Amendment 0001 Conform Copy
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912C3-17-B-0003_Sub-CLINs_Structure_REV1_20171211.xls | XLS spreadsheet | |
| W912C3-17-B-0003_Paint_Amendment_0005_released_20171211.pdf | ||
| W912C3-17-B-0003_Paint_Amendment_0005_Conform_Copy_released_20171211.pdf | ||
| W912C3-17-B-0003_Paint_Amendment_0004_release_20171204.pdf | ||
| W912C3-17-B-0003_Paint_Amendment_0004_release__conform_copy_20171204.pdf | ||
| W912C3-17-B-0003_Paint_Amendment_0001_released_20171006.pdf | ||
| W912C3-17-B-0003_Sub-CLINs_Structure.xls | XLS spreadsheet | |
| W912C3-17-B-0003_Solicitation_Rev4_released_20170918.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912C3-17-B-0003-0001
0011031941
THe Government anticipates the aw ard of a single IDQ Requirements Contract for Exterior and Interior Painting for Office Buildings, Family Housing and Domestic Elementary & Secondary School (DDESS) at Fort Buchanan, PR 00934 This Solicitation is issued to 8(a) Firms on a Competitive Basis for Certif ied Program Participants w ithin the SBA District of Puerto Rico and US Virgin Island only.
CONTRACTORS MUST BE ABLE TO ACCEPT PAYMENT VIA CREDIT CARD.
NAICS: 238320; Size Standard: $15 Millions Magnitude of this project is betw een $1,000,000.00 and $5,000,000.00 The Contract w ill be a firm f ixed Price Requirements Type Contract for one (1) Base Year of 12 months plus four (4) Option Years of tw elve months each if exercised by the Government.
Contractor shall submit w ith the bid a guarantee IAW 52.228-1 of 20% of the total estimated amount of the Base Period Scope, period of performance and funding for bid items w ill be issued via individual orders.
List of Attachments as follow s:
Document Description, Document date, Number of Pages Bid/CLLIN Schedule, 03/19/2017, 5 Pages Record of Environmental Consideration, 06/07/2017, 4 Pages Statement of Work, 07/07/2017, 119 pages
X
CARLA M. ROSARIO-RIVERA 787-707-4528
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
18-Sep-2017
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________See each order
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________15 Nov 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MICC - FT BUCHANAN
FT BUCHANAN
DIRECTORATE OF CONTRACTING
34 SOUTH GATE RD, STE 1104
FORT BUCHANAN PR 00934-4206
W912C3
PAGE OF PAGES
1 OF
CODE W912C3
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
MICC - FT BUCHANAN
FT BUCHANAN
DIRECTORATE OF CONTRACTING
34 SOUTH GATE RD, STE 1104
FORT BUCHANAN PR 00934-4206
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
787-707-2491FAX:TEL: 787-707-2487 TEL: 787-707-2487 FAX: 787-707-2491
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912C3-17-B-0003
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Exterior/ Interior Painting Base Period
FFP
Provide labor, materials, tools, equipment, supervision, transportation, insurance, permits and incidental supplies necessary to perform work in connection with the Exterior and Interior Paint for Office Buildings, Army Family Housing, and DDESS Buildings at Fort Buchanan, Puerto Rico in accordance with SOW, specifications, and all terms and conditions stated in the contract. Work under this Contract will be performed via individual Delivery Orders.
BASE PERIOD OF PERFORMANCE: 1 NOV 2017 THROUGH 31 OCT 2018
NOTE: CONTRACTOR SHALL PLACE TOTAL PRICING HERE FOR BASE
PERIOD AND PLACE INDIVIDUAL PRICING IN ATTACHMENT BID/CLIN
SCHEDULE (CLINS 0001AA through 0001AO). IF ANY OF THE CLINS IN
THE ATTACHED BID/CLIN SCHEDULE ARE LEFT BLANK, THE BID MAY
BE REJECTED. THE TOTAL PRICE IN THIS CLIN SHOULD EQUAL TO
THE TOTAL AMOUNT FOR ALL INDIVIDUAL ITEMS IN THE ATTACHED
CLIN SCHEDULE FOR THE BASE PERIOD. UNIT PRICES WILL BE USED
TO PLACE ORDERS.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011031941
NET AMT
0002 1 Each Contract Manpower Reporting BASE
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
Reporting period will be for the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year. Contractors filing their Contractor Manpower Reports will receive immediate e-mail confirmation that their reports have been received in the system. This should facilitate final payment to Contractors and expedite contract closeout. Administrative contracting staff should accept this confirmation as proof of completion of this contract deliverable. The Army CMRA website also maintains a “Frequently Asked Questions and Answers” that is updated periodically. Detailed instructions can also be found on the Army CMRA website in the various “User Guides”. For Army requirements, any technical or implementation questions not addressed on this site can be discussed and coordinated through the Army CMRA Help Desk at 703-377-6199, or Contractormanpower@hqda.army.mil.
1001 1 Job OPTION Exterior/ Interior Painting First Option
FFP
Provide labor, materials, tools, equipment, supervision, transportation, insurance, permits and incidental supplies necessary to perform work in connection with the Exterior and Interior Paint for Office Buildings, Army Family Housing, and DDESS Buildings at Fort Buchanan, Puerto Rico in accordance with SOW, specifications, and all terms and conditions stated in the contract. Work under this Contract will be performed via individual Delivery Orders.
FIRST OPTION PERIOD OF PERFORMANCE: 1 NOV 2018 THROUGH 31
OCT 2019
NOTE: CONTRACTOR SHALL PLACE TOTAL PRICING HERE FOR BASE
PERIOD AND PLACE INDIVIDUAL PRICING IN ATTACHMENT BID/CLIN
SCHEDULE (CLINS 0001AA through 0001AO). IF ANY OF THE CLINS IN
THE ATTACHED BID/CLIN SCHEDULE ARE LEFT BLANK, THE BID MAY
BE REJECTED. THE TOTAL PRICE IN THIS CLIN SHOULD EQUAL TO
THE TOTAL AMOUNT FOR ALL INDIVIDUAL ITEMS IN THE ATTACHED
CLIN SCHEDULE FOR THE BASE PERIOD. UNIT PRICES WILL BE USED
TO PLACE ORDERS.
1002 1 Each OPTION Contract Manpower Reporting Opt 1
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
Reporting period will be for the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year. Contractors filing their Contractor Manpower Reports will receive immediate e-mail confirmation that their reports have been received in the system. This should facilitate final payment to Contractors and expedite contract closeout. Administrative contracting staff should accept this confirmation as proof of completion of this contract deliverable. The Army CMRA website also maintains a “Frequently Asked Questions and Answers” that is updated periodically. Detailed instructions can also be found on the Army CMRA website in the various “User Guides”. For Army requirements, any technical or implementation questions not addressed on this site can be discussed and coordinated through the Army CMRA Help Desk at 703-377-6199, or
2001 1 Job OPTION Exterior/ Interior Painting Second Opt
FFP
Provide labor, materials, tools, equipment, supervision, transportation, insurance, permits and incidental supplies necessary to perform work in connection with the Exterior and Interior Paint for Office Buildings, Army Family Housing, and DDESS Buildings at Fort Buchanan, Puerto Rico in accordance with SOW, specifications, and all terms and conditions stated in the contract. Work under this Contract will be performed via individual Delivery Orders.
SECOND OPTION PERIOD OF PERFORMANCE: 1 NOV 2019 THROUGH 31
OCT 2020
NOTE: CONTRACTOR SHALL PLACE TOTAL PRICING HERE FOR BASE
PERIOD AND PLACE INDIVIDUAL PRICING IN ATTACHMENT BID/CLIN
SCHEDULE (CLINS 0001AA through 0001AO). IF ANY OF THE CLINS IN
THE ATTACHED BID/CLIN SCHEDULE ARE LEFT BLANK, THE BID MAY
BE REJECTED. THE TOTAL PRICE IN THIS CLIN SHOULD EQUAL TO
THE TOTAL AMOUNT FOR ALL INDIVIDUAL ITEMS IN THE ATTACHED
CLIN SCHEDULE FOR THE BASE PERIOD. UNIT PRICES WILL BE USED
2002 1 Each OPTION Contract Manpower Reporting Opt 2
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
Reporting period will be for the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year. Contractors filing their Contractor Manpower Reports will receive immediate e-mail confirmation that their reports have been received in the system. This should facilitate final payment to Contractors and expedite contract closeout. Administrative contracting staff should accept this confirmation as proof of completion of this contract deliverable. The Army CMRA website also maintains a “Frequently Asked Questions and Answers” that is updated periodically. Detailed instructions can also be found on the Army CMRA website in the various “User Guides”. For Army requirements, any technical or implementation questions not addressed on this site can be discussed and coordinated through the Army CMRA Help Desk at 703-377-6199, or
3001 1 Job OPTION Exterior/ Interior Painting Third Opt
FFP
Provide labor, materials, tools, equipment, supervision, transportation, insurance, permits and incidental supplies necessary to perform work in connection with the Exterior and Interior Paint for Office Buildings, Army Family Housing, and DDESS Buildings at Fort Buchanan, Puerto Rico in accordance with SOW, specifications, and all terms and conditions stated in the contract. Work under this Contract will be performed via individual Delivery Orders.
THIRD OPTION PERIOD OF PERFORMANCE: 1 NOV 2020 THROUGH 31
OCT 2021
NOTE: CONTRACTOR SHALL PLACE TOTAL PRICING HERE FOR BASE
PERIOD AND PLACE INDIVIDUAL PRICING IN ATTACHMENT BID/CLIN
SCHEDULE (CLINS 0001AA through 0001AO). IF ANY OF THE CLINS IN
THE ATTACHED BID/CLIN SCHEDULE ARE LEFT BLANK, THE BID MAY
BE REJECTED. THE TOTAL PRICE IN THIS CLIN SHOULD EQUAL TO
THE TOTAL AMOUNT FOR ALL INDIVIDUAL ITEMS IN THE ATTACHED
CLIN SCHEDULE FOR THE BASE PERIOD. UNIT PRICES WILL BE USED
3002 1 Each OPTION Contract Manpower Reporting Opt 3
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
Reporting period will be for the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year. Contractors filing their Contractor Manpower Reports will receive immediate e-mail confirmation that their reports have been received in the system. This should facilitate final payment to Contractors and expedite contract closeout. Administrative contracting staff should accept this confirmation as proof of completion of this contract deliverable. The Army CMRA website also maintains a “Frequently Asked Questions and Answers” that is updated periodically. Detailed instructions can also be found on the Army CMRA website in the various “User Guides”. For Army requirements, any technical or implementation questions not addressed on this site can be discussed and coordinated through the Army CMRA Help Desk at 703-377-6199, or
4001 1 Job OPTION Exterior/ Interior Painting Fourth Opt
FFP
Provide labor, materials, tools, equipment, supervision, transportation, insurance, permits and incidental supplies necessary to perform work in connection with the Exterior and Interior Paint for Office Buildings, Army Family Housing, and DDESS Buildings at Fort Buchanan, Puerto Rico in accordance with SOW, specifications, and all terms and conditions stated in the contract. Work under this Contract will be performed via individual Delivery Orders.
FOURTH OPTION PERIOD OF PERFORMANCE: 1 NOV 2021 THROUGH 31
OCT 2022
NOTE: CONTRACTOR SHALL PLACE TOTAL PRICING HERE FOR BASE
PERIOD AND PLACE INDIVIDUAL PRICING IN ATTACHMENT BID/CLIN
SCHEDULE (CLINS 0001AA through 0001AO). IF ANY OF THE CLINS IN
THE ATTACHED BID/CLIN SCHEDULE ARE LEFT BLANK, THE BID MAY
BE REJECTED. THE TOTAL PRICE IN THIS CLIN SHOULD EQUAL TO
THE TOTAL AMOUNT FOR ALL INDIVIDUAL ITEMS IN THE ATTACHED
CLIN SCHEDULE FOR THE BASE PERIOD. UNIT PRICES WILL BE USED
4002 1 Each OPTION Contract Manpower Reporting OPT 4
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
Reporting period will be for the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year. Contractors filing their Contractor Manpower Reports will receive immediate e-mail confirmation that their reports have been received in the system. This should facilitate final payment to Contractors and expedite contract closeout. Administrative contracting staff should accept this confirmation as proof of completion of this contract deliverable. The Army CMRA website also maintains a “Frequently Asked Questions and Answers” that is updated periodically. Detailed instructions can also be found on the Army CMRA website in the various “User Guides”. For Army requirements, any technical or implementation questions not addressed on this site can be discussed and coordinated through the Army CMRA Help Desk at 703-377-6199, or
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$500.00 $300,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 POP 01-NOV-2017 TO
31-OCT-2018
N/A W1H1 USAG FT BUCHANAN
CARLOS GUZMAN
34 SOUTH GATE ROAD
FORT BUCHANAN PR 00934
787-707-3991
W81YDN
0002 POP 01-NOV-2017 TO
31-OCT-2018
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 01-NOV-2018 TO
31-OCT-2019
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 01-NOV-2018 TO
31-OCT-2019
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-NOV-2019 TO
31-OCT-2020
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 01-NOV-2019 TO
31-OCT-2020
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-NOV-2020 TO
31-OCT-2021
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 01-NOV-2020 TO
31-OCT-2021
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-NOV-2021 TO
31-OCT-2022
N/A (SAME AS PREVIOUS LOCATION)
4002 POP 01-NOV-2021 TO
31-OCT-2022
N/A (SAME AS PREVIOUS LOCATION)
STATEMENT OF WORK
Directorate of Public Works Interior & Exterior Paint Contract
Fort Buchanan Guaynabo, Puerto Rico
Revision 6 - 20170707
Contents
SECTION 01 11 00 SCOPE OF WORK
SECTION 01 33 00 SUBMITTAL PROCEDURES
SECTION 01 35 26 GOVERNMENT SAFETY REQUIREMENTS
SECTION 01 45 00.00 10 QUALITY CONTROL
SECTION 02 82 33.13 20 REMOVAL AND DISPOSAL OF PAINT WITH LEAD
SECTION 07 92 00 JOINT SEALANTS
SECTION 09 90 00 PAINT AND COATINGS
SECTION 09 90 00.00 40 PAINTING AND COATING
SECTION 01 11 00 SCOPE OF WORK
01/10
PART 1 GENERAL
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work covered by this contract, consists of providing labor, materials, tools, equipment, supervision, transportation, insurance, permits and all necessary to perform work in connection with the Exterior and Interior Paint for Office Buildings, Army Family Housing, and Domestic Elementary & Secondary School (DDESS) Buildings at Fort Buchanan, Puerto Rico in accordance with SOW, specifications, and all terms and conditions stated in the contract. Work under this Contract will be performed via individual orders issued via this Requirements Type contract.The work includes the following deliverable tasks and unit of measure deliverable during the life of the contract:
Interior and Exterior Paint Unit of Measure Exterior Paint, Concrete, Masonry, Drywall Surface SF Interior Paint, Concrete, Masonry, Drywall Surface SF Exterior Paint, Wood Surface SF Interior Paint, Wood Surface SF Exterior Paint, Metal Surface SF Interior Paint, Metal Surface SF Floor Paint SF Surface Patch/Repair (Concrete, Masonry, Drywall Surface) SF Surface Patch/Repair (Steel Surface) SF Site Preparation, Pressure Wash SF Elevation Setup, 10ft - 20ft EA Elevation Setup, Additional 10ft EA Exterior Paint (Other than Normal Working Hours) SF Interior Paint (Other than Normal Working Hours) SF Payment and Performance Bond EA
The work includes labor, management, equipment & materials to accomplish surface preparation, interior & exterior painting and all necessary in accordance with all terms and conditions and specifications (See Technical Exhibit 1 (TE-1), Exhibit Line Item Numbers (ELINs))
The specific location, type, and quantities of the individual tasks will be specified in each Delivery Order. The Government will specify the sequence in which the Delivery Orders will be issued.
Each order will have a negotiated period for the completion of the specific task. The period begins the day the order is issued to the day the work is accepted by the Government.
1.1.2 Drawings:
Drawing details may or may not be included with Orderss to be done in conjunction with this contract. The Contractor shall visit the job site and verify all dimensions for proper execution of of the work as indicated in the issued Orders.
1.1.3 Location
1.1.3.1 Installation General Operation: Fort Buchanan is a U.S. Army Reserve installation in Puerto Rico located in the Municipalities of Guaynabo and Bayamon, within the San Juan metropolitan area. It serves under direct control of the Installation Management Command, Atlantic Region. Its mission is to synchronize, integrate, and deliver installation services and facilities in support of Senior Commanders in order to enable a ready and resilient Army.
1.1.3.2 Federal Observed Holidays. The Contractor shall submit to the Contracting Officer Representative (COR) an alternate schedule for service affected by federally observed holidays not later than ten (10) work days prior to the holiday. The schedule shall include dates for make-up of all services affected by the holiday.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.1.4 Hours of Operation. The Contractor is responsible for providing services between the Garrison’s normal hours of Operation: 7:00AM to 4:00PM, Monday through Friday. Exceptions include required services on Saturday and Sunday, Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall at all times maintain a workforce for uninterrupted performance of all tasks defined within this Statement of Work (SOW) when the Government facility is not closed for the above reasons.
1.1.3.1 Unless otherwise approved, the Contractor shall perform the work between the hours of 7:00 a.m. to 4:00 p.m., Monday through Friday, exclusively. Prior to the contractor performing any work during hours other than those specified, the contractor shall submit a written request to the Contracting Officer Representative (COR) for approval by the Contracting Officer (KO). Requests shall be submitted no less than 24 hours prior to the time the contractor desires to work.
1.1.3.4 Place of Performance. The work to be performed under this contract shall be performed at Fort Buchanan, Puerto Rico. The areas in which the work is to be done may be occupied during the performance of work under this contract. The contractor shall not receive any additional compensation due to the condition brought about by occupancy and usage by the Government. It shall be the contractor's responsibility to coordinate with the COR to schedule and perform work in such a manner as to create the least possible interference with the conduct of normal activities within the areas. The contractor shall not block more than one access of any building(s) at any time, nor shall they disrupt the existing parking arrangement to any of the building (s) parking areas, unless authorized by KO.
1.2 OCCUPANCY OF PREMISES
Building(s) may be occupied during performance of work under this Contract. Before work is started, the Contractor shall arrange with the COR a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways to minimize interference with ongoing Government operations, within the specified building(s) of the issued Orders(s).
1.3 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during operations to match existing or adjoining work, as approved by the KO. At the completion of operations, work shall be in a condition equal to or better than that which existed before new work started.
1.4 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
The Government will not furnish any material and/or equipment unless required by the KO. Water and electricity are provided IAW FAR 52.236-14.
PART 2 PRODUCTS
2.1 Green Procurement. In order to comply with the green procurement requirements of Section 6002 of the Resource Conservation and Recovery Act of 1976 (RCRA) and Executive Order 13423, the Government requires the use of recycled, bio-based, biodegradable, non-hazardous, and/or recovered materials and products identified in the Environmental Protection Agency's (EPA) Comprehensive Procurement Guidelines. These materials and products must meet the requirements of the PWS, must not delay the progress of work, must be available from more than one source, and must not be cost prohibitive. EPA guideline items are seen as the minimum that should be considered when evaluating recyclable materials. Other materials and products not listed, but commonly used in industry outside of the Government, should also be considered. Material and product submittals for all recycled-content items should list the recycled and recovered materials used and the percentage content. The Contractor shall track the purchase, quantities, and the percent of recyclable content for these materials throughout the life of the contract. The Contractor shall consolidate and provide this information to the COR quarterly, in reports. The Contractor shall annually submit a summary report of certification and estimate as required by FAR 52.223-9, title, Certification and Estimate of Percentage of Recovery Material Content for EPA Designated Items, upon completion of the base year and each follow-on year, until completion of the contract to the COR. The intended end use of the item, materials with recovered materials content, at levels recommended by the EPA's CPG is found at website;
http://www.epa.gov/cpg/products.
PART 3 EXECUTION
3.1 ADDITIONAL CONTRACT REQUIRENMENTS
3.1.1 Solid Waste
The contractor shall dispose solid waste debris resulting from preparation according to the waste classification.
See paragraph 3.8 Recycling Program, for more waste diversion instructions.
3.1.2 Daily Report
Contractor shall submit daily reports, on a weekly basis during project duration with the following but not limited to, information:
a. Work performed every day
b. Weather conditions
c. Personnel working every day
d. Equipment being used
3.1.3 Contract Specifications
Specifications in this contract are applicable to all Orderss.
3.1.4 Submittals
3.1.4.1 Submittals Required for Contract Duration:
DELIVERABLE FREQUENCY # OF COPIES MEDIUM/FORMAT DISTRIBUTION
Environmental Plan
SOW 3.1.6
Within 30 days of Contract Award
1 – Electronic Copy Word Document, PDF, or MS Word
COR
3.1.4.2 Submittals Required for Individual Projects and Orderss:
DELIVERABLE FREQUENCY # OF COPIES MEDIUM/FORMAT DISTRIBUTION
Daily Reports
SOW 3.1.2
Weekly During Project Activity
1 – Electronic Copy Excel Spreadsheet, PDF, or MS Word
COR
Pre-Project Site Visit
SOW 3.3.2.1
Within 3 Days of Notification
N/A N/A N/A
Project Plans:
Project Schedule, POP, & Additional Req.
SOW 3.3.2.4
Within 7 Days of NTP or KO
Established Timeline 1 – Electronic Copy
Excel Spreadsheet,
3.1.5 Base Operations Disruptions
Contractor shall conduct operations so as to cause the least possible interference with the normal operations of the Installation because the facilities (streets, driveways, and parking areas) will remain in operation during the entire performance period, unless otherwise authorized by the KO.
Product Specifications & Data Submittal
SOW 3.1.6.2
Within 30 days of Contract Award
1 – Electronic Copy Word Document, PDF, or MS Word
COR
Safety Plan
SOW 3.1.7
Within 30 days of Contract Award
1 – Electronic Copy Word Document, PDF, or MS Word
COR
AT Level I Training Certificate
SOW 3.1.10.1
Yearly (30 days after contract award or next Option Year)
1 – Electronic Copy per Employee
Received Certificate Copy
COR
iWatch Training Certificate
SOW 3.1.10.2
Yearly (30 days after contract award or next Option Year)
1 – Electronic Copy per Employee
Received Certificate Copy
COR
Accident Reporting
SOW 3.1.11.4
Within 30 Minutes of incident
1 – Electronic Copy
Phone or Email (if no response) and written Text Document
COR
Damage Reporting
SOW 3.1.12.3
Within 30 Minutes of incident
1 – Electronic Copy
Phone or Email (if no response) and written Text Document
COR
Contractor Quality Control (CQC) Plan
Section 01 45 00.00 10
Within 30 days of Contract Award
1 – Electronic Copy Word Document,
3.1.6 Environmental Protection
The Contractor shall provide an Environmental Plan that complies with the provisions contained within the model Environmental Protection Scope of Work (EPSOW), to minimize potential environmental impacts to the Installation’s natural, cultural and energy resources. The Environmental Protection Scope of Work (EPSOW) is attached in TE-2. The Contractor shall submit the Environmental Plan to the Contracting Officer within thirty
(30) calendar days after receipt of the contract award.
3.1.6.1 Pollution. Contractor shall comply with all applicable Federal, State and local laws, regulations, and standards regarding environment pollution. All environmental protection matters shall be coordinated through the Contracting Officer with the Post Environmental Protection Office at DPW. The Post Environmental Division Office is located at Building 34, telephone 707-3575 or 707-3508.
3.1.6.2 Material Spills. Contractor shall be responsible for the prompt containment, clean up, and restoration (if applicable, of any petroleum, oil, lubricant (POL) or coolant liquids that may have spilled from its vehicles as a result of the operation of its fleet in support of this contract. The contractor shall have at all times spill response equipment in sufficient amount to respond and contain any leak until garrison emergency responders are able to arrive at the spill scene. Furthermore, any such release shall be immediately notified via telephone, within the first 30 minutes from spill incident awareness, by the operator to the COR or DPW Environmental Office - The Post Environmental Division Office is located at Building 34, telephone 707-3575 or 707-3508.
3.1.6.3 Product Compliance. All paints, solvent, epoxy, and bituminous materials used as part of repairs and maintenance actions must be stored within protected areas. Contractor shall be responsible for the prompt containment, clean up, and restoration of any area where paints, solvent, epoxy, and bituminous materials used is spilled. They will not be left exposed or over unprotected soils or adjacent to streams or storm water discharge points. Spill prevention measures will be required. Contractor must submit all paints and or hazardous materials product specification and safety data sheets to the COR for review and approval prior to commencing work.
Large amounts of volatile organic compound (VOC) can become hazardous air pollutant affecting indoor air quality. Low VOC paints, stains and varnishes use water as a carrier instead of petroleum-based solvents. As such, the levels of harmful emissions are lower than solvent-borne surface coatings. These certified coatings also contain no, or very low levels, of heavy metals and formaldehyde. Paints and stains, to meet EPA standards must not contain VOCs in excess of 200 grams per liter. Varnishes must not contain VOCs in excess of 300 grams per liter. As a general rule, low VOC paints marketed by reputable paint manufacturers usually meet the 50 g/L VOC threshold.
3.1.6.4 Environmental Condition Reports. Contractor shall provide reports as follows: Report any circumstances of unusual soiling of an area which may affect performance of contract work, unhealthful and/or hazardous conditions, and any delays or interference of work by employees of the Government. Such reports shall be made as expeditiously as possible by the Contractor to the Contracting Officer. In any event, the report shall be made not later than the close of business (4:00 pm, Monday-Friday) on the same day.
3.1.7 SAFETY PROGRAM
The Contractor shall safeguard and maintain all Government property as well as provide for the safety and well being of personnel employed in the performance of this contract. The Contractor shall implement a safety program for employees performing work under this contract. The Contractor shall submit the safety plan to the Contracting Officer within thirty (30) calendar days after contract award.
3.1.7.1 The Contractor shall comply with the Occupational Safety and Health Act (OSHA). Contractor personnel shall wear safety items required by OSHA during the performance of tasks requiring protective equipment or clothing.
3.1.7.2 Contract work under the provisions of FAR Clause 52.236-13.
Contractors shall comply with the latest version of EM 385-1-1 (including interim changes) that is in effect on the date of solicitation. Prior to making an offer, bidders should check the HQUSACE Safety and Occupational Health web site (http://www.usace.army.mil/CESO/Pages/Home.aspx) for the latest changes. No separate payment will be made for compliance with this paragraph or for compliance with other safety and health requirements of this contract.
3.1.7.3 In addition to the standard safety rules applicable for Government work, the Contractor shall provide to all Contractor employees safety equipment as required below. The Contractor shall be responsible for the use of safety equipment at all time by all employees.
3.1.7.4 Noise reduction protection shall be worn by all employees when operating motorized equipment or in the vicinity of equipment inducted noise.
3.1.7.5 Occupational Safety and Health. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards on 29 CFR 1910. The Contractor shall be responsible for ensuring adherence to all applicable Fort Buchanan, Puerto Rico, and federal rules and regulations.
3.1.8 Accident Reports
The contractor and his sub-contractors shall maintain an accurate record, and shall report to the Contracting Officer, exposure data and all accidents resulting in death, traumatic injury, occupational disease, or damage to property, material, supplies, and equipment incidental to work performed under the contract.
3.1.9 Installation Security
3.1.9.1 Access and General Protection/Security Policy and Procedures. The Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by a Government representative).
The Contractor workforce must comply with all personal identity verification requirements as directed by DOD, Headquarters Department of the Army (HQDA), and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
3.1.9.2 Installation Access Procedures. Contractor personnel and property shall be subject to search and seizure upon entering and leaving the confines of Fort Buchanan. The Contractor shall be responsible for assuring that all personnel authorized to perform work under this contract obtain installation access as required. Before performance under this contract can begin, all Contractor employees shall complete and submit a DD Form 369, Police Record Check (latest version), with original signatures and a letter from the contractor listing all employees and the full social security number for each to the Contracting Officer. This process historically takes 10 calendar days. This is being provided for the purpose of obtaining identification badges and access clearances to enter into the installation. Should the Force Protection Condition (FPCON) change, the government may require additional changes in contractor access. Government furnished badges shall be returned immediately to the government when an employees no longer perform work for the contractor or sub-contractor under this contract. New/replacement personnel shall obtain this same approval prior to the proposed new/replacement hire performing on the contract. Contractor access to the post will be exclusively for work in connection with this contract.
3.1.9.3 Personnel. The Contractor shall provide a work force sufficient in number that possesses the skills, knowledge, licenses and training to satisfactorily perform the services required by this contract. The Contractor shall ensure that personnel present a professional appearance. Individuals with a record of conviction for criminal offenses shall not be employed to perform services under this contract.
3.1.9.4 Vehicle Registration/Operation. Contractor and employee owned motor vehicles entering Fort Buchanan shall have a valid license plate, current registration, and valid liability insurance. Heavy equipment operators shall have a current Puerto Rico license in order to operate such equipment (i.e. bucket truck, heavy tractors, backhoes, grapple truck, skid steers, etc.).
3.1.9.5 Contractor Vehicle Identification. Contractor owned vehicles used in the performance of services under this contract on the installation shall be marked with the contractor name and phone number.
3.1.9.6 Uniforms/Identification cards/badges. The Contractor shall provide uniforms for their employees for identification purposes. All Contractor personnel shall visibly have on them, at all times their identification cards. In the event a government issued identification card/badge is lost or stolen, the employee will immediately notify the government. The Contractor shall prohibit the use of Government issued identification badges by any persons other than the Contractor’s employees it has been issued to.
3.1.10 Required Security Training:
3.1.10.1 AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility, or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. This training shall be completed within thirty (30) calendar days of contract award and within five (5) calendar days of new employees commencing performance with the results reported to the COR NLT forty-five (45) calendar days after contract award.
3.1.10.2 iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO).
This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within thirty (30) calendar days of contract award and within five (5) calendar days of new employees commencing performance with the results reported to the COR NLT forty-five (45) calendar days after contract award.
3.1.11 Emergency Services:
3.1.11.1 Emergency Services. In case of emergency the Contractor and/or Contractor employees shall contact the Fire/Ambulance Service Emergency Number: (787) 707-5911. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. All incidents and accidents shall be reported to the COR within thirty (30) minutes of incident occurrence.
3.1.11.2 Fire Protection. The Contractor shall comply with AR 420-1 Army Facilities Management Chapter 25 and the Fort Buchanan USAG-FB Policy #29 Fire Prevention guidelines. See TE-10 for a copy of USAG-FB Policy #29 Fire Prevention.
3.1.11.3 Extinguishing Equipment. The Contractor equipment shall have available a portable fire extinguisher as required to comply with the Fire Department instructions. Existing building extinguishers shall not be used to meet this requirement.
3.1.11.4 Accident Reporting. The Contractor shall maintain an accurate record of accidents resulting in injury or death and accidents resulting in damage to government property, supplies, and equipment. The Contractor shall report accidents immediately to the COR IAW the requirements indicated in AR 385-40, Accident Reporting and Records.
3.1.12 Liability and Responsibility for Damaged Property:
3.1.12.1 Damage to Government Property. The Contractor shall be held liable for damage or destruction of Government property (e.g. buildings, vehicles, sidewalks, fences, etc.) caused by the Contractor, Contractor personnel or representatives of the Contractor in the performance of services on this contract. The Contractor shall be aware that Government property - beyond standard structures and equipment - also includes trees, flower beds, and turf (for example, wounded trees or damaged turf shall be repaired or replaced). If the Contractor fails to take the required corrective action, the Government retains the right to exercise other rights or remedies available to the KO.
3.1.12.2 Damage to Privately-Owned Property. The Contractor shall be held liable for damage or destruction of privately owned property (e.g. privately owned vehicles), as defined in this SOW, caused by the Contractor, Contractor personnel or representatives of the Contractor in the performance of services in this contract. The Contractor shall take corrective action within 5 working days to repair damages or replace destroyed property.
Contractor will purchase and maintain at all times a general third-party liability insurance policy of not less than $500,000 per event coverage.
3.1.12.3 Damage Reports. The Contractor shall submit a damage reports to the KO and COR within 24 hours of damage or destruction to Government property or privately owned property caused by the Contractor, Contractor personnel or representatives of the Contractor. The damage report shall detail the facts and the extent of damages or destruction and the corrective action taken by the Contractor to repair damages or replace destroyed property.
3.2 CONTRACT ADMINISTRATION AND MANAGEMENT ROLES:
3.2.1 Post Award Conference/Periodic Progress Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The Contracting Officer (KO) and Contracting Officer’s Representative (COR) shall meet periodically, quarterly as a minimum IAW AR 70-13, paragraph 4-4, b. (1), with the Contractor to review the Contractor's performance. Written minutes of such meetings will be recorded by the Contractor and signed by the Contractor’s Project Manager and the KO, or COR. The Contractor shall distribute written minutes electronically, within five (5) workdays after the meeting, to the KO and COR. The Contractor may request a meeting with the KO or COR when the Contractor believes such a meeting is necessary. Written minutes of such meetings shall be recorded by the Contractor and signed by all participants involved and distributed electronically within five (5) workdays after the meeting.
3.2.2 Performance/Progress Meetings. Performance/Progress meetings will be held as necessary. There may be occasions when subsequent meetings will be called by either party to reconfirm mutual understandings and/or address deficiencies in the QC system or procedures which may require corrective action by the Contractor. The Contractor Representative shall meet with the COR and/or Contracting Officer (KO) as required. A mutual effort will be made to resolve all problems identified. The Contractor Representative and the Quality Control Manager shall sign the written minutes of these meetings.
3.2.3 Contract Administration. Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination between the Government and the Contractor.
3.2.4 Contract Roles. The following provides the roles and their respective authority during the performance of the contract:
3.2.5 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely in the KO. In the event the Contractor effects any such change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be effected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes.
3.2.6 Contracting Officer’s Representative (COR). The KO shall designate contract level CORs during the term of this contract, under Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.201-7000 “Contracting Officer’s Representative.” The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR will perform in accordance with the responsibilities and duties identified in the Interim Army Contracting Command – Contracting Officer’s Representative Policy Guide Pamphlet 70-1, (ACC PAM 70-1, dated 26 March 2010).
3.2.7 COR Authority. A letter of designation issued to the COR by the KO, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
3.2.8 COR Functions. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the…