200317_MRPO_amendment_1.pdf
PDF 473 KB Posted
- Attached to
- Missouri River Project Office Rehab
- Solicitation number
- W9128F20Q0015
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
60' - 1"
0' - 6" 2' - 6"
10' - 2" 4' - 6" 3' - 4"
1' - 9" 13' - 9" 10' - 8" 9' - 9" 2' - 8" 0' - 6"
0' - 6" 17' - 0" 5' - 2" 1' - 10"
12' - 0" 2' - 10" 3' - 4" 16' - 11" 0' - 6"
60' - 1"
0'
6"
3'
4"
3'
4"
0"
0" 0'
6"
0'
6" 2'
6"
5'
0"
5'
0"
7'
8" 9'
0"
7'
8" 9'
0"
7'
8" 8'
0"
5'
2" 2'
4"
0'
6"
0'
8"
0'
8"
20' - 0"
15' - 4"
SIGN
SHOP
CARPENTRY
SHOP
STAIR 2
A-111
A-111
RESTROOM
WAREHOUSE
161818
17 TYP, ALL COLUMNS
STAIR 1
A
19B
C
15' - 4"
RESTROOM
STAIR 2
WAREHOUSE
2'
4" 5'
2"
1'
6"
13' - 4"
9'
0"
2'
2" 3'
4"
0'
2'
9"
BOTH SIDES,
UNDER STAIR
ABOVE
STAIR
7 BOTH SIDES
19D
19E
2'
5'
8"
SIGN
SHOP
CARPENTRY
SHOP
19' - 7"
3'
4"
2'
2'
6"
7' - 2" 9' - 9" 2' - 8"
STAIR 1
BOTH SIDES
19H
19F
19J
G
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
A-111
BL
D
G
FL
O O
R P
LA
N
M
IS
SO
U
R I R
IV
ER
P R
O
JE
C T
O
FF
IC
E, N
EB
R
AS
KA
O
M
AH
A D
IS
TR
IC
T
C
AP
IT
O
L
AV
EN
U
E O
M
AH
A, N
E
R . A
H
LE
R S
R . A
H
LE
R S
B.
G
O R
U P
B.
G
O R
U P
/1
8/
W
F-
-Q
-0
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
M R
PO
P
O
ST
F
LO
O D
R
EH
AB
IL
IT
AT
IO
N
(F Y1
9)
O D
_M
R
PO
.R
VT
3/32" = 1'-0"1 BLDG 19 FLOOR PLAN
1/4" = 1'-0"3 ENLARGED RESTROOM
1/4" = 1'-0"2 ENLARGED SHOPS
KEYNOTE LEGEND
1 REMOVE ALL FINISHES AND GYP BD, WASH, SANITIZE AND DRY
INSULATED CONCRETE FORMWORK TO 3’-0” AFF. PROVIDE AND
INSTALL NEW LINER PANEL (LP-1) WAINSCOT TO 3’-0” AFF. SEE
DETAIL 1/A-501. MODERATE WATER PRESSURE DURING WASH TO
PRESERVE THE INTEGRITY OF EXPANDED POLYSTYRENE (EPS)
MATERIAL.
2 REMOVE ALL LINER PANEL FOR FULL HEIGHT OF WALL. WASH,
SANITIZE AND DRY INSULATED CONCRETE FORMWORK TO 3’-0”
AFF. PROVIDE AND INSTALL NEW LINER PANEL (LP-1) FOR FULL
WALL HEIGHT OF WALL WITH METAL WAINSCOT TRIM AT 3’-0” AFF.
SEE DETAIL 2/A-501. MODERATE WATER PRESSURE DURING WASH
TO PRESERVE THE INTEGRITY OF EXPANDED POLYSTYRENE (EPS)
MATERIAL.
3 REMOVE ALL FINSHES AND GYP BD FLOOR TO CEILING. WASH,
SANITIZE AND DRY INSULATED CONCRETE FORMWORK TO 3’-0”
AFF. PROVIDE AND INSTALL NEW GLASS MAT GYP BD AND TILE
(CT-1) TO 6’-0” AFF. NEW TILE AND GROUT TO MATCH EXISTING TILE
AND GROUT IN COLOR, TEXTURE, AND PATTERN. PROVIDE AND
INSTALL NEW GLASS MAT GYP BD AND FRP WALL BOARD ABOVE
6’-0” AFF TO MATCH EXISTING. SEE DETAIL 3/A-501.
4 REMOVE ALL FINSHES AND GYP BD FLOOR TO CEILING. WASH,
SANITIZE AND DRY INSULATED CONCRETE FORMWORK TO 3’-0”
AFF. PROVIDE AND INSTALL NEW GLASS MAT GYP BD AND FRP
WALL BOARD TO MATCH EXISTING. PROVIDE NEW TILE BASE TRIM
(CT-2) to 0’-4” AFF. SEE DETAIL 4/A-501. MODERATE WATER
PRESSURE DURING WASH TO PRESERVE THE INTEGRITY OF
EXPANDED POLYSTYRENE (EPS) MATERIAL.
5 REMOVE ALL FINSHES, GYP BD, AND INSULATION, POWER WASH,
SANITIZE AND DRY CMU WALL AND WOOD FRAMING TO 3’-0” AFF.
PAINT CMU WALL AND WOOD FRAMING MEMBERS WITH A
WATER-REPELLENT, VAPOR-OPEN ACRYLIC LATEX PAINT. PROVIDE
2” MINIMUM CLOSED-CELL SPRAY FOAM INSULATION. PROVIDE
AND INSTALL NEW LINER PANEL (LP-2) WAINSCOT TO 3’-0” AFF. SEE
DETAIL 5/A-501.
6 REMOVE ALL FINSHES AND GYP BD, POWER WASH, SANITIZE AND
DRY WOOD FRAMING AND CMU WALL TO 4’-3 1/2” AFF (HEIGHT OF
FURRED PLUMBING WALL, FIELD VERIFY). PROTECT EXISTING
PLUMBING ROUGH-INS AND FIXTURES FROM DAMAGE. PAINT
WOOD FRAMING AND CMU WALL WITH A WATER-REPELLENT,
VAPOR-OPEN ACRYLIC LATEX PAINT. PROVIDE 2” MINIMUM
CLOSED-CELL SPRAY FOAM INSULATION. PROVIDE AND INSTALL
NEW GLASS MAT GYP BD AND TILE (CT-2) TO 4’-3 ½” AFF (FV) AND
AT HORIZONTAL LEDGE ABOVE FURRED PLUMBING WALL. NEW
TILE AND GROUT TO MATCH EXISTING TILE AND GROUT IN COLOR,
TEXTURE, AND PATTERN. SEE DETAIL 6/A-501.
7 REMOVE PANEL WAINSCOT, AND INSULATION. METAL WAINSCOT
TRIM TO REMAIN. POWER WASH, SANITIZE AND DRY FRAMING
MEMBERS TO APPROXIMATELY 3’-0” AFF (HEIGHT OF EXISTING
WAINSCOT, FIELD VERIFY). PROVIDE 2” MINIMUM CLOSED-CELL
SPRAY FOAM INSULATION. PROVIDE AND INSTALL NEW LINER
PANEL (LP-2) WAINSCOT TO 3’-0” AFF. SEE DETAIL 7/A-501.
8 REMOVE EXTERIOR METAL PANEL WHERE INDICATED, WASH,
SANITIZE AND DRY INSULATED CONCRETE FORMWORK TO
APPROXIMATELY 3’-2” AFF (HEIGHT OF EXISTING PAINT FINISH
TRANSITION, FIELD VERIFY). PROVIDE AND INSTALL NEW
EXTERIOR METAL PANEL (MP-1). PROVIDE FLASHING AT NEW
EXTERIOR METAL PANEL. FINISH TO MATCH EXISTING METAL
PANEL AT BUILDING WAINSCOT. SEE DETAIL 8/A-501. MODERATE
WATER PRESSURE DURING WASH TO PRESERVE THE INTEGRITY
OF EXPANDED POLYSTYRENE (EPS) MATERIAL.
9 REMOVE ALL FINSHES AND GYP BD, POWER WASH, SANITIZE AND
DRY WOOD FRAMING TO 3’-0” AFF. PAINT WOOD FRAMING WITH A
WATER-REPELLENT, VAPOR-OPEN ACRYLIC LATEX PAINT. PROVIDE
AND INSTALL NEW LINER PANEL (LP-1) WAINSCOT TO 3’-0” AFF. SEE
DETAIL 9/A-502.
10 REMOVE ALL FINSHES, GYP BD, AND INSULATION, POWER WASH,
SANITIZE AND DRY WOOD FRAMING AND LATH BEYOND (WHERE
OCCURS) TO 3’-0” AFF. PAINT WOOD FRAMING AND LATH BEYOND
(WHERE OCCURS) WITH A WATER-REPELLENT, VAPOR-OPEN
ACRYLIC LATEX PAINT. PROVIDE 2” MINIMUM CLOSED-CELL SPRAY
FOAM INSULATION. PROVIDE AND INSTALL NEW LINER PANEL
WAINSCOT TO 3’-0” AFF. SEE DETAIL 10/A-502.
11 REMOVE ALL FINSHES AND GYP BD FLOOR TO CEILING. POWER
WASH, SANITIZE AND DRY FRAMING MEMBER TO 3’-0” AFF.
PROTECT EXISTING PLUMBING ROUGH-INS AND FIXTURES FROM
DAMAGE. PROVIDE AND INSTALL NEW GLASS MAT GYP BD AND
TILE (CT-1) TO 6’-0” AFF. NEW TILE AND GROUT TO MATCH EXISTING
TILE AND GROUT IN COLOR, TEXTURE, AND PATTERN. PROVIDE
AND INSTALL NEW GLASS MAT GYP BD AND FRP WALL BOARD
ABOVE 6’-0” AFF TO MATCH EXISTING. SEE DETAIL 11/A-502.
12 REMOVE ALL FINSHES AND GYP BD, POWER WASH, SANITIZE AND
DRY WOOD FRAMING AND CMU WALL TO 4’-3 1/2” AFF (MATCH
HEIGHT OF FURRED PLUMBING WALL, FIELD VERIFY). PAINT WOOD
FRAMING AND CMU WALL WITH A WATER-REPELLENT,
VAPOR-OPEN ACRYLIC LATEX PAINT. PROVIDE 2” MINIMUM
CLOSED-CELL SPRAY FOAM INSULATION. PROVIDE AND INSTALL
NEW GLASS MAT GYP BD AND TILE (CT-2) TO 4’-3 ½” (FV). NEW TILE
AND GROUT TO MATCH EXISTING TILE AND GROUT IN COLOR,
TEXTURE, AND PATTERN. SEE DETAIL 12/A-501.
13 REMOVE ALL FINSHES AND GYP BD FLOOR TO CEILING. POWER
WASH, SANITIZE AND DRY FRAMING MEMBER TO 3’-0” AFF.
PROVIDE AND INSTALL NEW GLASS MAT GYP BD AND FRP WALL
BOARD TO MATCH EXISTING. PROVIDE NEW TILE BASE TRIM (CT-2)
to 0’-4” AFF. SEE DETAIL 13/A-502.
14 REMOVE LINER PANEL WAINSCOT. POWER WASH, SANITIZE AND
DRY CONCRETE CURB, FRAMING MEMBERS AND WOOD LATH TO
3’-0” AFF. PAINT WOOD FRAMING AND LATH WITH A
WATER-REPELLENT, VAPOR-OPEN ACRYLIC LATEX PAINT. PROVIDE
AND INSTALL NEW LINER PANEL (LP-2) WAINSCOT. SEE DETAIL
14/A-502.
15 REMOVE HARDWARE AND RETAIN FOR RE-INSTALLATION. REMOVE
AND REPLACE DOOR AND FRAME. POWER WASH, SANITIZE, AND
DRY ROUGH OPENING FRAMING MEMBERS TO 3’-0”. PAINT DOOR
AND FRAME TO MATCH EXISTING. RE-INSTALL EXISTING
HARDWARE. UNSERVICEABLE HARDWARE SHALL BE REPLACED TO
MATCH EXISTING WITH THE APPROVAL OF THE COR.
15A REMOVE HARDWARE AND RETAIN FOR RE-INSTALLATION. REMOVE
AND REPLACE DOOR PANEL ONLY. POWER WASH, SANITIZE, AND
DRY ROUGH OPENING FRAMING MEMBERS TO 3’-0”. PAINT DOOR
AND FRAME TO MATCH EXISTING. RE-INSTALL EXISTING
HARDWARE. UNSERVICEABLE HARDWARE SHALL BE REPLACED TO
MATCH EXISTING WITH THE APPROVAL OF THE COR.
16 REMOVE AND REPLACE BOTTOM OVERHEAD DOOR PANEL. POWER
WASH, SANITZE AND DRY ENTIRE REMAINING DOOR PANELS AND
TRACK TO REMOVE REMAINING FLOOD DEBRIS AND WATER
MARKS.
17 POWER WASH, SANITIZE AND DRY ELEMENT TO 3’-6” AFF. PREP
AND PAINT ELEMENT TO 3’-6” WITH FINISH EQUIVELANT TO THE
EXISTING.
18 POWER WASH, SANITIZE AND DRY CMU WALL TO 3’-6” AFF. PREP
AND PAINT WALL TO 3’-6” WITH FINISH EQUIVELANT TO THE
EXISTING.
19 REMOVE EXITING TILE BASE TRIM. POWER WASH, SANITIZE AND
DRY ALL EXISTING FLOOR TILE.
G
EN
ER
AL
R
EV
IS
IO
N
S 3/
/2
1 IF STRUCTURAL DAMAGE IS DISCOVERED
DURING REMEDIATION EFFORTS, STOP WORK
AND NOTIFY COR IMMEDIATELY.
2 ALL SANITIZING SHALL CONSIST OF MILD
DETERGENT WASH TO REMOVE ANY LOOSE
DIRT AND DEBRIS FROM REMAINING
SUBSTRATES. ANY DISCOVERED MOLD SHALL
BE REMEDIATED.
3 ALL DRAWINGS ARE SCHEMATIC IN NATURE
AND COMMUNICATE THE INTENT OF THE
REPAIRS.
4 CONTRACTOR IS RESPONSIBLE FOR
DISPOSAL OF ALL TRASH, DEBRIS, AND
FLOOD ITEMS DETERMINED TO BE RUINED BY
FLOOD WATERS IN THIS FACILITY. THE
REMOVAL, TEMPORARY STORAGE, AND/OR
SANITATION OF ANY EQUIPMENT SHALL BE
COORDINATED WITH COR.
5 ALL MATERIALS AND FINISHES SHALL MATCH
EXISTING IN APPEARANCE AND QUALITY AND
BE INSTALLED PER THE MANUFACTURER'S
RECOMMENDATION AND INDUSTRY
STANDARDS.
6 ANY EXISTING WAINSCOT HEIGHTS THAT
DEVIATE FROM THE HEIGHTS INDICATED IN
THE DRAWINGS SHALL BE BROUGHT TO THE
COR'S ATTENTION TO DETERMINE WETHER
THE DEVIATION IS ACCEPTABLE.
GENERAL NOTES
REF.
DW
LOCKER
ROOM
BREAK
ROOM
OFFICE
RESTROOM
WAREHOUSE
2'
8"
50' - 0"
0' - 6" 15' - 2" 18' - 8" 15' - 2" 0' - 6"
50' - 0"
2'
8"
A-112
2'
8"
50' - 0"
0' - 6" 15' - 2" 18' - 8" 15' - 2" 0' - 6"
50' - 0"
2'
8"
2'
8"
50' - 0"
0' - 6" 15' - 2" 18' - 8" 15' - 2" 0' - 6"
50' - 0"
0'
6"
3'
4"
3'
4"
3'
4"
3'
4"
3'
4"
4'
2" 3'
4"
1'
5" 0'
6"
2'
8"
0' - 6" 0' - 4"
3' - 4" 11' - 6" 18' - 8" 14' - 1" 1' - 7"
0'
6"
3'
4"
0"
1'
7"
0' - 6" 15' - 2" 18' - 8" 15' - 2" 0' - 6"
50' - 0"
2'
8"
17 TYP, ALL COLUMNS
STAIR
50C
50A
B
1' - 8" 7' - 9" 1' - 8"
3'
4" 0'
9"
1'
0" 9'
3'
5"
6'
5" 1'
4"
1'
0"
2'
0" 6'
2"
9'
9" 9'
0"
3'
4" 5'
5"
6'
5" 1'
4"
1'
0"
3'
4"
LOCKER
ROOM
BREAK
ROOM
OFFICE
RESTROOM
5' - 2"
2' - 11" 2'
6"
5'
0" 3' - 0"
1' - 0"
A-401
A
C
A-401
C
A
B
15A
15A
9 BOTH SIDES
METAL PANEL REMOVAL
LIMITS OF EXTERIOR
M
ET
AL
P
AN
EL
R
EM
O
VA
L
LI
M
IT
S
O F
EX
TE
R
IO
R
13 13
111111
11111111
STAIR
50F
50E
50D
A-502
A-502
OPP
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
A-112
BL
D
G
FL
O O
R P
LA
N
M
IS
SO
U
R I R
IV
ER
P R
O
JE
C T
O
FF
IC
E, N
EB
R
AS
KA
O
M
AH
A D
IS
TR
IC
T
C
AP
IT
O
L
AV
EN
U
E O
M
AH
A, N
E
R . A
H
LE
R S
R . A
H
LE
R S
B.
G
O R
U P
B.
G
O R
U P
/1
8/
W
F-
-Q
-0
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
M R
PO
P
O
ST
F
LO
O D
R
EH
AB
IL
IT
AT
IO
N
(F Y1
9)
O D
_M
R
PO
.R
VT
3/32" = 1'-0"1 BLDG 50 FLOOR PLAN
1/4" = 1'-0"2 ENLARGED BLDG 50 RESTROOM
G
EN
ER
AL
R
EV
IS
IO
N
S 3/
/2
KEYNOTE LEGEND
1 REMOVE ALL FINISHES AND GYP BD, WASH, SANITIZE AND DRY
INSULATED CONCRETE FORMWORK TO 3’-0” AFF. PROVIDE AND
INSTALL NEW LINER PANEL (LP-1) WAINSCOT TO 3’-0” AFF. SEE
DETAIL 1/A-501. MODERATE WATER PRESSURE DURING WASH TO
PRESERVE THE INTEGRITY OF EXPANDED POLYSTYRENE (EPS)
MATERIAL.
2 REMOVE ALL LINER PANEL FOR FULL HEIGHT OF WALL. WASH,
SANITIZE AND DRY INSULATED CONCRETE FORMWORK TO 3’-0”
AFF. PROVIDE AND INSTALL NEW LINER PANEL (LP-1) FOR FULL
WALL HEIGHT OF WALL WITH METAL WAINSCOT TRIM AT 3’-0” AFF.
SEE DETAIL 2/A-501. MODERATE WATER PRESSURE DURING WASH
TO PRESERVE THE INTEGRITY OF EXPANDED POLYSTYRENE (EPS)
MATERIAL.
3 REMOVE ALL FINSHES AND GYP BD FLOOR TO CEILING. WASH,
SANITIZE AND DRY INSULATED CONCRETE FORMWORK TO 3’-0”
AFF. PROVIDE AND INSTALL NEW GLASS MAT GYP BD AND TILE
(CT-1) TO 6’-0” AFF. NEW TILE AND GROUT TO MATCH EXISTING TILE
AND GROUT IN COLOR, TEXTURE, AND PATTERN. PROVIDE AND
INSTALL NEW GLASS MAT GYP BD AND FRP WALL BOARD ABOVE
6’-0” AFF TO MATCH EXISTING. SEE DETAIL 3/A-501.
4 REMOVE ALL FINSHES AND GYP BD FLOOR TO CEILING. WASH,
SANITIZE AND DRY INSULATED CONCRETE FORMWORK TO 3’-0”
AFF. PROVIDE AND INSTALL NEW GLASS MAT GYP BD AND FRP
WALL BOARD TO MATCH EXISTING. PROVIDE NEW TILE BASE TRIM
(CT-2) to 0’-4” AFF. SEE DETAIL 4/A-501. MODERATE WATER
PRESSURE DURING WASH TO PRESERVE THE INTEGRITY OF
EXPANDED POLYSTYRENE (EPS) MATERIAL.
5 REMOVE ALL FINSHES, GYP BD, AND INSULATION, POWER WASH,
SANITIZE AND DRY CMU WALL AND WOOD FRAMING TO 3’-0” AFF.
PAINT CMU WALL AND WOOD FRAMING MEMBERS WITH A
WATER-REPELLENT, VAPOR-OPEN ACRYLIC LATEX PAINT. PROVIDE
2” MINIMUM CLOSED-CELL SPRAY FOAM INSULATION. PROVIDE
AND INSTALL NEW LINER PANEL (LP-2) WAINSCOT TO 3’-0” AFF. SEE
DETAIL 5/A-501.
6 REMOVE ALL FINSHES AND GYP BD, POWER WASH, SANITIZE AND
DRY WOOD FRAMING AND CMU WALL TO 4’-3 1/2” AFF (HEIGHT OF
FURRED PLUMBING WALL, FIELD VERIFY). PROTECT EXISTING
PLUMBING ROUGH-INS AND FIXTURES FROM DAMAGE. PAINT
WOOD FRAMING AND CMU WALL WITH A WATER-REPELLENT,
VAPOR-OPEN ACRYLIC LATEX PAINT. PROVIDE 2” MINIMUM
CLOSED-CELL SPRAY FOAM INSULATION. PROVIDE AND INSTALL
NEW GLASS MAT GYP BD AND TILE (CT-2) TO 4’-3 ½” AFF (FV) AND
AT HORIZONTAL LEDGE ABOVE FURRED PLUMBING WALL. NEW
TILE AND GROUT TO MATCH EXISTING TILE AND GROUT IN COLOR,
TEXTURE, AND PATTERN. SEE DETAIL 6/A-501.
7 REMOVE PANEL WAINSCOT, AND INSULATION. METAL WAINSCOT
TRIM TO REMAIN. POWER WASH, SANITIZE AND DRY FRAMING
MEMBERS TO APPROXIMATELY 3’-0” AFF (HEIGHT OF EXISTING
WAINSCOT, FIELD VERIFY). PROVIDE 2” MINIMUM CLOSED-CELL
SPRAY FOAM INSULATION. PROVIDE AND INSTALL NEW LINER
PANEL (LP-2) WAINSCOT TO 3’-0” AFF. SEE DETAIL 7/A-501.
8 REMOVE EXTERIOR METAL PANEL WHERE INDICATED, WASH,
SANITIZE AND DRY INSULATED CONCRETE FORMWORK TO
APPROXIMATELY 3’-2” AFF (HEIGHT OF EXISTING PAINT FINISH
TRANSITION, FIELD VERIFY). PROVIDE AND INSTALL NEW
EXTERIOR METAL PANEL (MP-1). PROVIDE FLASHING AT NEW
EXTERIOR METAL PANEL. FINISH TO MATCH EXISTING METAL
PANEL AT BUILDING WAINSCOT. SEE DETAIL 8/A-501. MODERATE
WATER PRESSURE DURING WASH TO PRESERVE THE INTEGRITY
OF EXPANDED POLYSTYRENE (EPS) MATERIAL.
9 REMOVE ALL FINSHES AND GYP BD, POWER WASH, SANITIZE AND
DRY WOOD FRAMING TO 3’-0” AFF. PAINT WOOD FRAMING WITH A
WATER-REPELLENT, VAPOR-OPEN ACRYLIC LATEX PAINT. PROVIDE
AND INSTALL NEW LINER PANEL (LP-1) WAINSCOT TO 3’-0” AFF. SEE
DETAIL 9/A-502.
10 REMOVE ALL FINSHES, GYP BD, AND INSULATION, POWER WASH,
SANITIZE AND DRY WOOD FRAMING AND LATH BEYOND (WHERE
OCCURS) TO 3’-0” AFF. PAINT WOOD FRAMING AND LATH BEYOND
(WHERE OCCURS) WITH A WATER-REPELLENT, VAPOR-OPEN
ACRYLIC LATEX PAINT. PROVIDE 2” MINIMUM CLOSED-CELL SPRAY
FOAM INSULATION. PROVIDE AND INSTALL NEW LINER PANEL
WAINSCOT TO 3’-0” AFF. SEE DETAIL 10/A-502.
11 REMOVE ALL FINSHES AND GYP BD FLOOR TO CEILING. POWER
WASH, SANITIZE AND DRY FRAMING MEMBER TO 3’-0” AFF.
PROTECT EXISTING PLUMBING ROUGH-INS AND FIXTURES FROM
DAMAGE. PROVIDE AND INSTALL NEW GLASS MAT GYP BD AND
TILE (CT-1) TO 6’-0” AFF. NEW TILE AND GROUT TO MATCH EXISTING
TILE AND GROUT IN COLOR, TEXTURE, AND PATTERN. PROVIDE
AND INSTALL NEW GLASS MAT GYP BD AND FRP WALL BOARD
ABOVE 6’-0” AFF TO MATCH EXISTING. SEE DETAIL 11/A-502.
12 REMOVE ALL FINSHES AND GYP BD, POWER WASH, SANITIZE AND
DRY WOOD FRAMING AND CMU WALL TO 4’-3 1/2” AFF (MATCH
HEIGHT OF FURRED PLUMBING WALL, FIELD VERIFY). PAINT WOOD
FRAMING AND CMU WALL WITH A WATER-REPELLENT,
VAPOR-OPEN ACRYLIC LATEX PAINT. PROVIDE 2” MINIMUM
CLOSED-CELL SPRAY FOAM INSULATION. PROVIDE AND INSTALL
NEW GLASS MAT GYP BD AND TILE (CT-2) TO 4’-3 ½” (FV). NEW TILE
AND GROUT TO MATCH EXISTING TILE AND GROUT IN COLOR,
TEXTURE, AND PATTERN. SEE DETAIL 12/A-501.
13 REMOVE ALL FINSHES AND GYP BD FLOOR TO CEILING. POWER
WASH, SANITIZE AND DRY FRAMING MEMBER TO 3’-0” AFF.
PROVIDE AND INSTALL NEW GLASS MAT GYP BD AND FRP WALL
BOARD TO MATCH EXISTING. PROVIDE NEW TILE BASE TRIM (CT-2)
to 0’-4” AFF. SEE DETAIL 13/A-502.
14 REMOVE LINER PANEL WAINSCOT. POWER WASH, SANITIZE AND
DRY CONCRETE CURB, FRAMING MEMBERS AND WOOD LATH TO
3’-0” AFF. PAINT WOOD FRAMING AND LATH WITH A
WATER-REPELLENT, VAPOR-OPEN ACRYLIC LATEX PAINT. PROVIDE
AND INSTALL NEW LINER PANEL (LP-2) WAINSCOT. SEE DETAIL
14/A-502.
15 REMOVE HARDWARE AND RETAIN FOR RE-INSTALLATION. REMOVE
AND REPLACE DOOR AND FRAME. POWER WASH, SANITIZE, AND
DRY ROUGH OPENING FRAMING MEMBERS TO 3’-0”. PAINT DOOR
AND FRAME TO MATCH EXISTING. RE-INSTALL EXISTING
HARDWARE. UNSERVICEABLE HARDWARE SHALL BE REPLACED TO
MATCH EXISTING WITH THE APPROVAL OF THE COR.
15A REMOVE HARDWARE AND RETAIN FOR RE-INSTALLATION. REMOVE
AND REPLACE DOOR PANEL ONLY. POWER WASH, SANITIZE, AND
DRY ROUGH OPENING FRAMING MEMBERS TO 3’-0”. PAINT DOOR
AND FRAME TO MATCH EXISTING. RE-INSTALL EXISTING
HARDWARE. UNSERVICEABLE HARDWARE SHALL BE REPLACED TO
MATCH EXISTING WITH THE APPROVAL OF THE COR.
16 REMOVE AND REPLACE BOTTOM OVERHEAD DOOR PANEL. POWER
WASH, SANITZE AND DRY ENTIRE REMAINING DOOR PANELS AND
TRACK TO REMOVE REMAINING FLOOD DEBRIS AND WATER
MARKS.
17 POWER WASH, SANITIZE AND DRY ELEMENT TO 3’-6” AFF. PREP
AND PAINT ELEMENT TO 3’-6” WITH FINISH EQUIVELANT TO THE
EXISTING.
18 POWER WASH, SANITIZE AND DRY CMU WALL TO 3’-6” AFF. PREP
AND PAINT WALL TO 3’-6” WITH FINISH EQUIVELANT TO THE
EXISTING.
19 REMOVE EXITING TILE BASE TRIM. POWER WASH, SANITIZE AND
DRY ALL EXISTING FLOOR TILE.
1 IF STRUCTURAL DAMAGE IS DISCOVERED
DURING REMEDIATION EFFORTS, STOP WORK
AND NOTIFY COR IMMEDIATELY.
2 ALL SANITIZING SHALL CONSIST OF MILD
DETERGENT WASH TO REMOVE ANY LOOSE
DIRT AND DEBRIS FROM REMAINING
SUBSTRATES. ANY DISCOVERED MOLD SHALL
BE REMEDIATED.
3 ALL DRAWINGS ARE SCHEMATIC IN NATURE
AND COMMUNICATE THE INTENT OF THE
REPAIRS.
4 CONTRACTOR IS RESPONSIBLE FOR
DISPOSAL OF ALL TRASH, DEBRIS, AND
FLOOD ITEMS DETERMINED TO BE RUINED BY
FLOOD WATERS IN THIS FACILITY. THE
REMOVAL, TEMPORARY STORAGE, AND/OR
SANITATION OF ANY EQUIPMENT SHALL BE
COORDINATED WITH COR.
5 ALL MATERIALS AND FINISHES SHALL MATCH
EXISTING IN APPEARANCE AND QUALITY AND
BE INSTALLED PER THE MANUFACTURER'S
RECOMMENDATION AND INDUSTRY
STANDARDS.
6 ANY EXISTING WAINSCOT HEIGHTS THAT
DEVIATE FROM THE HEIGHTS INDICATED IN
THE DRAWINGS SHALL BE BROUGHT TO THE
COR'S ATTENTION TO DETERMINE WETHER
THE DEVIATION IS ACCEPTABLE.
GENERAL NOTES
TO REMAIN
EXISTING ICF FOR KEYNOTE
SEE FLOOR PLAN
3'-0" AFF
WAINSCOT HEIGHT
FINSH FLOOR
NEW LINER
PANEL (LP-1)
7/8" HAT CHANNEL,
SECURED TO ICF
INTERNAL WEB
EXISTING GYP
BD TO REMAIN
WASH, SANITIZE AND
DRY INSULATION
SEE KEYNOTES
ON FLOOR PLAN
FOR CONDITION
AT OPPOSITE
WALL FACE
TO REMAIN
EXISTING ICF FOR KEYNOTE
SEE FLOOR PLAN
3'-0" AFF
WAINSCOT HEIGHT
FINSH FLOOR
NEW LINER
PANEL (LP-1)
NEW LINER
PANEL (LP-1)
7/8" HAT CHANNEL,
SECURED TO ICF
INTERNAL WEB
WASH, SANITIZE AND
DRY INSULATION
SEE KEYNOTES
ON FLOOR PLAN
FOR CONDITION
AT OPPOSITE
WALL FACE
TO REMAIN
EXISTING GIRT PLANE EXISTING EXTERIOR WALL
PANEL TO REMAIN U.O.N.
APPROX. 3'-0" AFF
EXISTING WAINSCOT HEIGHT
(VERIFY IN FIELD)
FINSH FLOOR
NEW LINER PANEL (LP-2)
WASH SANITIZE AND DRY
EXISTING FRAMING
MEMBERS
EXISTING LINER
PANEL TO REMAIN
EXISTING FRAMING,
VERIFY LOCATION
EXISTING EXTERIOR
WALL PANEL TO REMAIN,
U.O.N. SEE KEYNOTES
ON FLOOR PLAN
REMOVE EXISTING
FIBERGLASS BATT
INSULATION AND REPLACE
WITH CLOSED-CELL SPRAY
FOAM INSULATION
MIN.
0' - 2"
EXISTING BATT
INSULATION TO REMAIN
3'-2" AFF
WAINSCOT HEIGHT
FINSH FLOOR
NEW EXTERIOR
METAL PANEL (MP-1),
MATCH EXISTING IN
COLOR AND PROFILE
WASH SANITIZE AND
DRY EXISTING
FRAMING MEMBERS
EXISTING EXTERIOR
METAL WALL PANEL
TO REMAIN
WASH, SANITIZE AND
DRY INSULATION,
WHERE OCCURS AT
ICF WALL
SEE KEYNOTES
ON FLOOR PLAN
FOR CONDITION
AT OPPOSITE
WALL FACE
PLANE TO REMAIN
EXISTING GIRT
FOR KEYNOTE
SEE FLOOR PLAN
REMOVE EXISTING
FIBERGLASS BATT
INSULATION AND
REPLACE WITH
CLOSED-CELL SPRAY
FOAM INSULATION
EXISTING STUD WALL
TO REMAIN
TO REMAIN
EXIST CMU TO REMAIN
EXISTING METAL PANEL
3'-0" AFF
WAINSCOT HEIGHT
FINSH FLOOR
NEW LINER
PANEL (LP-2)
WASH SANITIZE AND
DRY EXISTING WOOD
FRAMING, PAINT WITH
WATER REPELLENT,
VAPOR-OPEN,
ACRYLIC LATEX PAINT
EXISTING GYP
BD TO REMAIN
MIN.
0' - 2"
NEW STEEL
STUD BLOCKING
AT WAINSCOT
WASH SANITIZE AND
DRY EXISTING CMU
WALL, PAINT WITH
WATER REPELLENT,
VAPOR-OPEN, ACRYLIC
LATEX PAINT
REMOVE EXISTING
FIBERGLASS BATT
INSULATION AND
REPLACE WITH
CLOSED-CELL SPRAY
FOAM INSULATION
EXISTING BATT
INSULATION
TO REMAIN
4'-3 1/2" AFF
T.O. PLATE
FINSH FLOOR
EXISTING STUD WALL
TO REMAIN
TO REMAIN
EXIST CMU PNL TO REMAIN
EXIST METAL
NEW GLASS
MAT GYP BD
WASH SANITIZE AND
DRY EXISTING WOOD
FRAMING, PAINT WITH
WATER REPELLENT,
VAPOR-OPEN, ACRYLIC
LATEX PAINT
EXISTING CMU
WALL TO REMAIN
MIN.
0' - 2"
EXISTING TOP PLATE
AT PLUMBING WALL
WASH SANITIZE AND
DRY EXISTING CMU
WALL, PAINT WITH
WATER REPELLENT,
VAPOR-OPEN,
ACRYLIC LATEX PAINT
REMOVE EXISTING
FIBERGLASS BATT
INSULATION AND
REPLACE WITH
CLOSED-CELL SPRAY
FOAM INSULATION
NEW TILE (CT-2)
AND GROUT TO
MATCH EXISTING
TILE AND GROUT IN
COLOR, TEXTURE,
AND PATTERN
NEW TILE (CT-2)
AND GROUT TO
MATCH EXISTING
TILE AND GROUT IN
COLOR, TEXTURE,
AND PATTERN
MTL OUTSIDE CORNER
TRANSITION STRIP
TO REMAIN
EXISTING ICF FOR KEYNOTE
SEE FLOOR PLAN
9'-3" AFF
CEILING
HEIGHT
FINSH FLOOR
EXISTING GYP
BD CEILING TO
REMAIN
NEW FRP
WALL BOARD
NEW GLASS MAT GYP
BD, SECURED TO ICF
INTERNAL WEB
WASH, SANITIZE AND
DRY INSULATION
SEE KEYNOTES
ON FLOOR PLAN
FOR CONDITION
AT OPPOSITE
WALL FACE
NEW 4" H TILE
BASE TRIM (CT-2)
AND GROUT TO
MATCH EXISTING
TILE AND GROUT IN
COLOR, TEXTURE,
AND PATTERN
6'-0" AFF
TILE WAINSCOT
FINSH FLOOR
NEW TILE (CT-1) AND
GROUT TO MATCH
EXISTING TILE AND
GROUT IN COLOR,
TEXTURE, AND
PATTERN
NEW FRP WALL
BOARD OVER NEW
GLASS MAT GYP BD,
SECURED TO ICF
INTERNAL WEB
NEW GLASS MAT GYP
BD, SECURED TO ICF
INTERNAL WEB
WASH, SANITIZE
AND DRY
INSULATION
SEE KEYNOTES
ON FLOOR PLAN
FOR CONDITION
AT OPPOSITE
WALL FACE
NEW 4" H TILE
BASE TRIM (CT-2)
AND GROUT TO
MATCH EXISTING
TILE AND GROUT IN
COLOR, TEXTURE,
AND PATTERN
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
A-501
W
AL
L D
ET
AI
LS
M
IS
SO
U
R I R
IV
ER
P R
O
JE
C T
O
FF
IC
E, N
EB
R
AS
KA
O
M
AH
A D
IS
TR
IC
T
C
AP
IT
O
L
AV
EN
U
E O
M
AH
A, N
E
R . A
H
LE
R S
R . A
H
LE
R S
B.
G
O R
U P
B.
G
O R
U P
/1
8/
W
F-
-Q
-0
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
M R
PO
P
O
ST
F
LO
O D
R
EH
AB
IL
IT
AT
IO
N
(F Y1
9)
O D
_M
R
PO
.R
VT
G
EN
ER
AL
R
EV
IS
IO
N
S 3/
/2
1 1/2" = 1'-0"1 ICF W/ LINER PNL WSCT
1 1/2" = 1'-0"2 ICF W/ FULL HT LINER PNL
1 1/2" = 1'-0"7 GIRT PLANE W/ INT LINER PNL
1 1/2" = 1'-0"8 GIRT PLANE W/ EXT MTL PNL
1 1/2" = 1'-0"5 CMU W/ FURRED LINER PNL
1 1/2" = 1'-0"6 CMU W/ FURRED PLBG WALL
1 1/2" = 1'-0"4 ICF W/ FRP
1 1/2" = 1'-0"3 ICF W/ TILE
EXISTING STUD WALL
TO REMAIN
SEE FLOOR PLAN
FOR KEYNOTE
3'-0" AFF
WAINSCOT HEIGHT
FINSH FLOOR
EXISTING GYP BD TO REMAIN
NEW STEEL STUD BLOCKING
AT WAINSCOT
SEE KEYNOTES ON FLOOR
PLAN FOR CONDITION AT
OPPOSITE WALL FACE
NEW LINER PANEL (LP-1)
WASH SANITIZE AND DRY EXISTING
WOOD FRAMING, PAINT WITH
WATER REPELLENT, VAPOR-OPEN,
ACRYLIC LATEX PAINT
EXISTING STUD WALL
TO REMAIN
SEE FLOOR PLAN
FOR KEYNOTE
3'-0" AFF
WAINSCOT HEIGHT
FINSH FLOOR
NEW LINER PANEL (LP-1)
WASH SANITIZE AND DRY EXISTING
WOOD FRAMING, PAINT WITH
WATER REPELLENT, VAPOR-OPEN,
ACRYLIC LATEX PAINT
EXISTING GYP BD TO REMAIN
MIN.
0' - 2"
NEW STEEL STUD BLOCKING
AT WAINSCOT
SEE KEYNOTES ON FLOOR
PLAN FOR CONDITION AT
OPPOSITE WALL FACE
REMOVE EXISTING
FIBERGLASS BATT
INSULATION AND REPLACE
WITH CLOSED-CELL
SPRAY FOAM INSULATION
EXISTING BATT
INSULATION TO REMAIN
6'-0" AFF
TILE WAINSCOT
FINSH FLOOR
NEW GLASS MAT GYP BD
WASH SANITIZE AND DRY
EXISTING FRAMING
REMOVE EXISTING FIBERGLASS
BATT INSULATION AND REPLACE
WITH CLOSED-CELL SPRAY
FOAM INSULATION
NEW FRP WALL BOARD OVER
NEW GLASS MAT GYP BD
MIN.
0' - 2"
FOR KEYNOTE
SEE FLOOR PLAN
TO REMAIN
EXISTING STUD WALL
NEW TILE (CT-1) AND GROUT
TO MATCH EXISTING TILE
AND GROUT IN COLOR,
TEXTURE, AND PATTERN
SEE KEYNOTES ON FLOOR
PLAN FOR CONDITION AT
OPPOSITE WALL FACE
3'-0" AFF
SPRAY FOAM
INSULATION HEIGHT
NEW 4" H TILE BASE TRIM (CT-2)
AND GROUT TO MATCH EXISTING
TILE AND GROUT IN COLOR,
TEXTURE, AND PATTERN
4'-3 1/2" AFF
T.O. PLATE AT
PLUMBING WALL
FINSH FLOOR
NEW GLASS MAT GYP BD
WASH SANITIZE AND DRY
EXISTING WOOD FRAMING, PAINT
WITH WATER REPELLENT, VAPOR-
OPEN, ACRYLIC LATEX PAINT
REMOVE EXISTING
FIBERGLASS BATT INSULATION
AND REPLACE WITH CLOSED-
CELL SPRAY FOAM INSULATION
EXISTING BATT
INSULATION TO REMAIN
MIN.
0' - 2"
SEE FLOOR PLAN
FOR KEYNOTETO REMAIN
EXISTING STUD WALL
ALIGN T.O. TILE WAINSCOT TO
T.O. TILE AT PLUMBING WALL
NEW TILE (CT-2) AND GROUT
TO MATCH EXISTING TILE
AND GROUT IN COLOR,
TEXTURE, AND PATTERN
SEE KEYNOTES ON FLOOR
PLAN FOR CONDITION AT
OPPOSITE WALL FACE
EXISTING GYP
BD TO REMAIN
TO REMAIN
EXISTING STUD WALL
FOR KEYNOTE
SEE FLOOR PLAN
9'-3" AFF
CEILING
HEIGHT
FINSH FLOOR
EXISTING GYP BD
CEILING TO REMAIN
NEW FRP WALL BOARD
NEW GLASS MAT GYP BD
WASH SANITIZE
AND DRY EXISTING
FRAMING
SEE KEYNOTES ON
FLOOR PLAN FOR
CONDITION AT
OPPOSITE WALL FACE
NEW 4" H TILE BASE TRIM
(CT-2) AND GROUT TO
MATCH EXISTING TILE
AND GROUT IN COLOR,
TEXTURE, AND PATTERN
3'-0" AFF
WAINSCOT HEIGHT
FINSH FLOOR
EXISTING GYP
BD TO REMAIN
NEW STEEL STUD
BLOCKING AT
WAINSCOT
SEE KEYNOTES ON FLOOR
PLAN FOR CONDITION AT
OPPOSITE WALL FACE
NEW LINER PANEL (LP-2)
WASH SANITIZE AND DRY
EXISTING WOOD FRAMING
AND LATH, PAINT WITH
WATER REPELLENT,
VAPOR-OPEN, ACRYLIC
LATEX PAINT
AND LATH TO REMAIN
EXISTING STUD WALL
FOR KEYNOTE
SEE FLOOR PLAN
WASH SANITIZE
AND DRY EXISTING
CONCRETE CURB
3" 1' - 3" 5/8"
TO REMAIN
EXISTING ICF FOR KEYNOTE
SEE FLOOR PLAN
9'-3" AFF
CEILING HEIGHT
FINSH FLOOR
EXISTING GYP BD
CEILING TO REMAIN
NEW FRP WALL BOARD
NEW GLASS MAT GYP
BD, SECURED TO ICF
INTERNAL WEB
WASH, SANITIZE AND
DRY INSULATION
SEE KEYNOTES ON
FLOOR PLAN FOR
CONDITION AT
OPPOSITE WALL FACE
NEW 4" H TILE BASE
TRIM (CT-2) AND GROUT
TO MATCH EXISTING
TILE AND GROUT IN
COLOR, TEXTURE, AND
PATTERN, OVER GLASS
MAT GYP BD
0'
4"
NEW PLYWOOD AND
BLOCKING, AS
REQUIRED, PAINT WITH
WATER REPELLENT,
VAPOR-OPEN, ACRYLIC
LATEX PAINT, ALL SIDES
RE-INSTALL EXISTING
LOCKERS ON NEW BASE,
WITH APPROPRIATE
WALL ANCHORS
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
A-502
W
AL
L D
ET
AI
LS
M
IS
SO
U
R I R
IV
ER
P R
O
JE
C T
O
FF
IC
E, N
EB
R
AS
KA
O
M
AH
A D
IS
TR
IC
T
C
AP
IT
O
L
AV
EN
U
E O
M
AH
A, N
E
R . A
H
LE
R S
R . A
H
LE
R S
B.
G
O R
U P
B.
G
O R
U P
/1
8/
W
F-
-Q
-0
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
M R
PO
P
O
ST
F
LO
O D
R
EH
AB
IL
IT
AT
IO
N
(F Y1
9)
O D
_M
R
PO
.R
VT
G
EN
ER
AL
R
EV
IS
IO
N
S 3/
/2
1 1/2" = 1'-0"9 STUD WALL W/ LINER PNL
1 1/2" = 1'-0"10 INSUL STUD WALL W/ LINER PNL
1 1/2" = 1'-0"11 STUD WALL W/ 6'-0" H TILE
1 1/2" = 1'-0"12 STUD WALL W/ 4'-3 1/2" H TILE
1 1/2" = 1'-0"13 STUD WALL W/ FRP
1 1/2" = 1'-0"14 STUD WALL W/ LATH & LINER PNL
1 1/2" = 1'-0"15 LOCKER INSTALLATION
| MRPOA-111 |
| MRPOA-112 |
| MRPOA-501 |
| MRPOA-502 |
File details come from the government source that posted it. Updated .