AMD002.pdf
PDF 23 KB Posted
- Attached to
- Supply Transformers Federal contract opportunity
- Solicitation number
- W9128F-16-T-0001
About this file
Amendment 0002. Specifications change.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPS_Amd_0005.pdf | ||
| SPS_Amd_0004.pdf | ||
| Amd_0004_Specs.pdf | ||
| SPS_Amd_0003.pdf | ||
| Amd_0003_Combined.pdf | ||
| Amendment_1.pdf | ||
| Fort_Peck_Transformer_Supply_Drawings_2016.pdf | ||
| Approved_Solicitation.pdf | ||
| PPQ.pdf | ||
| Fort_Peck_GSU_Station_Service_Transformer_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W59XQG40387792
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Reason for this amendment is to address questions raised by interested vendors. The specifications document has changed to reflect pertinent updated info. See attached. In addition the Q&A document has been added. Reference Specification Section 48 10 23.04 Paragraph 2.1.5n. Changed the total transformer not to exceed w eight from 180,000 pounds to 200,000 pounds.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Feb-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F-16-T-0001
X 9B. DATED (SEE ITEM 11)
05-Feb-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Feb-2016
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F-16-T-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 02
1. Reference Specification Section 48 19 23.04 Paragraph 2.1.5n. Change the total transformer not to exceed weight from 180,000 pounds to 200,000 pounds.
See Amended Specifications highlighted in Yellow
QUESTION AND ANSWERS AS OF 26 February 2016
1) Your solicitation document for the subject project requires delivery of the transformers by April 17, 2017.
Do you also have tentative schedule to commission and energize the transformers after delivery?
Answer: The installation design will be based upon the product submitted by the winning offeror. The design will commence once that information is received. We anticipate an install contract will not be awarded for at least 1-1/2 years, with commissioning and energization to be part of that effort. So it could be at least 2 years before those tasks would occur.
2) Do you mean that field assembly/testing and commissioning of transformers will not be completed after delivery, but at least 1.5 years after delivery as mentioned below? Is it your final decision to keep the transformers in storage after delivery then?
3) It is our understanding that field assembly/testing and commissioning is also a part of bidder/contractor’s scope to be quoted and submitted to you. If there would be a gap in between the time from delivery and field assembly/testing of 1.5 years (If our interpretation is correct from your response below), then do you expect some sort of escalation clause on payment for the scope to be completed after delivery?
Answer: As required in the specifications Section 01 65 23, the transformers will be delivered to the power plant, off-loaded at a long-term storage location, reassembled, oil-filled and field tested. There is no requirement to perform the reassembly and testing 1.5 years after delivery.
4) Are there any drawings coming out? I do not see any physical size dimensions or constraints for the transformers. Also will there be a site visit or drawing showing where the units are being delivered to?
Answer: Since this is a supply only contract, the contractor will just drop the transformer at the site. I presume the package is detailed enough that the supplier will build as specified. Would need a bit more info on the necessity for a site visit.
5) According to our manufacturer after calculation, total weight of the transformer comes out to be around 90,000 kg. Is this acceptable?
Answer: The total weight will be amended in the solicitation. An amendment is forthcoming
6) From attached transformer specification, Section 48 19 23 01 (Pg. 16) mentions "Maximum load losses at maximum ONAN rated kVA and 1.0 power factor, kW: 150." but in the approved solicitation, Items III (Load Losses) and IV (No-Load Losses) specify following:
W9128F-16-T-0001
Guaranteed not to exceed 150kW (60/80MVA) and 95Kw (25/33MVA) for load losses & 45kW (60/80MVA) and 30kW (25/33MVA) for no-load losses. Please clarify if the load loss of 150kW is based on 60MVA or 80MVA.
Answer: The load loss is based upon 60 MVA
7) What is the Ambient temperature and operation altitude?
Answer: According to IEEE C57.12.00, maximum ambient temperature for cooling is 104F, and max altitude is 3,300 feet. Fort Peck altitude is about 2,000 feet, and the maximum temp rarely gets above 100F (around 2 days a year). Going back 10 years, there was one day where the high reached 104F.
(End of Summary of Changes)