This solicitation is for replacement of motor control centers (MCCs) and panels at the Big Bend Dam in South Dakota. The U.S. Army Corps of Engineers Engineering District Omaha seeks contractors to supply and install new MCCs and panels by January 2022. Pricing will be fixed-price. The work includes removal and disposal of existing equipment according to environmental regulations. Contractors must follow all applicable labor laws and safety standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amd 02 - W9128F21Q0001_BB MCC.pdf | ||
| Final Virtual Site Visit Roster.pdf | ||
| Big Bend MCC Virtual SITE VISIT Presentation 23 nov 2020.pdf | ||
| Pre-bid sign-in sheet BB MCC.pdf | ||
| Amd 01 - W9128F21Q0001_BB MCC.pdf | ||
| RedLineDrawings1of2.pdf | ||
| W9128F21Q0001_BB MCC Drawings.PDF | ||
| 1of2 W9128F21Q0001_BB MCC Solicitation.pdf | ||
| RedLineDrawings2of2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
(Supply and Install Contract)
Solicitation Number W9128F21Q0001
Motor Control Center And Panels Replacement (FY21) Big Bend Dam, SD November 2020
US Army Corps of Engineers Omaha District
This page was intentionally left blank for duplex printing.
Motor Control Center And Panels Replacement (FY21) Big Bend Dam, SD
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00-3 PROPOSAL SCHEUDLE
00 72 00 GENERAL CONDITIONS (CONTRACT CLAUSES - RFP)
00 73 00 SUPPLEMENTARY CONDITIONS (SPECIAL CONTRACT REQUIREMENTS)
DIVISION 01 - GENERAL REQUIREMENTS
01 12 00 CONSTRUCTION GENERAL
01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
01 30 60.00 26 OPERATION AND MAINTENANCE DATA
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 78 39.00 24 AS-BUILT DRAWINGS
DIVISION 02 - EXISTING CONDITIONS
02 82 00 ASBESTOS-CONTAINING MATERIALS
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 26 - ELECTRICAL
26 05 00.00 40 CONDUIT AND MISCELLANEOUS WIRING
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 28 00.00 10 MOTOR CONTROL CENTERS (MCCs) AND PANELBOARDS (PBs)
-- End of Project Table of Contents --
This page was intentionally left blank for duplex printing.
Replace MCCs, Big Bend Dam, SD BB87
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 72 00
GENERAL CONDITIONS (CONTRACT CLAUSES - RFP)
01/20
PART 1 GENERAL
1.1 *FAR 52.202-1 DEFINITIONS (NOV 2013)
1.2 *FAR 52.203-3 GRATUITIES (APR 1984)
1.3 *FAR 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
1.4 *FAR 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
1.5 *FAR 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
1.6 *FAR 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER
ACTIVITY (MAY 2014)
1.7 *FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (OCT 2010)
1.8 *FAR 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT
(OCT 2015)
1.9 *FAR 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND
REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)
1.10 *FAR 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
1.11 *FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER
FIBER CONTENT PAPER (MAY 2011)
1.12 FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (JAN 2011)
1.13 *FAR 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (OCT 2018)
1.14 *FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
1.15 *FAR 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE
MAINTENANCE (JUL 2016)
1.16 *FAR 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
1.17 *FAR 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,
AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER
COVERED ENTITIES (JUL 2018).
1.18 *FAR 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT
(AUG 2019)
1.19 *FAR 52.209-6 PROTECTING THE GOVERNMENTS INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED
FOR DEBARMENT (OCT 2015)
1.20 FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
1.21 *FAR 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED
DOMESTIC CORPORATIONS (NOV 2015)
1.22 *FAR 52.210-1 MARKET RESEARCH (APR 2011)
1.23 FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
1.24 *FAR 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)
1.25 *FAR 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR
DOCUMENT 00 72 00 Page 1
PRICING DATA-MODIFICATIONS (AUG 2011)
1.26 *FAR 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT
2010)
1.27 *FAR 52.215-17 WAIVER OF FACILITIES CAPITAL COST OF MONEY
(OCT 1997)
1.28 *FAR 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POST
RETIREMENT BENEFITS (PRB) OTHER THAN PENSIONS (JULY 2005)
1.29 *FAR 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
1.30 *FAR 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA
OR INFORMATION OTHER THAN COST OR PRICING DATA-MODIFICATIONS (OCT
2010)
1.31 *FAR 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB
1997)
1.32 *FAR 52.222-3 CONVICT LABOR (JUNE 2003)
1.33 *FAR 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-
OVERTIME COMPENSATION (MAY 2018)
1.34 *FAR 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS-SECONDARY SITE
OF THE WORK (MAY 2014)
1.35 *FAR 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018)
1.36 *FAR 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
1.37 *FAR 52.222-8 PAYROLLS AND BASIC RECORDS (AUG 2018)
1.38 *FAR 52.222-9 APPRENTICES AND TRAINEES (JULY 2005)
1.39 *FAR 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB
1988)
1.40 *FAR 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
1.41 *FAR 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)
1.42 *FAR 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE
REQUIREMENTS AND RELATED REGULATIONS (MAY 2014)
1.43 *FAR 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
1.44 *FAR 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)
1.45 *FAR 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
1.46 *FAR 52.222-26 EQUAL OPPORTUNITY (SEPT 2016)
1.47 *FAR 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR
CONSTRUCTION (APR 2015)
1.48 *FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)
1.49 *FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH
DISABILITIES (JUL 2014)
1.50 *FAR 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)
1.51 FAR 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (DEC 2010)
1.52 *FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (JAN 2019)
1.53 *FAR 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)
1.54 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)
1.55 *FAR 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN
2017)
1.56 *FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (SEPT 2013)
1.57 FAR 52.223 3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL
SAFETY DATA (JAN 1997)
1.58 *FAR 52.223-5 POLLUTION PREVENTION AND RIGHT TO KNOW
INFORMATION (MAY 2011)
1.59 FAR 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
1.60 FAR 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL
CONTENT FOR EPA-DESIGNATED PRODUCTS (MAY 2008)
1.61 FAR 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS
IN SERVICE AND CONSTRUCTION CONTRACTS (AUG 2018)
1.62 FAR 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT
MESSAGING WHILE DRIVING (AUG 2011)
1.63 FAR 52.225-9 BUY AMERICAN-CONSTRUCTION MATERIALS (MAY 2014) (For
DOCUMENT 00 72 00 Page 2
Contracts less than $6.932 million)
1.64 *FAR 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE
2008)
1.65 *FAR 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
1.66 *FAR 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND
COPYRIGHT INFRINGEMENT (DEC 2007)
1.67 *FAR 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC
2007)
1.68 FAR 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
1.69 FAR 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION
(JAN 1997)
1.70 *FAR 52.228-11 PLEDGES OF ASSETS (AUG 2018)
1.71 *FAR 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS
(MAY 2014)
1.72 FAR 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
1.73 FAR 52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION (OCT
2010)
1.74 FAR 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
1.75 FAR 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS
(MAY 2014)
1.76 *FAR 52.232-17 INTEREST (MAY 2014)
1.77 *FAR 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
1.78 FAR 52.232-27 PROMPT PAY FOR CONSTRUCTION CONTRACTS (JAN
2017)
1.79 FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER -SYSTEM
FOR AWARD MANAGEMENT (OCT 2018)
1.80 FAR 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN
2013)
1.81 FAR 52.232-40 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
1.82 FAR 52.233-1 DISPUTES (MAY 2014)
1.83 *FAR 52.233-3 PROTEST AFTER AWARD (AUG 1996)
1.84 FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT
2004)
1.85 FAR 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
1.86 FAR 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE
WORK (APR 1984)
1.87 FAR 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
1.88 FAR 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
1.89 FAR 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
1.90 *FAR 52.236-8 OTHER CONTRACTS (APR 1984)
1.91 FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,
EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)
1.92 *FAR 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
1.93 FAR 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
1.94 *FAR 52.236-12 CLEANING UP (APR 1984)
1.95 FAR 52.236-13 ACCIDENT PREVENTION-ALTERNATE I (NOV 1991)
1.96 FAR 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
1.97 FAR 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
1.98 FAR 52.236-17 LAYOUT OF WORK (APR 1984)
1.99 FAR 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(FEB 1997) ALTERNATE I (APR 1984)
1.100 FAR 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
1.101 *FAR 52.242-13 BANKRUPTCY (JUL 1995)
1.102 FAR 52.242-14 SUSPENSION OF WORK (APR 1984)
1.103 FAR 52.243-4 CHANGES (JUNE 2007)
1.104 FAR 52.244-2 SUBCONTRACTS (OCT 2010)
1.105 *FAR 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (AUG 2019)
1.106 FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
DOCUMENT 00 72 00 Page 3
1.107 FAR 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
1.108 *FAR 52.248-3 VALUE ENGINEERING--CONSTRUCTION (OCT 2015)
1.109 FAR 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT
(FIXED-PRICE) (APR 2012) ALTERNATE I (SEP 1996)
1.110 FAR 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
1.111 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
1.112 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
1.113 *DFARS 252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC
1991)
1.114 *DFARS 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF
FORMER DOD OFFICIALS (SEP 2011)
1.115 *DFARS 252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD
OR OTHER DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)
1.116 *DFARS 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF
WHISTLEBLOWER RIGHTS (SEP 2013)
1.117 *DFARS 252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG
2019 -
1.118 *DFARS 252.203-7004 DISPLAY OF FRAUD HOTLINE POSTER(S) (AUG 2019)
1.119 *DFARS 252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016)
1.120 *DFARS 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK
PRODUCT (APR 1992)
1.121 DFARS 252.204-7004 LEVEL I ANTITERRORISM AWARENESS TRAINING FOR
CONTRACTORS (FEB 2019)
1.122 *DFARS 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND
CYBER INCIDENT REPORTING (DEC 2019)
1.123 *DFARS 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF
INFORMATION FOR LITIGATION SUPPORT (MAY 2016)
1.124 DFARS 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED
OR CONTROLLED BY THE GOVERNMENT OF A COUNTRY THAT IS A STATE
SPONSOR OF TERRORISM (OCT 2015)
1.125 *DFARS 252.222-7006 RESTRICTIONS ON THE USE OF MANDATORY
ARBITRATION AGREEMENTS (DEC 2010)
1.126 *DFARS 252.223-7006 PROHIBITION ON STORAGE AND DISPOSAL OF
TOXIC AND HAZARDOUS MATERIALS - BASIC (SEP 2014)
1.127 *DFARS 252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JUN
2013)
1.128 *DFARS 252.225-7048 EXPORT CONTROLLED ITEMS (JUNE 2013)
1.129 *DFARS 252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS,
INDIAN-OWNED ECONOMIC ENTERPRISES, AND NATIVE HAWAIIAN SMALL
BUSINESS CONCERNS (APR 2019)
1.130 *DFARS 252.227-7033 RIGHTS IN SHOP DRAWINGS (APR 1966)
1.131 *DFARS 252.231-7000 SUPPLEMENTAL COST PRINCIPLES (DEC 1991)
1.132 *DFARS 252.232-7005 REIMBURSEMENT OF SUBCONTRACTOR ADVANCE
PAYMENTS--DOD PILOT MENTOR-PROTEGE PROGRAM (SEP 2001)
1.133 *DFARS 252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
1.134 DFARS 252.236-7000 MODIFICATION OF PROPOSALS - PRICE BREAKDOWN
(DEC 1991)
1.135 *DFARS 252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
1.136 DFARS 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC
2012)
1.137 *DFARS 252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2013)
1.138 *DFARS 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA - BASIC
(FEB 2019)
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
DOCUMENT 00 72 00 Page 4
-- End of Section Table of Contents --
DOCUMENT 00 72 00 Page 5
SECTION 00 72 00
GENERAL CONDITIONS (CONTRACT CLAUSES - RFP)
01/20
PART 1 GENERAL
*-CLAUSES INCORPORATED BY REFERENCE (IBR)
1.1 *FAR 52.202-1 DEFINITIONS (NOV 2013)
1.2 *FAR 52.203-3 GRATUITIES (APR 1984)
1.3 *FAR 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
1.4 *FAR 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
1.5 *FAR 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
1.6 *FAR 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER
ACTIVITY (MAY 2014)
1.7 *FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (OCT 2010)
1.8 *FAR 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT
2015)
1.9 *FAR 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND
REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)
1.10 *FAR 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
1.11 *FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER
CONTENT PAPER (MAY 2011)
1.12 FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL
(JAN 2011)
(a) The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24, and Federal Information Processing Standards Publication (FIPS PUB) Number 201.
(b) The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:
(1) When no longer needed for contract performance.
(2) Upon completion of the Contractor employee's employment.
(3) Upon contract completion or termination.
(c) The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements.
DOCUMENT 00 72 00 Page 6
(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts when the subcontractor's employees are required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in paragraph (b) of this section, unless otherwise approved in writing by the Contracting Officer.
(End of clause)
1.13 *FAR 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (OCT 2018)
1.14 *FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
(a) Definitions. As used in this clause-
“Electronic Funds Transfer (EFT) indicator” means a four character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management (SAM) records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
"Registered in the System for Award Management (SAM)" means that -
(1) The Contractor has entered all mandatory information, including the unique entity identifier and the EFT indicator (if applicable), the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into SAM;
(2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of Contact sections of the registration in SAM;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record "Active".
"System for Award Management (SAM)" means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes. It includes-
(1) Data collected from prospective Federal awardees required for the conduct of business with the Government;
(2) Prospective contractor-submitted annual representations and certifications in accordance with FAR Subpart 4.14; and
(3) Identification of those parties excluded from receiving Federal contracts, certain subcontracts, and certain types of Federal financial and non-financial assistance and benefits.
“Unique entity identifier” means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b) If the solicitation for this contract contained the provision 52.204-7 with its Alternate I, and the Contractor was unable to register prior to award, the Contractor shall be registered in SAM within 30 days
DOCUMENT 00 72 00 Page 7 after award or before three days prior to submission of the first invoice, whichever occurs first.
(c) The Contractor shall maintain registration in SAM during contract performance and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement. The Contractor is responsible for the currency, accuracy and completeness of the data within SAM, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in SAM after the initial registration, the Contractor is required to review and update on an annual basis, from the date of initial registration or subsequent updates, its information in SAM to ensure it is current, accurate and complete.
Updating information in SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(d) (1) (i) If a Contractor has legally changed its business name, doing business as name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to-
(A) Change the name in SAM;
(B) Comply with the requirements of subpart 42.12 of the FAR; and
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor shall provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (d)(1)(i) of this clause, or fails to perform the agreement at paragraph (d)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in SAM record to reflect an assignee for the purpose of assignment of claims (see FAR subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM database. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the EFT clause of this contract.
(3) The Contractor shall ensure that the unique entity identifier is maintained with the entity designated at www.sam.gov. for establishment of the unique entity identifier throughout the life of the contract. The Contractor shall communicate any change to the unique entity identifier to the Contracting Officer within 30 days after the change, so an appropriate modification can be issued to update the data on the contract. A change in the unique entity identifier does not necessarily require a novation be accomplished.
(e) Contractors may obtain additional information on registration and annual confirmation requirements at https://www.sam.gov.
(End of clause)
DOCUMENT 00 72 00 Page 8
1.15 *FAR 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE
(JUL 2016)
1.16 *FAR 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of clause)
1.17 *FAR 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND
SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES
(JUL 2018).
(a) Definitions. As used in this clause–
“Covered article” means any hardware, software, or service that–
(1) Is developed or provided by a covered entity;
(2) Includes any hardware, software, or service developed or provided in whole or in part by a covered entity; or
(3) Contains components using any hardware or software developed in whole or in part by a covered entity.
“Covered entity” means–
(1) Kaspersky Lab;
(2) Any successor entity to Kaspersky Lab;
(3) Any entity that controls, is controlled by, or is under common control with Kaspersky Lab; or
(4) Any entity of which Kaspersky Lab has a majority ownership.
(b) Prohibition. Section 1634 of Division A of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91) prohibits Government use of any covered article. The Contractor is prohibited from–
(1) Providing any covered article that the Government will use on or after October 1, 2018; and
(2) Using any covered article on or after October 1, 2018, in the development of data or deliverables first produced in the performance of the contract.
(c) Reporting requirement.
(1) In the event the Contractor identifies a covered article provided to the Government during contract performance, or the Contractor is notified of such by a subcontractor at any tier or any other source, the Contractor shall report, in writing, to the Contracting Officer or, in the case of the Department of Defense, to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the
DOCUMENT 00 72 00 Page 9 case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (c)(1) of this clause:
(i) Within 1 business day from the date of such identification or notification: the contract number; the order number(s), if applicable; supplier name; brand; model number (Original Equipment Manufacturer (OEM) number, manufacturer part number, or wholesaler number);
item description; and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the report pursuant to paragraph (c)(1) of this clause: any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of a covered article, any reasons that led to the use or submission of the covered article, and any additional efforts that will be incorporated to prevent future use or submission of covered articles.
(d) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts, including subcontracts for the acquisition of commercial items.
(End of clause)
1.18 *FAR 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2019)
1.19 *FAR 52.209-6 PROTECTING THE GOVERNMENTS INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR
DEBARMENT (OCT 2015)
1.20 FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management database at https://www.sam.gov.
(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments-
(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by-
(i) Government personnel and authorized users performing business on behalf of the Government; or
(ii) The Contractor, when viewing data on itself; and
(2) The publicly-available segment, to which all data in the non-public segment of FAPIIS is automatically transferred after a waiting period of 14 calendar days, except for-
(i) Past performance reviews required by subpart 42.15;
(ii) Information that was entered prior to April 15, 2011; or
(iii) Information that is withdrawn during the
DOCUMENT 00 72 00 Page 10
14-calendar- day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.
(c) The Contractor will receive notification when the Government posts new information to the Contractor's record.
(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the non-public segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of Information procedures, prior to reposting the releasable information.
The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.
(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.
(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.
(d) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.
(End of clause)
1.21 *FAR 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (NOV 2015)
1.22 *FAR 52.210-1 MARKET RESEARCH (APR 2011)
1.23 FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified.
DOCUMENT 00 72 00 Page 11
1.24 *FAR 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)
1.25 *FAR 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR
PRICING DATA-MODIFICATIONS (AUG 2011)
1.26 *FAR 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)
1.27 *FAR 52.215-17 WAIVER OF FACILITIES CAPITAL COST OF MONEY (OCT
1997)
1.28 *FAR 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POST
RETIREMENT BENEFITS (PRB) OTHER THAN PENSIONS (JULY 2005)
1.29 *FAR 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
1.30 *FAR 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR
INFORMATION OTHER THAN COST OR PRICING DATA-MODIFICATIONS (OCT 2010)
(a) Exceptions from certified cost or pricing data.
(1) In lieu of submitting certified cost or pricing data for modifications under this contract, for price adjustments expected to exceed the threshold set forth at FAR 15.403-4 on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in the following paragraphs. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable-
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Information on modifications of contracts or subcontracts for commercial items.
(A) If-
(1) The original contract or subcontract was granted an exception from certified cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or was a contract or subcontract for the acquisition of a commercial item; and
(2) The modification (to the contract or subcontract) is not exempted based on one of these exceptions, then the Contractor may provide information to establish that the modification would not change the contract or subcontract from a contract or subcontract for the acquisition of a commercial item to a contract or subcontract for the acquisition of an item other than a commercial item.
(B) For a commercial item exception, the Contractor shall provide, at a minimum, information on prices at which the same item or similar items have previously been sold that is adequate for evaluating the reasonableness of the price of the modification. Such information may include-
(1) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the
DOCUMENT 00 72 00 Page 12 basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.
(2) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.
(3) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(2) The Contractor grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this clause, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Contractor's determination of the prices to be offered in the catalog or marketplace.
(b) Requirements for certified cost or pricing data. If the Contractor is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:
(1) The Contractor shall submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used in this contract, unless the Contracting Officer and the Contractor agree to a different format and change this clause to use Alternate I.
(2) As soon as practicable after agreement on price, but before award (except for unpriced actions), the Contractor shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.
(End of clause)
1.31 *FAR 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
1.32 *FAR 52.222-3 CONVICT LABOR (JUNE 2003)
1.33 *FAR 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-
OVERTIME COMPENSATION (MAY 2018)
(a) Overtime requirements. No Contractor or subcontractor employing laborers or mechanics (see Federal Acquisition Regulation 22.300) shall require or permit them to work over 40 hours in any workweek unless they are paid at least 1 and 1/2 times the basic rate of pay for each hour worked over 40 hours.
(b) Violation; liability for unpaid wages; liquidated damages.
The responsible Contractor and subcontractor are liable for unpaid wages if they violate the terms in paragraph (a) of this clause. In addition, the Contractor and subcontractor are liable for liquidated damages payable to the Government. The Contracting Officer will assess liquidated damages at the rate specified at 29 CFR 5.5(b)(2) per affected employee for each calendar day on which the employer required or permitted the employee to work in excess of the standard workweek of 40 hours without paying overtime wages required by the Contract Work Hours and Safety Standards statute (found at 40 U.S.C. chapter 37). In accordance with the Federal Civil Penalties Inflation Adjustment Act of 1990 (28 U.S.C. 2461 Note), the Department of Labor adjusts this civil monetary penalty for inflation no later than January 15 each year.
DOCUMENT 00 72 00 Page 13
(c) Withholding for unpaid wages and liquidated damages. The Contracting Officer will withhold from payments due under the contract sufficient funds required to satisfy any Contractor or subcontractor liabilities for unpaid wages and liquidated damages. If amounts withheld under the contract are insufficient to satisfy Contractor or subcontractor liabilities, the Contracting Officer will withhold payments from other Federal or Federally assisted contracts held by the same Contractor that are subject to the Contract Work Hours and Safety Standards statute.
(d) Payrolls and basic records. (1) The Contractor and its subcontractors shall maintain payrolls and basic payroll records for all laborers and mechanics working on the contract during the contract and shall make them available to the Government until 3 years after contract completion. The records shall contain the name and address of each employee, social security number, labor classifications, hourly rates of wages paid, daily and weekly number of hours worked, deductions made, and actual wages paid. The records need not duplicate those required for construction work by Department of Labor regulations at 29 CFR 5.5(a)(3) implementing the Construction Wage Rate Requirements statute.
(2) The Contractor and its subcontractors shall allow authorized representatives of the Contracting Officer or the Department of Labor to inspect, copy, or transcribe records maintained under paragraph (d)(1) of this clause. The Contractor or subcontractor also shall allow authorized representatives of the Contracting Officer or Department of Labor to interview employees in the workplace during working hours.
(e) Subcontracts. The Contractor shall insert the provisions set forth in paragraphs (a) through (d) of this clause in subcontracts that may require or involve the employment of laborers and mechanics and require subcontractors to include these provisions in any such lower tier subcontracts. The Contractor shall be responsible for compliance by any subcontractor or lower-tier subcontractor with the provisions set forth in paragraphs (a) through (d) of this clause.
(End of clause)
1.34 *FAR 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS-SECONDARY SITE OF
THE WORK (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of provision)
1.35 *FAR 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018)
(a) Definition.-"Site of the work"- (1) Means-
(i) The primary site of the work. The physical place or places where the construction called for in the contract will remain when work on it is completed; and
(ii) The secondary site of the work, if any. Any other
DOCUMENT 00 72 00 Page 14 site where a significant portion of the building or work is constructed, provided that such site is-
(A) Located in the United States; and
(B) Established specifically for the performance of the contract or project;
(2) Except as provided in paragraph (3) of this definition, includes any fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., provided-
(i) They are dedicated exclusively, or nearly so, to performance of the contract or project; and
(ii) They are adjacent or virtually adjacent to the "primary site of the work" as defined in paragraph (a)(1)(i), or the "secondary site of the work" as defined in paragraph (a)(1)(ii) of this definition;
(3) Does not include permanent home offices, branch plant establishments, fabrication plants, or tool yards of a Contractor or subcontractor whose locations and continuance in operation are determined wholly without regard to a particular Federal contract or project. In addition, fabrication plants, batch plants, borrow pits, job headquarters, yards, etc., of a commercial or material supplier which are established by a supplier of materials for the project before opening of bids and not on the Project site, are not included in the "site of the work." Such permanent, previously established facilities are not a part of the "site of the work" even if the operations for a period of time may be dedicated exclusively or nearly so, to the performance of a contract.
(b)(1) All laborers and mechanics employed or working upon the site of the work will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, or as may be incorporated for a secondary site of the work, regardless of any contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics. Any wage determination incorporated for a secondary site of the work shall be effective from the first day on which work under the contract was performed at that site and shall be incorporated without any adjustment in contract price or estimated cost. Laborers employed by the construction Contractor or construction subcontractor that are transporting portions of the building or work between the secondary site of the work and the primary site of the work shall be paid in accordance with the wage determination applicable to the primary site of the work.
(2) Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Construction Wage Rate Requirements statute on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (e) of this clause; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such period.
(3) Such laborers and mechanics shall be paid not less than the appropriate wage rate and fringe benefits in the wage determination for the classification of work actually performed, without regard to skill, except as provided in the clause entitled Apprentices and Trainees. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein; provided that the employer's payroll records
DOCUMENT 00 72 00 Page 15 accurately set forth the time spent in each classification in which work is performed.
(4) The wage determination (including any additional classifications and wage rates conformed under paragraph (c) of this clause) and the Construction Wage Rate Requirements (Davis-Bacon Act) poster (WH-1321) shall be posted at all times by the Contractor and its subcontractors at the primary site of the work and the secondary site of the work, if any, in a prominent and accessible place where it can be easily seen by the workers.
(c)(1) The Contracting Officer shall require that any class of laborers or mechanics which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The Contracting Officer shall approve an additional classification and wage rate and fringe benefits therefor only when all the following criteria have been met:
(i) The work to be performed by the classification requested is not performed by a classification in the wage determination.
(ii) The classification is utilized in the area by the construction industry.
(iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
(2) If the Contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the Contracting Officer agree on the classification and wage rate (including the amount designated for fringe benefits, where appropriate), a report of the action taken shall be sent by the Contracting Officer to the Administrator of the:
Wage and Hour Division
U.S. Department of Labor Washington, DC 20210
The Administrator or an authorized representative will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the Contracting Officer or will notify the Contracting Officer within the 30-day period that additional time is necessary.
(3) In the event the Contractor, the laborers or mechanics to be employed in the classification, or their representatives, and the Contracting Officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the Contracting Officer shall refer the questions, including the views of all interested parties and the recommendation of the Contracting Officer, to the Administrator of the Wage and Hour Division for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the Contracting Officer or will notify the Contracting Officer within the 30-day period that additional time is necessary.
(4) The wage rate (including fringe benefits, where appropriate) determined pursuant to paragraphs (c)(2) and (c)(3) of this clause shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.
(d) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the Contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof.
DOCUMENT 00 72 00 Page 16
(e) If the Contractor does not make payments to a trustee or other third person, the Contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program; provided, That the Secretary of Labor has found, upon the written request of the Contractor, that the applicable standards of the Construction Wage Rate Requirements statute have been met. The Secretary of Labor may require the Contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.
(End of clause)
1.36 *FAR 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
The Contracting Officer shall, upon his or her own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the Contractor under this contract or any other Federal contract with the same Prime Contractor, or any other Federally assisted contract subject to prevailing wage requirements, which is held by the same Prime Contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, the Contracting Officer may, after written notice to the Contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.
(End of clause)
1.37 *FAR 52.222-8 PAYROLLS AND BASIC RECORDS (AUG 2018)
(a) Payrolls and basic records relating thereto shall be maintained by the Contractor during the course of the work and preserved for a period of 3 years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40 U.S.C. 3141(2)(B) (Construction Wage Rate Requirement statute)), daily and weekly number of hours worked, deductions made, and actual wages paid. Whenever the Secretary of Labor has found, under paragraph (d) of the clause entitled Construction Wage Rate Requirements, that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C. 3141(2)(B), the Contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.
(b)(1) The Contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the Contracting Officer. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under paragraph (a) of this
DOCUMENT 00 72 00 Page 17 clause, except that full social security numbers and home addresses shall not be included on…