This document provides details for a federal solicitation seeking replacement of motor control centers and panels at Oahe Dam. The U.S. Army Corps of Engineers, Omaha District is soliciting proposals to replace several aging motor control centers and associated panel boards with modern equipment designed to meet current arc flash safety standards and enable remote monitoring. Offerors are invited to participate in a virtual site visit on December 8th to learn more about the project scope and requirements. Proposals must be submitted through the Beta SAM portal by December 18th. The work includes replacement of motor control centers and lighting and power panels across multiple structures at the Oahe Dam facility and must be completed within 548 calendar days of award. The place of performance for installations is Oahe Dam in Pierre, South Dakota.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Motor Control Center & Panels Replacement
Oahe Power Plant, SD
10 AM CT
8 December 2020
Virtual Site Visit
SOLICITATION NUMBER W9128F21Q0002
OA MCC
INTRODUCTIONS
USACE, Omaha District Office David LaGrone, Project Manager Jessica Jackson Contract Officer Constance Ellard Contract Specialist Joe Chamberlain Electrical Engineer
Oahe Project Kris Cleveland Chief Technical Support Jace Anderson Electrical Engineer
Cody Nickolas Contracting Officer’s Rep
2OA MCC
AGENDA
• Introductions / Project Overview
• Contracting Briefing / Rules of
Engagement
• Statement of Work / Project Specs
• Project Site Specifics
• Q&A
3OA MCC
CONTRACTING
JESSICA JACKSON, CONTRACTING OFFICER
Rules of Engagement
• This is an informal virtual site visit to review the scope and general questions
• All questions and clarifications should be posted in
ProjNet for an official answer from the Government
• No discussions relating to other Corps acquisitions
• Hold all questions until the designated question and answer session
4OA MCC
PROJNET AND CONTACT INFORMATION
ProjNet
• Used for contractor submitted questions
• Web site: https://www.projnet.org
• Bidder Inquiry Key: 3R7PPN-FTGDAA Contract Specialist Contact Information Connie Ellard
• Email: Constance.R.Ellard@usace.army.mil
• Phone: 402-995-2726
5OA MCC
mailto:Constance.R.Ellard@usace.army.mil
CONTRACTING
Some Contracting Items
a. Supply / install differences and requirements
b. Price schedule
c. Construction specifications and bonds
OA MCC 6
PRICE SCHEDULE
BASIC
7OA MCC
PRICE SCHEDULE
OPTIONS
OA MCC 8
SELECTION CRITERIA
9OA MCC
PROJECT OVERVIEW
Basic Items:
Supply & Install MCCs:
1PG, 2PG, 3PG, 4PG, 5PG, 6PG, 7PG,
1PT, 2PT, 3PT, 4PT,
1PL, 2PL, 3PL,
11P, 12P, 13P, 14P, 16P, 18P
10OA MCC
PROJECT OVERVIEW
Options
Supply & Install Panelboards:
15P, 1PGV, 2PGV,3PGV, 4PGV, 5PGV, 6PGV, 7PGV,
2LA, 2LB, 2LC, 3LA, 3LB, 3LC, 3LD,
1P, 2P, 3P, 4P, 5P, 6P 1L, 2L, 3L, 4L, 5L,6L, 7L.
OA MCC 11
SCHEDULE
• Contract Work Schedule M-F 0700 to 1700 no Holidays
• Crane or clearance support M-Thu 0700 - 1530
• All equipment outages shall be requested not less than three (3) weeks in advance, in writing to the Contracting Officer and shall include outage duration.
• The Contractor will work the generator auxiliary boards in pairs in conjunction with the associated transformer oil pump boards for the paired units in order to minimize generator outages.
• Paired unit outages will not take place prior to October but will be allowed October to May.
• Refer to section 01 12 00 Construction General paragraph 1.6 Coordination and Outages for additional information.
OA MCC
MOTOR CONTROL
CABINETS
OA MCC 13
1PG UNIT 1 AUXILIARY BOARD
OA MCC 14
1PG UNIT 1 AUXILIARY BOARD PICS
OA MCC 15
2PG UNIT 2 AUXILIARY BOARD
OA MCC 16
2PG UNIT 2 AUXILIARY BOARD PICS
OA MCC 17
3PG UNIT 3 AUXILIARY BOARD
OA MCC 18
3PG UNIT AUXILIARY BOARD PICS
OA MCC 19
4PG UNIT 4 AUXILIARY BOARD
OA MCC 20
4PG UNIT 4 AUXILIARY BOARD PICS
OA MCC 21
5PG UNIT 5 AUXILIARY BOARD
OA MCC 22
5PG UNIT 5 AUXILIARY BOARD PICS
OA MCC 23
6PG UNIT 6 AUXILIARY BOARD
OA MCC 24
6PG UNIT 6 AUXILIARY BOARD PICS
OA MCC 25
7PG UNIT 7 AUXILIARY BOARD
OA MCC 26
7PG UNIT 7 AUXILIARY BOARD PICS
OA MCC 27
11P COMMON AUX BOARD
OA MCC 28
11P COMMON AUX BOARD PICS
OA MCC 29
18P COMPRESSOR BOARD
OA MCC 30
18P COMPRESSOR BOARD PICS
OA MCC 31
14P AIR CONDITIONING BOARD
OA MCC 32
14P AIR CONDITIONING BOARD
OA MCC 33
14P AIR CONDITIONING BOARD PICS
OA MCC 34
12P OIL PURIFYING BOARD
OA MCC 35
12P OIL PURIFYING BOARD PICS
OA MCC 36
13P PUMP BOARD
OA MCC 37
13P PUMP BOARD PICS
OA MCC 38
1PL LIGHTING DISTRIBUTION BOARD
OA MCC 39
1PL LIGHTING DISTRIBUTION BOARD PICS
OA MCC 40
2PL LIGHTING DISTRIBUTION BOARD
OA MCC 41
2PL LIGHTING DISTRIBUTION BOARD PICS
OA MCC 42
3PL LIGHTING DISTRIBUTION BOARD
OA MCC 43
3PL LIGHTING DISTRIBUTION BOARD PICS
OA MCC 44
1PT TRANSFORMER NO. 1 OIL PUMP BOARD
OA MCC 45
1PT TRANSFORMER NO. 1 OIL PUMP BOARD PICS
OA MCC 46
2PT TRANSFORMER NO. 2 OIL PUMP BOARD
OA MCC 47
2PT TRANSFORMER NO. 2 OIL PUMP BOARD PICS
OA MCC 48
3PT TRANSFORMER NO. 3 OIL PUMP BOARD
OA MCC 49
3PT TRANSFORMER NO. 3 OIL PUMP BOARD PICS
OA MCC 50
4PT TRANSFORMER NO. 4 OIL PUMP BOARD
OA MCC 51
4PT TRANSFORMER NO. 4 OIL PUMP BOARD PICS
OA MCC 52
16P SURGE TANK BOARD
OA MCC 53
16P SURGE TANK BOARD PICS
OA MCC 54
280/120 AND 480 PANELS
OA MCC 55
15P 480VAC MAINTENANCE SHOP PANEL
OA MCC 56
15P 480VAC MAINTENANCE SHOP PANEL PICS
OA MCC 57
1PGV 440 VAC VALVE POWER CABINET
Note: 1PGV – 7PGV are similar
OA MCC 58
1PGV 440 VAC VALVE POWER CABINET PICS
OA MCC 59
2PGV 440 VAC VALVE POWER CABINET
OA MCC 60
2PGV 440 VAC VALVE POWER CABINET PICS
OA MCC 61
3PGV 440 VAC VALVE POWER CABINET
OA MCC 62
3PGV 440 VAC VALVE POWER CABINET PICS
OA MCC 63
4PGV 440 VAC VALVE POWER CABINET
OA MCC 64
4PGV 440 VAC VALVE POWER CABINET PICS
OA MCC 65
5PGV 440 VAC VALVE POWER CABINET
OA MCC 66
5PGV 440 VAC VALVE POWER CABINET PICS
OA MCC 67
6PGV 440 VAC VALVE POWER CABINET
OA MCC 68
6PGV 440 VAC VALVE POWER CABINET PICS
OA MCC 69
7PGV 440 VAC VALVE POWER CABINET
OA MCC 70
7PGV 440 VAC VALVE POWER CABINET PICS
OA MCC 71
2LA LIGHTING PANEL
Note: 2LA has 38 Circuits, 2LB – 3LD have 34 Circuits
OA MCC 72
2LA LIGHTING PANEL PICS
OA MCC 73
2LB LIGHTING PANEL
OA MCC 74
2LB LIGHTING PANEL PICS
OA MCC 75
2LC LIGHTING PANEL
OA MCC 76
2LC LIGHTING PANEL PICS
OA MCC 77
3LA LIGHTING PANEL
OA MCC 78
3LA LIGHTING PANEL PICS
OA MCC 79
3LB LIGHTING PANEL
OA MCC 80
3LB LIGHTING PANEL PICS
OA MCC 81
3LC LIGHTING PANEL
OA MCC 82
3LC LIGHTING PANEL PICS
OA MCC 83
3LD LIGHTING PANEL
OA MCC 84
3LD LIGHTING PANEL PICS
OA MCC 85
INTAKE STRUCTURE LIGHTING
AND POWER PANELS
OA MCC 86
INTAKE STRUCTURE
OA MCC 87
Powerhouse
Intake Structure
1P POWER PANEL
OA MCC 88
1P POWER PANEL PICS
OA MCC 89
1L LIGHTING PANEL 1
OA MCC 90
1L LIGHTING PANEL 1 PICS
OA MCC 91
2P POWER PANEL
OA MCC 92
2P POWER PANEL PICS
OA MCC 93
2L LIGHTING PANEL 2
OA MCC 94
2L LIGHTING PANEL 2 PICS
OA MCC 95
3P POWER PANEL
OA MCC 96
3P POWER PANEL PICS
OA MCC 97
3L LIGHTING PANEL 3
OA MCC 98
3L LIGHTING PANEL 3 PICS
OA MCC 99
4P POWER PANEL
OA MCC 100
4P POWER PANEL PICS
OA MCC 101
4L LIGHTING PANEL 4
OA MCC 102
4L LIGHTING PANEL 4 PICS
OA MCC 103
5P POWER PANEL
OA MCC 104
5P POWER PANEL PICS
OA MCC 105
5L LIGHTING PANEL 5
OA MCC 106
5L LIGHTING PANEL 5 PICS
OA MCC 107
6P POWER PANEL
OA MCC 108
6P POWER PANEL PICS
OA MCC 109
6L LIGHTING PANEL 6
OA MCC 110
6L LIGHTING PANEL 6 PICS
OA MCC 111
7L LIGHTING PANEL 7
OA MCC 112
7L LIGHTING PANEL 7 PICS
OA MCC 113
CLOSING
OA MCC 114
All questions and clarifications should be asked through ProjNet for an official answer from the Government.
ProjNet Web site: https://www.projnet.org Bidder Inquiry Key: 3R7PPN-FTGDAA
Contract Specialist Connie Ellard Email: Constance.R.Ellard@usace.army.mil Phone: 402-995-2726
| � |
| Introductions |
| Agenda |
| Contracting�Jessica Jackson, contracting officer |
| Projnet and contact information� |
| Contracting |
| Price Schedule�Basic�� |
| Price Schedule�Options |
| Selection Criteria |
| Project overview |
| Project overview |
| Schedule |
| Motor Control Cabinets |
| 1PG Unit 1 Auxiliary Board |
| 1PG Unit 1 Auxiliary Board Pics |
| 2PG Unit 2 Auxiliary Board |
| 2PG Unit 2 Auxiliary Board Pics |
| 3PG Unit 3 Auxiliary Board |
| 3PG Unit Auxiliary Board Pics |
| 4PG Unit 4 Auxiliary Board |
| 4PG Unit 4 Auxiliary Board Pics |
| 5PG Unit 5 Auxiliary Board |
| 5PG Unit 5 Auxiliary Board Pics |
| 6PG Unit 6 Auxiliary Board |
| 6PG Unit 6 Auxiliary Board Pics |
| 7PG Unit 7 Auxiliary Board |
| 7PG Unit 7 Auxiliary Board Pics |
| 11P Common Aux Board |
| 11P Common Aux Board Pics |
| 18P Compressor Board |
| 18P Compressor Board Pics |
| 14P Air Conditioning Board |
| 14P Air Conditioning Board |
| 14P Air Conditioning Board Pics |
| 12P Oil Purifying Board |
| 12P Oil Purifying Board Pics |
| 13P Pump Board |
| 13P Pump Board Pics |
| 1PL Lighting Distribution Board |
| 1PL Lighting Distribution Board Pics |
| 2PL Lighting Distribution Board |
| 2PL Lighting Distribution Board Pics |
| 3PL Lighting Distribution Board |
| 3PL Lighting Distribution Board Pics |
| 1PT Transformer No. 1 Oil Pump Board |
| 1PT Transformer No. 1 Oil Pump Board Pics |
| 2PT Transformer No. 2 Oil Pump Board |
| 2PT Transformer No. 2 Oil Pump Board Pics |
| 3PT Transformer No. 3 Oil Pump Board |
| 3PT Transformer No. 3 Oil Pump Board Pics |
| 4PT Transformer No. 4 Oil Pump Board |
| 4PT Transformer No. 4 Oil Pump Board Pics |
| 16P Surge Tank Board |
| 16P Surge Tank Board Pics |
| 280/120 and 480 Panels |
| 15P 480VAC Maintenance Shop Panel |
| 15P 480VAC Maintenance Shop Panel Pics |
| 1PGV 440 VAC Valve Power Cabinet |
| 1PGV 440 VAC Valve Power Cabinet Pics |
| 2PGV 440 VAC Valve Power Cabinet |
| 2PGV 440 VAC Valve Power Cabinet Pics |
| 3PGV 440 VAC Valve Power Cabinet |
| 3PGV 440 VAC Valve Power Cabinet Pics |
| 4PGV 440 VAC Valve Power Cabinet |
| 4PGV 440 VAC Valve Power Cabinet Pics |
| 5PGV 440 VAC Valve Power Cabinet |
| 5PGV 440 VAC Valve Power Cabinet Pics |
| 6PGV 440 VAC Valve Power Cabinet |
| 6PGV 440 VAC Valve Power Cabinet Pics |
| 7PGV 440 VAC Valve Power Cabinet |
| 7PGV 440 VAC Valve Power Cabinet Pics |
| 2LA Lighting Panel |
| 2LA Lighting Panel Pics |
| 2LB Lighting Panel |
| 2LB Lighting Panel Pics |
| 2LC Lighting Panel |
| 2LC Lighting Panel Pics |
| 3LA Lighting Panel |
| 3LA Lighting Panel Pics |
| 3LB Lighting Panel |
| 3LB Lighting Panel Pics |
| 3LC Lighting Panel |
| 3LC Lighting Panel Pics |
| 3LD Lighting Panel |
| 3LD Lighting Panel Pics |
| Intake Structure Lighting �and Power Panels |
| Intake Structure |
| 1P Power Panel |
| 1P Power Panel Pics |
| 1L Lighting Panel 1 |
| 1L Lighting Panel 1 Pics |
| 2P Power Panel |
| 2P Power Panel Pics |
| 2L Lighting Panel 2 |
| 2L Lighting Panel 2 Pics |
| 3P Power Panel |
| 3P Power Panel Pics |
| 3L Lighting Panel 3 |
| 3L Lighting Panel 3 Pics |
| 4P Power Panel |
| 4P Power Panel Pics |
| 4L Lighting Panel 4 |
| 4L Lighting Panel 4 Pics |
| 5P Power Panel |
| 5P Power Panel Pics |
| 5L Lighting Panel 5 |
| 5L Lighting Panel 5 Pics |
| 6P Power Panel |
| 6P Power Panel Pics |
| 6L Lighting Panel 6 |
| 6L Lighting Panel 6 Pics |
| 7L Lighting Panel 7 |
| 7L Lighting Panel 7 Pics |
| CLOSING |
File details come from the government source that posted it. Updated .