AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Amendment No. 0001 Jul 21, 2016
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F-16-R-0015
Jun 24, 2016
MASS PARKING APRON REPAIR – SECTION 1, QJVF 10-0119, MINOT AFB, NORTH DAKOTA
See attached documentation for content of the amendment revisions
Date for receipt of Proposals is 01 AUG 2016 at 1400 hours
Government Point of Contact: Nadine Catania(402) 995-2056
7/21/2016
Am #0001 - 1
Am #0001 - 2 (Continuation of SF30)
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers
1616 Capitol Avenue Omaha, Nebraska 68102-4901
:NOTICE: Failure to acknowledge : Solicitation No. W9128F-16-R-0015 :all amendments may cause rejec-:
:tion of the offer. See FAR : Date of Issue: 24 JUN 2016 :52.215-1 of Section 00 21 00. : Date of Receiving Proposals:
01 AUG 2016
Amendment No. 0001
21 JUL 2016
SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for Construction of Mass Parking Apron Repair – Section 1, QJVF 10-0119.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes)
None.
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages as noted below. The substituted pages are revised and reissued with this amendment.
Pages Deleted Pages Substituted or Added
None.
c. Drawings (Not Reissued).
None.
d. Drawings (Reissued). The following drawings are revised with a revision date as indicated in the title block, and reissued with this amendment.
(1) Sheet CP101, PAVING PLAN, AREA A
(2) Sheet CP201, REPLACMENT PAVEMENT SECTIONS
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal thereby occasioned.
Am #0001 - 3 (Continuation of SF30)
a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.
b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00 10 00-1 of Standard Form 1442.
3. Offers will be received until 2:00 p.m, local time at place of receiving proposals, 01 AUG 2016.
Attachments:
Drawings listed in 1.d. above Mass Parking Apron Repair, Section 1 Site Visit Attendance List Mass Parking Apron Repair, Section 1 Site Visit Photos
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
21 July 2016
NEP/2160
This page was intentionally left blank for duplex printing.
E E
E
E
S T O
R
M
E
E
S
E
C O
M
F
E
E
G
F
S
S
E
E
IN
V=
.9 S
FT
E
E
E
IN
V=
.9 S
FT
E
E
E
IN
V=
.9 S
FT
E
E
E
IN
V=
.9 S
FT
E
E
E
IN
V=
.9 S
FT
E
E
E
IN
V=
.9 S
FT
E
E
E
IN
V=
.9 S
FT
(54" RCP)
(54
" R
CP)
(54 " R
CP)
(54 " R
CP)
BO
X
IN
VER
T=
3.
IN
VER
T O
U T " P
VC
4.
IN
VER
T
IN
7.
TO
P
ELE
VATI
O N
IN
VER
T
.4
S
O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
A
B
KEY PLAN
SCALE: 1" = 400'-0"
NN
.0
P I
1+00
1+50
2+00
2+50
3+00
3+50
4+00
4+50
5+00
5+50
6+00
6+50
T A
X
IW
A Y G
O L F
MASS PARKING APRON
T A X
IW
A Y K
ILO
B
CP201CP101
B
CP201CP101
A
C P
C P
C P
40'
/2
/2
:1
CP101
P A
V
IN
G P
L A
N
W F -1
-C -0
X
W F -1
-R -0
A R
E
H
OMAHA DISTRICT
B
G R
E P
A
IR
M
A S
S P
A R
K
IN
G A
P R
O N
G
O M
A H
A D
IS
T R
IC
T S
E C
T
IO
IN
O T A
F B
N D
Q J
V F
-0
O M
A H
A
N E
B R
A S
K
Q J
V F
-0
M
IB
C
P .d w g
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
/2
/2
A N
S I
D
MATCHLINE - AREA B
NN
SCALE: 1" = 30' - 0"
60'0 30'
LEGEND:
NEW 2" ACC / 6" AGGREGATE BASE COURSE / 9" SUBBASE COURSE
NOTES:
NEW 18" PCC / 6" (MIN) DRAINAGE LAYER
1. SEE SHEET CP103 GEOMETRIC PLAN FOR DIMENSIONS.
DRAINAGE LAYER AS SHOWN ON CP201
NEW 6.5" ACC / 9" AGGREGATE BASE COURSE /
NEW 5" ACC / 6" AGGREGATE BASE COURSE / 9" SUBBASE COURSE
/2
/1
A
M G
E N
E R
A L R
E V
IS
IO
N S
B
G
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
NOT TO SCALE
B
CP201
APRON REPLACEMENT SECTION
CP102
CP101
NOT TO SCALE
A
CP201
APRON REPLACEMENT SECTION
CP102
CP101
6 SPACES @ 18.75' = 112.5' 20' 18.75' 20' 9 SPACES @ 18.75' = 168.75' 14 SPACES @ 18.75' = 262.5' 20' 18.75' 20' 18.75'
28' 28'
NEW SHOULDERNEW SHOULDER
C
SUBDRAIN
L C
SUBDRAIN
L
340' 340'
SUBBASE COURSE - SEE NOTE 2
EXISTING SELECT MATERIAL
"10'
EXISTING 4" GRANULAR FILTER COURSE
NEW 18" PCC JOINT
CONTRACTION
DOWELED SAWED
JOINT (TYP.)
CONTRACTION
SAWED
NEW 18" PCC
DRAINAGE LAYER
NEW 6" (MIN)
(TYP.)
TACK COAT
NEW 2" ACC
NEW 6" ABC
(TYP.)
TACK COAT
NEW 6" ABC
NEW 5" ACC
COURSE
NEW 9" SUBBASE
SUBDRAIN DETAIL "A"
SEE SHEET CG704
SUBDRAIN LINE (TYP.)
NEW 8" PERFORATED
25'
13'
C
SUBDRAIN
LNEW 6.5" ACC
TACK COAT (TYP.)
NEW 9" (MIN) ABC
5'NEW DRAINAGE LAYER
JOINT (TYP.)
T.E. BUTT JOINT (TYP.)
CONSTRUCTION
DOWELED
NEW 18" PCC
DRAINAGE LAYER
NEW 6" (MIN)7
EXISTING 4" GRANULAR FILTER COURSE
SUBDRAIN DETAIL "B"
SEE SHEET CG704
SUBDRAIN LINE (TYP.)
NEW 8" PERFORATED
0.2836% SLOPE
0.51% SLOPE
0.45% SLOPE
VARIES
1.5% SLOPE
VARIES
LEGEND:
PORTLAND CEMENT CONCRETE
ASPHALT CEMENT CONCRETE
AGGREGATE BASE COURSE
PCC
ACC
ABC
NEW 6" ABC
NEW 2" ACC
NEW PRIME COAT (TYP.)
NEW 9" SUBBASE COURSE
SUBBASE COURSE - SEE NOTE 2
EXISTING SELECT MATERIAL
TACK COAT (TYP.)
T.E. BUTT JOINT (TYP.)
BUTT JOINT
BUTT JOINT
8 SPACES @ 18.75' = 150' NEW SHOULDER - 50'
50' 50'
COAT (TYP.)
NEW PRIME
COAT (TYP.)
NEW PRIME
NEW PRIME COAT (TYP.)
10'
10'
COURSE
NEW 9" SUBBASE
SUBBASE COURSE - SEE NOTE 2
EXISTING SELECT MATERIAL
NEW PCC
DRAINAGE LAYER
NEW 6" (MIN)
28'
LC
SUBDRAIN
FILTER COURSE
EXISTING 4" GRANULAR
18.75'
NOT TO SCALE
C
CP201
APRON REPLACEMENT SECTION
CP102
NOT TO SCALE
DETAIL 1
NOT TO SCALE
DETAIL 3
NEW PRIME COAT (TYP.)
NEW PRIME COAT (TYP.)
UNDERLYING LAYER
2.5" COMPACTED ACC INITIAL
SUFACE LAYER
2" COMPACTED ACC
INTERMEDIATE LAYER
2" COMPACTED ACC
SURFACE LAYER
2" COMPACTED ACC
NEW TACK COAT (TYP.)
.5
.5
NEW TACK COAT (TYP.)
NEW PRIME COAT (TYP.)
DETAIL 2
NOT TO SCALE
SURFACE LAYER
2" COMPACTED ACC
UNDERLYING LAYER
3" COMPACTED ACC
NEW GEOTEXTILE (TYP.)
NEW GEOTEXTILE (TYP.)
NEW GEOTEXTILE (TYP.)
Type Symmetric Parabola
L = 75.00'
G1 0.510%
G2 -0.450% e = -0.09'
K = 78.13
REMAIN
EX. PCC TO
JOINT
T.E. EXP.
SUBDRAIN DETAIL "A"
SEE SHEET CG704
SUBDRAIN LINE (TYP.)
NEW 8" PERFORATED
SUBDRAIN DETAIL "A"
SEE SHEET CG704
SUBDRAIN LINE (TYP.)
NEW 8" PERFORATED
5'
SEE NOTE 4
EXISTING SUBGRADE
SEE NOTE 4
EX. SUBGRADE
ACCORDANCE WITH SPECIFICATION SECTION 31 00 00 EARTHWORK.
4. SCARIFY AND RECOMPACT TOP 6" OF EXISTING SUBGRADE IN
ON THIS SHEET.
WITH A SINGLE 2-INCH LIFT OF COMPACTED ASPHALT AS SHOWN IN DETAIL 3
THICK COMPACTED ASPHALT PAVEMENT AREAS SHALL BE CONSTRUCTED
SHALL HAVE A COMPACTED LIFT THICKNESS OF 2-INCHES. NEW 2-INCH
COMPACTED LIFT THICKNESS OF 3-INCHES. THE TOP SURFACE LAYER
DETAIL 2 ON THIS SHEET. THE INITIAL UNDERLYING LAYER SHALL HAVE A
CONSTRUCTED WITH TWO LIFTS OF COMPACTED ASPHALT AS SHOWN IN
NEW 5-INCH THICK COMPACTED ASPHALT PAVEMENT AREAS SHALL BE
SURFACE LAYER SHALL HAVE A COMPACTED LIFT THICKNESS OF 2-INCHES.
SHALL HAVE A COMPACTED LIFT THICKNESS OF 2-INCHES. THE TOP
COMPACTED LIFT THICKNESS OF 2 1/2-INCHES. THE INTERMEDIATE LAYER
DETAIL 1 ON THIS SHEET. THE INITIAL UNDERLYING LAYER SHALL HAVE A
CONSTRUCTED WITH THREE LIFTS OF COMPACTED ASPHALT AS SHOWN IN
3. NEW 6.5-INCH THICK COMPACTED ASPHALT PAVEMENT AREAS SHALL BE
SUBBASE COURSE IN ACCORDANCE WITH SPECIFICATION 32 11 16 SUBBASE.
2. SCARIFY AND RECOMPACT TOP 6" OF EXISTING SELECT MATERIAL
PAVEMENT.
SUBBASE COURSE AS NECESSARY TO CONSTRUCT THE THICKER NEW PCC
EXISTING PAVEMENT REMOVED, REMOVE EXISTING SELECT MATERIAL
1. IN AREAS WHERE THE NEW PAVEMENT THICKNESS IS GREATER THAN THE
NOTES:
SEE NOTE 4
EXISTING SUBGRADE
/2
/2
:1
CP201
P L
A C
E M
E N
T P
A V
E M
E N
T S
E C
T
IO
N S
W F -1
-C -0
W F -1
-R -0
H
OMAHA DISTRICT
G R
E P
A
IR
M
A S
S P
A R
K
IN
G A
P R
G
O M
A H
A D
IS
T R
IC
T S
E C
T
IO
IN
O T A
F B
N D
Q J
V F
-0
O M
A H
A
N E
B R
A S
K
Q
V F
-0
M
IB
C
P .d w g
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
/2
/2
A N
S I
D
/2
/1
G
E N
E R
A L R
E V
IS
IO
G
Am #0001
This page was intentionally left blank for duplex printing.
Looking SE along Flight Line Drive (haul route)
Looking SE along Flight Line Drive (haul route)
Entering Taxiway G "Golf" on Flight Line Drive after FOD (Foreign Object Debris) check
Looking SW along eastern side of Golf with Taxiway K "Kilo" on the left
Looking down Kilo from Golf towards the south
Looking SW from Golf/Kilo boundary
Looking South from Golf/Kilo boundary
Looking SW from middle of Golf
Looking SSW from Golf
Looking SSW from Golf
Looking NE from southern end of Golf centerline
Looking SE towards along southern joint interface closest to Taxiway E "Echo"
Looking South from southern end of Mass Parking Apron/Golf Taxiway boundary
Looking SW from southern end of
MPA/Golf boundary
Looking NE from southern end of
Looking SW from MPA/Golf southern boundary
Looking SW from MPA/Golf southern boundary
Looking South from MPA/Golf southern Boundary
Looking North from MPA/Golf boundary
Looking across Golf from MPA/Golf boundary
Looking NW from MPA/Golf boundary
Looking SE from MPA/Golf boundary
Looking across Golf from near MPA/Golf boundary
Looking across Golf
Looking North from MPA/Golf Boundary
Looking across Golf from MPA/Golf Boundary
Looking NE along MPA/Golf boundary
Looking ENE across Golf from MPA/Golf boundary
Looking across Golf towards Kilo from MPA/Golf boundary
Looking NNE from MPA/Golf boundary near entry point
Entry point from Golf into MPA
Looking North from Entry
Point at MPA/Golf boundary
Looking across Golf
Looking NNW from MPA/Golf boundary
Looking East across Golf at northern end of project
Looking across Golf at northern end of project
Looking NNW at northern end near MPA/Golf boundary
Looking WNW from northern end of project near
Looking west from northern end of project near MPA/Golf boundary
Looking SW down Golf from northern
Looking East across Golf from near the
Looking ENE across Golf from northern
Looking South from northern end of project
Looking SW from northern end of project
Looking South from northern end of Golf Taxiway
Concrete panels at Golf Taxiway
More panels at Golf Taxiway
Looking south from centerline of Golf at northern end
Looking South towards Eastern Golf shoulder from northern end of project
Looking towards Flight Line Drive from Golf Taxiway
Looking at centerline of Golf Taxiway
Existing concrete at Golf Taxiway
Looking South from Golf Taxiway
Looking WSW from centerline of Golf
Looking SW down centerline of Golf
Looking NE down Golf centerline
Storm drain on easterly side of Golf
Storm Drain on easterly side of Golf
Shoulder on easterly side of Golf
Looking South at Kilo from Golf
Heading NW along Flight Line
Drive (Haul Route)
Heading NW down Flight Line Drive
(Haul Route)
Intersection of Bomber and Minuteman Drive looking NE
Heading NW along Bomber Blvd
(haul route)
Looking NW from Bomber Blvd adjacent to staging area which is on picture left.
Approaching turn from Bomber Blvd to milling stockpile site approach which is on the right
Road to milling stockpile site on other side of fence
Milling stockpile site on other side of fence looking NE
Looking at gate leading to milling stockpile site
Approaching Bomber Blvd from milling stockpile site
Looking down Bomber Blvd after leaving milling stockpile site
Contractor Staging/Storage/Batch plant area looking South from Bomber Blvd.
looking SSE from Bomber Blvd.
looking WSW from Bomber Blvd.
looking West from Bomber Blvd.
looking from Bomber Blvd.
Contractor Staging/Storage/Batch plant area on right looking SE down Bomber Blvd.
| Standard_Form_30 |
| Am_0001_Narrative |
| Attachments |
| Drawings (Reissued) |
| MIB2CP101 - PAVING PLAN, AREA A |
| MIB2CP201 - REPLACEMENT PAVEMENT SECTIONS |
| 20160712 Record of Attendance MPA Section 1 Site visit-Am1 |
| 20160713 Redacted Site Visit Photos MPA Section 1-Am1 |
File details come from the government source that posted it. Updated .