W912BV20Q01141.pdf
PDF 951 KB Posted
- Attached to
- Lock 14 Concrete Paving, Le Flore County, OK
- Solicitation number
- W912BV20Q0114
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912BV20Q0114 0002.pdf | ||
| FY19FLSUPP_WD Mayo Lock 14-Paving-SOW(Rev. July2020).docx | DOCX document | |
| 19FLSUPP_WD Mayo Lock 14-Paving-SOW(Rev. July2020).docx | DOCX document | |
| FY19FLSUPP Concrete Paving LK 14 Drawings (Rev-Jul2020).pdf | ||
| SOW.pdf | ||
| W912BV20Q0114.pdf | ||
| FY19FLSUPP Concrete Paving LK 14 Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is hereby issued to •Remove Sections 01 10 00 Statement of Work and Concrete Paving Draw ings •Add Sections 01 10 00 Statement of Work and Concrete Paving Draw ings oChanges are to no longer demolish the storage locker and clearly def ine slope.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV20Q0114
X 9B. DATED (SEE ITEM 11)
23-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jul-2020
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV20Q0114
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 73 10 - SUPPLEMENTAL CONTRACT REQUIREMENTS
CLIN 0003
The CLIN extended description has changed from:
Demolish and remove the existing bricks and concrete excluding the Curbs, Light Poles and Standards. Backfill and cap the flower beds with 4” of Concrete even with the top of the curb.
To:
Demolish and remove the existing bricks and concrete excluding the Curbs, Light Poles and Standards. Backfill and cap the flower beds with 4” of Concrete even with the top of the curb. Period of Performance for option is 30 days from notice to exercise the option.
(End of Summary of Changes)
The following items are applicable to this modification:
SECTION 01 10 00 - STATEMENT OF WORK
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
W.D. MAYO L&D No. 14
CONCRETE PAVING
PART 1 – GENERAL
1.1 SCOPE OF WORK
The contractor shall furnish all labor, materials, form-work, and equipment, remove remaining pavement and debris, and perform all services required to complete all the concrete paving area work shown on the drawings and specified herein.
Option 1. Salvage and stockpile the SB1 material currently in the area to be paved.
Option 2. Flower Beds (2): The Contractor shall demolish and remove the existing bricks and concrete excluding the Curbs, Light Poles and Standards. The Contractor shall backfill with aggregate base and cap the flower beds with 4” of Concrete even with the top of the curb. The flower bed control joints will be saw cut 10 ft. spacing each way. Work shall be completed in 30 days after Notice to Proceed (NTP).
A site visit by prospective bidders is encouraged to determine exact site conditions and work requirements.
1.2 REFERENCES
N/A
1.3 BASIS FOR PAYMENT
Please refer to FAR 52.232-5 for Fixed-Price payment procedures. Send invoice for payment to Paul Parris, Contracting Officer Representative (COR), by email: paul.c.parris@usace.army.mil.
1.4 WORK HOURS
Regular work hours will be from 8:00 am – 4:30 pm Monday through Friday, excluding federal holidays. Any proposed changes to the work hours must be approved by the Contracting Officer Representative (COR).
1.5 COMPLETION TIME
Work shall start NLT10 days from Notice to Proceed (NTP) and be completed in 30 calendar days after work starts.
1.6 SAFETY REQUIREMENTS
The contractor shall comply with the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 latest edition, and all applicable Federal, State, and local safety codes and practices. It is the contractor’s responsibility to insure public safety during the entire duration of the contract. Necessary signs, barriers, warning devices, etc. shall be operated and maintained by the contractor at contractor expense. Contractor employees shall comply with the minimum dress requirements as stated in EM 385-1-1.
1.7 EQUIPMENT
All equipment used to perform work under this contract shall be in good operating and mechanical condition and shall comply with Section 18 of EM 385-1-1. Equipment shall be inspected by the contractor and the inspection reports shall be submitted to the COR prior to utilization of such equipment to accomplish work on this contract.
1.8 WEATHER LIMITATIONS
Normal limitations are to be expected.
1.9 SUBMITTALS
The contractor furnish the mix specifications prior to placing concrete.
1.10 PREWORK CONFERENCE
A prework conference will be held with the COR and contractor prior to the commencement of any work. The contractor’s responsible person and necessary administrative staff (ex. QC, Safety Officer, and PM) will be required to attend this meeting. Procedures for proper invoicing and payment, schedule, etc., will be covered at this time.
1.11 ENVIRONMENTAL CLEANUP
The contractor shall maintain a clean work area at all times. The contractor shall be responsible for the protection of the environment and will be required to restore all damages subject to the approval of the contracting officer. The contractor shall remove and dispose of all debris off Government property in a state approved disposal site unless specified otherwise. The contractor will be required to comply with Federal and State environmental requirements.
1.12 COORDINATION OF WORK
All work and deliveries shall be coordinated with Paul Parris (COR) 918-775-4475 ext. 5816, Bob Steiner, Navigation Manager, 918-775-4475, Chad Kepke, Navigation Lock Manager, 918- 775-4475, ext. 5828, or Victor Heister, Navigation Maintenance Engineer, 918-669-7244.
PART 2 – PRODUCTS
2.1 MATERIALS
Aggregate:
A 10” stabilized aggregate base shall be placed under all pavement.
Concrete Requirements:
Concrete shall be manufactured and delivered in accordance with the latest revised Standard Specification for Ready Mixed Concrete, ASTM C94. All concrete shall have a minimum 28-day compressive strength of 4,000 psi.
Concrete slump shall be:
a) 1 - 4 inches if placement and consolidation is by mechanical method such as vibratory screed;
or
b) 1 - 5 inches if placement and consolidation is by other means, unless a super plasticizer is used in accordance with the manufacturer’s recommendations.
Concrete Thickness:
Parking areas and driveways, a 10″ minimum pavement thickness is required.
2.2 DELIVERY AND STORAGE
Materials shall be delivered to the site undamaged and stored out of contact with the ground.
Materials that are damaged during the delivery or improper storage shall be replaced at no cost to the government.
2.3 GOVERNMENT FURNISHED PROPERTY
N/A
PART 3 – EXECUTION
3.1 ACCOMPLISHMENT OF WORK
Demolition: The Contractor shall demolish any remaining asphalt or concrete paving to a depth sufficient to prepare the subgrade as defined below.
Subgrade Preparation:
The bottom of the excavation or the top of the fill shall be known as the pavement subgrade and shall conform to the lines, grade, and cross sections shown in the plans.
In most situations with most soils, simple removal of topsoil and excavation down to the desired pavement subgrade is sufficient preparation for the direct application of concrete pavement.
In situations where the subgrade contains sections of soft and yielding soil, such soil must be removed. It must be replaced with a material (or soil) that will, after compaction, bring the subgrade to a firm, unyielding; and uniformly dense condition. (If soil is used as a replacement material, it should be compacted at or slightly above optimum moisture.)
All trenches and structure excavations shall be backfilled to natural or finished grade with granular material or controlled density fill as soon as conditions permit. All backfill shall be compacted with mechanical tampers in layers not over 6 inches in compacted thickness to densities similar to that of surrounding soils. Under these conditions, no other base or subgrade material is required.
Following demolition and before paving the Contractor shall install a buried 2” conduit from the Control House to the southern edge of the paving to a location determined by the Government.
Concrete Placement:
Ready mixed concrete hauled in truck mixers or truck agitators shall be mixed and delivered in accordance with ASTM C-94. Before placing concrete, freestanding water, snow, ice, or other foreign materials shall be removed from subgrade. All forms shall be thoroughly cleaned, secured in position, and coated with a form release agent. Concrete shall not be placed on a soft, spongy, frozen, or otherwise unsuitable subgrade. The subgrade shall be damp when concrete is placed.
Concrete shall be placed, struck off, and consolidated to plan grade with a mechanical placement machine, vibrating screed, or by hand finishing methods when approved. In lieu of fixed forms, the contractor may place concrete with a slip form paver designed to spread, consolidate, screed, and float finish the freshly placed concrete in one complete pass of the machine. Thickened edge of concrete can either be of keyed construction or of monolithic pour. Pavement shall be sloped .005 in the direction away from lock wall and pitched to area drains or perimeter areas to remove water.
6”x6”-W2.9xW2.9 (6”x6”-6x6) reinforcement is required.
Finishing:
After concrete has been struck off and consolidated, a bull float may be used to remove any high or low spots. Bull float use shall be confined to a minimum. Mechanical finishing machine floating is acceptable; however, under no circumstances shall the concrete surface be steel troweled.
A final skid resistant finish shall be made with a burlap drag or broom.
Curing and Protection:
Concrete must be cured by protecting it from loss of moisture, rapid temperature change and mechanical injury according to the latest edition of ACI 301. When concrete is being placed in cold weather and the temperature may drop below 35·F., straw, hay, insulated curing blankets, or other suitable material shall be provided along the line of work to prevent freezing of concrete.
Concrete injured by frost action shall be removed and replaced at the contractor’s expense.
Joints:
Unless shown on the project drawings, a joining plan shall be prepared by the contractor and approved before paving begins. Typical drying shrinkage cracking must be minimized and controlled by proper jointing. To minimize and control cracking, joints shall be:
a) Continuous across the slab;
b) Symmetrical (in squares or rectangles where possible);
c) Spaced at no more than 2 1/2 times in feet the slab thickness in inches. (For example, the maximum joint spacing of a 4 inch thick slab would be 10 feet.)
Isolation joints (expansion joints) shall be used to isolate fixed objects abutting or within the paved area. They shall contain premolded joint filler for the full depth of the slab.
Control joints (contraction joints) should be produced by sawing (preferred), hand-tooling, or forming by use of premolded filler. Joint depth shall be a minimum of one-fourth the slab thickness. Hand-tooled joints shall have a maximum edge radius of 1/4 inch. Sawing of joints shall begin as soon as the concrete has hardened sufficiently to permit sawing without excessive raveling. All joints shall be completed before uncontrolled shrinkage cracking occurs.
Construction joints (joints ending a day’s pour) must allow wheel load transfer across the joints where necessary. In such cases, these joints shall be keyed or dowelled.
Joints shall extend completely through the curb when the curb is integrally formed with the slab.
Construction and control joint openings wider than 1/4 inch shall be cleaned and sealed before opening parking area to traffic. (Isolation joints will not require sealing.)
When approved, the contractor shall be permitted to make minor adjustments in joint location to make them coincide with drainage or other structures.
Option 1. Salvage and stockpile the SB1 material currently in the area to be paved.
Option 2. Flower Beds (2): The Contractor shall demolish and remove the existing bricks and concrete excluding the Curbs, Light Poles and Standards. The Contractor shall backfill with aggregate base and cap the flower beds with 4” of Concrete even with the top of the curb. The flower bed control joints will be saw cut 10 ft. spacing each way. Work shall be completed in 30 days after Notice to Proceed (NTP).
3.2 TESTING
N/A
3.3 WARRANTY
Warranty shall cover manufactures recommended product installation and specifications for a period of one year.