Technical_Features_Requirements_V1.pdf

PDF 40 KB Posted

Attached to
Dredge ESSAYONS - Fixed Marine Stores Cranes Federal contract opportunity
Solicitation number
W912BU-17-T-0011
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

Technical Features Requirement Revisions

View the file

Other files for this federal contract opportunity

Other files attached to Dredge ESSAYONS - Fixed Marine Stores Cranes, newest first.
File Type Posted
W912BU-17-T-0011-0002.pdf PDF
W912BU-17-T-0011-0001.pdf PDF
Questions_Answers_-_Amendment_0001_.pdf PDF
SOW_Spec_V2_.pdf PDF
SCANTLING_PLAN_POOP_DECK_681-700-124.pdf PDF
3160_QAP.pdf PDF
SCANTLING_PLAN_UPPER_DECK_681-700-123.pdf PDF
GENERAL_ARRANGEMENT_OUT_BOARD_PROFLE_681-700-201.pdf PDF
SCANTLING_PLAN_BOAT_DECK_AND_ABOVE_681-700-125.pdf PDF
W912BU-17-T-0011.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment to Solicitation No. W912BU-17-T-0011 Amendment 0001

PROPOSAL TECHNICAL FEATURES REQUIREMENTS

Each offeror shall provide a complete listing of all equipment and components to be provided and the crane design criteria that was used. At a minimum the following details shall be provided:

a. Pedestal:

• Diameter of pedestal

• Height of pedestal

• Height from boat deck level to slewing gear

• Material of pedestal constructed from

b. Crane Weights and Overturning Moment

• Crane Machine Total Weight

• Overturning Moment

• Upperworks Weight and CG

• Boom Weight and CG

c. Crane Load Capacity Charts

d. Crane Controls

• Technical specification

e. Hydraulic System

• Motor HP, type, and voltage

f. Crane Drum

• Performance specification for drum

g. Crane Boom Cylinders

• Boom maximum and minimum elevations

• Time from minimum to maximum elevation

Attachment to Solicitation No. W912BU-17-T-0011 Amendment 0001

h. Crane Swing System

• Speed of swing system

i. Crane Boom

j. Wire Rope

• Identify size and lengths of wire rope to be provided for drum

• Identify the certification the wire rope will receive

k. Crane Delivery

• Identify method for delivery and delivery location

l. Local Service Provider

• Identify local service provider

m. Warranty

• Length and specifics of warranty offered

n. Schedule

• Identify schedule with the key milestones in number of days post notice to proceed to include at least:

o Delivery of engineering submittals to the Government o Crane testing at manufacturer’s facility o Delivery to Portland, OR.

File details come from the government source that posted it. Updated .