distributed electronically. In the event of a Freedom of Information Act
(FOIA) (5 USC 552) request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released. In addition, in accordance with Executive Order 12600 (June 23, 1987), please be advised it is the Government's intention to also release the unit price(s) in response to any request under FOIA. Unit price is defined as the contract price per unit, or item purchased as it appears in Section B of the contract. Unit price does NOT refer to, nor does it include Cost or Pricing data or information. If an offeror objects to the release of the unit price(s) in the contract or contract modifications in the event of a FOIA request, the offeror must notify the Contracting Officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection, consistent with the provisions of FOIA. A release determination will be made in accordance with FOIA based on the rationale provided.
A.2.6 Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the APEX
(formerly Procurement Technical Assistance Center (PTAC)) website at http://www.miapex.org/ to locate a regional center.
A.3 ACKNOWLEDGEMENT OF AMENDMENTS
A.3.1 Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
2 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A.4 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON
A.4.1 Information regarding the Ombudsperson for this contract is located at the following website: https://tacom.army.mil/ombudsperson.
(Best viewed using Google Chrome or Microsoft Edge)
A.5 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
A.5.1 This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act
(Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
A.5.2 To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily
Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:
http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's
Section C Technical Data Package instructions.
A.5.3 Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
A.5.4 Destruction of this technical data shall be accomplished by shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
A.6 PROPOSAL SUBMISSIONS
A.6.1 Interested offerors shall submit a proposal via email to the Contract Specialist (kaley.h.weeden.civ@army.mil) and cc the corresponding Contracting Officer (elizabeth.l.levinewelhouse.civ@army.mil) with the subject header: Proposal Submission W912CH-25-R-
0139 (company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
A.6.2 Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors; therefore, offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
A.7 QUESTIONS AND ANSWER PERIOD
A.7.1 Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. All questions regarding the requirements of this solicitation and applicable attachments must be submitted by July 10, 2025, 12:00 PM EST to kaley.h.weeden.civ@army.mil. The Government will review all questions received but is not obligated to answer questions submitted after the date noted above prior to the solicitation close date. For technical assistance in doing business with the
Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.8 ALL OR NONE
A.8.1 Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
A.8.1.1 ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
A.8.1.2 OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE."
*** END OF NARRATIVE A0001 ***
3 84
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 FIRING MECHANISM,CA
NSN: 1010-01-679-5089
Mfr CAGE: 1NUW7
Mfr Part Number: 12901960
0001AA Production Quantity 249 EA $ $ ____________________ ______________ __________________
COMMODITY NAME: FIRING MECHANISM,CA
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH5C0010EH PRON AMD: 02
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W52H094277024V W562RP J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 249 0150
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
0002 FIRING MECHANISM
NSN: 1010-01-679-5089
0002AA UNEXERCISED OPTION 249 EA $ $ __________________ ______________ __________________
COMMODITY NAME: FIRING MECHANISM
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
4 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 249 0150
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
0003 Service for FAT
0003AA FIRST ARTICLE TEST REPORT (FATR) 1 LO $ ________________________________ __________________
SERVICE REQUESTED: Service for FAT
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH6C0102EH PRON AMD: 02
AMS CD: SM2B1100000
CONTRACTOR SHALL PRODUCE 3 UNITS AND CONDUCT THE FIRST
ARTICLE TEST PURSUANT TO THE REQUIREMENTS (FAR CLAUSE 52.209-
3 ALT I & II) OF THE CLAUSE ENTITLED "FIRST ARTICLE APPROVAL
CONTRACTOR TESTING".
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0120
9001 EXHIBIT A - CONTRACT DATA REQUIREMENTS LIST ___________________________________________
5 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A001 CDRL A001 - ENGINEERING CHANGE PROPOSAL (ECP) $ ** NSP ** _____________________________________________ __________________
SERVICE REQUESTED: EXHIBIT A
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
List.
See Section J, Exhibit A: DD Form 1423, A001 -
Engineering Change Proposal (ECP).
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
6 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A002 CDRL A002 - REQUEST FOR VARIANCE (RFV) $ ** NSP ** ______________________________________ __________________
SERVICE REQUESTED: EXIHIBIT A
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
List.
See Section J, Exhibit A: DD Form 1423, A002 -
Request For Variance (RFV).
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
7 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A003 CDRL A003 - NOTICE OF REVISION (NOR) $ ** NSP ** ____________________________________ __________________
SERVICE REQUESTED: EXHIBIT A
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
List.
See Section J, Exhibit A: DD Form 1423, A003 -
Notice of Revision (NOR).
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
8 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A004 CDRL A004 - TEST PROCEDURE - LIGHT PHOSPHATE ____________________________________________
COATING $ ** NSP ** _______ __________________
SERVICE REQUESTED: EXHIBIT A
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
List.
See Section J, Exhibit A: DD Form 1423, A004 -
Acceptance Inspection Equipment (AIE) Report.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
9 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A005 CDRL A005 - TEST PROCEDURE - HEAVY PHOSPHATE ____________________________________________
COATING $ ** NSP ** _______ __________________
SERVICE REQUESTED: EXHIBIT A
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
List.
See Section J, Exhibit A: DD Form 1423, A005 -
Test Procedure Light Phosphate Coating.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
10 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A006 CDRL A006 - ACCEPTANCE INSPECTION EQUIPMENT (AIE) _________________________________________________
REPORT $ ** NSP ** ______ __________________
SERVICE REQUESTED: EXHIBIT A
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
List.
See Section J, Exhibit A: DD Form 1423, A006 -
Test Procedure Heavy Phosphate Coating.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
11 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A007 CDRL A007 - FIRST ARTICLE TEST REPORT (FATR) $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: EXHIBIT A
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
List.
See Section J, Exhibit A: DD Form 1423, A007 -
First Article Test Report (FATR).
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
12 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A008 CDRL A008 - START OF WORK MEETING MINUTES $ ** NSP ** _________________________________________ __________________
SERVICE REQUESTED: EXHIBIT A
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
List.
See Section J, Exhibit A: DD Form 1423, A008 -
Start of Work Meeting Minutes.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
13 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A009 CDRL A009 - TEST/INSPECTION REPORT $ ** NSP ** __________________________________ __________________
SERVICE REQUESTED: EXHIBIT A
CLIN CONTRACT TYPE:
Firm Fixed Price
The contractor shall prepare and deliver data submissions IAW Exhibit A Contract Data Requirements
List.
See Section J, Exhibit A: DD Form 1423, A009 -
Radioactive Wipe Test Results.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
14 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
15 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 TECHNICAL DATA PACKAGE INFORMATION
C.1.1 The following "X"d item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:
W912CH-25-R-0139
C.1.2 To access the data through SAM:
C.1.2.1 Log on to the SAM web site: https://SAM.gov.
C.1.2.2 Search for the solicitation number.
C.1.2.3 Click on the attachment you would like to view.
C.1.2.4 If the attachment is restricted, request access to the document.
C.1.2.4.1 TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United
States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).
C.1.2.4.2 Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its
Distribution Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
C.1.2.4.3 To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with
Defense Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.
C.1.2.4.4 Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
C.1.2.5 If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract
Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download
TDP items.
C.1.2.6 If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, everyone MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
C.1.2.7 It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and
Non-Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.
C.2 CONFIGURATION MANAGEMENT DOCUMENTATION
C.2.1 The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
C.2.1.1 The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense
Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the
16 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
second sentence of paragraph 3.3.1.8.1(1).
C.2.1.2 Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
C.2.1.3 Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.
C.2.1.4 All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent, that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
C.2.1.5 For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in the return of the ECP/RFV/SCN/NOR without processing.
(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A00X.
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A00X.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A00X.
C.2.1.6 The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the
Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
C.2.1.7 The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).
C.2.1.8 The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.
C.3 ARMY INFORMATION SYSTEM (IS) SECURITY REQUIREMENT
C.3.1 CONTRACTOR INVESTIGATION/CLEARANCE. Reference AR25-2, AR 380-67, DoD 5200.2-R and Final Credentialing Standards for Issuing
Personal Identity Verification Cards under HSPD-12 (31 Jul 2008). All contractors and consultants that access government owned or operated automated information systems, networks, or databases and to safeguard controlled unclassified information shall have a favorable background investigation as required above references positions designated as IT-I, IT-II or IT-III to perform functions stipulated in contract scope of work. The minimum investigative requirements are as follows: ADP-I (AKA: IT-1 or Privileged Access) =
Tier 5 (T5) / Tier 5 Reinvestigation (T5R)(AKA: Single Scope Background Investigation (SSBI), Single Scope Periodic Reinvestigation
(SSPR) or Phased Period Reinvestigation (PPR)); ADP-II (AKA: IT-2 or Limited Privileged Access) = Tier 3 (T3) / Tier 3 Reinvestigation
(T3R)(AKA : Access National Agency Check with Written Inquiries and Credit Check (ANACI) or National Agency Check with Law and Credit
Check (NACLC)); or ADP-III (AKA: IT-3 or (Non-Privileged Access) = Tier 1 (T1) / Tier 2 with Subject Interview (T2S) or Tier 2
Reinvestigation with Subject Interview (T2RS) (AKA: National Agency Check with Inquiries (NACI)). A Common Access Card (CAC) may be issued on an interim basis based on favorable T1 or a Federal Bureau of Investigation (FBI) National Criminal History Check (fingerprint check) adjudicated by appropriate approved automated procedures or by a trained security or human resource (HR) specialist, and successful submission to the investigative service provider (ISP) of a T1 investigation or an investigation greater in scope than a T1.
Investigations will be coordinated with the G2, TACOM LCMC (AMSTA-CSS / 586-282-6262) and investigations will be through the Personnel
Security Investigations Portal Center of Excellence (PSIP COE). Non-U.S. citizens shall be Permanent Resident Aliens with requisite investigation. All personnel shall receive and certify to an Information Systems Security Briefing.
C.4 NOTICE OF LIGHT PHOSPHATE COATING REQUIREMENT
C.4.1 This solicitation and any resulting purchase order are subject to Federal Specification TT-C-490, Type I, Cleaning Methods for
Ferrous Surfaces and Pretreatments for Organic Coatings.
C.5 HEAVY PHOSPHATE COATING REQUIREMENT
C.5.1 The following requirements regarding heavy phosphate coatings are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification MIL-DTL-16232.
C.5.1.1 Paragraph 3.1 of MIL-DTL-16232 refers to "Preproduction Inspection." The procedure shall be submitted in accordance with the
Contract Data Requirements List (CDRL) contained in the contract. The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All
17 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
processes, equipment, controls along with testing and test frequencies used for phosphating including application of supplemental finishes shall be described in detail.
C.5.1.2 Paragraph 3.2.5-c of MIL-DTL-16232 refers to the "Chromic acid rinse, (Classes 1, 2 and 3)." The final rinse shall be checked by a standard free and total acid titration along with a pH reading "prior to starting production and at least every 8 hours thereafter."
C.5.1.3 Paragraph 4.7.3 of MIL-DTL-16232 refers to "Weight per unit area of phosphate coatings." The frequency for testing coating weight is "per lot, at least every 8 hours."
C.5.1.4 Paragraph 4.7.5 of MIL-DTL-16232 refers to "Accelerated corrosion resistance." Accelerated corrosion resistance shall be determined in accordance with 4.7.5.1. The frequency for testing accelerated corrosion resistance per ASTM B117 is "per lot, at least every 8 hours."
C.5.1.5 The "product name" along with the manufacturer of the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure and shall be traceable to the applicable Qualified Products List (QPL) or Qualified Products Database (QPD) at
Assist Online. QPD products may be obtained at the quick search site, type the specification number (i.e., 3150) in the second block and click the "Submit" button. Then click on the specification (i.e., MIL-PRF-3150). In the next screen, click on the word "Qualification".
C.5.1.5.1 To obtain MIL Specs, MIL Standards, QPL and QPD products see <https://assist.dla.mil/online/start />.
C.5.1.5.2 To obtain MIL Specs, MIL Standards, QPD products see <https://assist.dla.mil/online/start/>.
C.5.1.6 A thickness range for the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure along with a frequency for testing. A daily frequency is required.
C.5.1.7 Heat cured dry film lubricant shall be air dried for 1.0 hour (until dry to touch) after dipping/spraying or flash dried at 155-
175 degrees F for 10-30 minutes and then heat cured at a temperature of 375-425 degrees F for 55-65 minutes per paragraph 4.4.2.2 of MIL-
PRF-46010.
C.5.1.8 Air cure dry film lubricant shall be air dried at room temperature for 24 hours minimum.
C.5.1.9 Adhesion testing shall be stated in the procedure for a supplemental coating of dry film lubricant per ASTM D2510 or CARC paint per ASTM D3359, method B along with the frequency for testing. A daily frequency is required.
C.5.1.10 Salt spray testing of parts with phosphate and supplemental dry film lubricant per ASTM B117 for 100 hours shall be stated in the procedure along with the frequency for testing. The frequency for testing is "per lot or weekly." Parts shall show no more than 3 rust spots per 3" x 6" area with none larger than 1.0mm in diameter. Salt spray testing of parts with phosphate and primer per ASTM B117 for 336 hours shall be included in the procedure for supplemental coatings of CARC paint along with a frequency for testing. The frequency for salt spray testing is "per lot or monthly." Parts shall show no visible rust exceeding rust grade no. 9 per ASTM D610, no more than 5 blisters per 4" x 6" area with none larger than 3/64 inch in diameter. Under film attack at the scribe shall not exceed 1/8 inch.
C.5.1.11 Topcoat color shall be visual/equipment checked against the specified chip no. of SAE AMS-STD-595 per paint batch. The procedure shall include the specified color chip number.
C.5.1.12 Cure of the paint shall be checked daily by solvent wipe per paragraph 4.2.3.2 of MIL-DTL-53072. The manufacturer of the MEK solvent shall be stated in the procedure.
C.6 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN
C.6.1 The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government
OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the government's critical information, why it needs to be
18 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
protected, where it is located, who is responsible for it, and how to protect it.
C.6.2 The contractor will receive a copy of the SOP/Plan at the time of the award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
C.6.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is
OPSEC Level I.
C.7 OPSEC TRAINING REQUIREMENT
C.7.1 Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https:/securityawareness.usalearning.gov/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer's Representative (COR), if assigned to the contract, or the Procuring
Contracting Officer (PCO).
C.8 Counterintelligence Awareness and Reporting (CIAR); formerly known as Threat Awareness Reporting Program (TARP):
C.8.1 Per AR 381-12, all Department of the Army (DA) personnel (Military/Civilian/Contractor) must complete CIAR training within 30 days of assignment or employment to an organization/contract, and then once every 12 months thereafter pursuant to DoDD 5240.06. DA personnel will complete "Counterintelligence Awareness and Reporting for DoD Employees" CI116.16, located at https://www.cdse.edu/, to satisfy most Army annual training requirements.
C.8.2 In addition, per AR 381-12 Chapter 5, the following individual(s) must receive an in-person CIAR briefing directly from an ACI
Special Agent or a CI-experienced person in addition to the annual training requirement:
C.8.2.1 DA personnel scheduled to travel (official, unofficial, permanent change of station) to or through countries with a high foreign intelligence or terrorist threat level as identified by Defense Intelligence Agency or the Department of State, will receive a special
CIAR briefing prior to the travel and will be debriefed upon return. AR 38112 13 June 2025 11
C.8.2.2 DA personnel who have security clearances travelling to foreign locations in any duty status must fulfill pre-and-post travel security briefing and debriefing requirements in accordance with the DoD Foreign Clearance Guide and DoDD 4500.54E.
C.8.2.3 DA personnel deploying in support of military exercises or contingency operations will receive a special CIAR briefing prior to departure.
C.8.2.4 DA personnel taking part in bilateral or multilateral engagements with foreign governments or international organizations will receive a CIAR briefing prior to the event.
C.8.2.5 Foreign visitors, personnel, and personal connections Commanders will coordinate with unit security managers to identify personnel potentially vulnerable to FIE exploitation and ensure they are referred to ACI to receive specialized CIAR briefing.
C.8.2.6 Such personnel will receive foreign intelligence threat briefings prior to foreign travel or event.
C.8.2.7 Personnel with access to Sensitive Compartmented Information and Special Access Programs.
C.8.2.8 Personnel assigned to or supporting defense critical infrastructure or associated assets, pursuant to DoDD 3020.40 and DoDI
5240.19, will receive an in-person special CIAR briefing on an annual basis. Such personnel will notify their local ACI office of all projected foreign travel or foreign visits.
C.8.2.9 Foreign government employment. Current and retired DA personnel seeking employment with foreign government entities will have
CIAR training and support made available.
C.8.2.10 Information technology professionals System administrators, privileged users, and those with privileged access that provides an individual capability to alter the properties, behavior, or control of a DoD information system will receive in-person special CIAR briefings on an annual basis.
C.8.2.11 Professional and educational exchange programs with foreign governments.
C.8.3 These briefings will be tailored to the particular risk or threat involved, including methods the person may use to minimize the risk, and will place special emphasis on reporting responsibilities. Debriefings will be conducted as soon as feasible following completion of travel, duty, or visit to a foreign country, or attendance at a conference with foreign personnel by an ACI Special Agent.
Failure to receive training does not relieve individuals from their reporting responsibilities in chapter 4 of this regulation.
19 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE C0001 ***
20 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D.1 Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1 and the Special Packaging Instruction (SPI) contained in the TDP.
PRESERVATION: MILITARY
LEVEL OF PACKING: -B-
QUANTITY PER UNIT PACKAGE: -001-
SPI NUMBER 12901960, DATED 10 AUG 23, REV -
D.2 Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
D.3 Marking: In addition to any special markings called out on the SPI.
D.3.1 All unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for the application of special markings as discussed in the Military Standard regardless of whether it is specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers' Passive RFID Information Guide and Supplier Implementation
Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.
D.4 Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two-foot intervals.
D.5 This SPI has been validated, and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI are detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the
SPI. Minor dimensional and size changes are acceptable provided the contractor provides the PCO and ACO with notification 60 days prior to delivery. Any changes or changes in the method of preservation that provide cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO.
The government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
D.6 Hazardous Materials (as applicable):
D.6.1 Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
D.6.2 Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFMAN24-604/TM38-250/NAVSUPPUB 505/MCO
P4030.19/DLAM 4145.3 (for military air shipments).
21 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
D.6.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
D.6.4 When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
SUPPLEMENTAL INSTRUCTIONS: N/A.
*** END OF NARRATIVE D0001 ***
22 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
N/A
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
E.1.1 The Government's inspection of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility, or subcontractor's facility, where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: ORIGIN
a. NAME
b. CAGE
c. ADDRESS, CITY, STATE, ZIP
ACCEPTANCE POINT: ORIGIN
a. NAME
b. CAGE
c. ADDRESS, CITY, STATE, ZIP
E.1.2 FIRST ARTICLE TEST REPORT (FATR) ACCEPTANCE: DESTINATION
The Government's acceptance of the First Article Test Report (if required) offered under this order shall take place at DESTINATION.
E.2 REWORK AND REPAIR OF NONCONFORMING MATERIAL
E.2.1 Rework and Repair are defined as follows:
E.2.1.1.1 Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
E.2.1.1.2 Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not eliminate, the nonconformance. The purpose of repairing is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all the applicable drawings, specifications or contract requirements.
E.2.2 Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
Revision: 14 April 2021
23 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.2.3 Repair procedures shall be documented by the Contractor and submitted on a Request for Variance, DD Form 1694, to the Contracting
Officer for review and written approval prior to implementation.
d. Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances, and a description of the action taken or to be taken to prevent recurrence.
E.2.4 The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data
Package requirements and shall in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
E.3 PRE-PRODUCTION MEETING
E.3.1 The contractor shall hold a pre-production meeting at its facility, unless some other location is designated in the contract, within 30 days of the contract award. The Pre-production Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort.
E.3.2 The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .