GP91_AMENDMENT_1_SHEETS.PDF
PDF 2 MB Posted
- Attached to
- Vertical mixed flow pumps
- Solicitation number
- W9128F18R0054
About this file
Amendment 0001 drawing revisions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am0001.pdf | ||
| Flood_Pumps_Garrison_Specs_final.pdf | ||
| REPLACE_ELECTRIC_FLOOD_PUMPS-GARRISON_DAM,_ND_-RTA_-_FULL_SIZE.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
P R
O J E
C T O
R D
E R /M
IP
R
GR91 E-002
TO DRAWING
2000 AMP BUS DUCT
7200/12,470Y-277/480Y
1500 KVA
BY CONTRACTOR
4/0 AWG
BY UTILITY
7200/12,470Y SERVICE
3-PHASE, 4-WIRE,
FROM UTILITY
CT
WHM
VT
PRIMARY METERING CABINET
NOTES:
VACUUM FAULT INTERUPTER
FOR APPROVAL.
CONTRACTOR. CONTRACTOR SHALL SUBMIT SHOP DRAWING OF BUS
MCC IN ELECTRIC PUMP HOUSE. PROVIDED AND INSTALLED BY
NON-SEGREGATED COPPER BUS FROM OUTDOOR TRANSFORMER TO
2000 AMP BUS DUCT: TIN-PLATED, METAL-ENCLOSED,
SECONDARY CONTAINMENT FOR APPROVAL. SEE DRAWING EU-001.
CONTRACTOR SHALL SUBMIT SHOP DRAWING OF PAD AND
WITH CONCRETE PAD AND SECONDARY OIL CONTAINMENT.
CONTRACTOR SHALL PROVIDE AND INSTALL TRANSFORMER, ALONG
PRIMARY BAYONET FUSES AND CURRENT-LIMITING FUSES.
K-FACTOR 13, OIL-FILLED DISTRIBUTION TRANSFORMER WITH
1500 KVA TRANSFORMER: 1500 KVA, 3-PHASE, 7200/12,470Y-277/480Y,
PHASE. PROVIDED AND INSTALLED BY CONTRACTOR.
INSULATION, PVC JACKETED 1/3 CONCENTRIC NEUTRAL, 1 CABLE PER
4/0 AWG CABLE: 4/0 AWG, 15 KV STRANDED AL, 133% EPR 90°C
CONDUIT FROM PRIMARY METERING CABINET TO POST.
PROVIDE AND INSTALL METER POST AND 1" PVC SCHEDULE 40
WHM: WATT-HOUR METER. PROVIDED BY UTILITY. CONTRACTOR TO
VT: VOLTAGE TRANSFORMER PROVIDED BY UTILITY.
CT: CURRENT TRANSFORMER PROVIDED BY UTILITY.
BE SUFFICIENT.
SHORT CIRCUIT CURRENT RATINGS OF 15 KV VFI SWITCHGEAR WILL
STANDARD AVAILABLE MOMENTARY, SHORT-TIME WITHSTAND, AND
CIRCUIT CURRENT DATA PROVIDED BY THE UTILITY CONFIRMS THAT
SHORT THAN OIL. PROVIDED AND INSTALLED BY CONTRACTOR.
A LEVEL FIBERGLASS PAD. INSULATING SYSTEMS SHALL BE OTHER
POSITION VIEWING WINDOWS. EQUIPMENT SHALL REST SOLIDLY ON
EXTERNALLY-OPERABLE LOAD-BREAK CAPABILITY, AND CONTACT
INTERRUPTER WITH 200 AMP BUSHING WELLS,
VFI: 15 KV, 95 KV BIL, DEAD-FRONT, PAD-MOUNTED VACUUM FAULT
CONTRACTOR.
SYSTEMS SHALL BE OTHER THAN OIL. PROVIDED AND INSTALLED BY
SHALL REST SOLIDLY ON A LEVEL FIBERGLASS PAD. INSULATING
AMP BUSHING WELLS AND A 13-JAW METER SOCKET. EQUIPMENT
PAD-MOUNTED PRIMARY METERING CABINET FURNISHED WITH 200
PRIMARY METERING CABINET: 15 KV, 95 KV BIL, DEAD-FRONT,
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg5:21:11 PM 8/30/2018
...\30500 - Construction E&D\GR91\30DA0 - Plans & Specs\CAD_BIM\_Sheets\3
M
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
G R
E -0
.d g n
A N
S I
D
E-001
J
M O
E N
C H
S
O T
T
A J
O H
N S
O N
S
O T
T F
Y
G A -1
-1
P U
M P A
S S
E M
B L
Y
C O
N T
R O
L S
O M
A H
A D
IS
T R
IC
T
G A
R R
IS
O N D
A M
N O
R T
H D
A K
O T
A
R E
P L
A C
E E
L E
C T
R
IC
F
L O
O D P
U M
P S
P R
IM
A R
Y D
IS
T R
IB
U T
IO
N O
N E -L
IN
E D
IA
G R
A M
W F
R
A U
G U
S T
A
M G
E N
E R
A L R
E V
IS
IO
N S
-3
-2
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
P R
O J E
C T O
R D
E R /M
IP
R
BUS - 2000A COPPER/TIN PLATED 42,000A RMS BRACING
25 KVA
1-Ø
TRANSFORMER
MAINTENANCE SHOP
HP
LIFT PUMP #1
STORMWATER
FDR
GFR
ST
FDR
GFR
ST
FDR
GFR
ST
3-Ø
HEAT EXCHANGERS
TRANSFORMER AND
DIESEL PUMP HOUSE
LIFT PUMP #2
STORMWATER
LIFT PUMP #3
STORMWATER
FDR
GFR
ST
50 KVA
1-Ø
TRANSFORMER
SPECIES BUILDING
THREATENED/ENDANGERED
OFFICE AND
FDR
GFR
ST
3-Ø
480 VOLT PANEL
ELECTRIC PUMP HOUSE
(EMPTY SPACE)
FUTURE UNIT
(EMPTY SPACE)
FUTURE UNIT
BREAKER
CIRCUIT
MAIN
CABLE #3CABLE #2CABLE #1 CABLE #4
BUS DUCT
2000 AMP
GR91-E-001
FROM DRAWING
MAIN INCOMING LINE
60 A 60 A 150 A 150 A 2000 A
VFD CB
441 A
VFD
HP
441 A
VFD
VFD CB
HP
441 A
VFD
VFD CB
CONDUIT BELOW PUMP HOUSE FLOOR.
MOTOR, SUCH AS NEXANS 37-102-327VFD 110 DEG C CABLE OR EQUAL. RUN IN NEW OVERHEAD RACEWAY OR IN
CONTRACTOR TO PULL NEW 700 MCM SHIELDED Cu VFD CABLES BETWEEN MCC AND VFD AND BETWEEN VFD AND VFD CABLES
NEW SURFACE MOUNT RMC CONDUIT FROM MCC TO PANELBOARD.
PANELBOARD IN ELECTRIC PUMP HOUSE. REMOVE EXISTING WIRES FROM EXISTING CONDUIT. RUN
CONTRACTOR TO PULL NEW 600 VOLT 1/0 CU CABLES FROM MCC TO EXISTING 480 VOLT CABLE #4
TRANSFORMER AT OFFICE BUILDING. SEE DRAWING EU-001
CONTRACTOR TO DIRECT BURY NEW 600 VOLT 1/0 CU CABLES FROM MCC TO NEW 50 KVA PAD-MOUNT CABLE #3
INGRESSION. SEE DRAWING EU-001.
THE ELECTRIC PUMP HOUSE TO REACH THE MCC. SEAL WALL PENETRATION AGAINST MOISTURE AND DIRT
WEST OF DIESEL PUMP HOUSE. REMOVE EXISTING WIRES FROM EXISTING CONDUIT. EXTEND EXISTING CONDUIT INTO
CONTRACTOR TO PULL NEW 600 VOLT 2 AWG CU CABLES IN EXISTING BURIED CONDUIT TO EXISTING JUNCTION BOX CABLE #2
DRAWING EU-001.
ELECTRIC PUMP HOUSE TO REACH MCC. SEAL WALL PENETRATION AGAINST MOISTURE AND DIRT INGRESSION. SEE
SHOP TRANSFORMER. REMOVE EXISTING WIRES FROM EXISTING CONDUIT. EXTEND EXISTING CONDUIT INTO THE
CONTRACTOR TO PULL NEW 600 VOLT 6 AWG CU CABLES IN EXISTING BURIED CONDUIT TO EXISTING MAINTENANCE CABLE #1
THERMAL MAGNETIC BRANCH CIRCUIT BREAKER FOR VFD, TO BE SIZED BY MCC/VFD MANUFACTURER.VFD CB
VFD SHALL HAVE AN ACTIVE FRONT END. VFDS WILL BE LOCATED REMOTELY FROM MCC.
VARIABLE FREQUENCY DRIVE, WITH A MINIMUM CONTINUOUS NORMAL DUTY RATING OF 441 AMPS. TO MEET IEEE 519, VFD
SHUNT TRIPST
GROUND FAULT RELAYGFR
FEEDER BREAKERFDR
NOTES
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg5:08:37 PM 8/30/2018
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
G R
E -0
.d
S I
D
E-002
J
M O
E N
C H
S
O T
T
A J
O H
N S
O N
S
O T
T
M C
C O
N E -L
IN
E D
IA
G R
A M
F Y
G A -1
-1
P U
M P A
S S
E M
B L
Y
C O
N T
R O
L S
O M
A H
A D
IS
T R
IC
T
G A
R R
IS
O N D
A M
N O
R T
H D
A K
O T
A
R E
P L
A C
E E
L E
C T
R
IC
F
L O
O D P
U M
P S
W F
R
A U
G U
S T
A
M G
E N
E R
A L R
E V
IS
IO
N S
-3
-2
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
P R
O J E
C T O
R D
E R /M
IP
R
2 1
NOT TO SCALE
NOT TO SCALE
VACUUM BREAKERS - PLANTURBINE PUMP
VERTICAL
SUMP PUMP
UNIT HEATER
PUMP ROOM - PLAN AT EL. 1848.50
SHACK. SEE DRAWING EU-001.
2-PAIR 16 AWG SHIELDED TWISTED PAIR (STP) CABLE FROM THE NEW CONTROL PANEL IN THE PUMP HOUSE TO THE STREAM GAUGE
INSTALL NEW 3/4" SCHEDULE 40 PVC CONDUIT UNDERGROUND BETWEEN PUMP HOUSE AND STREAM GAUGE SHACK. PULL ONE NEW
10. EXISTING U.S. GEOLOGICAL SURVEY STREAM GAUGE SHACK (NOT TO SCALE) ON LEVEE CREST, EAST OF VACUUM BREAKER MANHOLE.
THE PUMP HOUSE TO THE MANHOLE. EXISTING SOLENOID VALVES TO BE REPLACED. SEE DRAWING EU-001.
UNDERGROUND BETWEEN PUMP HOUSE AND MANHOLE. PULL EIGHT NEW 12 AWG CONDUCTORS FROM THE NEW CONTROL PANEL IN
MANHOLE TO BE DISCONNECTED, ABANDONED IN PLACE, MARKED AS SUCH. INSTALL NEW 1-1/4” SCHEDULE 40 PVC CONDUIT
9. EXISTING MANHOLE FOR VACUUM BREAKER SOLENOID VALVES, SOUTH OF PUMP HOUSE ON LEVEE CREST. EXISTING CONDUCTORS TO
EQUIPMENT IF NECESSARY.
INCLUDING PULLING PUMPS AND MOTORS FROM THE WET WELL. RELOCATE EXISTING UNIT HEATERS AND OTHER WALL-MOUNTED
CHAIN HOIST OR OTHER EQUIPMENT. RACEWAYS MUST NOT INTERFERE WITH FUTURE PUMP AND MOTOR MAINTENANCE ACTIVITIES, ROUTE ALL RACEWAYS TO PREVENT INTERFERENCE WITH EXISTING HOUSE FLOOR VARIES BETWEEN 10" AND 12" OF CONCRETE).
VFD-RATED CABLES FROM VFDS TO MOTORS MAY ALSO BE RUN IN CONDUITS BELOW PUMP HOUSE FLOOR (PUMP MOTORS.
OVERHEAD RACEWAY FROM MCC TO VFDS AND NEW VFD-RATED CABLES SHALL BE RUN IN NEW OVERHEAD RACEWAY FROM VFDS TO
LEVEL REGARDLESS OF THE ORIGINAL FLOOR SLOPE WHERE THE VFDS ARE TO BE LOCATED. NEW VFD-RATED CABLES SHALL BE RUN IN NEW
PAD SHALL EXTEND A MINIMUM OF 3” BEYOND ALL ENCLOSURE SIDES. THE PAD FOUNDATION, PAD SURFACE, AND SIDES SHALL ALL BE LOCATIONS, SIZES, EMBEDMENTS, AND PROJECTIONS SHALL SUIT THE REQUIREMENTS OF THE APPROVED EQUIPMENT FURNISHED. THE
SHALL BE 3000 PSI AND MEET THE REQUIREMENTS OF ACI 301-16. THE PLAN DIMENSIONS OF EQUIPMENT BASES AND THEIR ANCHOR BOLT
8. TWO OF THREE NEW VARIABLE FREQUENCY DRIVES. INSTALL 4” HIGH CONCRETE HOUSEKEEPING PAD. THE CONCRETE PAD SYSTEM
7. IF NECESSARY, RELOCATE EXISTING 37.5 KVA TRANSFORMER TO THE NORTH ALONG THE ADJACENT WALL.
WELL. RELOCATE EXISTING UNIT HEATERS AND OTHER WALL-MOUNTED EQUIPMENT IF NECESSARY.
NOT INTERFERE WITH FUTURE PUMP AND MOTOR MAINTENANCE ACTIVITIES, INCLUDING PULLING PUMPS AND MOTORS FROM THE WET
ROUTE ALL RACEWAYS TO PREVENT INTERFERENCE WITH EXISTING CHAIN HOIST OR OTHER EQUIPMENT. RACEWAYS MUST CONCRETE).
MOTOR MAY ALSO BE RUN IN CONDUIT BELOW PUMP HOUSE FLOOR (PUMP HOUSE FLOOR VARIES BETWEEN 10" AND 12" OF
VFD-RATED CABLE FROM VFD TO AND NEW VFD-RATED CABLES SHALL BE RUN IN NEW OVERHEAD RACEWAY FROM VFD TO MOTOR.
MCC PLUS VFD MUST BE LESS THAN 14’-3”LONG. NEW VFD-RATED CABLES SHALL BE RUN IN NEW OVERHEAD RACEWAY FROM MCC TO VFD
6. NEW MCC AND ONE OF THREE NEW VARIABLE FREQUENCY DRIVES. MCC AND VFD TO BE INSTALLED ON EXISTING HOUSEKEEPING PAD.
APPROVAL.
WALL PENETRATION AGAINST MOISTURE AND DIRT INGRESSION. PROVIDE A SHOP DRAWING OF THE BUS DUCT FOR GOVERNMENT
5. NEW 2000 AMP, 480 VOLT, METAL-ENCLOSED, NON-SEGREGATED BUS DUCT FROM NEW 1500 KVA TRANSFORMER TO NEW MCC. SEAL
NEW 1500 KVA TRANSFORMER AND NEW CONCRETE PAD TO BE INSTALLED IN THIS LOCATION. SEE DRAWING EU-001.
4. EXISTING TRANSFORMER AND SECTIONALIZER TO BE REMOVED, INCLUDING DEMOLITION OF EXISTING TRANSFORMER CONCRETE PAD.
AND MOTORS FROM THE WET WELL. RELOCATE EXISTING UNIT HEATERS AND OTHER WALL-MOUNTED EQUIPMENT IF NECESSARY.
EQUIPMENT. RACEWAYS MUST NOT INTERFERE WITH FUTURE PUMP AND MOTOR MAINTENANCE ACTIVITIES, INCLUDING PULLING PUMPS
INSTRUMENTATION AND CONTROL CIRCUITS. ROUTE ALL RACEWAYS TO PREVENT INTERFERENCE WITH EXISTING CHAIN HOIST OR OTHER
3. NEW CONTROL PANEL. INSTALL NEW OVERHEAD RACEWAYS, SEPARATE FROM POWER RACEWAYS, FOR ROUTING OF ALL
DRAWING E-007.
2. EXISTING FLOOR PENETRATION INTO WET WELL. INSTALL NEW SUBMERSIBLE LEVEL SENSOR AND STILLING PIPE AT THIS LOCATION. SEE
1. EXISTING SUBMERSIBLE LEVEL SENSOR TO BE REMOVED.
KEYED NOTES:
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg5:08:24 PM 8/30/2018
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
G R
E -0
.d
S I
D
E-004
J
M O
E N
C H
S
O T
T
A J
O H
N S
O N
S
O T
T F
Y
G A -1
-1
P U
M P A
S S
E M
B L
Y
C O
N T
R O
L S
O M
A H
A D
IS
T R
IC
T
G A
R R
IS
O N D
A M
N O
R T
H D
A K
O T
A
R E
P L
A C
E E
L E
C T
R
IC
F
L O
O D P
U M
P S
P U
M P
IN
G P
L A
N T E
L E
C T
R
IC
A L P
L A
N
W F
R
A U
G U
S T
A M G
E N
E R
A L R
E V
IS
IO
N S
-3
-2
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
P R
O J E
C T O
R D
E R /M
IP
R
SUBSTATION (MDU)
EXISTING
LINES (MDU)
EXISTING OVERHEAD
(COE)
EXISTING RISER POLE
LONG
APPROXIMATELY 340'
EXISTING DUCT BANK
SIGN
2' FORCEMAIN
E N
T R
A N
C E R
O A
D
DRAINAGE DITCH
STATION
SEWER LIFT
TRANSFORMER
PAD-MOUNT
BUILDING
OFFICE
DRAINAGE DITCH
UG
SIDEWALK
BURIED
DIRECT
SUBSTATION
COE
SS
SS
SS
SS
MANHOLE
BREAKER
VACUUM
TYPE EB-20 PVC
2X6 IN.
3000 PSI CONCRETE
NOT TO SCALE
SITE PLAN
1-1/4" PVC
SHACK
GAUGE
STREAM
USGS
9-1/2"
SPECIES BUILDING
THREATENED/ENDANGERED
NOTES:
POINT
DUCT BANK UP TO THIS
IS DIRECT BURIED ABOVE
TO OFFICE TRANFORMER
EXISTING 2.4 KV CABLE
3/4" PVC
HOUSE
PUMP
ELECTRIC
SHOP
MAINT.HOUSE
PUMP
DIESEL
FENCE
EXISTING
NOT TO SCALE
3" 3"
DETAIL A
NOT TO SCALE
DETAIL B
NOTES:
PLAN VIEW
XFMR
ELEVATION VIEW
UNDERGROUND DUCT BANK
CROSS-SECTION OF NEW CONCRETE-ENCASED
XFMR
CONTAINMENT
OIL
CONTAINMENT
OIL
PERIMETER.
THE SLAB SHOULD ALSO EXTEND UP INTO THE SECONDARY CONTAINMENT CURBS AROUND THE SLAB
DETERMINE REQUIRED VOLUME BASED ON TRANSFORMER MANUFACTURER'S DATA. THE REINFORCING BARS OF
VOLUME OF PRECIPITATION RESULTING FROM A 25-YEAR, 24-HOUR STORM EVENT. CONTRACTOR SHALL
ALONG THE PERIMETER, CAPABLE OF HOLDING THE ENTIRE VOLUME OF OIL FROM THE TRANSFORMER, PLUS THE
TRANSFORMER, CONSISTING OF AN IMPERVIOUS WATERTIGHT CONCRETE BASIN WITH RAISED CONCRETE CURBS
6. THE CONCRETE SYSTEM SHALL INCLUDE SECONDARY OIL CONTAINMENT FOR THE PAD-MOUNTED
5. PROVIDE EDGES ABOVE GRADE WITH 1/2 INCH CHAMFER.
GROUND SLOPE WHERE THE TRANSFORMER IS TO BE LOCATED.
4. THE PAD FOUNDATION, PAD SURFACE, AND SIDES SHALL ALL BE LEVEL REGARDLESS OF THE ORIGINAL
3. PLACE SLAB ON A 6 INCH THICK, WELL-COMPACTED GRAVEL BASE.
SYSTEM FOR GOVERNMENT APPROVAL. DETAIL B IS A TYPICAL REPRESENTATION ONLY.
ON TRANSFORMER MANUFACTURER'S DATA. CONTRACTOR SHALL SUBMIT SHOP DRAWING OF THE CONCRETE
PROJECTIONS SHALL SUIT THE REQUIREMENTS OF THE APPROVED EQUIPMENT FURNISHED AND SHALL BE BASED
DIMENSIONS OF EQUIPMENT BASES AND THEIR ANCHOR BOLT LOCATIONS, SIZES, EMBEDMENTS, AND
WITH A 6 BY 6 INCHES - W2.9 BY W2.9 MESH PLACED UNIFORMLY 4 INCHES FROM THE TOP OF THE SLAB. THE PLAN
2. UNLESS OTHERWISE INDICATED, PROVIDE THE SLAB WITH DIMENSIONS AT LEAST 8 INCHES THICK, REINFORCED
EXCEED THE REQUIREMENTS IN ACCORDANCE WITH ACI 301-16.
DESIGNED FOR THE SPECIFIC TRANSFORMER BEING INSTALLED. THESE CONCRETE SYSTEMS MUST MEET OR
1. THE CONTRACTOR SHALL PROVIDE A FOUNDATION, CONCRETE PAD, AND CONTAINMENT SYSTEM THAT IS
SECONDARY CONTAINMENT
CONCRETE PAD AND
1500 KVA TRANSFORMER
13. CONTRACTOR RESPONSIBLE FOR RESTORING ANY INFRASTRUCTURE OR LANDSCAPING DISTURBED BY CONSTRUCTION ACTIVITIES.
CONDUITS.
12. CONTRACTOR TO INSTALL WARNING RIBBON AND TRACER WIRE 12”ABOVE NEW DUCT BANK, NEW DIRECT-BURIAL CABLE, AND NEW PVC
125’. SEE DRAWINGS E-004 AND E-005 FOR THE NEW CABLES TO BE PROVIDED AND INSTALLED IN THESE CONDUITS.
CONDUITS SHALL BE BETWEEN 24”AND 30”IN ACCORDANCE WITH NEC REQUIREMENTS. APPROXIMATE LENGTH OF EACH PVC CONDUIT RUN IS THE VACUUM BREAKER MANHOLE AND USGS STREAM GAUGE SHACK ON THE LEVEE CREST AS SHOWN ON THIS DRAWING. DEPTH OF NEW
11. CONTRACTOR TO PROVIDE AND INSTALL NEW UNDERGROUND 1-1/4”AND 3/4”SCHEDULE 40 PVC CONDUITS FROM ELECTRIC PUMP HOUSE TO
CABLE. APPROXIMATE LENGTH OF EXISTING DIRECT-BURIAL CABLE IS 220’. SEE DRAWING E-002.
EXISTING 2.4 KV DIRECT-BURIAL CABLE TO BE DISCONNECTED AND ABANDONED BELOW GRADE AND SHALL BE SO MARKED AT EACH END OF THE
36”IN ACCORDANCE WITH NEC REQUIREMENTS. EXISTING 2.4 KV-240/120 VOLT OFFICE TRANSFORMER TO BE REMOVED BY CONTRACTOR.
480-240/120 VOLT 50 KVA PAD-MOUNT TRANSFORMER AT OFFICE BUILDING. DEPTH OF NEW DIRECT-BURIAL CABLE SHALL BE BETWEEN 24”AND
10. CONTRACTOR TO PROVIDE AND INSTALL 600 VOLT DIRECT-BURIAL CABLE FROM NEW MCC IN ELECTRIC PUMP HOUSE TO NEW SINGLE-PHASE
LENGTH IS 370’. SEE DRAWING E-002.
JUNCTION BOX WEST OF DIESEL PUMP HOUSE. CONDUIT SHALL BE EXTENDED TO REACH NEW MCC IN ELECTRIC PUMP HOUSE. APPROXIMATE
9. CONTRACTOR TO PROVIDE AND INSTALL NEW 600 VOLT CABLE IN EXISTING BURIED CONDUIT FROM ELECTRIC PUMP HOUSE TO EXISTING
200’. SEE DRAWING E-002.
MAINTENANCE SHOP TRANSFORMER. CONDUIT SHALL BE EXTENDED TO REACH NEW MCC IN ELECTRIC PUMP HOUSE. APPROXIMATE LENGTH IS
8. CONTRACTOR TO PROVIDE AND INSTALL NEW 600 VOLT CABLE IN EXISTING BURIED CONDUIT FROM ELECTRIC PUMP HOUSE TO EXISTING
REQUIREMENTS IN DETAIL A ON THIS SHEET.
EXISTING DUCT BANK. EXISTING DUCT BANK ROUTE AND LENGTH SHOWN ON THIS SHEET ARE APPROXIMATE. SEE NEW DUCT BANK
CONTRACTOR-SUPPLIED AS-BUILT DRAWINGS SHALL ACCURATELY DEPICT THE LOCATIONS OF THE NEW DUCT BANK AND THE ABANDONED
REQUIREMENTS. EXISTING DUCT BANK TO BE ABANDONED IN PLACE. EXISTING 2.4 KV CABLES IN EXISTING DUCT BANK TO BE REMOVED.
BANK ALONGSIDE EXISTING DUCT BANK. TOP OF NEW DUCT BANK SHALL BE BETWEEN 24" AND 30" BELOW GRADE IN ACCORDANCE WITH NEC
6. CONTRACTOR TO PROVIDE AND INSTALL NEW 12.47 KV CABLE IN NEW CONCRETE DUCT BANK. CONTRACTOR SHALL CONSTRUCT NEW DUCT
DRAWING.
REQUIREMENTS. EXISTING DUCT BANK ROUTE AND LENGTH SHOWN ARE APPROXIMATE. SEE DUCT BANK REQUIREMENTS IN DETAIL A OF THIS
CABLE INSIDE EXISTING DUCT BANK. TOP OF NEW DUCT BANK SHALL BE BETWEEN 24”AND 30”BELOW GRADE IN ACCORDANCE WITH NEC SHALL CONSTRUCT NEW DUCT BANK ALONGSIDE EXISTING DUCT BANK PRIOR TO DEMOLISHING THE EXISTING DUCT BANK AND EXISTING 2.4 KV
6. CONTRACTOR TO PROVIDE AND INSTALL NEW 12.47 KV CABLE IN IN NEW CONCRETE DUCT BANK INSTALLED BY CONTRACTOR. CONTRACTOR
CONTRACTOR WILL CONNECT TO THE UTILITY’S NEW UNDERGROUND CABLE INSIDE PRIMARY METERING CABINET.
PROVIDE AND INSTALL NEW PRIMARY METERING CABINET AND VACUUM FAULT INTERRUPTER AT THIS LOCATION. NEW 12.47 KV CABLE BY
5. EXISTING RISER POLE TO BE REMOVED BY CONTRACTOR. LOCAL UTILITY WILL DEMOLISH THEIR EXISTING SUBSTATION. CONTRACTOR WILL
14 00) SECTIONS.
CONTINUITY OF WILLISTON RESOURCE OFFICE OPERATIONS, AS DESCRIBED IN THE SUMMARY OF WORK (01 11 00) AND WORK RESTRICTIONS (01
4. CONTRACTOR RESPONSIBLE FOR PROVIDING ANY TEMPORARY POWER THAT MAY BE REQUIRED FOR CONSTRUCTION ACTIVITIES AND
3. CONTRACTOR RESPONSIBLE FOR COORDINATING WITH LOCAL UTILITY FOR POWER OUTAGES.
2. CONTRACTOR RESPONSIBLE FOR LOCATING EXISTING UTILITIES. LOCATIONS SHOWN ARE APPROXIMATE.
THERETO.
1. CONTRACTOR TO FIELD VERIFY ALL PERTINENT EXISTING CONDITIONS AND INSTALLATION REQUIREMENTS, MAKING ALLOWANCES IN BID
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg5:20:03 PM 8/30/2018
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
G R
E
U .d
S I
D
EU001
J
M O
E N
C H
S
O T
T
A J
O H
N S
O N
S
IT
E P
L A
N
S
O T
T
P U
M P A
S S
E M
B L
Y
C O
N T
R O
L S
F Y
G A -1
-1
O M
A H
A D
IS
T R
IC
T
G A
R R
IS
O N D
A M
N O
R T
H D
A K
O T
A
R E
P L
A C
E E
L E
C T
R
IC
F
L O
O D P
U M
P S
W F
R
U
G U
S T
-3
-2
A M G
E N
E R
A L R
E V
IS
IO
N S
| GR91E-001 |
| GR91E-002 |
| GR91E-004 |
| GR91EU001 |
File details come from the government source that posted it.