Bidder's_Inquiry_Q A.pdf
PDF 95 KB Posted
- Attached to
- Diving Services USACE Tulsa District Federal contract opportunity
- Solicitation number
- W912BV-15-R-0098
About this file
Bidder's Inquiry questions and answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV-15-R-0098_0001_Diving_Services_MOD.pdf | ||
| Price_Schedule_for_Diving_Services_Protected.xls | XLS spreadsheet | |
| QASP_for_Diving_Services.pdf | ||
| Price_Schedule_for_Diving_Services_Protected.xls | XLS spreadsheet | |
| Technical_Proposal_Situation_for_Diving_Services.pdf | ||
| W912BV-15-R-0098_Diving_Services.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: Diving Services-Tulsa District Review: Diving Services-Tulsa District (00001) (sorted by CommentID ) Displaying 8 inquiries.
Id Discipline Sheet Detail Spec 6306990 Contracting small business participation
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify the required percentage of participation for a small business prime contractor using a large business sub contractor to perform the work.
On: Nov 26 2015.
Government Response. . This is a service contract Small Business Set-Aside. Please review FAR 52.219- 14 -- Limitations on Subcontracting (c)(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. On: Dec 02
Current Request Status: Request Closed Information for this report is procurement sensitive.
6313786 Other W912BV-15-R-0098 W912BV-15-R-0098
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
We would like to inquiry with you on a clarification that was mentioned on your Synopsis posted on 11/03/15 for Solicitation # W912BV-15-R-0098, regarding Response Date & Time Requirement for Quote. The Synopsis states Quotes are anticipated to be due on or about 12/05/15, but the Response D&T states 12/21/15 @ 1400 hrs CST. Would you please advise on the official Quote Due Date & Time for Price Schedule Only? We understand all Technical Aspects will be required upon award of contract. Any assistance you can provide would be greatly appreciated.
On: Dec 04 2015.
Government Response. . The solicitation states in Block 8. on Standard Form 1449 the Offer Due Date/Local Time is 02:00 PM 21 December 2015.
All information as required in SECTION L is due at that time. All respondents will be evaluated as per SECTION M. On: Dec 07 2015 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6334814 Contracting Solicitation 4.4 Depth of Water
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In the Solicitation 4.4 Depth of Water, Page 5 of 122, it states the various water depths for each powerhouse, and then the same in section 4.6 page 8 for the Lock and Dams. Some of the depths show the need for a decompression chamber on site such as Tenkiller Power house, 145' dives. Is there a listing we can get as to the locations or job tasks that require a chamber on site? There is no mention of the chamber or manning requirements in the solicitation.
On: Dec 21 2015.
Government Response. . It is not possible to list every piece of equipment that could possibly be used or the bidder's preferred manpower requirements for operating that equipment. It is a measure of the bidder's technical competency for dives that require ancilliary equipment and the manpower requirements.
Dive depths are listed in the Solicitation on Page 4 at 4.1, Page 5 at 4.4, starting at the bottom of Page 6 at 5.1, and Page 7 at 5.6. On: Dec 22 2015
Current Request Status: Request Closed Information for this report is procurement sensitive.
6334958 Contracting Scope of Work
Page 1 of 3ProjNet: Logged In User
12/22/2015https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReport...
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What do you estimate the average number of days will be per year for this contract?
On: Dec 21 2015.
Government Response. . SECTION I, 52.216-19 Order Limitations on Page 67 of 122 of the Solicitation outlines the Order Limitations to include the Minimum Order. On average, the Government has seen the number of dives per year fluctuate between three and eight. On: Dec 22 2015
Current Request Status: Request Closed Information for this report is procurement sensitive.
6334965 Contracting Scope of Work
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What is the average length of penetration at each site or can this be added as an addition to the bid?
What will the length of penetration be on Tenkiller and Denison locations?
On: Dec 21 2015.
Government Response. . Per the solicitation price schedule, penetration dives will be negotiated at the task order level. Due to the various sites and work requirements the penetration dives will not be pre-priced at the IDIQ level. On: Dec 22 2015
Current Request Status: Request Closed Information for this report is procurement sensitive.
6334970 Contracting Scope of Work Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can depth premiums be added as an addition or extra pricing to the bid?
On: Dec 21 2015.
Government Response. . The contractor shall propose a firm fixed price according to the bid schedule. On:
Dec 22 2015 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6334994 Contracting Techincal Competency Scenario Work Required
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In the Technical Competency Scenario, at the Webber Falls location, you state a vessel will be required, then you state equipment will have to be hand-transported from the parking lot to the intake deck (-30ft.) Which equipment are you referring to? Our compressors weigh over 500 lbs. Can you please clarify.
On: Dec 21 2015.
Government Response. . The Offeror is responsible for determining the equipment and locations of the equipment required to meet safety and regulatory requirements. Equipment varies from task to task. The Government provides a Performance Work Statement to allow each offeror to formulate their own unique method to safely approach the task and provide a cost effective and safe solution. On: Dec 22 2015 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6335043 Contracting Scope of Work
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What are the gate sizes at the powerhouses?
What size are the trash racks at each location?
On: Dec 21 2015.
Page 2 of 3ProjNet: Logged In User
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
Report Complete
Government Response. . The gate sizes and configurations vary by location. General sizes are listed below:
Trash racks are generally 24' - 25' wide and comprised of sections 10' - 12' high. The number of sections and the number of racks varies by location.
Intake racks on locks are typically 10' x 7' Tail race gate slots vary from 19' to 36' Mitre Gates (locks) are approximately 35' x 66' Spillway Tainter gates are 50'-60' wide with a dive depth of up to 50' Draft tube gates are 25' x 42' in two sections On: Dec 22 2015 Current Request Status: Request Closed
Information for this report is procurement sensitive.