Oahe Virtual Site Visit revised.pdf

PDF 5 MB Posted

Attached to
Oahe Dam Motor Control Center (MCC) and Panels Replacement
Solicitation number
W9128F21Q0002
Issued by

About this file

This document provides details for a federal solicitation seeking replacement of motor control centers and panels at Oahe Dam. The U.S. Army Corps of Engineers, Omaha District is soliciting proposals to replace several aging motor control centers and associated panel boards with modern equipment designed to meet current arc flash safety standards and enable remote monitoring. Offerors are invited to participate in a virtual site visit on December 8th to learn more about the project scope and requirements. Proposals must be submitted through the Beta SAM portal by December 18th. The work includes replacement of motor control centers and lighting and power panels across multiple structures at the Oahe Dam facility and must be completed within 548 calendar days of award. The place of performance for installations is Oahe Dam in Pierre, South Dakota.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Motor Control Center & Panels Replacement

Oahe Power Plant, SD

10 AM CT

8 December 2020

Virtual Site Visit

SOLICITATION NUMBER W9128F21Q0002

OA MCC

INTRODUCTIONS

USACE, Omaha District Office David LaGrone, Project Manager Jessica Jackson Contract Officer Constance Ellard Contract Specialist Joe Chamberlain Electrical Engineer

Oahe Project Kris Cleveland Chief Technical Support Jace Anderson Electrical Engineer

Cody Nickolas Contracting Officer’s Rep

2OA MCC

AGENDA

• Introductions / Project Overview

• Contracting Briefing / Rules of

Engagement

• Statement of Work / Project Specs

• Project Site Specifics

• Q&A

3OA MCC

CONTRACTING

JESSICA JACKSON, CONTRACTING OFFICER

Rules of Engagement

• This is an informal virtual site visit to review the scope and general questions

• All questions and clarifications should be posted in

ProjNet for an official answer from the Government

• No discussions relating to other Corps acquisitions

• Hold all questions until the designated question and answer session

4OA MCC

PROJNET AND CONTACT INFORMATION

ProjNet

• Used for contractor submitted questions

• Web site: https://www.projnet.org

• Bidder Inquiry Key: 3R7PPN-FTGDAA Contract Specialist Contact Information Connie Ellard

• Email: Constance.R.Ellard@usace.army.mil

• Phone: 402-995-2726

5OA MCC

mailto:Constance.R.Ellard@usace.army.mil

CONTRACTING

Some Contracting Items

a. Supply / install differences and requirements

b. Price schedule

c. Construction specifications and bonds

OA MCC 6

PRICE SCHEDULE

BASIC

7OA MCC

PRICE SCHEDULE

OPTIONS

OA MCC 8

SELECTION CRITERIA

9OA MCC

PROJECT OVERVIEW

Basic Items:

Supply & Install MCCs:

1PG, 2PG, 3PG, 4PG, 5PG, 6PG, 7PG,

1PT, 2PT, 3PT, 4PT,

1PL, 2PL, 3PL,

11P, 12P, 13P, 14P, 16P, 18P

10OA MCC

PROJECT OVERVIEW

Options

Supply & Install Panelboards:

15P, 1PGV, 2PGV,3PGV, 4PGV, 5PGV, 6PGV, 7PGV,

2LA, 2LB, 2LC, 3LA, 3LB, 3LC, 3LD,

1P, 2P, 3P, 4P, 5P, 6P 1L, 2L, 3L, 4L, 5L,6L, 7L.

OA MCC 11

SCHEDULE

• Contract Work Schedule M-F 0700 to 1700 no Holidays

• Crane or clearance support M-Thu 0700 - 1530

• All equipment outages shall be requested not less than three (3) weeks in advance, in writing to the Contracting Officer and shall include outage duration.

• The Contractor will work the generator auxiliary boards in pairs in conjunction with the associated transformer oil pump boards for the paired units in order to minimize generator outages.

• Paired unit outages will not take place prior to October but will be allowed October to May.

• Refer to section 01 12 00 Construction General paragraph 1.6 Coordination and Outages for additional information.

OA MCC

MOTOR CONTROL

CABINETS

OA MCC 13

1PG UNIT 1 AUXILIARY BOARD

OA MCC 14

1PG UNIT 1 AUXILIARY BOARD PICS

OA MCC 15

2PG UNIT 2 AUXILIARY BOARD

OA MCC 16

2PG UNIT 2 AUXILIARY BOARD PICS

OA MCC 17

3PG UNIT 3 AUXILIARY BOARD

OA MCC 18

3PG UNIT AUXILIARY BOARD PICS

OA MCC 19

4PG UNIT 4 AUXILIARY BOARD

OA MCC 20

4PG UNIT 4 AUXILIARY BOARD PICS

OA MCC 21

5PG UNIT 5 AUXILIARY BOARD

OA MCC 22

5PG UNIT 5 AUXILIARY BOARD PICS

OA MCC 23

6PG UNIT 6 AUXILIARY BOARD

OA MCC 24

6PG UNIT 6 AUXILIARY BOARD PICS

OA MCC 25

7PG UNIT 7 AUXILIARY BOARD

OA MCC 26

7PG UNIT 7 AUXILIARY BOARD PICS

OA MCC 27

11P COMMON AUX BOARD

OA MCC 28

11P COMMON AUX BOARD PICS

OA MCC 29

18P COMPRESSOR BOARD

OA MCC 30

18P COMPRESSOR BOARD PICS

OA MCC 31

14P AIR CONDITIONING BOARD

OA MCC 32

14P AIR CONDITIONING BOARD

OA MCC 33

14P AIR CONDITIONING BOARD PICS

OA MCC 34

12P OIL PURIFYING BOARD

OA MCC 35

12P OIL PURIFYING BOARD PICS

OA MCC 36

13P PUMP BOARD

OA MCC 37

13P PUMP BOARD PICS

OA MCC 38

1PL LIGHTING DISTRIBUTION BOARD

OA MCC 39

1PL LIGHTING DISTRIBUTION BOARD PICS

OA MCC 40

2PL LIGHTING DISTRIBUTION BOARD

OA MCC 41

2PL LIGHTING DISTRIBUTION BOARD PICS

OA MCC 42

3PL LIGHTING DISTRIBUTION BOARD

OA MCC 43

3PL LIGHTING DISTRIBUTION BOARD PICS

OA MCC 44

1PT TRANSFORMER NO. 1 OIL PUMP BOARD

OA MCC 45

1PT TRANSFORMER NO. 1 OIL PUMP BOARD PICS

OA MCC 46

2PT TRANSFORMER NO. 2 OIL PUMP BOARD

OA MCC 47

2PT TRANSFORMER NO. 2 OIL PUMP BOARD PICS

OA MCC 48

3PT TRANSFORMER NO. 3 OIL PUMP BOARD

OA MCC 49

3PT TRANSFORMER NO. 3 OIL PUMP BOARD PICS

OA MCC 50

4PT TRANSFORMER NO. 4 OIL PUMP BOARD

OA MCC 51

4PT TRANSFORMER NO. 4 OIL PUMP BOARD PICS

OA MCC 52

16P SURGE TANK BOARD

OA MCC 53

16P SURGE TANK BOARD PICS

OA MCC 54

280/120 AND 480 PANELS

OA MCC 55

15P 480VAC MAINTENANCE SHOP PANEL

OA MCC 56

15P 480VAC MAINTENANCE SHOP PANEL PICS

OA MCC 57

1PGV 440 VAC VALVE POWER CABINET

Note: 1PGV – 7PGV are similar

OA MCC 58

1PGV 440 VAC VALVE POWER CABINET PICS

OA MCC 59

2PGV 440 VAC VALVE POWER CABINET

OA MCC 60

2PGV 440 VAC VALVE POWER CABINET PICS

OA MCC 61

3PGV 440 VAC VALVE POWER CABINET

OA MCC 62

3PGV 440 VAC VALVE POWER CABINET PICS

OA MCC 63

4PGV 440 VAC VALVE POWER CABINET

OA MCC 64

4PGV 440 VAC VALVE POWER CABINET PICS

OA MCC 65

5PGV 440 VAC VALVE POWER CABINET

OA MCC 66

5PGV 440 VAC VALVE POWER CABINET PICS

OA MCC 67

6PGV 440 VAC VALVE POWER CABINET

OA MCC 68

6PGV 440 VAC VALVE POWER CABINET PICS

OA MCC 69

7PGV 440 VAC VALVE POWER CABINET

OA MCC 70

7PGV 440 VAC VALVE POWER CABINET PICS

OA MCC 71

2LA LIGHTING PANEL

Note: 2LA has 38 Circuits, 2LB – 3LD have 34 Circuits

OA MCC 72

2LA LIGHTING PANEL PICS

OA MCC 73

2LB LIGHTING PANEL

OA MCC 74

2LB LIGHTING PANEL PICS

OA MCC 75

2LC LIGHTING PANEL

OA MCC 76

2LC LIGHTING PANEL PICS

OA MCC 77

3LA LIGHTING PANEL

OA MCC 78

3LA LIGHTING PANEL PICS

OA MCC 79

3LB LIGHTING PANEL

OA MCC 80

3LB LIGHTING PANEL PICS

OA MCC 81

3LC LIGHTING PANEL

OA MCC 82

3LC LIGHTING PANEL PICS

OA MCC 83

3LD LIGHTING PANEL

OA MCC 84

3LD LIGHTING PANEL PICS

OA MCC 85

INTAKE STRUCTURE LIGHTING

AND POWER PANELS

OA MCC 86

INTAKE STRUCTURE

OA MCC 87

Powerhouse

Intake Structure

1P POWER PANEL

OA MCC 88

1P POWER PANEL PICS

OA MCC 89

1L LIGHTING PANEL 1

OA MCC 90

1L LIGHTING PANEL 1 PICS

OA MCC 91

2P POWER PANEL

OA MCC 92

2P POWER PANEL PICS

OA MCC 93

2L LIGHTING PANEL 2

OA MCC 94

2L LIGHTING PANEL 2 PICS

OA MCC 95

3P POWER PANEL

OA MCC 96

3P POWER PANEL PICS

OA MCC 97

3L LIGHTING PANEL 3

OA MCC 98

3L LIGHTING PANEL 3 PICS

OA MCC 99

4P POWER PANEL

OA MCC 100

4P POWER PANEL PICS

OA MCC 101

4L LIGHTING PANEL 4

OA MCC 102

4L LIGHTING PANEL 4 PICS

OA MCC 103

5P POWER PANEL

OA MCC 104

5P POWER PANEL PICS

OA MCC 105

5L LIGHTING PANEL 5

OA MCC 106

5L LIGHTING PANEL 5 PICS

OA MCC 107

6P POWER PANEL

OA MCC 108

6P POWER PANEL PICS

OA MCC 109

6L LIGHTING PANEL 6

OA MCC 110

6L LIGHTING PANEL 6 PICS

OA MCC 111

7L LIGHTING PANEL 7

OA MCC 112

7L LIGHTING PANEL 7 PICS

OA MCC 113

CLOSING

OA MCC 114

All questions and clarifications should be asked through ProjNet for an official answer from the Government.

ProjNet Web site: https://www.projnet.org Bidder Inquiry Key: 3R7PPN-FTGDAA

Contract Specialist Connie Ellard Email: Constance.R.Ellard@usace.army.mil Phone: 402-995-2726

�
Introductions
Agenda
Contracting�Jessica Jackson, contracting officer
Projnet and contact information�
Contracting
Price Schedule�Basic��
Price Schedule�Options
Selection Criteria
Project overview
Project overview
Schedule
Motor Control Cabinets
1PG Unit 1 Auxiliary Board
1PG Unit 1 Auxiliary Board Pics
2PG Unit 2 Auxiliary Board
2PG Unit 2 Auxiliary Board Pics
3PG Unit 3 Auxiliary Board
3PG Unit Auxiliary Board Pics
4PG Unit 4 Auxiliary Board
4PG Unit 4 Auxiliary Board Pics
5PG Unit 5 Auxiliary Board
5PG Unit 5 Auxiliary Board Pics
6PG Unit 6 Auxiliary Board
6PG Unit 6 Auxiliary Board Pics
7PG Unit 7 Auxiliary Board
7PG Unit 7 Auxiliary Board Pics
11P Common Aux Board
11P Common Aux Board Pics
18P Compressor Board
18P Compressor Board Pics
14P Air Conditioning Board
14P Air Conditioning Board
14P Air Conditioning Board Pics
12P Oil Purifying Board
12P Oil Purifying Board Pics
13P Pump Board
13P Pump Board Pics
1PL Lighting Distribution Board
1PL Lighting Distribution Board Pics
2PL Lighting Distribution Board
2PL Lighting Distribution Board Pics
3PL Lighting Distribution Board
3PL Lighting Distribution Board Pics
1PT Transformer No. 1 Oil Pump Board
1PT Transformer No. 1 Oil Pump Board Pics
2PT Transformer No. 2 Oil Pump Board
2PT Transformer No. 2 Oil Pump Board Pics
3PT Transformer No. 3 Oil Pump Board
3PT Transformer No. 3 Oil Pump Board Pics
4PT Transformer No. 4 Oil Pump Board
4PT Transformer No. 4 Oil Pump Board Pics
16P Surge Tank Board
16P Surge Tank Board Pics
280/120 and 480 Panels
15P 480VAC Maintenance Shop Panel
15P 480VAC Maintenance Shop Panel Pics
1PGV 440 VAC Valve Power Cabinet
1PGV 440 VAC Valve Power Cabinet Pics
2PGV 440 VAC Valve Power Cabinet
2PGV 440 VAC Valve Power Cabinet Pics
3PGV 440 VAC Valve Power Cabinet
3PGV 440 VAC Valve Power Cabinet Pics
4PGV 440 VAC Valve Power Cabinet
4PGV 440 VAC Valve Power Cabinet Pics
5PGV 440 VAC Valve Power Cabinet
5PGV 440 VAC Valve Power Cabinet Pics
6PGV 440 VAC Valve Power Cabinet
6PGV 440 VAC Valve Power Cabinet Pics
7PGV 440 VAC Valve Power Cabinet
7PGV 440 VAC Valve Power Cabinet Pics
2LA Lighting Panel
2LA Lighting Panel Pics
2LB Lighting Panel
2LB Lighting Panel Pics
2LC Lighting Panel
2LC Lighting Panel Pics
3LA Lighting Panel
3LA Lighting Panel Pics
3LB Lighting Panel
3LB Lighting Panel Pics
3LC Lighting Panel
3LC Lighting Panel Pics
3LD Lighting Panel
3LD Lighting Panel Pics
Intake Structure Lighting �and Power Panels
Intake Structure
1P Power Panel
1P Power Panel Pics
1L Lighting Panel 1
1L Lighting Panel 1 Pics
2P Power Panel
2P Power Panel Pics
2L Lighting Panel 2
2L Lighting Panel 2 Pics
3P Power Panel
3P Power Panel Pics
3L Lighting Panel 3
3L Lighting Panel 3 Pics
4P Power Panel
4P Power Panel Pics
4L Lighting Panel 4
4L Lighting Panel 4 Pics
5P Power Panel
5P Power Panel Pics
5L Lighting Panel 5
5L Lighting Panel 5 Pics
6P Power Panel
6P Power Panel Pics
6L Lighting Panel 6
6L Lighting Panel 6 Pics
7L Lighting Panel 7
7L Lighting Panel 7 Pics
CLOSING

File details come from the government source that posted it. Updated .