Pool 3 Corrected Images.pdf
PDF 4 MB Posted
- Attached to
- Pool 3 Combined Services, Pine Bluff Site Office Federal contract opportunity
- Solicitation number
- W9127S20Q0008
About this file
This document contains a monthly exposure report and accident prevention report submitted by a contractor, XYZ Company, Inc., to the U.S. Army Corps of Engineers Engineering District Little Rock under contract number W9127S-99-C-0999. The reports provide safety exposure data from December 2004, including 184.5 man-hours for administrative, professional, and supervisory staff and 495.5 man-hours for skilled and common labor for the prime contractor. No accidents or injuries were reported for the period.
A related solicitation is also provided for combo services including park attendant, cleanup and solid waste removal, and mowing and trimming at four parks located along the McClellan-Kerr Arkansas River Navigation System in Pine Bluff, Arkansas. Responses to solicitation number W9127S20Q0008 are due on an unspecified date. The services are required for the U.S. Army Corps of Engineers MKARNS Pine Bluff Site Office.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.02 Amendment 2 20Q0008 Pool 3.pdf | ||
| Service Schedule Pool 3 Combined Service(03-20 to 02-21)_.xlsx | XLSX spreadsheet | |
| Site Visit Q&A for Pools 3 and 4.pdf | ||
| Site Visit Agenda Pools 3 and 4.pdf | ||
| Site Visit Minutes for Pools 3 and 4.pdf | ||
| Amendment 1 20Q0008 Pool 3.pdf | ||
| Site Visit Sign In Sheets Pool 3 and 4.pdf | ||
| W9127S20Q0008 Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(2 o f
IN
V
E N
T O
R Y
O F
A R
E A
S R
E Q
U
IR
IN
G
P
IN
E
B L
U F
F P
R O
J E
C T
A
R K
S O
F
(L
IN
E A
R
Q U
A N
T
IT
Y
P E
R
R is in g
S tar P ark
,4
T ru lo c k P a rk
H u ffs Is lan d
P a rk
Jo e
H a rdin L o ck &
D am
F
O R
IN
F
O R
M A
T
IO
N O
N L
Y Q
U A
N T
IT
IE
S M
A Y
V A
R Y
T A
C H
M E
N T
(1 O
F
SW
D
Form 743-J
R ev 10 N ov 80
M O
N T
H L
Y E
X P
O S
U
E
O
F O
P E
R A
T
IO
N S A
N D eports C ontrol
E
-30-1 ate:
R ead instructions below
M onthly report of accident and exposure data as required by the A ccident P revention A rticle of contract show n below
T H
R U ngineer
T O
: D istrict E ngineer C ontractor:
C ontract N um ber:
otal dm inistrative, Professional &
Supervisors M
H rim e C ontractor D ate (
Skilled & com m on L abor
S ub-C ontractor D ate (
D ate (
D ate (
D ate (
D ate (
D ate (
D ate (
G F orm 3394, M
IS
H
A P
R E
P O
R T
, subm itted this period:
isabling Injuries ubm itted by:
(C ontractor)
Instructions:
1. This report to be subm itted in duplicate by each prim e contractor as directed by C ontracting O fficer, or A uthorized R epresentative.
2. The above figures include all operations directly supporting the contract. They do not include offsite operations not on governm ent property or under governm ent supervision w hich supply projects other than this contract. N either do they include m aterials supplied F .O
.B . the job site.
3. A bove figures include overtim e, etc.
4. F igures w ill cover regular pay periods w ithout allow ing for calendar m onth. This m ethod autom atically corrects the lag every three m onths as eight m onths w ill have four pay periods and four m onths w ill have five pay periods.
T A
C H
M E
N T
(2 O
F
SW
D
Form 743-J
R ev 10 N ov 80
M O
N T
H L
Y E
X P
O S
U
O
F O
P E
R A
T
IO
N S A eports C ontrol
E
-30-1 ate: D ecem ber 2004
R ead instructions below
M onthly report of accident and exposure data as required by the A ccident P revention A rticle of contract show n below
T H
R U
E ngineer T
O : D istrict E ngineer
C ontractor: X
Y Z
C om p any, Inc.
C ontract N um ber: W
9127S -99-C
-0999 dm inistrative, Professional &
Supervisors
P rim e C ontractor D ate ( 01-04 ) ( 05-11 )
( 12-18 ) ( 19-25 )
( 26-31
Skilled & com m on L abor
155.5
( 01-04 )
( 05-11 ) ( 12-18 )
( 19-25 ) ( 26-31 ) ub-C ontractor D ate (
D ate (
D ate (
D ate (
D ate (
D ate (
D ate (
G rand T otal otal
G
F orm
3394, M
IS
H A
P R
E P
O R
T , subm itted this period: N on e ubm itted by: Joh n
D oe Joh n
(C ontractor)
Instructions:
1. This report to be subm itted in duplicate by each prim e contractor as directed by C ontracting O fficer, or A uthorized R epresentative.
2. The above figures include all operations directly supporting the contract. They do not include offsite operations not on governm ent property or under governm ent supervision w hich supply projects other than this contract. N either do they include m aterials supplied F .O
.B . the job site.
3. A bove figures include overtim e, etc.
4. F igures w ill cover regular pay periods w ithout allow ing for calendar m onth. This m ethod autom atically corrects the lag every three m onths as eight m onths w ill have four pay periods and four m onths w ill have five pay periods.
File details come from the government source that posted it. Updated .