AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

THIS AMENDMENT ANSWERS RFI'S, MODIFIES FAR 52.236-27 and MODIFIES SPECIFICATIONS 01 00 00 and 26 13 24. ALL OTHER

SECTIONS OF THE SPECIFICATIONS REMAIN THE SAME.

PROPOSAL DUE DATE REMAINS 17 AUGUST 2018 AT 11:00 AM EST.

Please indicate receipt of this amendment on the Standard Form 1442 (Solicitation, Offer, and Aw ard) as Amendment 0002. Failure to acknow ledge all amendments may be cause for rejection of the bid.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU18B0009

X 9B. DATED (SEE ITEM 11)

02-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0002

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jul-2018

CODE

CONTR DIV-CONTRACTS BR

USACE, PHILA DISTRICT

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU18B0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

REQUESTS FOR INFORMATION with RESPONSES

IFB No. W912BU-18-B-0009

RFI# Request for Information Response

1 Short Circuit Rating: The Switchgear Schedule found on Page E-93 states the switchgear shall be rated 12.5 kA. However, the Medium Voltage Specification, 26-13-24, Part 2.4.4 S states the switchgear shall be rated 25 kA. Please verify the switchgear shall be rated 12.5 kA.

Computer modelling shows that short circuit rating of 12.5kA is sufficient and will be used for all equipment in those two projects.

Specification, 26-13-24, Part 2.4.4 S shall be read as " the switchgear shall be rated

12.5 kA".

2 Switchgear Configuration: The medium voltage switchgear designated SWFDR1-14 has a conflicting switch configuration.

Drawing E-72 shows a Vista 633. That means there are six total ways. Three of these ways are switches and three of these ways are fault interrupters. However, the Switchgear Schedule found on Page E-93 states this switch shall be a Model 523. That means there are five total ways. Two of these ways are switches and three of these ways are fault interrupters. Please verify which model switch shall be supplied.

Required SWFDR 1-14 for MSBL 151012 is VISTA model: 633.

Correct model number on E 93, SWFDR 1-14 will be "Model No.

633".

3 Optional Items: Medium Voltage Specification, 26-13-24, Part

2.20.B requests two cable connected remote operators for remote operation. Please verify this means two portable remote operators are required for the entire project. Or, are two required for the

Main Base Project and two required for the Buildings 194 and 195 project.

Total of 2 (Two) Cable connected remote operators to operate medium voltage switchgears are to be provided for both projects- one remote operator for each project.

4 Switchgear Configuration: The medium voltage switchgear designated SWFDR2-1 has a conflicting switch configuration.

Drawing E-47 shows a Vista 413. That means there are four total ways. One of these ways is a switch and three of these ways are fault interrupters. However, the Switchgear Schedule found on Page E-74 states this switch shall be a Model 532. That means there are five total ways. Three of these ways are switches and two of these ways are fault interrupters. Please verify which model switch shall be supplied.

Required SWFDR 2-1 for MSBL 101116 is VISTA model: 431. That means it is a 4 way switch with 3 load break switches and 1 fault interrupter switch. Correct model number on E 74, SWFDR 2-1 will be "Model No. 431".

W912BU18B0009

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visit is scheduled for 02 August 2018 at 9:00 AM. The contractor must complete the attached form labeled

“Lakehurst EAL Form MSBL101116 and return to Soe Lynn at soe.lynn@us.af.mil no later than Thursday 26 July

2018 by 3:00 PM EST.

Name: Soe Lynn

Telephone: (732) 323-1025

(End of provision)

(End of Summary of Changes) mailto:soe.lynn@us.af.mil