REGISTER.pdf
PDF 16 KB Posted
- Solicitation number
- W912CF-09-B-0014
About this file
REGISTER.pdf
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
Hangar 5 at Lakehurst
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal register
07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials
SD-07 Certificates 2.1Firestopping Materials 1.5Installer Qualifications 3.3Inspection
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure 26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
GTransformers GCable trays GWireways
SD-03 Product Data GTransformers GGrounding Busbar
SD-06 Test Reports GTransformer tests
SD-09 Manufacturer’s Field Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES
Hangar 5 at Lakehurst
26 20 00 2.29.1Transformer factory tests 33 70 02.00 10 SD-02 Shop Drawings
1.4.1Detail Drawings 1.4.2As-Built Drawings
SD-03 Product Data GFault Current Analysis GProtective Device
2.2 GNameplates
2.1 GMaterial and Equipment
3.2 GInstallation Requirements
SD-06 Test Reports 2.17Factory Tests 3.12Field Testing 3.12.12Operating Tests 3.3.1.4Cable Installation
SD-07 Certificates 2.1Material and Equipment 3.4Cable Joints 3.13.2Installation Engineer
SD-10 Operation and Maintenance Data
3.13.1Operation and Maintenance Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
File details come from the government source that posted it. Updated .