This document provides specifications for the replacement of motor control centers (MCCs) and panel boards at the Big Bend Dam in South Dakota. The U.S. Army Corps of Engineers seeks the design, fabrication, delivery, installation and testing of new MCCs and panel boards to replace existing equipment. Specific equipment to be replaced includes MCCs 1PG through 8PG, 1PT through 4PT, 1PL through 3PL, 11P through 15P, and panel boards 16P through 18P, and 1PV through 8PV. Offerors must submit quotes by December 8, 2020 and any questions via the ProjNet system by December 1st. The agency will evaluate quotes based on factors including work plan, experience, past performance, small business participation, and price.

View the file

Other files for this federal contract opportunity

Other files attached to Big Bend Motor Control Center (MCC) Replacement, newest first.
File Type Posted
Amd 02 - W9128F21Q0001_BB MCC.pdf PDF
Final Virtual Site Visit Roster.pdf PDF
Pre-bid sign-in sheet BB MCC.pdf PDF
Amd 01 - W9128F21Q0001_BB MCC.pdf PDF
RedLineDrawings1of2.pdf PDF
1of2 W9128F21Q0001_BB MCC Solicitation.pdf PDF
W9128F21Q0001_BB MCC Drawings.PDF PDF
2of2 W9128F21Q0001_BB MCC Specifications.pdf PDF
RedLineDrawings2of2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1File Name

PROJECT SITE

SPECIFICS

BIG BEND CONTROL CENTER (MCC)

VIRTUAL SITE VISIT 11-23-2020

TREVOR MCDONALD, EE OPERATIONS SUPERVISOR

AGENDA

INTRODUCTIONS & SIGN-IN SHEET

Contracting Officer’s Representative (COR) – Kathlene Shook Quality Assurance Representative (QA) – Alan Prismantas Lead Designer – Joe Chamberlain Project Manager – David LaGrone

REMINDERS TO OFFERORS

• Incorporate all amendments (if applicable) posted with this solicitation into your offer before submitting them.

• Be advised that anything discussed during this site visit is not a binding part of the contract, unless it is part of the solicitation documents.

• Technical inquiries and questions relating to technical requirements, solicitation and all questions related to this project must be submitted via Bidder Inquiry in ProjNet for an official response.

AGENDASUMMARY

These specifications include the design, fabrication, assembly, wiring, delivery, installation, and testing of the items of equipment and accessories and spare parts listed on the Price Schedule, shown below, and shown on the drawings.

The drawings and the Appendix to this specification are intended to indicate existing conditions and equipment locations only, as modified by this specification. This specification indicates requirements for the new Motor Control Centers (MCCs) and Panel Boards (PBs).

Equipment to be replaced in this contract includes:

MCCs 1PG, 2PG, 3PG, 4PG, 5PG, 6PG, 7PG, 8PG, 1PT, 2PT, 3PT, 4PT, 1PL, 2PL, 3PL, 11P, 12P, 13P, 14P, 15P.

PBs 16P, 17P, 18P, 1PV, 2PV, 3PV, 4PV, 5PV, 6PV, 7PV, 8PV.

Reference Specification Section 26 05 00.00 40 for wiring requirements related to this equipment replacement.

PRICING SCHEDULE

FAR 52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.

Evaluation Factor Description and Relative Importance

FACTOR 1 Work Plan Factors 1, 2 and 3 are of equal importance FACTOR 2 Experience Factors 1, 2 and 3 are of equal importance FACTOR 3 Past Performance Factors 1, 2 and 3 are of equal importance FACTOR 4 Small Business Participation 4 less important than Factors 1, 2, and 3 FACTOR 5 Price

Factors 1, 2, 3 and 4 when combined, are approximately equal to Factor 5 - Price.

PRICING SCHEDULE

OFFEROR QUESTIONS, COMMENTS, OR INQUIRIES

OFFEROR QUESTIONS AND COMMENTS

Questions and/or comments relative to these documents must be submitted via Bidder Inquiry as indicated below. See instructions on when e-mail or mailing is appropriate.

Questions and/or comments relative to these documents that are proprietary in nature or if Bidder Inquiry system (See Below) is out of service should be submitted to the Contract Specialist and the Contracting Officer at:

Contracting Officer: Nadine Catania Nadine.L.Catania@usace.army.mil

Contract Specialist - Primary POC: Constance Ellard Constance.R.Ellard@usace.army.mil 402-995-2726 (Telephone) mailto:Nadine.L.Catania@usace.army.mil mailto:Constance.R.Ellard@usace.army.mil

OFFEROR QUESTIONS, COMMENTS, OR INQUIRIES

BIDDER INQUIRY

Technical inquiries and questions relating to technical requirements, bidding procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at:

https://www.projnet.org/projnet/

Bidder Inquiry Code: 3J47NK-MR8HIF

Bidder Inquiries Must be in ProjNet by 4:00PM (CST)1 December 2020, to allow for adequate response time by the government

Quotes are Due by 2:00PM (CST) 8 December 2020 https://www.projnet.org/projnet/

SECTION 01 12 00

CONSTRUCTION GENERAL

PARA. 1.6 COORDINATION

AND OUTAGES

PARA. 1.10.1 POWERHOUSE

BRIDGE CRANE OPERATION

PARA. 1.11 TOILETS

PARA. 1.12 FEDERAL

HOLIDAYS AND WORKING

HOURS

LOCATION:

EL. 1383 GEN FLOOR

ASSEMBLY BAY

Hatch Cover

SECTION 01 12 00

CONSTRUCTION GENERAL

PARA. 1.11 TOILETS

FIRST AID ROOM

FOR RESTROOM,

LOCATION:

EL. 1363 TURBINE

FLOOR BAY5 AREA

Hatch Cover

AS-BUILT SPREAD SHEET

END OF SPECIFICATIONS

CONTROL DIAGRAMS IN

REDLINE DWGS 1 OF 2

COMPARTMENT NUMBER

CIRCUIT DESIGNATION

CIRCUIT RATING

BREAKER SIZE

STARTER SIZE

COMP EQUIP AUXILLARY

CONTROL DIAG

NOTES

LOCATION:

Hatch Cover

Control Diagram

Compart.

Equipment

Notes

Control Diagram 83E367

VIEW OF EL. 1363

CORRIDOR

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

|-----AC------|

DC DCContraction Joint

Downstream

3PL and 7PG Bds

1PG

MCC UNIT AUX BDS

1PG-8PG (DC & AC)

SIMILAR EXCEPT AS

NOTED ON

SPREADSHEET

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

|-----AC------|

MCC Available Spacing from existing is listed in Sec 26 28

00.00 10 Para. 2.7.15 1PG: left no space; right 2'-0" w/contraction joint at 1'-0".

DC

Vertical Section

C on tra ct io n

Jo in t

2PG

1PG-8PG (DC & AC)

SIMILAR EXCEPT AS

NOTED ON

SPREADSHEET

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

|-----AC------|

DC

DC

Vertical Section2PG: left possible space will have to move cabinet;

right 3'-0" w/contraction joint at 1'-0".

3PG

1PG-8PG (DC & AC)

SIMILAR EXCEPT AS

NOTED ON

SPREADSHEET

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

|-----AC------|

DCDCPad and Board Dimensions On Contract Drawings E-026 for 3PG for example.

4PG

1PG-8PG (DC & AC)

SIMILAR EXCEPT AS

NOTED ON

SPREADSHEET

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

|-----AC------|

DCDC

5PG

1PG-8PG (DC & AC)

SIMILAR EXCEPT AS

NOTED ON

SPREADSHEET

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

|-----AC------|

DC

6PG

1PG-8PG (DC & AC)

SIMILAR EXCEPT AS

NOTED ON

SPREADSHEET

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

|-----AC------|

7PG

1PG-8PG (DC & AC)

SIMILAR EXCEPT AS

NOTED ON

SPREADSHEET

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

DC DC

8PG

1PG-8PG (DC & AC)

SIMILAR EXCEPT AS

NOTED ON

SPREADSHEET

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

|-----AC------|

1PL

MCC 1PL LIGHTING

BOARD

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

|-----AC------|

1PL

MCC 1PL LIGHTING

BOARD

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

|-----AC------|

3PL

MCC 3PL LIGHTING

BOARD

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

|-----AC------|

11P

MCC 11P COMMON

BOARD

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

|-----AC------|

COMMON BD Room

11P

MCC 11P COMMON

BOARD

LOCATION:

EL. 1363 TURBINE

FLOOR

12P

MCC 12P PUMP

BOARD

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

DC

VIEW OF EL. 1342

CORRIDOR

ALL MCC AND PANELS ON

UPSTREAM WALL

LOCATION:

EL. 1342

EQUIPMENT FLOOR

DC

DC

|-----AC------|

DC

Upstream

South 14P Bd.

13P

MCC 13P AIR COND.

BOARD & CREST

ROAD LTG

TRANSFORMER

LOCATION:

EL. 1342

GENERATOR FLOOR

DC

DC

14P

MCC 14P

COMPRESSOR

BOARD

LOCATION:

EL. 1342

GENERATOR FLOOR

DC

DC

|-----AC------|

DC

Reconfiguration of 14P into

14P1 & 14P2 is Described in Sec 26 28 00.00 10 Para. 2.10

14P

MCC 14P

COMPRESSOR

BOARD

LOCATION:

EL. 1342

GENERATOR FLOOR

DC

DC

|-----AC------|

DC

Reconfiguration of 14P into

14P1 & 14P2 is Described in Sec 26 28 00.00 10 Para. 2.10

C O

N

TR

AC

TI

O N

J O

IN

T

CABLE TRAYS

UPSTREAM WALL

ABOVE MCC’S

CABLE ENTRANCE TO

MAIN STATION

SERVICE BREAKERS

ABOVE

LOCATION:

EL. 1342 EQUIPMENT

FLOOR

DC

DC

|-----AC------|

DC

DRAWING E-801

FEEDER

REPLACEMENTS

1PT & 2PT

MCC 1 & 2PT

TRANSFORMER OIL

PUMP BOARDS

3PT & 4PT SIMILAR

LOCATION:

EL. 1342

GENERATOR FLOOR

DC

DC

|-----AC------|

DC

14P TO BE SPLIT INTO 2 MCC’S

14P1 AND 14P2

Existing Control Cubicle

1-8PV

PANELS 1-8PV VALVE

POWER PANELS

LOCATION:

EL. 1342 EQUIPMENT

FLOOR

IN EACH BAY SIMILAR

DC

DC

|-----AC------|

DC

PANELBOARDS

SEC 26 28 00.00 10

PARA. 2.8

DRAWING E-054D

DETAILS

E-801 FEEDER

REPLACEMENT

18P

PANELS 18P RIGHT

TAILRACE POWER

PANEL

LOCATION:

EL. 1342 EQUIPMENT

FLOOR

DC

DC

|-----AC------|

DC

SOUTH PH

WALL

PANALBOARDS in Sec 26 28

00.00 10 Para. 2.8 E-054C Detail Drawing

15P

MCC 15P OIL

PURIFYING BOARD

LOCATION:

EL. 1316 INSPECTION

GALLERY

DC

DC

UPSTREAM

WALL

16P

PANEL 16P

MAINTENANCE SHOP

LOCATION:

EL. 1383 GENERATOR

FLOOR

DC

DC

UPSTREAM

WALL

PANALBOARDS in Sec 26 28

00.00 10 Para. 2.8 E-054A Detail Drawing Provides Embedded Frame Size

17P

PANEL 17P INTAKE

GALLERY

LOCATION:

EL. 1429 INTAKE

GALLERY

DC

DC

UPSTREAM

WALL

PANALBOARDS in Sec 26 28

00.00 10 Para. 2.8 E-054B Detail Drawing

LTG BD 1PL

UNIT AUX BD 1PG

UPPER WIRE

ENTRANCE

COMPARTMENTS

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

LTG BD 1PL

LOWER WIRE

ENTRANCE

COMPARTMENTS

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

UPPER WIRE

ENTRANCE

COMPARTMENT

CLOSEUP

LOCATION:

EL. 1363 TURBINE

FLOOR

DC

Q & A

Reminder: All questions and answers will be posted on beta.SAM

CLOSING REMARKS

• Quotes are Due by 2:00PM (CST) 8 December 2020

• Bidder Inquiries Must be in ProjNet by 4:00PM (CST)1 December 2020, to allow for adequate response time by the government.

��Project SITE�Specifics�
AGENDA
AGENDA
AGENDA
AGENDA
OFFEROR Questions, Comments, or Inquiries
OFFEROR Questions, Comments, or Inquiries
SECTION 01 12 00�CONSTRUCTION GENERAL��Para. 1.6 COORDINATION AND OUTAGES��Para. 1.10.1 Powerhouse Bridge Crane Operation��Para. 1.11 TOILETS��Para. 1.12 FEDERAL HOLIDAYS AND WORKING HOURS����LOCATION:�EL. 1383 Gen floor assembly bay
SECTION 01 12 00�CONSTRUCTION GENERAL��Para. 1.11 TOILETS���first aid room�for restroom, ����LOCATION:�EL. 1363 Turbine floor Bay5 area
AS-BUILT Spread sheet�end of specifications��Control diagrams in Redline dwgs 1 of 2��Compartment number�circuit designation�circuit rating�breaker size�starter size�Comp equip auxillary�control diag�notes�����LOCATION:�
View of el. 1363 corridor��LOCATION:�EL. 1363 Turbine FLOOR
1PG�mcc Unit Aux bds 1PG-8PG (dc & ac) similar except as noted on spreadsheet��LOCATION:�EL. 1363 Turbine FLOOR
2PG�mcc Unit Aux bds 1PG-8PG (dc & ac) similar except as noted on spreadsheet��LOCATION:�EL. 1363 Turbine FLOOR
3PG�mcc Unit Aux bds 1PG-8PG (dc & ac) similar except as noted on spreadsheet��LOCATION:�EL. 1363 Turbine FLOOR
4PG�mcc Unit Aux bds 1PG-8PG (dc & ac) similar except as noted on spreadsheet��LOCATION:�EL. 1363 Turbine FLOOR
5PG�mcc Unit Aux bds 1PG-8PG (dc & ac) similar except as noted on spreadsheet��LOCATION:�EL. 1363 Turbine FLOOR
6PG�mcc Unit Aux bds 1PG-8PG (dc & ac) similar except as noted on spreadsheet��LOCATION:�EL. 1363 Turbine FLOOR
7PG�mcc Unit Aux bds 1PG-8PG (dc & ac) similar except as noted on spreadsheet��LOCATION:�EL. 1363 Turbine FLOOR
8PG�mcc Unit Aux bds 1PG-8PG (dc & ac) similar except as noted on spreadsheet��LOCATION:�EL. 1363 Turbine FLOOR
1PL�mcc 1pl lighting board��LOCATION:�EL. 1363 Turbine FLOOR
1PL�mcc 1pl lighting board��LOCATION:�EL. 1363 Turbine FLOOR
3PL�mcc 3pl lighting board��LOCATION:�EL. 1363 Turbine FLOOR
11P�mcc 11p common board��LOCATION:�EL. 1363 Turbine FLOOR
11P�mcc 11p common board��LOCATION:�EL. 1363 Turbine FLOOR
12P�mcc 12p pump board��LOCATION:�EL. 1363 Turbine FLOOR
View of el. 1342 corridor�all Mcc and panels on upstream wall��LOCATION:�EL. 1342 equipment FLOOR
13P�mcc 13p Air cond. Board & crest road ltg transformer��LOCATION:�EL. 1342 GENERATOR FLOOR
14P�mcc 14p compressor board��LOCATION:�EL. 1342 GENERATOR FLOOR
14P�mcc 14p compressor board��LOCATION:�EL. 1342 GENERATOR FLOOR
Cable trays upstream wall above MCC’s��Cable entrance to Main Station service breakers above��LOCATION:�EL. 1342 equipment FLOOR�
1PT & 2Pt�mcc 1 & 2pT Transformer oil pump boards�3PT & 4PT Similar��LOCATION:�EL. 1342 GENERATOR FLOOR
1-8PV�Panels 1-8PV Valve Power Panels��LOCATION:�EL. 1342 equipment FLOOR�in each bay similar
18P�Panels 18P right tailrace Power Panel��LOCATION:�EL. 1342 equipment FLOOR�
15P�MCC 15P Oil purifying board��LOCATION:�EL. 1316 Inspection Gallery
16P�Panel 16P Maintenance Shop ��LOCATION:�EL. 1383 generator floor
17P�Panel 17P intake gallery ��LOCATION:�EL. 1429 intake gallery
Ltg Bd 1PL�Unit Aux bd 1PG�Upper wire entrance compartments��LOCATION:�EL. 1363 Turbine FLOOR
Ltg Bd 1PL�Unit Aux bd 1PG�Lower wire entrance compartments��LOCATION:�EL. 1363 Turbine FLOOR
�Unit Aux bd 1PG�Upper wire entrance compartment�Closeup��LOCATION:�EL. 1363 Turbine FLOOR
Q & A
AGENDA

File details come from the government source that posted it. Updated .