W912BV-16-R-0137-0003.pdf

PDF 87 KB Posted

Attached to
Replace Generator and Switchgear B504 & B506, Tinker Air Force Base, Oklahoma Federal contract opportunity
Solicitation number
W912BV-16-R-0137
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to Replace Generator and Switchgear B504 & B506, Tinker Air Force Base, Oklahoma, newest first.
File Type Posted
W912BV-16-R-0137-0007.pdf PDF
Appendix_E-B506_Electric_Report.xlsx XLSX spreadsheet
W912BV-16-R-0137_Amendment_6_extend_due_date.pdf PDF
W912BV-16-R-0137-0005.pdf PDF
Appendix_D-820014.pdf PDF
Appendix_D-DACA56-84-C-0050.pdf PDF
Appendix_D-910722.pdf PDF
Appendix_D-890004.pdf PDF
Appendix_D-DACA63-73-C-0179.pdf PDF
Appendix_C-2016_TAFB_ELECTRICAL_STANDARD.pdf PDF
W912BV-16-R-0137-0004.pdf PDF
SIGN_IN_SHEET_DLA_Generators_20_Oct_16_Site_Visit.pdf PDF
Appendix_B-_DLA_Tinker_Electrical_Power_System_Assessment.pdf PDF
W912BV-16-R-0137-0002.pdf PDF
W912BV-16-R-0137-0001.pdf PDF
W912BV-16-R-0137.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

DLA Replace Generator & Sw itchgear B504 & 506, Tinker AFB, OK.

1. Appendix B is incorporated into this solicitation for informational purposes.

2. The proposal due date remains unchanged.

3. POC for this amendment is Pun Chittchang, punnie.chittchang@usace.army.mil, phone 918-669-7544, fax:918-669-7495.

4. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED BY THIS AMENDMENT.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Oct-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-16-R-0137

X 9B. DATED (SEE ITEM 11)

20-Sep-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Oct-2016

CODE

CONTRACTING DIV

USACE, TULSA 1645 S 101 E AVE

TULSA OK 74128-4609

W912BV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BV-16-R-0137

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE

SUMMARY OF CHANGES

(End of Summary of Changes) i

TABLE OF CONTENTS

DOCUMENTS 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 11 00 CLIN SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

00 22 11 PROPOSAL SUBMISSION REQUIREMENTS AND BASIS OF AWARD

00 72 00 CONTRACT CLAUSES

00 73 00 SPECIAL CONTRACT REQUIREMENTS

00 73 46 WAGE DETERMINATIONS

DIVISON 01 – GENERAL REQUIREMENTS

01 04 00 COORDINATION, FIELD ENGINEERING, AND MEETINGS

01 10 00 STATEMENT OF WORK

01 32 01.00 10 PROJECT SCHEDULE COAO FULL DB

01 33 00.00 10 DIGITAL SUBMITTAL PROCEDURES AND CORRESPONDENCE

01 33 16.00 10 DESIGN AFTER AWARD

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 45 01.00 10 USACE QUALITY CONTROL

01 50 02.00 10 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

01 57 20.00 02 ENVIRONMENTAL PROTECTION

01 58 00.00 10 BULLETIN BOARD, PROJECT SIGN, AND SAFETY SIGN

01 60 00.00 50 MATERIAL AND EQUIPMENT

01 62 35 RECYCLED/RECOVERED MATERIALS

01 70 00.00 10 CONTRACT CLOSEOUT

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 23 OPERATION AND MAINTENANCE DATA

APPENDIX

TINKER AFB BASE STANDARDS

-- End of Table of Contents--

A

B DLA TINKER ELECTRICAL POWER SYSTEM ASSESSMENT*AM3 *

File details come from the government source that posted it. Updated .