2019_KAW_LAKE_GA_SARGE_CREEK.DOCX
DOCX document 15 KB Posted
- Attached to
- Gate Attendants v 4
- Solicitation number
- W912BV-19-Q-0056
About this file
Sarge Creek
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Heyburn_Bid_Schedule.doc | DOC document | |
| W912BV-19-Q-0056.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KAW LAKE, OK
SARGE CREEK COVE PUA
GATE ATTENDANT SERVICES
POC for this location is Kelly Vanzandt or Dakota Allison, 580-762-5611
In addition to the requirements stated in the GENERAL SCOPE OF WORK, the following work will be performed at this location.
1. Period of performance is 1 April thru 30 September.
a. Start work date is 1 April.
b. The contractor shall work 5 days on/ 2 days off throughout the performance period. Days Worked will be Thursday through Monday, off days Tuesday and Wednesday. If July 4th Holiday or prior day falls on Tuesday or Wednesday non-work day, that day shall also be worked.
c. For the period 1-30 April, and the day after Labor Day through the end of the performance period, work hours are 12 Noon – 8 p.m. each work day.
b. For the period 1 May - Labor Day, work hours are 12 Noon – 10 p.m. each work day.
2. Sarge Creek PUA has 51 campsites, 1 group camping area and a Boat Ramp.
a. Contractor will perform specific duties to implement the reservation program and submit paperwork and fees collected to NRRS. Fees will be submitted by cashier’s check. Copies of paperwork related to fees collected must be turned in weekly to the recreation fee cashier at the Lake Office.
b. Contractor will post reservation information daily (or as needed) at each individual campsite and group picnic shelter, and process all Self-Deposit fees collected.
c. A minimum of 2 patrols of the campground are required during each shift but additional patrols may be required to insure all fees have been collected, reservation markers have not been changed by visitors and for general security.
d. Contractor will keep the gate house clean at all times. Flower beds at the gate house shall be weeded and watered as needed. Contractor will supply all hand tools required for flower bed maintenance. The Government will supply most cleaning and office supplies; the Contractor shall be responsible for providing any supplies not provided by the Government.
e. Open park entry gate at 6:00 a.m. and close gate at 10:00 p.m. on scheduled work days. Raise/ lower flags daily on work days.
3. Security bond will be $5,000 (as stated in “General Requirements”).
PRICING SCHEDULE
GATE ATTENDANT SERVICES
KAW LAKE, OK
SARGE CREEK COVE PUA
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
*The number of days would depend on the actual start date.
| Unit | Total | ||||
| Description | Quantity | Unit | Price | Amount |
BASE ITEMS:
| 0001 | Gate Attendant Services | 132 | DAYS | $__________ | $__________ |
| 2019 - 2020 Contract Period |
Option 1:
1001 Gate Attendant Services 131 DAYS $__________ $__________ 2020 - 2021 Contract Period
Option 2:
2001 Gate Attendant Services 131 DAYS $__________ $__________ 2021 - 2022 Contract Period
TOTAL (CLINs 0001 thru 2001) $__________
| _______________________________________ | ____________________________________ |
| Contractor Name (printed) | Signature |
File details come from the government source that posted it.