- ADAL Flight Simulator Facility, Ellsworth AFB, SD Federal contract opportunity
- Solicitation number
- W9128F21R0080
About this file
This solicitation requests proposals for the construction of an addition and alteration to an existing flight simulator facility at Ellsworth Air Force Base in South Dakota. The estimated construction cost is between $20-40 million. Proposals are due by 15 October 2021.
The solicitation is unrestricted and open to both large and small businesses. Offerors must register in the System for Award Management and ensure the applicable NAICS code is included in their profile prior to submission. Virtual site access will be provided through photos, drawings and a teleconference due to current access limitations. Questions should be directed to the identified Contract Specialist and Contracting Officer via the Bidder Inquiry system.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Am-0013_W9128F21R0080.pdf | ||
| Am-0012_W9128F21R0080.pdf | ||
| Am-0011_W9128F21R0080.pdf | ||
| Am_0009.pdf | ||
| EAFB B-21 SIM Amendment AM-0009 Dwgs Vol2.pdf | ||
| EAFB B-21 SIM Amendment AM-0009 Dwgs Vol1.pdf | ||
| AM-0008 Dwgs Vol1.pdf | ||
| AM-0008 Dwgs Vol2.pdf | ||
| Am_0008.pdf | ||
| Am-0007_W9128F21R0080.pdf | ||
| Am-0006_W9128F21R0080.pdf | ||
| Am-0005_W9128F21R0080.pdf | ||
| Am-0004_W9128F21R0080.pdf | ||
| 100-Design_Vol1_W9128F21R0080_B21-ADAL-Flight-Sim(EL95).pdf | ||
| 100-Design_Vol2_W9128F21R0080_B21-ADAL-Flight-Sim(EL95).pdf | ||
| Am-0003_W9128F21R0080.pdf | ||
| 100-Design_SPECS_W9128F21R0080_B21-ADAL-Flight-Sim(EL95).pdf | ||
| Am-0002_W9128F21R0080.pdf | ||
| Am-0001_W9128F21R0080.pdf | ||
| 100-BackCheck_DWGS_Vol2_W9128F21R0080_B21-ADAL-Flight-Sim(EL95).pdf | ||
| 100-BackCheck_DWGS_Vol1_W9128F21R0080_B21-ADAL-Flight-Sim(EL95).pdf | ||
| Vol-1-Technical_SPECS_W9128F21R0080_B21-ADAL-Flight-Sim(EL95).pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment 0010 W9128F
B-21: ADAL FLIGHT SIMULATOR FACILITY, PN FXBM1093407, FY22, ELLSWORTH AFB, SOUTH DAKOTA
See attached documentation for content of the amendment revisions to solicitation
Date for receipt of Volume II proposals is 26 MAY 2022 at 1600 hours CST
Government Point of Contact: Michele Renkema, Contract Specialist, Michele.A.Renkema@usace.army.mil
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
See Item 6
W9128F21R0080
05/17/2022
09/14/2021
12/30/2021
Am #0010 - 2 (Continuation SF 30)
16 MAY 2022
Solicitation No. W9128F 21 R 0080
Date of Issue: 14 SEP 2021 NEW Date of Receiving Volume II Proposal: 26 MAY 2022
SUBJECT: Amendment No. 0010 to Request for Proposal Solicitation Package for Construction of B-21: ADAL FLIGHT SIMULATOR FACILITY, PN FXBM1093407.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “[*Am- 10]”(underlining of added text and/or strikeout of deleted text).
Pages or Sections Deleted Pages or Sections Substituted or Added
00 10 00-SF1442 00 10 00-SF1442*
01 30 00.24 01 30 00.24*
SD20220027 SD20220027*
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.
4. Electronic Offers will be received until 4:00 p.m. CST, 26 MAY 2022, as stated in the Request For Proposal.
Attachments:
Spec Pages listed in 1.a., above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
16 MAY 2022
jmh/2181
Am #0010 00 10 00(SF1442) - Page 1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9128F-21-R-0080
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
14 SEP 2021
PAGES OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S. ARMY CORPS OF ENGINEERS, OMAHA
Attn: CONTRACTING DIVISION (CENWO-CT-M) 1616 Capitol Avenue Omaha, NE 68102-4901
See Block 7
9. FOR INFORMATION
CALL:
A. NAME
Michele Renkema
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) Use Email: Michele.A.Renkema@usace.army.mil
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
The offeror hereby agrees to do all work described in the documents entitled:
B-21: ADAL FLIGHT SIMULATOR FACILITY, PN FXBM1093407, FY22
ELLSWORTH AFB, SOUTH DAKOTA
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.
*BLOCK 13A. – REFER TO SECTION 00 22 00 FOR THE NUMBER OF COPIES TO BE SUBMITTED WITH THE ORIGINAL OFFER.
THIS SOLICITATION IS UNRESTRICTED.
This procurement will be through a bifurcated request for proposal (RFP) best-value tradeoff
11. The Contractor shall begin performance within 10 calendar days and complete it within 730 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 1600 (hour) local time 26 MAY 202224 MAY 2022. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442(REV. 4-85)
Prescribed by GSA FAR(48 CFR) 53.236-1(d)
Am #0010 00 10 00(SF1442) - Page 2
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
DUNS Number:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 90 calendar days after the date extension confirmation is due.
AMOUNTS
SEE ATTACHED CLIN PRICING SCHEDULE
Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
U.S. Army Engineer District, Omaha 1616 Capitol Ave.
Omaha, Nebraska 68102-4901
USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
STANDARD FORM 1442 BACK (REV. 4-85)
Am #0010 00 10 00(SF1442) - Page 3
B-21-ADAL Flight Simulator Facility , Ellsworth AFB, SD EL95
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 30 00.24
OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
07/20
PART 1 GENERAL
1.1 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1.2 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING
CONSTRUCTION WAGE RATE REQUIREMENTS STATUTE CERTIFIED LABOR
PAYROLLS
1.3 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS
CONTRACTS
1.4 COMPLETION OF WORK
1.5 CONTRACTOR PERFORMANCE EVALUATIONS
1.6 EXCEPTION TO COMPLETION TIME AND LIQUIDATED DAMAGES
1.7 ORDER OF WORK
1.8 MISSION DELAY DAYS
1.9 CONTRACT DRAWINGS AND SPECIFICATIONS
1.9.1 SETS FURNISHED
1.9.2 REPRODUCTION AND DISTRIBUTION
1.9.3 NOTIFICATION OF DISCREPANCIES
1.9.4 OMISSIONS
1.10 SUBMITTALS
1.11 CONCURRENT CONSTRUCTION
1.12 PAYMENT
1.12.1 PROMPT PAYMENT ACT
1.12.2 PAYMENT FOR MATERIALS DELIVERED OFFSITE
1.13 AVAILABILITY OF UTILITY SERVICES
1.14 UTILITY SERVICE INTERRUPTIONS
1.15 DIGGING PERMITS AND ROAD CLOSINGS
1.16 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.17 INSURANCE REQUIRED
1.18 SECURITY REQUIREMENTS
1.18.1 Contractor's Employee Identification
1.18.2 Entry Requirements
1.19 CONTRACTOR QUALITY CONTROL (CQC)
1.20 NONDOMESTIC CONSTRUCTION MATERIALS
1.21 DAILY WORK SCHEDULES AND WEEKLY COORDINATION MEETINGS
1.22 AS-BUILT DRAWINGS
1.23 SIGN
1.24 GOVERNMENT-FURNISHED PROPERTY
1.25 EQUIPMENT ROOM DRAWINGS
1.26 CONTRACTOR FURNISHED EQUIPMENT DATA
1.27 CONTRACTOR TRAILER AREA(S) LAY-DOWN PLAN
1.28 ASBESTOS
1.29 PARTNERING
1.30 PROFIT
1.31 LABOR CONDITIONS APPLICABLE TO TEMPORARY FACILITIES
1.32 DRAWING SCALES
1.33 WAGE RATE APPLICATION
SECTION 01 30 00.24 Page 1
1.33.1 Building Schedule
1.33.2 Heavy and Highway Schedule
1.34 SIGNAL LIGHTS
1.35 FEDERAL HOLIDAYS
1.36 BASE HOURS
1.37 UPKEEP OF ROADWAYS WITHIN A MILITARY INSTALLATION
1.38 COST AND TIME IMPACT (CTI) LOG
PART 2 NOT USED
PART 3 EXECUTION
3.1 APPENDIX A- CONTRACT DOCUMENT DISTRIBUTION LIST
ATTACHMENTS:
Appendix A - Contract Document Distribution List
AF103OI - 28 CES AF Form 103 Base Civil Engineer Work Clearance Operating Instruction
AF103 - Base Civil Engineer Work Clearance Request
Project Sign Details
[*Am-9] General Wage Decision Nos. SD20220001[**Am-9] - Heavy and Highway, and [*Am-10] SD20220027 [**Am-10]- Building
-- End of Section Table of Contents --
SECTION 01 30 00.24 Page 2
SECTION 01 30 00.24
OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
07/20
PART 1 GENERAL
Attachments:
Appendix A - Contract Document Distribution List AF103OI - 28 CES AF Form 103 Base Civil Engineer Work Clearance Operating Instruction AF103 - Base Civil Engineer Work Clearance Request Project Sign Details [*Am-9] General Wage Decision Nos. SD20220001 SD20210001 [**Am-9] - Heavy and Highway, and [*Am-10] SD20220027 SD20210027 [**Am-10] - Building
1.1 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
In accordance with FAR 31.105(d)(2)(i)(b), for the predetermined schedule of construction equipment use rates, use Engineer Pamphlet (EP) 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule. Copies of each regional schedule may be obtained through the following internet site:
https://www.publications.usace.army.mil/USACE-Publications/Engineer-Pamphlets/ on pages 10 and 11 of 13.
1.2 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING
CONSTRUCTION WAGE RATE REQUIREMENTS STATUTE CERTIFIED LABOR PAYROLLS
a. The Contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Wage Rate Requirements statute.
b. The Contractor is responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the Contractor to comply with the Wage Rate Requirements statute. When the Contractor uses an electronic payroll system, use the electronic payroll service used by the Contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract. The electronic payroll service must be capable of preserving these payrolls and related basic records for the required three years after contract completion. The Contractor must obtain and provide electronic system access to the Government, as required to comply with the Wage Rate Requirements over the duration of the construction contract.
(c) The Contractor's provision and use of an electronic payroll processing system must meet the following basic functional criteria:
(1) commercially available;
SECTION 01 30 00.24 Page 3
(2) compliant with appropriate Wage Rate Requirements statute payroll provisions in the FAR;
(3) able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract;
(4) capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records for export into an Excel spreadsheet to be imported into the contractor's mode of Resident Management System 3.0;
(5) demonstrated security of data and data entry rights;
(6) ability to produce Contractor-certified electronic versions of weekly payroll data;
(7) ability to identify erroneous entries and track the data/time of all versions of the certified Wage Rate Requirements statute payrolls submitted to the government over the life of the contract;
(8) capable of generating a durable record copy in a Compact Disc (CD) or Digital Versatile Disc (DVD) and Portable Document Format (PDF) file record of data from the system database at the end of the contract closeout. This durable record copy of data from the electronic payroll processing system must be provided to the Government during contract closeout.
d. All Contractor-incurred costs related to the Contractor's provision and use of an electronic payroll processing service must be included in the Contractor's price for the overall work under the contract. The costs for compliance with the Wage Rate Requirements statute by using electronic payroll processing services must not be a separately bid or reimbursed item under this contract.
1.3 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS
222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
- U.S. Department of Labor Veterans’ Employment and Training Service
(VETS):
https://www.dol.gov/vets/
- Federal Veteran Employment Information: https://www.fedshirevets.gov/
- Veterans Opportunity to Work (VOW) Program:
https://www.benefits.va.gov/vow/
- U.S. Army Warrior Transition Command Employment Index:
https://wct.army.mil/modules/employers/index.html
- Hiring Our Heroes: https://www.uschamberfoundation.org/hiring-our-heroes
1.4 COMPLETION OF WORK
See FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR
SECTION 01 30 00.24 Page 4
1984).
1.5 CONTRACTOR PERFORMANCE EVALUATIONS
Federal Acquisition Regulation (FAR) Subpart 36.201(Evaluation of Contractor Performance) requires evaluation of the construction contractor's performance throughout the contract period of performance.
For construction contracts valued at or above $700,000.00, including all modifications, the USACE will evaluate Contractor's performance using the web-based Contractors Performance Assessment Reporting System (CPARS).
After the USACE drafts an evaluation (interim or final), the Contractor will have the opportunity to access, review, comment and either concur or non-concur with the evaluation in the CPARS system for a period of 60 days. Access to the CPARS system requires either specific software called PKI certification (recommended method) or a username and password. The PKI certification is a Department of Defense recommendation and to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and may be purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and contacting vendors can be found on the web site: https://www.cpars.gov .
1.6 EXCEPTION TO COMPLETION TIME AND LIQUIDATED DAMAGES
In case the Contracting Officer determines that seeding and/or the specified maintenance thereof is not feasible during the construction period, such work will be exempt from the completion time and liquidated damages. Accomplish this work during the first seeding period and the specified maintenance period following the completion date.
1.7 ORDER OF WORK
See Section 01 14 00 WORK RESTRICTIONS.
1.8 MISSION DELAY DAYS
See Section 01 14 00 WORK RESTRICTIONS for mission delay days. When possible, the Contractor will be notified one week in advance of these interruptions. This time is included in the overall completion time stated.
1.9 CONTRACT DRAWINGS AND SPECIFICATIONS
1.9.1 SETS FURNISHED
Make copies of conformed specifications with amendments incorporated.
Utilize the bid drawings and specifications as amended in the performance of the work until the conformed specifications and contract drawings (i.e., bid drawings that have been posted with all amendment changes) are mailed or sent electronically to the Contractor. See Appendix A for Document Distribution list. See paragraph below for contract drawing reproduction and distribution requirements. The work must conform to the contract drawings, set out in the drawing index, all of which form a part of these specifications. The work must also conform to any of the standard details bound or referenced herein.
1.9.2 REPRODUCTION AND DISTRIBUTION
Reproduce multiple legible hard copy sets (half-size English unless
SECTION 01 30 00.24 Page 5 directed otherwise) of contract drawings from Government provided read-only Adobe Acrobat.pdf file drawings. Within 14 calendar days after receipt of conformed specifications and drawings containing read-only Adobe Acrobat.pdf drawing files, provide legible hard copy drawing and conformed specification sets to the addressees contained in the Contract Document Distribution List for Project in Appendix A to this specification. The Government will process no progress payments prior to receipt of the legible contract drawings and conformed specification sets. After receipt and distribution of the legible hard copy drawing and conformed specification sets, the Government will provide the Contractor with editable CAD file drawings (format defined in Section 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS). Prepare final record or as-built drawings as defined in Section 01 78 39.00 24 AS-BUILT
DRAWINGS.
1.9.3 NOTIFICATION OF DISCREPANCIES
Check all drawing files furnished by the government immediately upon their receipt and promptly notify the Contracting Officer of any discrepancies.
Follow dimensions marked on drawings in lieu of scale measurements.
Enlarged plans and details govern where the same work is shown at smaller scales. All scales shown are based on a standard drawing size of 22" x 34". If any other size drawings are furnished or plotted adjust the scales accordingly. The Contractor must also advise his sub-contractors of the above. The Contractor must compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby.
1.9.4 OMISSIONS
Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, does not relieve the Contractor from performing such omitted or misdescribed details of the work but work must be performed as if fully and correctly set forth and described in the drawings and specifications.
1.10 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit items below in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Contractor Trailer Area(s) Lay-Down Plan ; G, RO
SD-02 Shop Drawings
Equipment Room Drawings ; G-RO.
1.11 CONCURRENT CONSTRUCTION
Construction work closely related to and/or located at the site of the work under a concurrent contract will be in progress simultaneously with work under this contract (as described in the design drawings). Cooperate with others as necessary in the interest of timely completion of all
SECTION 01 30 00.24 Page 6 work. In the event of interference, notify the Contracting Officer immediately for resolution.
All contractors involved in performing B-21 facilities beddown work will be required to participate in weekly coordination meetings throughout their project's respective periods of performance.
1.12 PAYMENT
1.12.1 PROMPT PAYMENT ACT
Pay requests authorized in GENERAL CONDITIONS (CONTRACT CLAUSES) clause:
"Payments Under Fixed-Price Construction Contracts", will be paid pursuant to the clause, "Prompt Payment for Construction Contracts". Submit pay requests on ENG Form 93 and 93a, "Payment Estimate-Contract Performance" and "Continuation". All information and substantiation required by the identified contract clauses must be submitted with the ENG Form 93, and the required certification included on the last page of the ENG Form 93a, signed by an authorized contractor official and dated when signed. The designated billing office is the Office of the Area Engineer.
1.12.2 PAYMENT FOR MATERIALS DELIVERED OFFSITE
a. Pursuant to Federal Acquisition Regulation (FAR) 52.232-5, Payments Under Fixed Price Construction Contracts, materials delivered to the contractor at locations other than the site of the work may be taken into consideration in making payments, if included in payment estimates and if all the conditions of the General Provisions are fulfilled. Payment for items delivered to locations other than the work site are limited to:
(1) Materials required by the technical provisions; or
(2) Materials that have been fabricated to the point where they are identifiable to an item of work required under this contract; or
(3) Items specifically listed below in paragraph b.
b. Payment for materials delivered off-site must be made only after receipt of paid invoices listing the value of material and labor incorporated in the items along with a canceled check showing the prime contractor's title to the items delivered off site. Payment for materials delivered off-site must be limited to the following items:
[*Am-10]
- None identified. Structural Steel as defined by section 05 12 00 of this
RFP.
-Metal Wall panels as defined by section 07 42 13.23 of this RFP.
-Metal roofing as defined by section 07 61 14.00 20 of this RFP.
[**Am-10]
1.13 AVAILABILITY OF UTILITY SERVICES
All reasonably required amounts of domestic water and electricity will be made available to the Contractor by the Government from existing system outlets and supplies. The Contractor is reponsible to, at their own expense, make all temporary connections and install distribution lines.
Furnish to the Contracting Officer a complete system layout drawing showing type of materials to be used and method of installation for all temporary electrical systems. Make arrangements with the Using Service, through the Contracting Officer, as to the method of determining the
SECTION 01 30 00.24 Page 7 amount of water and electricity to be used by and the method of payment therefore. All temporary lines must be maintainedin a workmanlike manner satisfactory to the Contracting Officer and removed by the Contractor in like manner prior to final acceptance of the construction. Normal quantities of electricity and water used to make final tests of completely installed systems will be furnished by the Government.
1.14 UTILITY SERVICE INTERRUPTIONS
Submit written notification not less than 15 calendar days in advance of each interruption of each utility and communication service to or within existing buildings and facilities being used by others. No single outage will exceed 4 hours unless approved in writing. The time and duration of all outages will be coordinated and approved with the Using Agency by the Contracting Officer. See Section 01 14 00 WORK RESTRICTIONS for additional requirements.
1.15 DIGGING PERMITS AND ROAD CLOSINGS
The Contractor must allow 14 calendar days from date of written application to receive permission to dig and to close roads. Only close roads one lane at a time and allow vehicular traffic to pass through the construction area. Flag work on or near roadways in accordance with the safety requirements in Safety and Health Requirements Manual EM 385-1-1, which forms a part of these specifications. Do not cause blockage of work located along the alert force route and maintain unobstructed access for alert force traffic at all times. See Section 01 14 00 WORK RESTRICTIONS for additional requirements
1.16 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the GENERAL CONDITIONS (CONTRACT CLAUSES) clause entitled "Default:
(Fixed-Price Construction)." In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the contractor.
b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
Jan 9 Feb 9
SECTION 01 30 00.24 Page 8
Mar 8 Apr 5 May 6 Jun 5 Jul 4 Aug 3 Sep 3 Oct 3 Nov 4
Dec 10
c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the contractor will record on the RMS daily CQC report, any occurrence of adverse weather and resultant impact to normally scheduled work, within 24 hours of the event. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the contractor's scheduled work day. Describe in the RMS daily CQC reports the critical path item that is being affected and provide the critical path activity number(s) from the current schedule. The COR must acknowledge and accept the agreed upon occurrence of each adverse weather delay in RMS for the delays to be considered as adverse weather delays.
At the end of each month, identify the number of actual adverse weather delay days that includes days impacted by actual adverse weather (even if adverse weather occurred in previous month), calculated chronologically from the first to the last day of each month, and recorded as full days.
If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b. above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the GENERAL CONDITIONS (CONTRACT CLAUSES) clause entitled "Default (Fixed Price Construction)". (ER 415-1-15)
1.17 INSURANCE REQUIRED
In accordance with GENERAL CONDITIONS (CONTRACT CLAUSES) clause:
"Insurance Work on a Government Installation," procure the following minimum insurance:
Type Amount
Workmen's Compensation and Employer's Liability Insurance $100,000
General Liability Insurance $500,000 per occurrence
Automobile Liability Insurance Bodily injury $200,000 per person and $500,000 per occurrence Property damage $ 20,000 per occurrence
(Coverages per FAR 28.307-2)
1.18 SECURITY REQUIREMENTS
1.18.1 Contractor's Employee Identification
The Contractor is responsible for furnishing to each employee and for requiring each employee engaged on the work to display such identification
SECTION 01 30 00.24 Page 9 as may be approved and directed by the Contracting Officer. Deliver all prescribed identification immediately be delivered to the Contracting Officer, for cancellation upon release of any employees. When the contract involves work in restricted security areas, only employees who are U.S. citizens will be permitted to enter. Proof of U.S. citizenship is required prior to entry. When required by the Contracting Officer, obtain and submit fingerprints of all persons employed or to be employed on the project. (Based on FAR 52.204-2)
1.18.2 Entry Requirements
See Section 01 14 00 WORK RESTRICTIONS.
1.19 CONTRACTOR QUALITY CONTROL (CQC)
See Section 01 45 00.00 10 QUALITY CONTROL.
1.20 NONDOMESTIC CONSTRUCTION MATERIALS
The list of excepted nondomestic construction materials or their components referenced in the Buy American Construction Material Contract Clauses includes the list set forth in paragraph 25.104 of the Federal Acquisition Regulation.
1.21 DAILY WORK SCHEDULES AND WEEKLY COORDINATION MEETINGS
In order to closely coordinate work under this contract, prepare a written agenda/meeting minutes and attend a weekly coordination meeting with the Contracting Officer and Using Service at which time the Contractor must submit for coordination and approval, their proposed daily work schedule for the next two week period. Provide a copy of modifications (MODs), Serial Letters, Requests for Information (RFIs)and any other information that is needed in the minutes of the meeting.
Include required temporary utility services, time and duration of interruptions, and protection of adjoining areas with the Contractor's proposed 2-week work schedule. At this meeting, the Contractor must also submit their schedule of proposed dates and times of all preparatory inspections to be performed during the next 2 weeks. The items of work listed on the proposed 2-week schedule are to be keyed to the NAS by activity number and description for each activity anticipated to be performed during the next 2-week period. Coordination action by the Contracting Officer relative to these schedules will be accomplished during these weekly meetings. Daily reports must be completed and given to the Contracting Officer or Representative within 24 hours of work. All official correspondence such as serial letters and RFIs, with attachments are to be provided in one hardcopy original with original signatures and one electronic (Adobe pdf format) copy by email. The Government will consider the correspondence to be received when the official hardcopy or electronic copy is received by the designated office. See Section 01 14 00 WORK RESTRICTIONS for additional requirements.
1.22 AS-BUILT DRAWINGS
See SECTION 01 78 39.00 24 - AS-BUILT DRAWINGS.
1.23 SIGN
On commencement of work on this project, furnish and erect the temporary sign in the location selected by the Contracting Officer near the project
SECTION 01 30 00.24 Page 10 site. Maintain the sign in good condition through the project construction period. Upon completion of the project remove the sign from the premises. The project sign must conform to standard drawing attached to this section. A decal of the "Engineer Castle" and the U. S. Air Force emblem will be furnished the Contractor upon request.
1.24 GOVERNMENT-FURNISHED PROPERTY
Pursuant to CONTRACT CLAUSES clause: "Government Property " the Government will furnish to the Contractor the following property to be incorporated or installed in the work. Such property will be furnished f.o.b or at the project site and the Contractor must accept delivery when made, and unload and transport the property to the jobsite at their own expense. All such property must be installed or incorporated into the work at the expense of the Contractor. Verify the quantity and condition of such Government-furnished property when delivered to him and report the receipt of Government-Furnished Property in accordance with DFARS 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY. For damage or loss or property follow DFARS 252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY.
Quantity Item Description Dollar Value See FF&E Package
1.25 EQUIPMENT ROOM DRAWINGS
Prior to construction, prepare and submit room plans for all mechanical, electrical, and communication rooms or similar areas. The plans must be consolidated for all trades, be to scale, and show all pertinent structural features. In addition, other items such as doors, windows, and cabinets required for installation and which will affect the available space, must be shown. All mechanical and electrical equipment and accessories must be shown to scale in plan and elevation and/or section in their installed positions. All duct work and piping must be shown.
1.26 CONTRACTOR FURNISHED EQUIPMENT DATA
See Section 01 78 36.00 24 WARRANTY OF CONSTRUCTION for Contractor Furnished Equipment Data to be submitted as part of the Warranty Equipment Booklet.
1.27 CONTRACTOR TRAILER AREA(S) LAY-DOWN PLAN
The Contractor shall submit a Contractor Trailer Area(s) Lay-Down Plan for COR approval within 30 calendar days of receiving Notice to Proceed. The plan shall include the proposed location and dimensions of any area to be fenced and used by the Contractor, the number of trailers to be used, arrangement of field offices, parking areas, avenues of ingress/egress to the fenced area, dumpster locations and material storage locations.
Identify any areas which may have to be graveled to prevent the tracking of mud.
[*Am-9]
1.28 ACCOMMODATIONS FOR GOVERNMENT INSPECTORS
If the Government excercises the corresponding bid option, provide a new stand-alone weather-tight government-only field office on the site indicated in the design drawings.
a. The location and configuration of the government field office shall be included in the Contractor Trailer Area(s) Lay-Down plan.
SECTION 01 30 00.24 Page 11
b. Parking areas shall be gravel to prevent mud and be reserved for government employees only. Contractor shall provide government only parking for a minimum of 15 vehicles.
c. Provide office suitable in size (minimum 1400SF) to accommodate ten cubicles (minimum 6 ft x 6 ft), small conference table (seating six persons), restroom and kitchen/break area.
d. Drinking water facilities, adequate lighting, high speed internet (minimum ISP mid-tier 200 Mbps with spare line provision), air-conditioning, heating equipment, and an enclosed restroom shall be furnished and maintained by the Contractor. Contractor is responsible for payment of all utilities (including internet) for government office. ISP on base is Midcontinent Communications (Midco). Web address:
www.midco.com. Phone: 1(800)888-1300.
e. Provide all furniture to include cubicles, chairs, small conference table, drafting table & plan rack, trash cans, etc. Cubicles shall be a minimum of 6 ft x 6 ft and contain adequate storage for drawings, plans, documents, etc. Used furniture in good condition is acceptable.
f. Provide kitchen/break area to include sink, refrigerator (minimum 16 cu-ft), coffee pot and microwave.
g. Provide color printer capable of printing 11 in x 17 in. Printer must be from USACE approved devices list. Contractor shall replace ink as necessary throughout the project.
h. Provide a conference room capable of seating a minimum of 20 persons with a minimum of 12 seated at the table. Conference room will be for government use only. Provide conference table, chairs, projector, whiteboard and conference speakerphone capable of connecting to a cell phone.
i. Conference room may be a separate building or attached to government field office. If the room is a separate building, locate it directly adjacent to government field office.
j. Entrance doors shall be equipped with a substantial lock.
k. Provide once a week janitorial service. Janitorial service shall include trash removal, light dusting, floor sweeping and mopping, restroom cleaning and carpet vacuuming. Provide supplies to include hand soap, toilet paper, paper towels, cleaning supplies and trash can liners throughout.
l. Provide pest control as necessary.
m. Provide snow removal for parking areas and walkways between buildings.
n. Provide boot brush at each entrance.
o. Provide weed control and mowing around the trailer complex.
p. Perform repairs as needed for routine maintenance, weather damage (high winds, hail, water damage, etc.) during construction.
SECTION 01 30 00.24 Page 12
q. Provide sign mounted on exterior of building indicating it is the USACE office. Sign shall be a minimum of 18 in x 24 in. Coordinate sign content and location with the COR.
r. At completion of the project, the office & conference room, including furniture will remain the property of the Contractor and be removed from the site. Restore area to previous condition.
s. The Contractor may, at their option, furnish and maintain a trailer-type mobile office acceptable to the Contracting Officer and providing as a minimum the facilities specified above. Trailers shall be in new condition and present a clean and neat exterior appearance.
t. All contractor and contractor-provided Government trailers shall be provided with signage that indicates company name and Primary POC phone number readily visible on the exterior of the trailer facility.
[**Am-9]
1.28 ASBESTOS
a. The Contractor is warned that inhalation of asbestos has been associated with health hazards.
b. Asbestos-containing materials have been identified in area(s) where contract work is to be performed. All contract work activities where the potential exists for worker exposure to airborne asbestos fibers shall be performed in accordance with the requirements set forth in Section 02 82 00
ASBESTOS REMEDIATION.
1.29 PARTNERING
[*Am-9]
a. The Government intends to encourage the formation of a cohesive partnership with the Contractor. This partnership will be structured to draw on the strengths of each organization to identify and achieve reciprocal goals. The objective is effective contract performance in achieving completion within budget, on schedule and in accordance with plans and specifications. This partnership between the Contractor and the Government will be voluntary and its implementation will not be part of the contract requirements nor will it result in a change to contract price or terms.
b. It is anticipated that immediately after the preconstruction conference, the appropriate Contractor's key personnel and Government key personnel will attend a 2-day team building workshop. Follow-up workshops of 1 or 2 days duration may be held periodically throughout the duration of the contract as agreed to by the Contractor and the Government. Costs of the facilitator and facilities for the workshops will be shared equally by the participants. a. Contractor shall host a formal partnering session within 45 calendar days of contract award or as coordinated and approved by the Government. To most effectively accomplish this Contract, the Contractor and Government must form a cohesive partnership with the common goal of drawing on the strength of each organization in an effort to achieve a successful project without safety mishaps, conforming to the Contract, within budget and on schedule. The partnering team must consist of personnel from both the Government and Contractor including project level and corporate level leadership positions. Key Personnel from the supported command, end user (an associated representatives), USACE, AFCEC, Contractor, key subcontractors and the Designer of Record are required to participate in the Partnering process. This partnership between the
SECTION 01 30 00.24 Page 13
Contractor and the Government will be voluntary and its implementation will not be part of the contract requirements nor will it result in a change to contract price or terms.
b. Host the Formal Partnering session with key personnel from the project team including both Contractor and Government personnel near Ellsworth Air Force Base (in the Rapid City area). All costs associated with the Partnering session including the third-party independent Facilitator Consultant, meeting room and other incidental items are the responsibility of the Contractor.
c. Before the Facilitated (Formal) Partnering session, coordinate with the Facilitator all requirements for incidental items (such as audio-visual equipment, easels, flipchart paper, colored markers, note pads, pens/pencils, colored flash cards) and have these items available at the Partnering session. Provide copies of any documents required for distribution to all attendees. Participants will bear their own costs for meals, lodging and transportation associated with Partnering.
d. The Initial Partnering Session must be a duration of at least one day and be held at a location off base as agreed to by the Contracting Officer. Partnering session may take place concurrently with the Pre-Construction Post-Award Kickoff Meeting.
e. Facilitator must be experienced in conducting corporate Partnering sessions and must be a third-party independent facilitating consultant -not an employee of the Contractor. The Facilitator is responsible for leading all aspects of the Partnering session necessary to achieve the Partnering goal.
f. An outcome of the Partnering session must be an escalation matrix agreed upon by both the Government and Contractor, which identifies key Government and Contractor decision makers by name and anticipated decision durations.
g. Host follow-on Partnering Sessions at approximately six-month intervals (minimum of 3 additional sessions) or more frequently if needed and lasting generally a half day or less. Attendees need only be those required to resolve current issues. The same Facilitator used in the Initial Partnering session must lead the follow-on sessions unless an alternative is permitted by the Contractor Officer. All costs associated with follow-on Partnering sessions are the responsibility of the Contractor. [**Am-9]
1.30 PROFIT
a. Use the weighted guidelines method of determining profit on any equitable adjustment change order or modification issued under this contract. The profit factors must be as follows:
Factor Rate Weight Value Degree of Risk 20 See Item Relative difficulty of work 15 b. below Size of Job 15 Period of performance 15 Contractor's investment 5 Assistance by Government 5 Subcontracting 25
SECTION 01 30 00.24 Page 14
b. Based on the circumstances of each procurement action, each of the above factors must be weighted from .03 to .12 as indicated below. Obtain the value by multiplying the rate by the weight. The value column when totaled indicates the fair and reasonable profit percentage under the circumstances of the particular procurement.
(1) Degree of Risk. Where the work involves no risk or the degree of risk is very small, the weighting should be .03; as the degree of risk increases, the weighting should be increased up to a maximum of .12.
Lump sum items will have, generally, a higher weighted value than the unit price items for which quantities are provided. Other things to consider:
the portion of the work to be done by subcontractors, nature of work, where work is to be performed, reasonableness of negotiated costs, amount of labor included in costs, and whether the negotiation is before or after performance of work.
(2) Relative Difficulty of Work. If the work is most difficult and complex, the weighting should be .12 and should be proportionately reduced to .03 on the simplest of jobs. This factor is tied in to some extent with the degree of risk. Some things to consider: the nature of the work, by whom it is to be done, where, and what is the time schedule.
(3) Size of Job. All work not in excess of $100,000 shall be weighted at .12. Work estimated between $100,000 and $5,000,000 shall be proportionately weighted from .12 to .05.
(4) Periods of Performance. Jobs in excess of 24 months are to be weighted at .12. Jobs of lesser duration are to be proportionately weighted to a minimum of .03 for jobs not to exceed 30 days. No weight where additional time not required.
(5) Contractor's Investment. To be weighted from .03 to .12 on the basis of below average, average, and above average. Things to consider: amount of subcontracting, mobilization payment item, Government furnished property, equipment and facilities, and expediting assistance.
(6) Assistance by Government. To be weighted from .12 to .03 on the basis of average to above average. Things to consider: use of Government-owned property, equipment and facilities, and expediting assistance.
(7) Subcontracting. To be weighted inversely proportional to the amount of subcontracting. Where 80 percent or more of the work is to be subcontracted, the weighting is to be .03 and such weighting proportionately increased to .12 where all the work is performed by the Contractor's own forces.
1.31 LABOR CONDITIONS APPLICABLE TO TEMPORARY FACILITIES
It is the position of the Department of Defense that the Davis-Bacon Act, 40 U.S.C. 276a is applicable to temporary facilities such as job headquarters, tool yards, batch plants, borrow pits, sandpits, rock quarries, and similar operations, provided they are dedicated exclusively, or nearly so, to performance of the contract or project, and provided they are adjacent or virtually adjacent to the site of the work and are established after receipt of the proposal or bid. Clause "Payrolls and Basic Records" of the GENERAL CONDITIONS (CONTRACT CLAUSES) is applicable
SECTION 01 30 00.24 Page 15 to such operations.
1.32 DRAWING SCALES
All scales shown are based on a standard drawing size of 22" x 34". If any other size drawings are furnished or plotted, the contractor adjust the scales accordingly. The Contractor must also advise their sub-contractors of the above.
1.33 WAGE RATE APPLICATION
1.33.1 Building Schedule
Applicable to all building construction and work up to 5 feet outside of the building.
1.33.2 Heavy and Highway Schedule
Applicable to all work not properly classified as building.
1.34 SIGNAL LIGHTS
The Contractor must display signal lights and conduct their operations in accordance with the General Regulations of the Department of the Army and of the Coast Guard governing lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations, lights to be displayed on dredge pipe lines, and day…