W912BU-15-B-0002-0001.pdf

PDF 33 KB Posted

Attached to
Two (2) Steel Deck Cargo Barges (120 ft x 30 ft x 7 ft)
Solicitation number
W912BU-15-B-0002
Issued by

About this file

Amendment 01

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: ADRIANA A. DUNAWAY

100 PENN SQUARE EAST

CENAP-CT

PHILADELPHIA PA 19107-3390

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

MDC 2887 – CEMVN DECK BARGES

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Mar-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-15-B-0002

X 9B. DATED (SEE ITEM 11)

06-Feb-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Mar-2015

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912BU

FACILITY CODECODE

EMAIL:TEL:

W912BU-15-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 01

The purpose of this amendment is to:

1. Extend the due date to submit bids from 24 March 2015 to 31 March 2015; time remains the same.

2. Replace Bid Schedule in its entirety

3. Revise Scope of Work, C406, Section I. COATING COLOR SCHEDULE

4. Include drawing 806-C406-01

5. Answer questions from bidders. Questions that may be of general interest of all Bidders/Government will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify the question(s). Questions and answers are issued to the Bidders for information purposes only.

All other terms and conditions remains the same.

Bidder must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended).

FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN

REJECTION OF YOUR PROPOSAL

Section C - Descriptions and Specifications

C406 COATING SYSTEM

I. COATING COLOR SCHEDULE

The coloring schedule shall be as follows:

AREA COLOR/FS595 NUMBER

Hull Exterior Black/17038 Hull & Draft Markings White/27880 Deck Exterior Medium Gray/26270 Deck Fittings Yellow/13655 Towknee Exterior Black/17038 Hull Interior White/27880

QUESTIONS / ANSWERS SECTION

Q1. Regarding this solicitation, is there a bill of materials?

A1. The Contractor is required to develop their own bill of materials from the solicitation plans and specifications.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 24-Mar-2015 02:00 PM to 31-Mar-2015 02:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

BID SCHEDULE

Planning, Scheduling, Engineering, Construction, Testing, and Delivery of two Deck Barges for the Corps of Engineers, New Orleans District, for use in the support of its maintenance and repair missions.

ITEM UNIT TOTAL

NUMBER ITEM

QTY. UNIT PRICE PRICE

0001 DECK BARGES (New Orleans District – Project 2887) 1 JOB XXXX XXXXXXX

0001AA PLANNING, SCHEDULING, AND ENGINEERING

(The submittals required for “Planning, Scheduling, and Engineering” are listed in contract clause H02). This item is initiated only by a Notice To Proceed issued by the Contracting Officer. The Contractor may not start this item until he receives a Notice To Proceed for this item.

1 JOB XXXX $________

0001AB CONSTRUCT, TEST AND DELIVER Two deck barges. (The submittals for “Construct, Test and Deliver” are listed in contract Clause H02). This item is initiated only by a Notice To Proceed issued by the Contracting Officer. The Contractor may not start this item until he receives a Notice To Proceed for this item.

1 JOB XXXX $________

TOTAL ITEM 0001 (0001AA-0001AB) 1 JOB XXXX $________

RESTRICTIONS ON FOREIGN SHIPYARDS:

In accordance with 10 U.S.C 7309 and 7310 and DFAR 225.7013, Restrictions on Construction or Repair of Vessels in a Foreign Shipyard, the work performed under this contract shall not be performed in a foreign shipyard.

INSERT LOCATION OF THE SHIPYARD WHERE THE WORK WILL BE PERFORMED:

The Government may reject an offer as non-responsive if it is materially and mathematically unbalanced as to price for any offered item or combination of offered items. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.

The following have been deleted:

BID SCHEDULE

(End of Summary of Changes)

File details come from the government source that posted it. Updated .