W912BV18Q0140
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modif ication is to extend the proposal due date of the Spall Repair and changes to the Statement of Work including adding a bid schedule. The NEW proposal date is 14 September 2018 NLT 2:00 PM CST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV18Q0140
X 9B. DATED (SEE ITEM 11)
29-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Sep-2018
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
The required response date/time has changed from 10-Sep-2018 02:00 PM to 14-Sep-2018 02:00 PM.
The following have been added by full text:
BID SCHEDULE
BID SCHEDULE
Spall Repair
John Redmond Lake, Kansas
Item Unit
No. Description Quantity Unit Price ___ Amount
0001 – Spall Repair 3” and Deeper 1 JOB $_______ $________
Total Bid $___________________
Option 1
1001 – Option 1 – Spall 2” and Deeper 1 JOB $_______ $________
Option 2
1002 - Option 2 – Spall Repair 1” to 2” 1 JOB $_______ $________
Option 3
1003 – Option 3 – Repair Bridge 1 JOB $_______
Total Options 1-3: ____________
Total Base plus Options:______________
Contractor Name (printed) Signature
Bid Notes
1. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered the offer.
2. Refer to Section 00100, “Evaluation of Options (July 1990)” for information on evaluating options.”
SECTION 01 10 00 - STATEMENT OF WORK
The following have been added by full text:
REVISED STATMENT OF WORK
PART 1 – GENERAL
1.1 SCOPE OF WORK
The contractor shall provide labor, equipment, and materials needed to efficiently complete all work in accordance with this scope of work, the attached drawings, the specifications, and all other contract documents and requirements. The final result will be an identification and location of all spalls measuring 1 inch and deeper on the downstream weir of the John
Redmond Dam Structure. This Scope of Work contains option bid items for permanent concrete repairs and includes all aspects of concrete repair, use of fall protection, and work over water.
Base Bid Item: Repair All Spalls that are 3 Inches and Deeper.
Option Bid Item A: Repair All Spalls that are a minimum of 2 Inches yet less than
3 Inches in Depth.
Option Bid Item B: Repair All Spalls that are a minimum of 1 Inch yet less than
2 Inches in Depth.
Option Bid Item C: Grind and Seal Repair on Bridge.
1.2 REFERENCES
US ARMY CORPS OF ENGINEERS SAFETY AND HEALTH
REQUIREMENTS MANUAL, EM 385-1.1, 30 NOV 14
Manual on Uniform Traffic Control Devices (hereafter referred to as the MUTCD), 2009 version with Revisions 1 and 2
US ARMY CORPS OF ENGINEERS HANDBOOK FOR CONCRETE AND
CEMENT, CRD-C 137; (1977) Soundness of Aggregate by Use Of Sodium Sulfate or Magnesium Sulfate.
ASTM C881/C881M (2015) Epoxy Resin-Base Bonding Systems For Concrete
1.3 BASIS FOR PAYMENT
Payment will be made in a lump sum upon completion of work.
1.4 WORK HOURS
Regular work hours will be from 7:00 am- 4:30 pm Monday through Friday, excluding federal holidays. Any proposed changes to the work the
Contracting Officer’s Representative (COR).
1.5 COMPLETION TIME
Work shall be completed in 90 calendar days after award and within 60 days after start of work.
1. 6 SAFETY REQUIREMENTS
The contractor shall comply with the Army Corps of Engineers Safety and Health Requirements
Manual, EM 385-1-1 dated 30 November 2014 in addition to all applicable Federal, State, and
Local safety codes and practices. It is the contractor's responsibility to insure public safety during the entire duration of the contract. Necessary signs, barriers, warning devices, etc. shall be operated and maintained by the contractor at contractor expense. Contractor employees shall comply with the minimum dress requirements as stated in Chapter 5 of EM 385-1-1.
1.7 EQUIPMENT
All equipment used to perform work under this contract shall be in good operating and mechanical condition and shall comply with EM 385-1-1. All equipment shall be inspected by the contractor and the inspection reports shall be submitted to the Contracting Officer’s
Representative prior to utilization of such equipment to accomplish work on this contract.
Equipment designated for use on the water must be inspected with Government Representative on site. Equipment with fluid leaks such as gasoline, oil, and hydraulic fluid are NOT authorized for use and equipment needing repairs must be removed from Government Property for servicing.
1.8 WEATHER LIMITATIONS
The following schedule of monthly anticipated adverse weather delays is based on National
Oceanic and Atmospheric Administration (NOAA) or similar data for project location and will constitute the base line for monthly weather time evaluations. The contractor’s progress schedule must reflect these anticipated weather delays in all-weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
4 4 4 5 5 4 4 4 4 3 4 4
1.9 SUBMITTALS
The contractor may be required to furnish certain submittals. These submittals may be progress reports, certifications of materials, safety plans, drawings, training certifications, work plans, etc.
These will be specifically listed and shall be furnished to the Contracting Officer’s
Representative. Submittals requiring Government approval shall be formally prepared and approval granted prior to proceeding with work involving these submittals. FIO (For Information
Only) submittals do not require Government approval.
The basic submittals shall include but are not limited to:
Contracting Company’s Health and Safety Program.
Job Plan Including:
Proposed Schedule.
List of Equipment Needed for Specific Tasks.
List of Personnel Needed for Specific Tasks.
Key Personnel Certificates, Qualifications, and Credentials.
Accident Prevention Plan (APP).
Activity Hazard Analysis (AHA) for All Definable Features of Work.
Anti-terrorism Level 1 Awareness for all personnel accessing the jobsite (including sub-contractors).
Proof of E-verify performed on all personnel accessing the jobsite (including sub-contractors).
Daily site visit, status reports, and pictures.
**Materials, Components, and Equipment Used, Replaced, or Disposed on Government Property or Originating from Government Property shall also require the Contractor to furnish certain documentation at the discretion of the Contracting Officer’s Representative.
1.10 PREWORK CONFERENCE
A pre-work conference will be held with the Contracting Officer and Contractor prior to the commencement of any work. The contractor's responsible person and necessary administrative staff will be required to attend this meeting. Procedures for proper invoicing and payment, schedule, etc., will be covered at this time.
1.11 ENVIRONMENTAL CLEANUP
The contractor shall maintain a clean work area at all times. The contractor shall be responsible for the protection and preservation of the environment and will be required to restore all damages/disturbances subject to the approval of the Contracting Officer. The contractor shall remove and dispose of all debris off Government property in a state approved disposal site unless specified otherwise. The contractor will be required to comply with all Federal and State environmental requirements.
1.12 COORDINATION OF WORK
The contractor shall coordinate all work with the Contracting Officer’s Representative, maintain communications with lake office personnel relating to campsite use, and efficiently raise awareness to the effected public. The Contractor shall be required to complete the work without impacting the day to day operations in the park. The Government point of contact (POC) for this work will be Casey Williams at (620) 364-8614. The contractor must also allow government representatives access to contractor facilities with 24-hour notice.
1.13 ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS
The Contractor shall be responsible for ensuring all personnel, to include sub-contractor personnel, comply with the training requirements and procedures identified on the document titled “Antiterrorism/Operations Security Requirements” in Section H, Special Contract
Requirements. When items for which training is identified, the Contractor shall ensure that all personnel complete acknowledgement for the specified training; the Contractor is responsible for ensuring all training acknowledgments, when applicable, are submitted to the COR or
Contracting Officer within 10 calendar days of contract award (or NTP for construction contracts). In no event shall any contractor or sub-contractor personnel be onsite prior to completion of any applicable training and submission of training verification. Training materials and verification forms will be provided by the Contracting Officer upon written request. Pre‐ screen candidates using E‐Verify Program. The Contractor must pre‐screen candidates using the
E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The contractor must ensure that the Candidate has two valid forms of
Government issued identification prior to ensure the correct information is entered into the E‐ verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
1.14 CONTRACTOR PERSONNEL
Personnel hired by the contractor shall be fully qualified to perform the work in a professional manner and in industry installation standards. The Contracting Officer may require, in writing, that the contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.
The contractor is responsible for providing the Contracting Officer’s Representative with a copy all required licenses, certifications, and other documents pertaining to the contracted personnel.
1.15 LIQUIDATED DAMAGES
Liquidated damages of $300.00/day shall be incurred by the contractor for every day beyond the end of the performance period in which the contract is not completed.
PART 2 – PRODUCTS
2.1 MATERIALS
Other than those listed as Government furnished the contractor shall furnish all materials and supplies required to complete all tasks within this Scope of Work. All materials shall be new and unused. Reference “Part 3—Execution” for specific requirements. Materials shall include:
Five Star Structural Concrete V/O or equivalent as approved by Contracting Officer.
Method for anchoring patch as approved by the Contracting Officer’s Representative.
Epoxy Sealer as approved by the Contracting Officer’s Representative.
2.2 DELIVERY AND STORAGE
Materials shall be delivered to the site undamaged and stored out of contact with the ground.
Materials that are damaged during the delivery or improper storage shall be replaced at no cost to the government.
2.3 GOVERNMENT FURNISHED PROPERTY
NONE
PART 3 – EXECUTION
http://www.dhs.gov/E
3.1 ACCOMPLISHMENT OF WORK
The acceptance of work performed will be determined by the Contracting Officer’s
Representative in reference to the pre-negotiated performance standards outlined in this Scope of
Work. All negotiations shall be performed by the Contracting Officer and any modifications or changes to the contract will be reflected in the Contracting Officer’s Representative’s assessment of contract compliance and performance.
3.2 PRE-BID SITE VISIT
A pre-bid site visit is strongly suggested in order to gather all information needed to assess the current site conditions and materials needed for accurate proposals.
3.3 SITE PREPARATION
The contractor shall be responsible for all aspects of pre-work activities including establishing traffic control and public safety. All traffic control devices must be MUTCD compliant and if road closures are necessary; all activities must be approved by both the U.S. Army Corps of
Engineers and the State of Kansas. Traffic control maps will be a required submittal to the
Contracting Officer’s Representative and must also be given to the County Emergency Manager.
3.4 PERFORMANCE OF WORK
3.4.1 Bid Items for Spall Repairs
**All aspects of performance shall be the same for all Spall Repair Bid Options.
Base Bid Item: Repair All Spalls that are 3 Inches and Deeper.
Option Bid Item A: Repair All Spalls that are a minimum of 2 Inches yet less than 3 Inches in Depth.
Option Bid Item B: Repair All Spalls that are a minimum of 1 Inch yet less than
2 Inches in Depth.
It is the contractor’s responsibility to acquire and deliver potable water for cleaning activities, concrete mix, and all other activities requiring the use of fresh water. The use of lake water and government purchased water will not be approved or permitted for any activities related to this contract.
The spalled areas shall be cleaned using pressurized water such as a pressure washer without causing damage to the structure outside of the area to be repaired by the contractor. The use of chemicals will not be permitted for cleaning use.
The identified spall shall be chipped back to sound concrete, approved anchoring method shall be installed, and the surfaces shall be prepared in accordance with Manufacturers
Recommendations and Contracting Officer’s Approval.
All spall sites will need to have all loose spalled material or damaged concrete removed and dried before application of any fill material. The removed debris shall be considered construction waste and will be collected by the contractor and disposed of in a waste disposal facility with proof of disposal submitted to the Contracting Officer’s
Representative.
Unless approved by the Contracting Officer’s Representative, use only hand tools or power-driven chipping hammers (15 lb. class maximum) to remove concrete.
If more than ½ the perimeter of any mild reinforcement is exposed or if the exposed bar exhibits significant corrosion, remove the concrete from around the entire bar. Provide ¾ inch clearance or 1 times the largest sized aggregate in the repair material, whichever is greater, between the steel and surrounding concrete to permit adequate flow of the repair material.
The exposed rebar in the spall sites will require an encapsulated agent coat to ensure all rust is handled. Before application of agent, wire brush will be used to remove known rust.
The patch perimeters shall be saw-cut to eliminate feathered edges and to ensure that the repair material will be applied in depths no less than the manufacturer’s recommended minimum depth or ½ inch, whichever is the deepest.
Handheld grinders or saws may be used to square the patch perimeters. When practical, undercut the patch perimeter at an approximate angle of 15 to 20 degrees from perpendicular so that the profile will help hold the patch material in place.
The Contractor shall roughen the substrate to ensure that there will be a mechanical bond between the patch material and the parent concrete. Areas to be patched shall be prepared, contaminants removed, cleaned and placed per manufactures recommendation. Bonding agents shall be used where required by the manufacturer.
The spall sites will need to be filled with either concrete, epoxy, or another appropriate sealing material. Shallow repairs (< 1 ½ inches) or deep narrow holes shall be repaired with an epoxy type material Large deep repairs (> 1 ½ inches) shall be repaired with multiple dowels, welded wire mesh and a high strength cement based patch material (6000 p.s.i.).
Samples of sealing/filling material shall be obtained by the contractor and submitted to the
COR for approval.
When no mild reinforcement is exposed, install anchors at no more than 12 inches on center each way with a minimum of one anchor per site spaced evenly into the existing spall site to ensure that the patch material will have an anchor. In spall locations that require welded wire fabric, the fabric will be tied to all anchors 2 inches below the finished top. All sites must be inspected by USACE prior to drilling, epoxy, and placement of patch material.
The anchors must consist of one the following: stainless steel, galvanized, or zinc-painted expansion anchors. All locations where installing expansion anchors drill and clean the holes as required by the anchor manufacturer. Do not use a drill bit that has a larger diameter than that required. Embed the anchor the minimum amount required by the manufacturer. In order to function as intended, the head of the anchor must protrude into the repair material.
Where anchors are installed, ensure that there will be a minimum cover of ½ inch for stainless steel and 1 inch form non-stainless steel after the patch material is applied.
All construction joints shall be consistent with the original engineered design of the structure and the contractor shall be responsible for addressing this aspect of performance either through forming before applying the repair material or cutting after the concrete patch has fully cured.
Defects in the repairs such as cracking (in all forms) or gaps between patch and existing concrete will not be accepted.
3.4.2 Bid Items for Grinding Repairs
Option Bid Item C: Grind and Seal Repair on Bridge.
The Contractor shall establish all necessary traffic control to establish a safe work environment for workers and public safety in accordance with MUTCD. All traffic control measures (including temporary road closures) must be approved by the Contracting Officer’s
Representative and the County Engineer. The contractor shall be responsible for notifying the local emergency manager and local dispatchers.
The Contractor shall use a diamond wheel horizontal grinder with a dust collector to resurface a previously repaired area to establish a smooth and level edge across the expansion joint. The vertical offset shall not exceed plus or minus 1/10 of an inch form level measuring from the existing slab across the expansion joint.
After the edge has been grinded smooth and level, the Contractor shall apply Master Protect
440HZ concrete sealer (or equivalent as approved by the Contracting Officer). The
Contracting Officer’s Representative shall be onsite for measurement of vertical offset prior to acceptance of work.
3.5 DISPOSAL
Disposal of all construction wastes must be disposed of outside of government property and performed in accordance with Kansas Department of Health and Environment guidelines. Proof of waste disposal must be submitted to the Contracting Officer’s Representative prior to acceptance of work.
Due to invasive species such as Zebra Mussels, all equipment used in the water must be properly cleaned upon completion of work in accordance with Kansas Department of Health and Environment requirements at no additional cost to the Federal Government.
3.6 TESTING
All materials and equipment will be inspected upon arrival by the Contracting Officer’s
Representative for compliance and daily by the Contractor which shall be recorded in the contractor’s daily reports.
The repaired concrete shall be inspected by the Contracting Officer’s Representative prior to acceptance of work.
3.7 WARRANTY
Contractor will guarantee that all completed work will be free of any defects and poor workmanship for a period of 1 year. All defects and poor workmanship found will be corrected with no extra charge to the government.
The following have been deleted:
STATEMENT OF WORK
(End of Summary of Changes)