17-R-0050-Amd_0001.pdf
PDF 72 KB Posted
- Attached to
- Install Spillway Gate Hoist Wire Ropes Federal contract opportunity
- Solicitation number
- W9128F-17-R-0050
About this file
Amd 0001-Updates 1) Bidder Inquiry Key and 2) General Wage Determination SD170013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F-17-R-0050,_Amd_0002.pdf | ||
| Attachment_1-Install_Spillway_Gate_Wire_Rope_Big_Bend_Spesc.pdf | ||
| Attachment_3-CSI_MasterFormat_Cost_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_2-Drawings_WIRE_ROPE_BIG_BEND_DAM,_SD-11X17.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0001
Install Spillway Gate Wire Rope, Big Bend Dam, SD.
See attached documentation for content of the amendment revisions
Date for receipt of Proposals is 27 June 2017 at 2:00 pm
Government Point of Contact: Kevin Thomsen, Contract Specialist (402) 995-2919
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F-17-R-0050
06/07/2017
05/25/2017
06/07/2017
Am #0001 - 2 (Continuation SF 30)
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901
:NOTICE: Failure to acknowledge : Solicitation No. W9128F 17 R 0050 :all amendments may cause rejec- :
:tion of the offer. See FAR : Date of Issue: 25 May 2017 :52.215-1 of Section 00 21 00 : Date of Receiving Proposals:
27 June 2017
Amendment No. 0001 07 June 2017
SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for Construction of Install Spillway Gate Wire Rope, Big Bend Dam, SD.
Solicitation No. W9128F 17 R 0050.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 00 21 00 Page 18, paragraph 1.18.1, top of page, delete “The Bidder Inquiry Key is: RYKFM2-W5UR6K” and substitute “The Bidder Inquiry Key is: G7296G-TIK3ZP”
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.
Pages or Sections Deleted Pages or Sections Substituted or Added
General Wage Deci8sion No SD170013 General Wage Deci8sion No SD170013 Dated 04/21/2017 Dated 06/02/2017
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal occasioned thereby.
a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.
b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00 10 00-1 of Standard Form 1442.
3. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 27 June 2017.
Am #0001 - 3 (Continuation SF 30)
Attachments: General Wage Decision No. SD170013 dated 06/02/2017
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
7 Jul 2017
MFS/2184
SD170013 Page 1 Am0001
General Decision Number: SD170013 06/02/2017 SD13
Superseded General Decision Number: SD20160013
State: South Dakota
Construction Type: Building
County: Buffalo County in South Dakota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 01/27/2017 2 04/21/2017 3 06/02/2017
ASBE0057-001 07/01/2014
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Duct, Pipe & Mechanical System Insulation)....$ 30.04 14.50
CARP0587-001 06/01/2016
Rates Fringes
CARPENTER (Drywall Hanging and Metal Stud Installation Only)............................$ 28.48 9.91
* ELEC0426-002 06/01/2017
Rates Fringes
ELECTRICIAN......................$ 27.94 1.5%+11.26
ELEV0033-004 01/01/2017
SD170013 Page 2 Am0001
Rates Fringes
ELEVATOR MECHANIC................$ 42.13 31.585
FOOTNOTES: 8 Paid Holidays: New Year's Day; Memorial Day;Independence Day; Labor Day; Veteran's Day;
Thanksgiving Day; the Day after Thanksgiving & Christmas Day.
ENGI0049-009 03/01/2014
Rates Fringes
POWER EQUIPMENT OPERATOR
(1) Tower Crane.............$ 23.47 6.02
(3) Hydro Crane; Crane (All Other Types)...........$ 22.88 6.02
Long Boom Pay: 151' to 200' - $0.50 per hour additional; 201' and over - $0.60 per hour. Measurement shall be from butt pins of the boom to the top of the sheave or jib sheave.
Tower Crane Premium: From the top of the tower crane foundation to the top of the tower crane apex. In the case of luffing cranes, to the top of Gantry, plus boom length per classification:
250' to 299' - $1.00 300' to 349 - $1.50 350' to 399' - $2.00 400' to 449' - $2.50 450' and over - $3.00
IRON0021-018 05/01/2016
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 22.21 15.13
PLAS0538-001 10/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 26.00 12.59
SHEE0010-022 06/01/2014
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 24.47 11.71
SUSD2012-004 08/21/2014
Rates Fringes
SD170013 Page 3 Am0001
BRICKLAYER.......................$ 31.88 1.83
CARPENTER, Excludes Drywall Hanging, and Metal Stud Installation.....................$ 17.28 3.37
LABORER: Common or General......$ 11.45 2.28
LABORER: Mason Tender - Brick...$ 14.19 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 19.34 0.00
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 16.14 0.00
PAINTER (Brush, Roller, and Spray)...........................$ 19.22 0.00
PLUMBER..........................$ 19.02 5.20
ROOFER...........................$ 14.52 2.09
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
SD170013 Page 4 Am0001
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in
SD170013 Page 5 Am0001 the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
SD170013 Page 6 Am0001
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
| SF30-Am1 |
| am_0001 |
| wageAm1 |
File details come from the government source that posted it. Updated .