GP91_AMENDMENT_1_SHEETS.PDF

PDF 2 MB Posted

Attached to
Vertical mixed flow pumps
Solicitation number
W9128F18R0054
Issued by

About this file

Amendment 0001 drawing revisions

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

P R

O J E

C T O

R D

E R /M

IP

R

GR91 E-002

TO DRAWING

2000 AMP BUS DUCT

7200/12,470Y-277/480Y

1500 KVA

BY CONTRACTOR

4/0 AWG

BY UTILITY

7200/12,470Y SERVICE

3-PHASE, 4-WIRE,

FROM UTILITY

CT

WHM

VT

PRIMARY METERING CABINET

NOTES:

VACUUM FAULT INTERUPTER

FOR APPROVAL.

CONTRACTOR. CONTRACTOR SHALL SUBMIT SHOP DRAWING OF BUS

MCC IN ELECTRIC PUMP HOUSE. PROVIDED AND INSTALLED BY

NON-SEGREGATED COPPER BUS FROM OUTDOOR TRANSFORMER TO

2000 AMP BUS DUCT: TIN-PLATED, METAL-ENCLOSED,

SECONDARY CONTAINMENT FOR APPROVAL. SEE DRAWING EU-001.

CONTRACTOR SHALL SUBMIT SHOP DRAWING OF PAD AND

WITH CONCRETE PAD AND SECONDARY OIL CONTAINMENT.

CONTRACTOR SHALL PROVIDE AND INSTALL TRANSFORMER, ALONG

PRIMARY BAYONET FUSES AND CURRENT-LIMITING FUSES.

K-FACTOR 13, OIL-FILLED DISTRIBUTION TRANSFORMER WITH

1500 KVA TRANSFORMER: 1500 KVA, 3-PHASE, 7200/12,470Y-277/480Y,

PHASE. PROVIDED AND INSTALLED BY CONTRACTOR.

INSULATION, PVC JACKETED 1/3 CONCENTRIC NEUTRAL, 1 CABLE PER

4/0 AWG CABLE: 4/0 AWG, 15 KV STRANDED AL, 133% EPR 90°C

CONDUIT FROM PRIMARY METERING CABINET TO POST.

PROVIDE AND INSTALL METER POST AND 1" PVC SCHEDULE 40

WHM: WATT-HOUR METER. PROVIDED BY UTILITY. CONTRACTOR TO

VT: VOLTAGE TRANSFORMER PROVIDED BY UTILITY.

CT: CURRENT TRANSFORMER PROVIDED BY UTILITY.

BE SUFFICIENT.

SHORT CIRCUIT CURRENT RATINGS OF 15 KV VFI SWITCHGEAR WILL

STANDARD AVAILABLE MOMENTARY, SHORT-TIME WITHSTAND, AND

CIRCUIT CURRENT DATA PROVIDED BY THE UTILITY CONFIRMS THAT

SHORT THAN OIL. PROVIDED AND INSTALLED BY CONTRACTOR.

A LEVEL FIBERGLASS PAD. INSULATING SYSTEMS SHALL BE OTHER

POSITION VIEWING WINDOWS. EQUIPMENT SHALL REST SOLIDLY ON

EXTERNALLY-OPERABLE LOAD-BREAK CAPABILITY, AND CONTACT

INTERRUPTER WITH 200 AMP BUSHING WELLS,

VFI: 15 KV, 95 KV BIL, DEAD-FRONT, PAD-MOUNTED VACUUM FAULT

CONTRACTOR.

SYSTEMS SHALL BE OTHER THAN OIL. PROVIDED AND INSTALLED BY

SHALL REST SOLIDLY ON A LEVEL FIBERGLASS PAD. INSULATING

AMP BUSHING WELLS AND A 13-JAW METER SOCKET. EQUIPMENT

PAD-MOUNTED PRIMARY METERING CABINET FURNISHED WITH 200

PRIMARY METERING CABINET: 15 KV, 95 KV BIL, DEAD-FRONT,

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg5:21:11 PM 8/30/2018

...\30500 - Construction E&D\GR91\30DA0 - Plans & Specs\CAD_BIM\_Sheets\3

M

A H

A

N E

F

IL

E N

A M

E

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C

A P

IT

O L A

V E

F

IL

E N

U M

B E

R

G R

E -0

.d g n

A N

S I

D

E-001

J

M O

E N

C H

S

O T

T

A J

O H

N S

O N

S

O T

T F

Y

G A -1

-1

P U

M P A

S S

E M

B L

Y

C O

N T

R O

L S

O M

A H

A D

IS

T R

IC

T

G A

R R

IS

O N D

A M

N O

R T

H D

A K

O T

A

R E

P L

A C

E E

L E

C T

R

IC

F

L O

O D P

U M

P S

P R

IM

A R

Y D

IS

T R

IB

U T

IO

N O

N E -L

IN

E D

IA

G R

A M

W F

R

A U

G U

S T

A

M G

E N

E R

A L R

E V

IS

IO

N S

-3

-2

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

P R

O J E

C T O

R D

E R /M

IP

R

BUS - 2000A COPPER/TIN PLATED 42,000A RMS BRACING

25 KVA

1-Ø

TRANSFORMER

MAINTENANCE SHOP

HP

LIFT PUMP #1

STORMWATER

FDR

GFR

ST

FDR

GFR

ST

FDR

GFR

ST

3-Ø

HEAT EXCHANGERS

TRANSFORMER AND

DIESEL PUMP HOUSE

LIFT PUMP #2

STORMWATER

LIFT PUMP #3

STORMWATER

FDR

GFR

ST

50 KVA

1-Ø

TRANSFORMER

SPECIES BUILDING

THREATENED/ENDANGERED

OFFICE AND

FDR

GFR

ST

3-Ø

480 VOLT PANEL

ELECTRIC PUMP HOUSE

(EMPTY SPACE)

FUTURE UNIT

(EMPTY SPACE)

FUTURE UNIT

BREAKER

CIRCUIT

MAIN

CABLE #3CABLE #2CABLE #1 CABLE #4

BUS DUCT

2000 AMP

GR91-E-001

FROM DRAWING

MAIN INCOMING LINE

60 A 60 A 150 A 150 A 2000 A

VFD CB

441 A

VFD

HP

441 A

VFD

VFD CB

HP

441 A

VFD

VFD CB

CONDUIT BELOW PUMP HOUSE FLOOR.

MOTOR, SUCH AS NEXANS 37-102-327VFD 110 DEG C CABLE OR EQUAL. RUN IN NEW OVERHEAD RACEWAY OR IN

CONTRACTOR TO PULL NEW 700 MCM SHIELDED Cu VFD CABLES BETWEEN MCC AND VFD AND BETWEEN VFD AND VFD CABLES

NEW SURFACE MOUNT RMC CONDUIT FROM MCC TO PANELBOARD.

PANELBOARD IN ELECTRIC PUMP HOUSE. REMOVE EXISTING WIRES FROM EXISTING CONDUIT. RUN

CONTRACTOR TO PULL NEW 600 VOLT 1/0 CU CABLES FROM MCC TO EXISTING 480 VOLT CABLE #4

TRANSFORMER AT OFFICE BUILDING. SEE DRAWING EU-001

CONTRACTOR TO DIRECT BURY NEW 600 VOLT 1/0 CU CABLES FROM MCC TO NEW 50 KVA PAD-MOUNT CABLE #3

INGRESSION. SEE DRAWING EU-001.

THE ELECTRIC PUMP HOUSE TO REACH THE MCC. SEAL WALL PENETRATION AGAINST MOISTURE AND DIRT

WEST OF DIESEL PUMP HOUSE. REMOVE EXISTING WIRES FROM EXISTING CONDUIT. EXTEND EXISTING CONDUIT INTO

CONTRACTOR TO PULL NEW 600 VOLT 2 AWG CU CABLES IN EXISTING BURIED CONDUIT TO EXISTING JUNCTION BOX CABLE #2

DRAWING EU-001.

ELECTRIC PUMP HOUSE TO REACH MCC. SEAL WALL PENETRATION AGAINST MOISTURE AND DIRT INGRESSION. SEE

SHOP TRANSFORMER. REMOVE EXISTING WIRES FROM EXISTING CONDUIT. EXTEND EXISTING CONDUIT INTO THE

CONTRACTOR TO PULL NEW 600 VOLT 6 AWG CU CABLES IN EXISTING BURIED CONDUIT TO EXISTING MAINTENANCE CABLE #1

THERMAL MAGNETIC BRANCH CIRCUIT BREAKER FOR VFD, TO BE SIZED BY MCC/VFD MANUFACTURER.VFD CB

VFD SHALL HAVE AN ACTIVE FRONT END. VFDS WILL BE LOCATED REMOTELY FROM MCC.

VARIABLE FREQUENCY DRIVE, WITH A MINIMUM CONTINUOUS NORMAL DUTY RATING OF 441 AMPS. TO MEET IEEE 519, VFD

SHUNT TRIPST

GROUND FAULT RELAYGFR

FEEDER BREAKERFDR

NOTES

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg5:08:37 PM 8/30/2018

A H

A

N E

F

IL

E N

A M

E

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C

A P

IT

O L A

V E

F

IL

E N

U M

B E

R

G R

E -0

.d

S I

D

E-002

J

M O

E N

C H

S

O T

T

A J

O H

N S

O N

S

O T

T

M C

C O

N E -L

IN

E D

IA

G R

A M

F Y

G A -1

-1

P U

M P A

S S

E M

B L

Y

C O

N T

R O

L S

O M

A H

A D

IS

T R

IC

T

G A

R R

IS

O N D

A M

N O

R T

H D

A K

O T

A

R E

P L

A C

E E

L E

C T

R

IC

F

L O

O D P

U M

P S

W F

R

A U

G U

S T

A

M G

E N

E R

A L R

E V

IS

IO

N S

-3

-2

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

P R

O J E

C T O

R D

E R /M

IP

R

2 1

NOT TO SCALE

NOT TO SCALE

VACUUM BREAKERS - PLANTURBINE PUMP

VERTICAL

SUMP PUMP

UNIT HEATER

PUMP ROOM - PLAN AT EL. 1848.50

SHACK. SEE DRAWING EU-001.

2-PAIR 16 AWG SHIELDED TWISTED PAIR (STP) CABLE FROM THE NEW CONTROL PANEL IN THE PUMP HOUSE TO THE STREAM GAUGE

INSTALL NEW 3/4" SCHEDULE 40 PVC CONDUIT UNDERGROUND BETWEEN PUMP HOUSE AND STREAM GAUGE SHACK. PULL ONE NEW

10. EXISTING U.S. GEOLOGICAL SURVEY STREAM GAUGE SHACK (NOT TO SCALE) ON LEVEE CREST, EAST OF VACUUM BREAKER MANHOLE.

THE PUMP HOUSE TO THE MANHOLE. EXISTING SOLENOID VALVES TO BE REPLACED. SEE DRAWING EU-001.

UNDERGROUND BETWEEN PUMP HOUSE AND MANHOLE. PULL EIGHT NEW 12 AWG CONDUCTORS FROM THE NEW CONTROL PANEL IN

MANHOLE TO BE DISCONNECTED, ABANDONED IN PLACE, MARKED AS SUCH. INSTALL NEW 1-1/4” SCHEDULE 40 PVC CONDUIT

9. EXISTING MANHOLE FOR VACUUM BREAKER SOLENOID VALVES, SOUTH OF PUMP HOUSE ON LEVEE CREST. EXISTING CONDUCTORS TO

EQUIPMENT IF NECESSARY.

INCLUDING PULLING PUMPS AND MOTORS FROM THE WET WELL. RELOCATE EXISTING UNIT HEATERS AND OTHER WALL-MOUNTED

CHAIN HOIST OR OTHER EQUIPMENT. RACEWAYS MUST NOT INTERFERE WITH FUTURE PUMP AND MOTOR MAINTENANCE ACTIVITIES, ROUTE ALL RACEWAYS TO PREVENT INTERFERENCE WITH EXISTING HOUSE FLOOR VARIES BETWEEN 10" AND 12" OF CONCRETE).

VFD-RATED CABLES FROM VFDS TO MOTORS MAY ALSO BE RUN IN CONDUITS BELOW PUMP HOUSE FLOOR (PUMP MOTORS.

OVERHEAD RACEWAY FROM MCC TO VFDS AND NEW VFD-RATED CABLES SHALL BE RUN IN NEW OVERHEAD RACEWAY FROM VFDS TO

LEVEL REGARDLESS OF THE ORIGINAL FLOOR SLOPE WHERE THE VFDS ARE TO BE LOCATED. NEW VFD-RATED CABLES SHALL BE RUN IN NEW

PAD SHALL EXTEND A MINIMUM OF 3” BEYOND ALL ENCLOSURE SIDES. THE PAD FOUNDATION, PAD SURFACE, AND SIDES SHALL ALL BE LOCATIONS, SIZES, EMBEDMENTS, AND PROJECTIONS SHALL SUIT THE REQUIREMENTS OF THE APPROVED EQUIPMENT FURNISHED. THE

SHALL BE 3000 PSI AND MEET THE REQUIREMENTS OF ACI 301-16. THE PLAN DIMENSIONS OF EQUIPMENT BASES AND THEIR ANCHOR BOLT

8. TWO OF THREE NEW VARIABLE FREQUENCY DRIVES. INSTALL 4” HIGH CONCRETE HOUSEKEEPING PAD. THE CONCRETE PAD SYSTEM

7. IF NECESSARY, RELOCATE EXISTING 37.5 KVA TRANSFORMER TO THE NORTH ALONG THE ADJACENT WALL.

WELL. RELOCATE EXISTING UNIT HEATERS AND OTHER WALL-MOUNTED EQUIPMENT IF NECESSARY.

NOT INTERFERE WITH FUTURE PUMP AND MOTOR MAINTENANCE ACTIVITIES, INCLUDING PULLING PUMPS AND MOTORS FROM THE WET

ROUTE ALL RACEWAYS TO PREVENT INTERFERENCE WITH EXISTING CHAIN HOIST OR OTHER EQUIPMENT. RACEWAYS MUST CONCRETE).

MOTOR MAY ALSO BE RUN IN CONDUIT BELOW PUMP HOUSE FLOOR (PUMP HOUSE FLOOR VARIES BETWEEN 10" AND 12" OF

VFD-RATED CABLE FROM VFD TO AND NEW VFD-RATED CABLES SHALL BE RUN IN NEW OVERHEAD RACEWAY FROM VFD TO MOTOR.

MCC PLUS VFD MUST BE LESS THAN 14’-3”LONG. NEW VFD-RATED CABLES SHALL BE RUN IN NEW OVERHEAD RACEWAY FROM MCC TO VFD

6. NEW MCC AND ONE OF THREE NEW VARIABLE FREQUENCY DRIVES. MCC AND VFD TO BE INSTALLED ON EXISTING HOUSEKEEPING PAD.

APPROVAL.

WALL PENETRATION AGAINST MOISTURE AND DIRT INGRESSION. PROVIDE A SHOP DRAWING OF THE BUS DUCT FOR GOVERNMENT

5. NEW 2000 AMP, 480 VOLT, METAL-ENCLOSED, NON-SEGREGATED BUS DUCT FROM NEW 1500 KVA TRANSFORMER TO NEW MCC. SEAL

NEW 1500 KVA TRANSFORMER AND NEW CONCRETE PAD TO BE INSTALLED IN THIS LOCATION. SEE DRAWING EU-001.

4. EXISTING TRANSFORMER AND SECTIONALIZER TO BE REMOVED, INCLUDING DEMOLITION OF EXISTING TRANSFORMER CONCRETE PAD.

AND MOTORS FROM THE WET WELL. RELOCATE EXISTING UNIT HEATERS AND OTHER WALL-MOUNTED EQUIPMENT IF NECESSARY.

EQUIPMENT. RACEWAYS MUST NOT INTERFERE WITH FUTURE PUMP AND MOTOR MAINTENANCE ACTIVITIES, INCLUDING PULLING PUMPS

INSTRUMENTATION AND CONTROL CIRCUITS. ROUTE ALL RACEWAYS TO PREVENT INTERFERENCE WITH EXISTING CHAIN HOIST OR OTHER

3. NEW CONTROL PANEL. INSTALL NEW OVERHEAD RACEWAYS, SEPARATE FROM POWER RACEWAYS, FOR ROUTING OF ALL

DRAWING E-007.

2. EXISTING FLOOR PENETRATION INTO WET WELL. INSTALL NEW SUBMERSIBLE LEVEL SENSOR AND STILLING PIPE AT THIS LOCATION. SEE

1. EXISTING SUBMERSIBLE LEVEL SENSOR TO BE REMOVED.

KEYED NOTES:

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg5:08:24 PM 8/30/2018

A H

A

N E

F

IL

E N

A M

E

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C

A P

IT

O L A

V E

F

IL

E N

U M

B E

R

G R

E -0

.d

S I

D

E-004

J

M O

E N

C H

S

O T

T

A J

O H

N S

O N

S

O T

T F

Y

G A -1

-1

P U

M P A

S S

E M

B L

Y

C O

N T

R O

L S

O M

A H

A D

IS

T R

IC

T

G A

R R

IS

O N D

A M

N O

R T

H D

A K

O T

A

R E

P L

A C

E E

L E

C T

R

IC

F

L O

O D P

U M

P S

P U

M P

IN

G P

L A

N T E

L E

C T

R

IC

A L P

L A

N

W F

R

A U

G U

S T

A M G

E N

E R

A L R

E V

IS

IO

N S

-3

-2

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

P R

O J E

C T O

R D

E R /M

IP

R

SUBSTATION (MDU)

EXISTING

LINES (MDU)

EXISTING OVERHEAD

(COE)

EXISTING RISER POLE

LONG

APPROXIMATELY 340'

EXISTING DUCT BANK

SIGN

2' FORCEMAIN

E N

T R

A N

C E R

O A

D

DRAINAGE DITCH

STATION

SEWER LIFT

TRANSFORMER

PAD-MOUNT

BUILDING

OFFICE

DRAINAGE DITCH

UG

SIDEWALK

BURIED

DIRECT

SUBSTATION

COE

SS

SS

SS

SS

MANHOLE

BREAKER

VACUUM

TYPE EB-20 PVC

2X6 IN.

3000 PSI CONCRETE

NOT TO SCALE

SITE PLAN

1-1/4" PVC

SHACK

GAUGE

STREAM

USGS

9-1/2"

SPECIES BUILDING

THREATENED/ENDANGERED

NOTES:

POINT

DUCT BANK UP TO THIS

IS DIRECT BURIED ABOVE

TO OFFICE TRANFORMER

EXISTING 2.4 KV CABLE

3/4" PVC

HOUSE

PUMP

ELECTRIC

SHOP

MAINT.HOUSE

PUMP

DIESEL

FENCE

EXISTING

NOT TO SCALE

3" 3"

DETAIL A

NOT TO SCALE

DETAIL B

NOTES:

PLAN VIEW

XFMR

ELEVATION VIEW

UNDERGROUND DUCT BANK

CROSS-SECTION OF NEW CONCRETE-ENCASED

XFMR

CONTAINMENT

OIL

CONTAINMENT

OIL

PERIMETER.

THE SLAB SHOULD ALSO EXTEND UP INTO THE SECONDARY CONTAINMENT CURBS AROUND THE SLAB

DETERMINE REQUIRED VOLUME BASED ON TRANSFORMER MANUFACTURER'S DATA. THE REINFORCING BARS OF

VOLUME OF PRECIPITATION RESULTING FROM A 25-YEAR, 24-HOUR STORM EVENT. CONTRACTOR SHALL

ALONG THE PERIMETER, CAPABLE OF HOLDING THE ENTIRE VOLUME OF OIL FROM THE TRANSFORMER, PLUS THE

TRANSFORMER, CONSISTING OF AN IMPERVIOUS WATERTIGHT CONCRETE BASIN WITH RAISED CONCRETE CURBS

6. THE CONCRETE SYSTEM SHALL INCLUDE SECONDARY OIL CONTAINMENT FOR THE PAD-MOUNTED

5. PROVIDE EDGES ABOVE GRADE WITH 1/2 INCH CHAMFER.

GROUND SLOPE WHERE THE TRANSFORMER IS TO BE LOCATED.

4. THE PAD FOUNDATION, PAD SURFACE, AND SIDES SHALL ALL BE LEVEL REGARDLESS OF THE ORIGINAL

3. PLACE SLAB ON A 6 INCH THICK, WELL-COMPACTED GRAVEL BASE.

SYSTEM FOR GOVERNMENT APPROVAL. DETAIL B IS A TYPICAL REPRESENTATION ONLY.

ON TRANSFORMER MANUFACTURER'S DATA. CONTRACTOR SHALL SUBMIT SHOP DRAWING OF THE CONCRETE

PROJECTIONS SHALL SUIT THE REQUIREMENTS OF THE APPROVED EQUIPMENT FURNISHED AND SHALL BE BASED

DIMENSIONS OF EQUIPMENT BASES AND THEIR ANCHOR BOLT LOCATIONS, SIZES, EMBEDMENTS, AND

WITH A 6 BY 6 INCHES - W2.9 BY W2.9 MESH PLACED UNIFORMLY 4 INCHES FROM THE TOP OF THE SLAB. THE PLAN

2. UNLESS OTHERWISE INDICATED, PROVIDE THE SLAB WITH DIMENSIONS AT LEAST 8 INCHES THICK, REINFORCED

EXCEED THE REQUIREMENTS IN ACCORDANCE WITH ACI 301-16.

DESIGNED FOR THE SPECIFIC TRANSFORMER BEING INSTALLED. THESE CONCRETE SYSTEMS MUST MEET OR

1. THE CONTRACTOR SHALL PROVIDE A FOUNDATION, CONCRETE PAD, AND CONTAINMENT SYSTEM THAT IS

SECONDARY CONTAINMENT

CONCRETE PAD AND

1500 KVA TRANSFORMER

13. CONTRACTOR RESPONSIBLE FOR RESTORING ANY INFRASTRUCTURE OR LANDSCAPING DISTURBED BY CONSTRUCTION ACTIVITIES.

CONDUITS.

12. CONTRACTOR TO INSTALL WARNING RIBBON AND TRACER WIRE 12”ABOVE NEW DUCT BANK, NEW DIRECT-BURIAL CABLE, AND NEW PVC

125’. SEE DRAWINGS E-004 AND E-005 FOR THE NEW CABLES TO BE PROVIDED AND INSTALLED IN THESE CONDUITS.

CONDUITS SHALL BE BETWEEN 24”AND 30”IN ACCORDANCE WITH NEC REQUIREMENTS. APPROXIMATE LENGTH OF EACH PVC CONDUIT RUN IS THE VACUUM BREAKER MANHOLE AND USGS STREAM GAUGE SHACK ON THE LEVEE CREST AS SHOWN ON THIS DRAWING. DEPTH OF NEW

11. CONTRACTOR TO PROVIDE AND INSTALL NEW UNDERGROUND 1-1/4”AND 3/4”SCHEDULE 40 PVC CONDUITS FROM ELECTRIC PUMP HOUSE TO

CABLE. APPROXIMATE LENGTH OF EXISTING DIRECT-BURIAL CABLE IS 220’. SEE DRAWING E-002.

EXISTING 2.4 KV DIRECT-BURIAL CABLE TO BE DISCONNECTED AND ABANDONED BELOW GRADE AND SHALL BE SO MARKED AT EACH END OF THE

36”IN ACCORDANCE WITH NEC REQUIREMENTS. EXISTING 2.4 KV-240/120 VOLT OFFICE TRANSFORMER TO BE REMOVED BY CONTRACTOR.

480-240/120 VOLT 50 KVA PAD-MOUNT TRANSFORMER AT OFFICE BUILDING. DEPTH OF NEW DIRECT-BURIAL CABLE SHALL BE BETWEEN 24”AND

10. CONTRACTOR TO PROVIDE AND INSTALL 600 VOLT DIRECT-BURIAL CABLE FROM NEW MCC IN ELECTRIC PUMP HOUSE TO NEW SINGLE-PHASE

LENGTH IS 370’. SEE DRAWING E-002.

JUNCTION BOX WEST OF DIESEL PUMP HOUSE. CONDUIT SHALL BE EXTENDED TO REACH NEW MCC IN ELECTRIC PUMP HOUSE. APPROXIMATE

9. CONTRACTOR TO PROVIDE AND INSTALL NEW 600 VOLT CABLE IN EXISTING BURIED CONDUIT FROM ELECTRIC PUMP HOUSE TO EXISTING

200’. SEE DRAWING E-002.

MAINTENANCE SHOP TRANSFORMER. CONDUIT SHALL BE EXTENDED TO REACH NEW MCC IN ELECTRIC PUMP HOUSE. APPROXIMATE LENGTH IS

8. CONTRACTOR TO PROVIDE AND INSTALL NEW 600 VOLT CABLE IN EXISTING BURIED CONDUIT FROM ELECTRIC PUMP HOUSE TO EXISTING

REQUIREMENTS IN DETAIL A ON THIS SHEET.

EXISTING DUCT BANK. EXISTING DUCT BANK ROUTE AND LENGTH SHOWN ON THIS SHEET ARE APPROXIMATE. SEE NEW DUCT BANK

CONTRACTOR-SUPPLIED AS-BUILT DRAWINGS SHALL ACCURATELY DEPICT THE LOCATIONS OF THE NEW DUCT BANK AND THE ABANDONED

REQUIREMENTS. EXISTING DUCT BANK TO BE ABANDONED IN PLACE. EXISTING 2.4 KV CABLES IN EXISTING DUCT BANK TO BE REMOVED.

BANK ALONGSIDE EXISTING DUCT BANK. TOP OF NEW DUCT BANK SHALL BE BETWEEN 24" AND 30" BELOW GRADE IN ACCORDANCE WITH NEC

6. CONTRACTOR TO PROVIDE AND INSTALL NEW 12.47 KV CABLE IN NEW CONCRETE DUCT BANK. CONTRACTOR SHALL CONSTRUCT NEW DUCT

DRAWING.

REQUIREMENTS. EXISTING DUCT BANK ROUTE AND LENGTH SHOWN ARE APPROXIMATE. SEE DUCT BANK REQUIREMENTS IN DETAIL A OF THIS

CABLE INSIDE EXISTING DUCT BANK. TOP OF NEW DUCT BANK SHALL BE BETWEEN 24”AND 30”BELOW GRADE IN ACCORDANCE WITH NEC SHALL CONSTRUCT NEW DUCT BANK ALONGSIDE EXISTING DUCT BANK PRIOR TO DEMOLISHING THE EXISTING DUCT BANK AND EXISTING 2.4 KV

6. CONTRACTOR TO PROVIDE AND INSTALL NEW 12.47 KV CABLE IN IN NEW CONCRETE DUCT BANK INSTALLED BY CONTRACTOR. CONTRACTOR

CONTRACTOR WILL CONNECT TO THE UTILITY’S NEW UNDERGROUND CABLE INSIDE PRIMARY METERING CABINET.

PROVIDE AND INSTALL NEW PRIMARY METERING CABINET AND VACUUM FAULT INTERRUPTER AT THIS LOCATION. NEW 12.47 KV CABLE BY

5. EXISTING RISER POLE TO BE REMOVED BY CONTRACTOR. LOCAL UTILITY WILL DEMOLISH THEIR EXISTING SUBSTATION. CONTRACTOR WILL

14 00) SECTIONS.

CONTINUITY OF WILLISTON RESOURCE OFFICE OPERATIONS, AS DESCRIBED IN THE SUMMARY OF WORK (01 11 00) AND WORK RESTRICTIONS (01

4. CONTRACTOR RESPONSIBLE FOR PROVIDING ANY TEMPORARY POWER THAT MAY BE REQUIRED FOR CONSTRUCTION ACTIVITIES AND

3. CONTRACTOR RESPONSIBLE FOR COORDINATING WITH LOCAL UTILITY FOR POWER OUTAGES.

2. CONTRACTOR RESPONSIBLE FOR LOCATING EXISTING UTILITIES. LOCATIONS SHOWN ARE APPROXIMATE.

THERETO.

1. CONTRACTOR TO FIELD VERIFY ALL PERTINENT EXISTING CONDITIONS AND INSTALLATION REQUIREMENTS, MAKING ALLOWANCES IN BID

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg5:20:03 PM 8/30/2018

A H

A

N E

F

IL

E N

A M

E

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C

A P

IT

O L A

V E

F

IL

E N

U M

B E

R

G R

E

U .d

S I

D

EU001

J

M O

E N

C H

S

O T

T

A J

O H

N S

O N

S

IT

E P

L A

N

S

O T

T

P U

M P A

S S

E M

B L

Y

C O

N T

R O

L S

F Y

G A -1

-1

O M

A H

A D

IS

T R

IC

T

G A

R R

IS

O N D

A M

N O

R T

H D

A K

O T

A

R E

P L

A C

E E

L E

C T

R

IC

F

L O

O D P

U M

P S

W F

R

U

G U

S T

-3

-2

A M G

E N

E R

A L R

E V

IS

IO

N S

GR91E-001
GR91E-002
GR91E-004
GR91EU001

File details come from the government source that posted it.