ABSTRACT OF OFFERS - CONSTRUCTION1. SOLICITATION NUMBER2. DATE ISSUED3. DATE OPENEDPage 1 of 6
W9128F-12-B-000721-Mar-1224-Apr-12
4. ISSUING OFFICEI CERTIFY THAT I HAVE OPENED, READ ANDNAME AND TITLE OF CERTIFYING OFFICIAL (Type)
US ARMY CORPS OF ENGINEERSRECORDED ON THIS ABSTRACT ALL OFFERSJustine Womboldt, Contract Specialist
CONTRACTING DIVISION (CENWO-CT)RECEIVED IN RESPONSE TO THIS SOLICITATIONSIGNATUREDATE SIGNED
1616 Capitol Avenue*
OMAHA, NE 68102
5. PROJECT TITLE8. GOVERNMENT ESTIMATE9. OFFERS
(Check A, B or C AND COMPLETE D, E AND F)NO. 1NO. 2
SOF Operations and Storage FacilityA. HIRED LABORPurgatoire Valley ConstructionMesan, Inc
PN80234-FY12
Fort Carson, CO
B. REASONABLE CONTRACTB. BID SECURITYB. BID SECURITY
(Without Profit)20%20%
6. NUMBER OF AMENDMENTS ISSUEDC. REASONABLE CONTRACTC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED
(Including Profit)44
7A7B7CD.E.F.E.F.E.F.
ITEM #DESCRIPTION OF OFFER ITEMEST. QTYUNITUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNT
0001Construction of the SOF Operations and Storage Facility, PN 80234; excluding Item Nos. 0002 and Option Items listed below.JobLS$1,055,752.00$1,165,100.00$1,302,445.00
0002Construction of SITEWORK AND UTILITIES, complete from the five-foot line of the SOF Operations and Storage Facility, PN 80234; excluding Option Items listed below.JobLS$523,281.00$905,025.00$660,156.00
TOTAL AMOUNT - (Basic Items 0001 & 0002)$1,579,033.00$2,070,125.00$1,962,601.00
0003 (Option 1)Entire work complete to provide the mezzanine as shown on drawing sheet S-100.JobLS$39,649.00$42,950.00$10,961.00
0004 (Option 2)Entire work complete to design and construct the antenna tower including the concrete base as shown in CS100 and A-300.JobLS$49,099.00$44,950.00$53,567.00
0005 (Option 3)Entire work complete to provide bituminous paving in lieu of gravel paving as shown on drawing sheet CS100.JobLS$42,654.00$62,050.00$66,363.00
0006 (Option 4)Entire work complete to provide the bio-retention pond and associated revised grading as shown on drawing sheets CG102, CG203, CG402, CG403, CG505, and CG506.JobLS$25,262.00$38,150.00$49,258.00
0007 (Option 5)Entire work complete to provide 6” concrete hardstand as shown on drawing sheet CS100.JobLS$5,175.00$13,500.00$10,378.00
0008 (Option 6)Provide and install engine generator set and enclosure as described in Section 26 32 14.00 10 and shown on sheet CS101.JobLS$88,864.00$72,500.00$60,062.00
0009 (Option 7)Entire work complete for the contractor to obtain LEED Silver Certification including all required coordination with USGBC for the SOF Operations and Storage Facility, PN 80234. See Note 5.JobLS$10,000.00$6,500.00$26,967.00
TOTAL AMOUNT (BASIC ITEMS 0001 AND 0002, and ALL Option Items)$1,839,736.00$2,350,725.00$2,240,157.00
ABSTRACT OF OFFERS - CONSTRUCTION1. SOLICITATION NUMBER2. DATE ISSUED3. DATE OPENEDPage 2 of 5
W9128F-12-B-000721-Mar-1224-Apr-12
4. ISSUING OFFICEI CERTIFY THAT I HAVE OPENED, READ AND
US ARMY CORPS OF ENGINEERSRECORDED ON THIS ABSTRACT ALL OFFERSJustine Womboldt, Contract Specialist
CONTRACTING DIVISION (CENWO-CT)RECEIVED IN RESPONSE TO THIS SOLICITATION
1616 Capitol Avenue*
OMAHA, NE 68102
5. PROJECT TITLE9. OFFERS
NO.3NO. 4NO. 5
SOF Operations and Storage FacilityFord ConstructionDRG ConstructionAztec General Contractors
PN80234-FY12(Intentionally left blank)
Fort Carson, CO
B. BID SECURITYB. BID SECURITYB. BID SECURITY
20%20%20%
6. NUMBER OF AMENDMENTS ISSUEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED
444
7A7B7CD.E.F.E.F.E.F.
ITEM #DESCRIPTION OF OFFER ITEMEST. QTYUNITUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNT
0001Construction of the SOF Operations and Storage Facility, PN 80234; excluding Item Nos. 0002 and Option Items listed below.JobLS$1,928,805.00$1,521,000.00
0002Construction of SITEWORK AND UTILITIES, complete from the five-foot line of the SOF Operations and Storage Facility, PN 80234; excluding Option Items listed below.JobLS$606,419.00$815,000.00
TOTAL AMOUNT - (Basic Items 0001 & 0002)$2,535,224.00$2,336,000.00
0003 (Option 1)Entire work complete to provide the mezzanine as shown on drawing sheet S-100.JobLS$43,697.00$75,000.00
0004 (Option 2)Entire work complete to design and construct the antenna tower including the concrete base as shown in CS100 and A-300.JobLS$97,582.00$35,000.00
0005 (Option 3)Entire work complete to provide bituminous paving in lieu of gravel paving as shown on drawing sheet CS100.JobLS$59,278.00$165,000.00
0006 (Option 4)Entire work complete to provide the bio-retention pond and associated revised grading as shown on drawing sheets CG102, CG203, CG402, CG403, CG505, and CG506.JobLS$69,543.00$55,000.00
0007 (Option 5)Entire work complete to provide 6” concrete hardstand as shown on drawing sheet CS100.JobLS$9,023.00$10,000.00
0008 (Option 6)Provide and install engine generator set and enclosure as described in Section 26 32 14.00 10 and shown on sheet CS101.JobLS$69,278.00$55,000.00
0009 (Option 7)Entire work complete for the contractor to obtain LEED Silver Certification including all required coordination with USGBC for the SOF Operations and Storage Facility, PN 80234. See Note 5.JobLS$2,438.00$125,000.00
TOTAL AMOUNT (BASIC ITEMS 0001 AND 0002, and ALL Option Items)$2,886,063.00$2,856,000.00
ABSTRACT OF OFFERS - CONSTRUCTION1. SOLICITATION NUMBER2. DATE ISSUED3. DATE OPENEDPage 3 of 5
W9128F-12-B-000721-Mar-1224-Apr-12
4. ISSUING OFFICEI CERTIFY THAT I HAVE OPENED, READ AND
US ARMY CORPS OF ENGINEERSRECORDED ON THIS ABSTRACT ALL OFFERS
CONTRACTING DIVISION (CENWO-CT)RECEIVED IN RESPONSE TO THIS SOLICITATION
1616 Capitol Avenue*
OMAHA, NE 68102
5. PROJECT TITLE9. OFFERS
NO.6NO. 7NO. 8
SOF Operations and Storage FacilityBosco Constructors, IncIron Mike ConstructionAlvarado Construction, Inc
PN80234-FY12
Fort Carson, CO
B. BID SECURITYB. BID SECURITYB. BID SECURITY
20%20%20%
6. NUMBER OF AMENDMENTS ISSUEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED
344
7A7BD.E.F.E.F.E.F.
ITEM #DESCRIPTION OF OFFER ITEMEST. QTYUNITUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNT
0001Construction of the SOF Operations and Storage Facility, PN 80234; excluding Item Nos. 0002 and Option Items listed below.JobLS$1,311,681.00$1,362,237.00$1,289,678.00
0002Construction of SITEWORK AND UTILITIES, complete from the five-foot line of the SOF Operations and Storage Facility, PN 80234; excluding Option Items listed below.JobLS$595,776.00$662,920.00$696,581.00
TOTAL AMOUNT - (Basic Items 0001 & 0002)$1,907,457.00$2,025,157.00$1,986,259.00
0003 (Option 1)Entire work complete to provide the mezzanine as shown on drawing sheet S-100.JobLS$55,585.00$41,900.00$44,008.00
0004 (Option 2)Entire work complete to design and construct the antenna tower including the concrete base as shown in CS100 and A-300.JobLS$21,154.00$54,300.00$42,796.00
0005 (Option 3)Entire work complete to provide bituminous paving in lieu of gravel paving as shown on drawing sheet CS100.JobLS$62,532.00$45,900.00$82,838.00
0006 (Option 4)Entire work complete to provide the bio-retention pond and associated revised grading as shown on drawing sheets CG102, CG203, CG402, CG403, CG505, and CG506.JobLS$67,470.00$52,000.00$11,350.00
0007 (Option 5)Entire work complete to provide 6” concrete hardstand as shown on drawing sheet CS100.JobLS$6,577.00$19,000.00$17,270.00
0008 (Option 6)Provide and install engine generator set and enclosure as described in Section 26 32 14.00 10 and shown on sheet CS101.JobLS$48,063.00$72,400.00$64,829.00
0009 (Option 7)Entire work complete for the contractor to obtain LEED Silver Certification including all required coordination with USGBC for the SOF Operations and Storage Facility, PN 80234. See Note 5.JobLS$8,188.00$7,000.00$4,944.00
TOTAL AMOUNT (BASIC ITEMS 0001 AND 0002, and ALL Option Items)$2,177,026.00$2,317,657.00$2,254,294.00
ABSTRACT OF OFFERS - CONSTRUCTION1. SOLICITATION NUMBER2. DATE ISSUED3. DATE OPENEDPage 4 of 5
W9128F-12-B-000721-Mar-1224-Apr-12
4. ISSUING OFFICEI CERTIFY THAT I HAVE OPENED, READ AND
US ARMY CORPS OF ENGINEERSRECORDED ON THIS ABSTRACT ALL OFFERS
CONTRACTING DIVISION (CENWO-CT)RECEIVED IN RESPONSE TO THIS SOLICITATION
1616 Capitol Avenue*
OMAHA, NE 68102
5. PROJECT TITLE9. OFFERS
NO. 9NO. 10NO.11
SOF Operations and Storage FacilityWhite ConstructionFacilities Contracting, IncKomada, LLC
PN80234-FY12Apparent Low
Fort Carson, CO
B. BID SECURITYB. BID SECURITYB. BID SECURITY
20%20%20%
6. NUMBER OF AMENDMENTS ISSUEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED
444
7A7B7CD.E.F.E.F.E.F.
ITEM #DESCRIPTION OF OFFER ITEMEST. QTYUNITUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNT
0001Construction of the SOF Operations and Storage Facility, PN 80234; excluding Item Nos. 0002 and Option Items listed below.JobLS$1,299,000.00$1,227,000.00$1,448,000.00
0002Construction of SITEWORK AND UTILITIES, complete from the five-foot line of the SOF Operations and Storage Facility, PN 80234; excluding Option Items listed below.JobLS$709,000.00$595,000.00$506,000.00
TOTAL AMOUNT - (Basic Items 0001 & 0002)$2,008,000.00$1,822,000.00$1,954,000.00
0003 (Option 1)Entire work complete to provide the mezzanine as shown on drawing sheet S-100.JobLS$43,820.00$38,250.00$45,000.00
0004 (Option 2)Entire work complete to design and construct the antenna tower including the concrete base as shown in CS100 and A-300.JobLS$35,000.00$33,550.00$73,000.00
0005 (Option 3)Entire work complete to provide bituminous paving in lieu of gravel paving as shown on drawing sheet CS100.JobLS$50,720.00$51,330.00$69,000.00
0006 (Option 4)Entire work complete to provide the bio-retention pond and associated revised grading as shown on drawing sheets CG102, CG203, CG402, CG403, CG505, and CG506.JobLS$27,000.00$55,650.00$44,000.00
0007 (Option 5)Entire work complete to provide 6” concrete hardstand as shown on drawing sheet CS100.JobLS$21,000.00$6,890.00$15,000.00
0008 (Option 6)Provide and install engine generator set and enclosure as described in Section 26 32 14.00 10 and shown on sheet CS101.JobLS$71,500.00$69,750.00$69,000.00
0009 (Option 7)Entire work complete for the contractor to obtain LEED Silver Certification including all required coordination with USGBC for the SOF Operations and Storage Facility, PN 80234. See Note 5.JobLS$16,666.00$4,685.00$45,000.00
TOTAL AMOUNT (BASIC ITEMS 0001 AND 0002, and ALL Option Items)$2,273,706.00$2,082,105.00$2,314,000.00
ABSTRACT OF OFFERS - CONSTRUCTION1. SOLICITATION NUMBER2. DATE ISSUED3. DATE OPENEDPage 5 of 5
W9128F-12-B-000721-Mar-1224-Apr-12
4. ISSUING OFFICEI CERTIFY THAT I HAVE OPENED, READ AND
US ARMY CORPS OF ENGINEERSRECORDED ON THIS ABSTRACT ALL OFFERS
CONTRACTING DIVISION (CENWO-CT)RECEIVED IN RESPONSE TO THIS SOLICITATION
1616 Capitol Avenue*
OMAHA, NE 68102
5. PROJECT TITLE9. OFFERS
NO. 12NO. 13NO. 14NO. 15
SOF Operations and Storage FacilityGFC ContractingAlutiiqThe Copestone CompnayGrowling Bear Co.
PN80234-FY12
Fort Carson, CO
B. BID SECURITYB. BID SECURITYB. BID SECURITYB. BID SECURITY
20%20%20%20%
6. NUMBER OF AMENDMENTS ISSUEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED
4444
7A7B7CD.E.F.E.F.E.F.F.
ITEM #DESCRIPTION OF OFFER ITEMEST. QTYUNITUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNTEstimated AmountESTIMATED AMOUNTESTIMATED AMOUNT
0001Construction of the SOF Operations and Storage Facility, PN 80234; excluding Item Nos. 0002 and Option Items listed below.JobLS$1,430,000.00$1,181,193.20$1,236,720.00$$1,349,711.00
0002Construction of SITEWORK AND UTILITIES, complete from the five-foot line of the SOF Operations and Storage Facility, PN 80234; excluding Option Items listed below.JobLS$561,000.00$783,881.80$596,460.00$$633,331.00
TOTAL AMOUNT - (Basic Items 0001 & 0002)$1,991,000.00$1,965,075.00$1,833,180.00$1,983,042.00
0003 (Option 1)Entire work complete to provide the mezzanine as shown on drawing sheet S-100.JobLS$18,000.00$33,825.00$68,080.00$$57,962.00
0004 (Option 2)Entire work complete to design and construct the antenna tower including the concrete base as shown in CS100 and A-300.JobLS$58,000.00$47,353.00$40,410.00$$44,397.00
0005 (Option 3)Entire work complete to provide bituminous paving in lieu of gravel paving as shown on drawing sheet CS100.JobLS$65,000.00$14,235.00$72,660.00$$138,216.00
0006 (Option 4)Entire work complete to provide the bio-retention pond and associated revised grading as shown on drawing sheets CG102, CG203, CG402, CG403, CG505, and CG506.JobLS$43,000.00$19,276.00$43,200.00$50,592.00
0007 (Option 5)Entire work complete to provide 6” concrete hardstand as shown on drawing sheet CS100.JobLS$16,000.00$15,249.00$17,140.00$23,669.00
0008 (Option 6)Provide and install engine generator set and enclosure as described in Section 26 32 14.00 10 and shown on sheet CS101.JobLS$67,000.00$69,241.00$72,180.00$70,743.00
0009 (Option 7)Entire work complete for the contractor to obtain LEED Silver Certification including all required coordination with USGBC for the SOF Operations and Storage Facility, PN 80234. See Note 5.JobLS$70,000.00$3,568.00$14,660.00$47,743.00
TOTAL AMOUNT (BASIC ITEMS 0001 AND 0002, and ALL Option Items)$2,328,000.00$2,167,822.00$2,161,510.00$$2,416,364.00
NO. 16
Bridagier Construction Company
B. BID SECURITY
20%
C. AMENDMENTS ACKNOWLEDGED
4
7A7B
ITEM #DESCRIPTION OF OFFER ITEMEstimated Amount
0001Construction of the SOF Operations and Storage Facility, PN 80234; excluding Item Nos. 0002 and Option Items listed below.JobLS$1,388,265.00
0002Construction of SITEWORK AND UTILITIES, complete from the five-foot line of the SOF Operations and Storage Facility, PN 80234; excluding Option Items listed below.JobLS$697,348.00
TOTAL AMOUNT - (Basic Items 0001 & 0002)$2,085,613.00
0003 (Option 1)Entire work complete to provide the mezzanine as shown on drawing sheet S-100.JobLS$69,136.00
0004 (Option 2)Entire work complete to design and construct the antenna tower including the concrete base as shown in CS100 and A-300.JobLS$39,210.00
0005 (Option 3)Entire work complete to provide bituminous paving in lieu of gravel paving as shown on drawing sheet CS100.JobLS$41,714.00
0006 (Option 4)Entire work complete to provide the bio-retention pond and associated revised grading as shown on drawing sheets CG102, CG203, CG402, CG403, CG505, and CG506.JobLS$51,307.00
0007 (Option 5)Entire work complete to provide 6” concrete hardstand as shown on drawing sheet CS100.JobLS$5,781.00
0008 (Option 6)Provide and install engine generator set and enclosure as described in Section 26 32 14.00 10 and shown on sheet CS101.JobLS$65,667.00
0009 (Option 7)Entire work complete for the contractor to obtain LEED Silver Certification including all required coordination with USGBC for the SOF Operations and Storage Facility, PN 80234. See Note 5.JobLS$5,753.00
TOTAL AMOUNT (BASIC ITEMS 0001 AND 0002, and ALL Option Items)$2,364,181.00