Site Visit Q&A for Pools 3 and 4.pdf
PDF 218 KB Posted
- Attached to
- Pool 3 Combined Services, Pine Bluff Site Office Federal contract opportunity
- Solicitation number
- W9127S20Q0008
About this file
This document contains questions and answers from a site visit for two solicitations issued by the U.S. Army Corps of Engineers MKARNS-Pine Bluff Site Office. Solicitation W9127S20Q0008 seeks combined services including park attendant, clean up, solid waste removal, and mowing and trimming at Rising Star, Trulock, Huff's Island, and Joe Hardin Lock & Dam 3 parks. The anticipated start date for services at Rising Star Park is April 1, 2020 due to 2019 flood recovery efforts, and the number of days off for park attendants at Rising Star Park is two days per week. Solicitation W9127S20Q0013 originally sought similar combined services at Sheppard Island Park but it is no longer anticipated to open in 2020 also due to flood recovery efforts, though the road access will still require mowing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.02 Amendment 2 20Q0008 Pool 3.pdf | ||
| Service Schedule Pool 3 Combined Service(03-20 to 02-21)_.xlsx | XLSX spreadsheet | |
| Site Visit Minutes for Pools 3 and 4.pdf | ||
| Amendment 1 20Q0008 Pool 3.pdf | ||
| Site Visit Agenda Pools 3 and 4.pdf | ||
| Pool 3 Corrected Images.pdf | ||
| Site Visit Sign In Sheets Pool 3 and 4.pdf | ||
| W9127S20Q0008 Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Army Corps of Engineers MKARNS-Pine Bluff Site Office
W9127S20Q0008 and W9127S20Q0013 Questions and Answers
Tuesday, February 18, 2020 at 10:00 a.m.
Question 1: Will there be a delay in opening the parks due the 2019 flood recovery effort and the present weather conditions and will there be an amendment posted to the solicitations?
Answer 1: W9127S-20-Q-0008 Pool 3 Combined Services Contract 1. There will be a delayed opening for Rising Star Park in Pool 3 due to flood recovery efforts during the base year of this contract. This delayed opening will result in less than the total quantity of mowings, cleanings and park attendant days during the base year of this contract. The contactor should anticipate the park opening on or around 1 April 2020 for the recreation season and be ready to operate. An amendment will be posted to the solicitation.
W9127S-20-Q-0013 Pool 4 Combined Services Contract 1. It is not anticipated that Sheppard Island Park in Pool 4 will open in 2020 due to flood recovery efforts during the base year of this contract. This delayed opening will result in less than the total quantity of mowings and cleanings during the base year of this contract. The access road will still need to be mowed on schedule up to the gate at the entrance to the park. An amendment will be posted to the solicitation.
Question 2: In the solicitations (W9127S20Q0008 and W9127S20Q0013), in section C.8.1 of the performance work statement, the number of days off for the Park Attendants at Rising Star Park and Ste. Marie Park both state one day off, which does not coincide with the bid schedule. Should there be two days off in section C.8.1 instead of one?
Answer 2: W9127S20Q0008 In Section C.8.1 of performance work statement, the number of days off for the Park Attendants at Rising Star Park is two (2) days per week. This will coincide with the total number of work days in the work schedule. W9127S20Q0013 In Section C.8.1 of performance work statement, the number of days off for the Park Attendants at Ste Marie Park is two (2) days per week. This will coincide with the total number of work days in the work schedule.