AMD002.pdf
PDF 22 KB Posted
- Attached to
- Supply and Install Monorail Crane Federal contract opportunity
- Solicitation number
- W9128F-16-R-0095
About this file
Amended Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Prebid_Q A_and_Roster_.pdf | ||
| Solicitation_amd0001.pdf | ||
| Monorail_Crane_specs1.pdf | ||
| Solicitation.pdf | ||
| Dwgs_Replace_Spillway_Monorail_Crene _Big_Bend.PDF | ||
| Dwgs_Replace_Spillway_Monorail_Crene _Big_Bend.PDF | ||
| Monorail_Crane_specs1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W59XQG60391235
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this modification is to change some specifications. See attached Spec changes.
The quote due date is also changed to 16 September 2016, at 10:00 AM CST
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F-16-R-0095
X 9B. DATED (SEE ITEM 11)
25-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Sep-2016
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F-16-R-0095
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
SPECS AMENDMENT 0002
MATERIAL PROCESSING AND HANDLING EQUIPMENT
OVERHEAD ELECTRIC CRANE WORK DESCRIPTION AND SALIENT CHARACTERISTICS
Paragraph 2.2.5 Additional Options for Outside Service
Delete Last Sentence: “Crane trolleys shall be provided with manually-operated pin locks, designed to securely anchor the crane against a wind pressure of 30 psf for out-of-service conditions.”
Paragraph 2.3.3 Hoisting Ropes
Third Sentence: “Hoisting rope shall be the rated capacity load plus the lifting beam weight divided by the number of rope parts, and shall not exceed 20 percent of the certified breaking strength of rope.”
Delete: “plus”
Substitute “including”
SECTION TABLE OF CONTENTS
METALS
STOPLOG LIFTING BEAM
Paragraph 1.2 REFERENCES, ASTM INTERNATIONAL (ASTM):
Add:
ASTM A123/A123M (2013) Standard Specification for Zinc
(Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A780/A780M (2009; R 2015) Standard
Practice for Repair of Damaged and Uncoated Areas of Hot-Dip
Galvanized Coatings</RTL>
ASTM F2329 (2013) Zinc Coating, Hot-Dip, Requirements for Application to Carbon and Alloy Steel
Bolts, Screws, Washers, Nuts, and Special Threaded
Fasteners</RTL>
Add to Paragraph 1.3 SUBMITTALS, SD-03 Product Data: Galvanizing
Add Sub-paragraph:
3.2.2 Galvanizing Option
As an option to painting, all lifting beam components specified to be painted may alternatively be hot- dip galvanized in accordance with ASTM A123/A123M for structural steel members, and ASTM F2329 for threaded parts, as applicable. Galvanizing of components shall be accomplished only after all welding is complete. Repair damage to galvanized coatings shall be made using ASTM A780/A780M zinc rich paint, for galvanizing damaged by handling, transporting, cutting, welding, or bolting. Do not heat surfaces to which repair paint has been applied.
PAINTING: HYDRAULIC STRUCTURES
PART 1 GENERAL Painting in this section applies to the following items:
Item 1:
After: “Painting of the new lifting beam.”
Add: “(If galvanizing option is not implemented).”
Item 3: Delete
Paragraph 3.5 PAINTNG SCHEDULES
SYSTEM 23-A-Z, Items or surfaces to be coated:
Item 1:
After: “Painting of the new lifting beam.”
Add: “(If galvanizing option is not implemented).”
Item 3:
Delete: “Painting of new monorail track beam (if Option 2)” Substitute: “Not Used”
SECTION TABLE OF CONTENTS
MATERIAL PROCESSING AND HANDLING EQUIPMENT
OPTION 2 - MONORAIL REPLACEMENT
Paragraph 2.4 PAINTNG SYSTEM
Delete: “Painting of the monorail track system shall be as specified in Section 09 97 02 PAINTING: HYDRAULIC STRUCTURES.”
Substitute: “Monorail track shall be painted with 2 coats of fast cure, two part epoxy. Minimum dry coat thickness shall be 5 mils per coat. Sherwin Williams Macropoxy 646 or approved equal. The coating system shall have the following minimum performance characteristics when tested by the referenced standards:
Abrasion Resistance ASTM D4060, CS17 Wheel, 1000 Cycles, 1 kg Load 84 mg loss
UV Weathering ASTM D4587, QUV-A, 12,000 hrs Pass
Adhesion ASTM D4541 1037 psi
Corrosion Weathering ASTM D5894, 36 Cycles, 12,000 hrs Blister Rating 10
(per ASTM D714) Rusting Rating 9 (per ASTM D610)
Impact Resistance ASTM D2794 30 in. lbs.
Dry Heat Resistance ASTM D2485 250 deg. F
Humidity Resistance ASTM D4585, 6000 hrs No blistering, cracking, or rusting
Immersion 1 year fresh and salt water No blistering, cracking, or adhesion loss
Pencil Hardness ASTM D3363 3H
Water Vapor Permeance ASTM D1653, Method B 1.16 US Perms
(End of Summary of Changes)