Ft Randall MCC SITE VISIT Presentation APR302020 (003).pdf
PDF 7 MB Posted
- Attached to
- Fort Randall Motor Control Center Federal contract opportunity
- Solicitation number
- W9128F20Q0002
About this file
This document provides details for a federal solicitation to replace motor control centers and panel boards at Fort Randall Powerhouse in Pickstown, South Dakota. The project involves supplying and installing approximately twenty-two motor control centers with voltages ranging from 120 to 480 volts and interrupt ratings from 14,000 to 42,000 amps, as well as five panel boards. Offerors must register in the System for Award Management to access the solicitation documents, which will be posted on beta.sam.gov. Questions can be directed to the named contracting specialist by email. The primary North American Industry Classification code is 335313. The period of performance is 547 days from award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F20Q0002 Amd 02 - Motor Control Centers and Panel Replacement at Ft....pdf | ||
| Projnet comment 8548664.pdf | ||
| FR MCC Virtual Site Visit Vendor Participation List.pdf | ||
| W9128F20Q0002 Amd 01 - Motor Control Centers and Panel Replacement at Ft.._.pdf | ||
| W9128F20Q0002 - 1of 2 Motor Control Centers and Panel Replacement at Ft. Randall Dam, SD.pdf | ||
| Motor Control Center and Panel Replacement Drawings.PDF | ||
| W9128F20Q0002 - 2of 2 Motor Control Centers and Panel Replacement at Ft. Randall Dam, SD.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1File Name
SOLICITATION NUMBER
W9128F20Q0002
MOTOR CONTROL CENTER
& PANELS REPLACEMENT
FORT RANDALL DAM, SD
VIRTUAL
SITE VISIT
APRIL 30, 2020
AGENDA
April 30
• Introductions / Project Overview
• Contracting Briefing / Rules of Engagement
• Statement of Work / Project Specs
• Project Site Specifics
• Q&A
INTRODUCTIONS
USACE, Omaha District Office David LaGrone, Project Manager Nadine Catania Contracting Officer Lynne Reed Contract Specialist Lucas Kirkpatrick Electrical Engineer Joe Chamberlain Electrical Engineer
Ft Randall Mike Schenkel Maintenance and Operations Manager
Jaime Poignee Fort Randall Electrical Engineer
Black Hills Area Office Katie Shook COR - Resident Engineer
USACE, OMAHA DISTRICT CONTRACTING
NADINE CATANIA, CONTRACTING OFFICER
LYNNE REED CONTRACT SPECIALIST
Rules of Engagement
• This is an virtual site visit to review the scope and discuss general questions
• All questions and requests for clarifications will be posted in ProjNet for an official answer from the Government
• No discussions relating to other Corps acquisitions
• Hold all questions until the designated question and answer session
PROJNET AND CONTACT INFORMATION
ProjNet
• Used for contractor submitted questions
• Web site: https://www.projnet.org
• Bidder Inquiry Key: J6ZN4W-TWGFHJ
• Questions and answers will be formally processed through ProjNet
Contract Specialist Contact Information
Lynne Reed
• Email: Lynne.D.Reed@usace.army.mil
• Phone: 402-995-2039 mailto:Lynne.D.Reed@usace.army.mil
REPLACE SWITCHGEARS, MOTOR CONTROL CENTERS AND PANEL BOARDS IN THE
FORT RANDALL POWER PLANT.
9File Name
PROJECT SITE
SPECIFICS
FT RANDALL PROJECT BRIEF
MIKE SCHENKEL, MAINTENANCE AND OPERATIONS MANAGER
PROJECT OVERVIEW
General Project Scope:
• Supply 21 Motor Control Centers: MCC1, MCC2, MCC3, MCC4, MCC5, MCC6, MCC7, MCC8, MCC9, MCC10, MCC11, MCC12, MCC15, MCC16, MCC17, MCC21, MCC22, MCC23, MCC24, MCC26, MCC28.
• Install 21 Motor Control Centers: MCC1, MCC2, MCC3, MCC4, MCC5, MCC6, MCC7, MCC8, MCC9, MCC10, MCC11, MCC12, MCC15, MCC16, MCC17, MCC21, MCC22, MCC23, MCC24, MCC26, MCC28.
• Supply two Panel boards: 25, 25ALP.
• Install two Panel boards: 25, 25ALP.
Work includes installation of the following:
• Optional items
• Supply Panel boards PL51, PL52, PL53
• Install Panel boards PL51, PL52, PL53
• Includes Feeder Cables
• Remove existing Panel boards PL51, PL52, PL53
The Contractor will be limited to no more than one (1) generator outage at a time.
The Contractor shall submit a proposed sequence of equipment in the form of a Preconstruction Outage Schedule:
• MCC for 1-8 to be replaced during existing Generator outages:
• MCC 5 - Sept 1-22, 2020
• MCC 6 - Oct. 13- Nov. 5, 2020
• MCC 7 - Dec. 1, 2020 - Jan 5, 2021
• MCC 8 - Dec. 7, 2020 - Jan 14, 2021
• MCC 4 - Jan. 25 - Feb 23, 2021
• MCC 2 - Feb 15 - Mar. 15, 2021
• MCC 3 - Mar. 15 - Apr. 12, 2021
• MCC 1 - Apr. 12 - May 11, 2021
Outage schedule will be verified during pre-construction conference meeting. Additional Generator outages will be available in November and December of 2021 for units 5-8 if they are missed
Only one switchgear may be replaced at a time to keep outage durations to a minimum unless approved by the COR.
Switchgears with HVAC equipment (MCC 9,10,11,12,22, and 26) shall be replaced in mild weather during April, May, September, and October.
Switchgear 23 cannot be replaced November 15 - March 15 due to high air compressor demand.
FORT RANDALL DAM, SD
GENERAL LOCATION – ENTRANCE, SWITCH YARD, POWERHOUSE
SWITCHGEAR / MCC
1,3,5,7 (DC & AC)
SIMILAR
LOCATION:
EL. 1273
GENERATOR FLOOR
DC
DC
|-----AC------|
2,4,6,8 (DC & AC)
SIMILAR
(LEFT 4 SECTIONS)
SWITCHGEAR / MCC
9,10,11,12 SIMILAR
(RIGHT 3 SECTIONS)
LOCATION:
EL. 1273
GENERATOR FLOOR
DC DC |-----AC------|
|---9,10,11,12 SIMILAR---|
SUMP PUMP
15&16 SIMILAR
LOCATION:
EL. 1244
TURBINE FLOOR
DTDA COMPRESSOR
SWITCHGEAR / MCC 17
LOCATION:
EL. 1244
TURBINE OIL HANDLING
SWITCHGEAR / MCC 21
LOCATION:
EL. 1244
PUMP SWGR/
MCC 22
LOCATION:
EL. 1244
HEAT PUMP ROOM
AIR COMPRESSOR
SWITCHGEAR / MCC 23
LOCATION:
EL. 1244
HEAT PUMP ROOM
MACHINE SHOP
PANELBOARD 25
LOCATION:
EL. 1258
MACHINE SHOP
PANELBOARD
25ALP
LOCATION:
EL. 1258
COMPUTER
ROOM
Back side of Machine Shop Panel board 25
SWITCHGEAR /
MCC 26
LOCATION:
EL. 1291
FAN ROOM
MCC 26
LOCATION:
EL. 1291
FAN ROOM
SHOWING
DOORWAY FOR
ACCESS
MCC 28
LOCATION:
UNTANKINGHOUSE
Transformer compartment not being replaced
LOCATION:
UNTANKINGHOUSE
FRONT AND BACK
SIDE SHOWN
LOCATION:
UNTANKINGHOUSE
REMOVABLE
HATCH ABOVE
TRANSFORMER
AND STAIRS FOR
ACCESS
LOCATION:
UNTANKINGHOUSE
DOORWAY AND
STAIRS SHOWN
FOR ACCESS
PL51
LOCATION:
EL. 1273
115KV
SWITCHYARD
PL51
LOCATION:
EL. 1273
115KV
PL52
LOCATION:
EL. 1273
230KV
PANELBOARD PL52
LOCATION:
EL. 1273
230KV SWITCHYARD
PL53
LOCATION:
EL. 1273
230KV
OPTION ITEM
PANEL 50
(NEW FEED FOR
PL 51,52,53)
LOCATION IN
CONTROL CABLE
TUNNEL
EL. 1258
Looking East Looking West (towards switchyard)
(NEW FEED FOR
PL 51,52,53)
LOCATION IN
CONTROL CABLE
TUNNEL
EL. 1258
Series of photos walking away from new Panel 50 towards switchyard
(NEW FEED FOR
PL 51,52,53)
LOCATION IN
CONTROL CABLE
TUNNEL
EL. 1258
TRANSITION FROM
TRANSITE TO
ALUMINUM TRAY
90 degree corner, left picture looking back towards 50, right looking towards switchyard
(NEW FEED FOR
PL 51,52,53)
LOCATION IN
CONTROL CABLE
TUNNEL BELOW
CONTROL CABLE
TUNNEL IN
POWERHOUSE
CABLE TRAY
MADE OF
TRANSITE
CONTROL CABLE
TUNNEL UNDER
SWITCHYARD WITH
ALUMINUM TRAY.
CABLES AND
CONDUITS FOR PL
51,52,53 WILL BE
ROUTED IN THIS
TUNNEL
(OPTIONAL
BID ITEM)
ANY ADDITIONAL PICTURES NEEDED?
REQUEST IN PROJNET
BIDDER KEY = J6ZN4W-TWGFHJ
Q & A
Reminder: All questions and answers should be posted in ProjNet for an official response
| �Solicitation Number W9128F20Q0002�__________________________�Motor Control Center�& Panels Replacement�Fort Randall Dam, SD�Virtual �site visit��April 30, 2020�� | ||
| agenda | ||
| introductions | ||
| USACE, Omaha District Contracting��Nadine Catania, | contracting officer�Lynne Reed | Contract Specialist |
| Projnet and contact information� | ||
| � | ||
| Replace switchgears, Motor control centers and panel boards in the fort Randall power plant. � | ||
| Slide Number 8 | ||
| ��Project SITE�Specifics� | ||
| Project overview | ||
| � | ||
| Slide Number 12 | ||
| Fort Randall Dam, SD | ||
| General Location – Entrance, Switch Yard, Powerhouse | ||
| switchgear / mcc 1,3,5,7 (dc & ac) similar��LOCATION:�EL. 1273�GENERATOR FLOOR | ||
| switchgear / mcc 2,4,6,8 (DC & AC) similar�(LEFT 4 SECTIONS)��switchgear / mcc 9,10,11,12 similar�(RIGHT 3 SECTIONS)��LOCATION:�EL. 1273�GENERATOR FLOOR� | ||
| SUMP PUMP�switchgear / mcc 15&16 SIMILAR��LOCATION:�EL. 1244 �TURBINE FLOOR | ||
| DTDA COMPRESSOR�switchgear / mcc 17��LOCATION:�EL. 1244 �TURBINE FLOOR | ||
| TURBINE OIL HANDLING�switchgear / mcc 21��LOCATION:�EL. 1244 �TURBINE FLOOR | ||
| PUMP SWGR/�mcc 22���LOCATION: �EL. 1244 �HEAT PUMP ROOM | ||
| AIR COMPRESSOR�SWITCHGEAR / mcc 23���LOCATION: �EL. 1244 �HEAT PUMP ROOM | ||
| MACHINE SHOP�PANELBOARD 25���LOCATION: �EL. 1258�MACHINE SHOP | ||
| �PANELBOARD 25ALP���LOCATION: �EL. 1258�COMPUTER ROOM | ||
| SWITCHGEAR / mcc 26���LOCATION:�EL. 1291�FAN ROOM | ||
| SWITCHGEAR / mcc 26���LOCATION:�EL. 1291�FAN ROOM���showing doorway for access | ||
| SWITCHGEAR / mcc 28���LOCATION:�UNTANKINGHOUSE | ||
| SWITCHGEAR / mcc 28���LOCATION:�UNTANKINGHOUSE��Front and Back side shown | ||
| SWITCHGEAR / mcc 28���LOCATION:�UNTANKINGHOUSE���Removable hatch above transformer and stairs for access | ||
| SWITCHGEAR / mcc 28���LOCATION:�UNTANKINGHOUSE���doorway and stairs shown for access | ||
| PANELBOARD PL51���LOCATION:�EL. 1273�115kv SWITCHYARD | ||
| PANELBOARD PL51���LOCATION:�EL. 1273�115kv SWITCHYARD | ||
| PANELBOARD PL52���LOCATION:�EL. 1273�230kv SWITCHYARD | ||
| PANELBOARD PL52��LOCATION:�EL. 1273�230kv SWITCHYARD | ||
| PANELBOARD PL53���LOCATION:�EL. 1273�230kv�SWITCHYARD | ||
| Option item�Panel 50�(new feed for �Pl 51,52,53)��location in control cable tunnel�el. 1258 | ||
| Option item�Panel 50�(new feed for �Pl 51,52,53)��location in control cable tunnel�el. 1258 | ||
| Option item�Panel 50�(new feed for �Pl 51,52,53)��location in control cable tunnel�el. 1258��transition from transite to aluminum tray | ||
| Option item�Panel 50�(new feed for �Pl 51,52,53)��location in control cable tunnel below switchyard | ||
| Control cable tunnel in powerhouse��cable tray made of transite | ||
| Control cable tunnel under switchyard with aluminum tray.��Cables and conduits for PL 51,52,53 will be routed in this tunnel �(optional �bid item) | ||
| Any additional pictures needed?��Request in ProjNet��Bidder Key = J6ZN4W-TWGFHJ | ||
| ��Q & A |