Attachment_3-CSI_MasterFormat_Cost_Schedule.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Install Spillway Gate Hoist Wire Ropes Federal contract opportunity
- Solicitation number
- W9128F-17-R-0050
About this file
CSI MasterFormat Cost Schedule worksheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F-17-R-0050,_Amd_0002.pdf | ||
| 17-R-0050-Amd_0001.pdf | ||
| Attachment_2-Drawings_WIRE_ROPE_BIG_BEND_DAM,_SD-11X17.pdf | ||
| Attachment_1-Install_Spillway_Gate_Wire_Rope_Big_Bend_Spesc.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| General Requirements Subgroup | ||
| Division | Description | Total Cost |
| Division 01 | General Requirements | |
| Division 02 | Existing Conditions (Ex. Alterations to existing natural conditions) | |
| Division 03 | Concrete (Ex. Footings) | |
| Division 04 | Masonry (ex. Concrete block and brick work) | |
| Division 05 | Metals (Ex. Steel Framing) | |
| Division 06 | Wood, Plastics, and Composites (Ex. House framing) | |
| Division 07 | Thermal and Moisture Protection (Ex. Insulation and water barriers) | |
| Division 08 | Openings | |
| Division 09 | Finishes | |
| Division 10 | Specialities | |
| Division 11 | Equipment | |
| Division 12 | Furnishings | |
| Division 13 | Special Construction | |
| Division 14 | Conveying Equipment | |
| Facility Services Subgroup | ||
| Division | Description | Total Cost |
| Division 21 | Fire Suppression | |
| Division 22 | Plumbing | |
| Division 23 | Heating, Ventilating, and Air Conditioning (HVAC) | |
| Division 25 | Integrated Automation | |
| Division 26 | Electrical | |
| Division 27 | Communications | |
| Division 28 | Electronic Safety and Security | |
| Site and Infrastructure Subgroup | ||
| Division | Description | Total Cost |
| Division 31 | Earthwork | |
| Division 32 | Exterior Improvements | |
| Division 33 | Utilities | |
| Division 34 | Transportation | |
| Division 35 | Waterway and Marine Construction | |
| Process Equipment Subgroup | ||
| Division | Description | Total Cost |
| Division 40 | Process Integration | |
| Division 41 | Material Processing and Handling Equipment | |
| Division 42 | Process Heating, Cooling, and Drying Equipment | |
| Division 43 | Process Gas and Liquid Handling, Purification and Storage Equipment | |
| Division 44 | Pollution and Waste Control Equipment | |
| Division 45 | Industry-Specific Manufacturing Equipment | |
| Division 46 | Water and Wastewater Equipment | |
| Division 48 | Electrical Power Generation | |
| Subtotal: | $ - 0 | |
| Markups | ||
| Insurance Rate: | 0.00% | |
| Insurance Cost: | $ - 0 | |
| Payment and Performance Bond Rate: | 0.00% | |
| Payment and Performance Bond Cost: | $ - 0 | |
| General and Administrative Expense Rate: | 0.00% | |
| General and Administrative Expense Cost: | $ - 0 | |
| Profit Rate: | 0.00% | |
| Profit: | $ - 0 | |
| Subtotal Markups: | $ - 0 | |
| Total Project Price: | $ - 0 | |
| Offerors will only provide information in the "yellow" highlighed cells. |
File details come from the government source that posted it. Updated .