A.01.29_Specifications_16R0012.pdf
PDF 5 MB Posted
- Attached to
- Field Office Repairs & Additions Federal contract opportunity
- Solicitation number
- W9127S-16-R-0012
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_Amendment_0002_16R0012.pdf | ||
| A.07.24_Amendment_0001_16R0012.pdf | ||
| A.01.13_Drawings_16R0012.pdf | ||
| A.07.23_Solicitation_16R0012.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers Little Rock District SPECIFICATIONS
FIELD OFFICE REPAIRS AND ADDITION
TOAD SUCK FERRY FIELD OFFICE
McCLELLAN-KERR ARKANSAS RIVER
NAVIGATION SYSTEM
FAULKNER COUNTY, ARKANSAS
PN456018
JUNE 2016
SOLICITATION NO. W9127S-16-R-0012
SECTION B
BIDDING SCHEDULE
(To be attached to SF 1442)
Line Item No.
Description Estimated Quantity
Unit Measure
Unit Price Amount
Renovate Existing Office Space And Construct A New Addition To The Existing Toad Suck Field Office Building And Incidental Related Work
1 Job XXX $__________
Overexcavate And Backfill Under New Foundation - One (1) Foot In Depth Measured From Bottom Of Adjacent Foundation Member For Entire New Building Addition and Atrium.
135 SY XXX $__________
TOTAL BASE BID $__________
PN 456018
Field Office Repairs and Addition Toad Suck Ferry Field Office, MKARNS Faulkner County, Arkansas Solicitation No. W9127S-16-R-0012
THIS PAGE INTENTIONALLY LEFT BLANK
PN 456018
Field Office Repairs and Addition
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 50 FORMS AND ATTACHMENTS
01 11 00 SUMMARY OF WORK
01 14 00.00 46 WORK RESTRICTIONS (SWL)
01 15 10.10 46 AT/OPSEC SITE SECURITY REQUIREMENTS
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 32 16.01 CONSTRUCTION PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 21 19 FOAMED-IN-PLACE INSULATION
07 31 13 ASPHALT SHINGLES
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 29 00 GYPSUM BOARD
09 30 10 CEMENT TILING, QUARRY TILING, AND PAVER TILING
09 65 00 RESILIENT FLOORING
PROJECT TABLE OF CONTENTS Page 1
PN 456018
Field Office Repairs and Addition
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 23 00 REFRIGERANT PIPING
23 82 01.00 10 WARM AIR HEATING SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 20 99 INTRUSION DETECTION, ACCESS CONTROL, AND FIRE DETECTION
AND ALARM SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
PN 456018
Field Office Repairs and Addition
SECTION 01 00 50
FORMS AND ATTACHMENTS
PART 1 GENERAL
Listed below, and attached at the end of this section, are forms and attachments referred to in to other parts of the technical specifications.
1.1 SUBMITTAL REGISTER
See Section 01 33 00 SUBMITTAL PROCEDURES
1.2 TRANSMITTAL FORM (ENG FORM 4025-R)
See Section 01 33 00 SUBMITTAL PROCEDURES
1.3 ACTIVITY HAZARD ANALYSIS (AHA)
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1.4 ACCIDENT INVESTIGATION REPORT (ENG FORM 3394)
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1.5 SWL FORM 463
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1.6 OSHA FORM 300 & 301
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1.7 RMS-QCS MONTHLY INJURIES-ILLNESSES & EXPOSURE
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1.8 SAFETY PERFORMANCE SIGN
See Section 01 14 00.00 46 WORK RESTRICTIONS
1.9 PROJECT IDENTIFICATION SIGN
See Section 01 14 00.00 46 WORK RESTRICTIONS
1.10 USACE-LITTLE ROCK DISTRICT NATIONAL BACKGROUND SCREENING
CONSENT/RELEASE FORM (SSCI-2013)
See Section 01 15 10.10 46 AT/OPSEC SITE SECURITY REQUIREMENTS
1.11 OPTIONAL FORM 306
See Section 01 15 10.10 46 AT/OPSEC SITE SECURITY REQUIREMENTS
1.12 SWL Form 487 USACE-SWL CONTRACTOR REQUIRED INFORMATION FORM
See Section 01 15 10.10 46 AT/OPSEC SITE SECURITY REQUIREMENTS
SECTION 01 00 50 Page 1
PN 456018
Field Office Repairs and Addition
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 00 50 Page 2
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 22 PAGES
456018
Toad Suck Ferry Field Office Repairs and Addition
01 33 00 SD-01 Preconstruction Submittals
1.10 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 GAccident Reports
SD-07 Certificates 1.8Activity Hazard Analysis (AHA)
Certificate of Compliance License Certificates
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan 01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan 1.6.5Warranty Tags
Spare Parts Data SD-08 Manufacturer’s Instructions
1.6.1Instructions SD-10 Operation and Maintenance Data
3.6 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
01 78 00 3.1 GAs-Built Drawings
3.2.1 GRecord Drawings
3.3 GRecord Drawings
3.5As-Built Record of Equipment and Materials 3.4Final Approved Shop Drawings
Construction Contract Specifications
GCertification of EPA Designated Items
01 78 23 SD-10 Operation and Maintenance Data
1.3O&M Database 3.1.1Training Plan 3.1.3Training Outline 3.1.2Training Content
SD-11 Closeout Submittals Training Video Recording
3.1.5Validation of Training Completion 02 41 00 SD-01 Preconstruction Submittals
1.2.1Demolition Plan 03 30 00 SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-05 Design Data
2.3.1 GMix Design
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
03 30 00 3.12.2.3 GCompressive Strength Tests 04 20 00 SD-02 Shop Drawings
3.4.1.1Detail Drawings SD-03 Product Data
1.5.1Hot Weather Procedures 1.5.2Cold Weather Procedures 2.1.2Clay Brick
SD-04 Samples 2.1.2Clay Brick
SD-05 Design Data Masonry Compressive Strength
SD-06 Test Reports 2.1.2.1.3Efflorescence Test
Field Testing of Mortar Field Testing of Grout
3.6.1.2Prism Tests SD-07 Certificates
2.1.2Clay Brick 2.3.1.4Admixtures for Masonry Mortar 2.3.2.2Admixtures for Grout 2.5.2Anchors, Ties, and Bar
Positioners 2.5.3Joint Reinforcement
06 10 00 SD-02 Shop Drawings
2.4.1 GTrussed rafters
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
06 10 00 1.4.3Structural-use and OSB panels 2.3.1.1Structural-use and OSB panels 2.3Oriented Strand Board
SD-05 Design Data
2.4.1 GTrussed rafters
06 20 00 SD-02 Shop Drawings 1.3Detail Drawings
SD-04 Samples Siding Fascias and Trim
SD-07 Certificates 1.4Certificates of grade 1.4Certificates of compliance
07 21 16 SD-03 Product Data 2.1Blanket Insulation 2.2Sill Sealer Insulation 2.4Vapor Retarder
SD-08 Manufacturer’s Instructions 3.3.1Insulation
07 21 19 SD-06 Test Reports 2.2Closed-Cell Spray Polyurethane
Foam SD-07 Certificates
1.5.1 GInstaller Qualifications
SD-09 Manufacturer’s Field Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
07 21 19 2.2.1Spray Polyurethane Foam 07 31 13 SD-03 Product Data
2.1.1Shingles SD-04 Samples
2.1.1 GShingles
2.1.1 GColor charts
SD-08 Manufacturer’s Instructions 3.3Application
07 60 00 SD-02 Shop Drawings Covering on flat, sloped, or curved surfaces
3.1.10Gutters 3.1.11Downspouts 3.1.12Expansion joints
Gravel stops and fascias Base flashing
3.1.13Flashing at roof penetrations 3.1.9Drip edge
Eave flashing SD-11 Closeout Submittals
3.5Quality Control Plan 07 92 00 SD-03 Product Data
2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
07 92 00 SD-07 Certificates 3.3.6Sealant
08 11 13 SD-02 Shop Drawings 2.1Doors 2.1Doors 2.4Frames 2.4Frames 2.2Accessories 2.5Weatherstripping
SD-03 Product Data 2.1Doors 2.4Frames 2.2Accessories 2.5Weatherstripping
08 11 16 SD-02 Shop Drawings 1.5.1Doors, windows and frames
SD-04 Samples 1.5.2.1Finish sample
SD-05 Design Data 1.2.1calculations
SD-08 Manufacturer’s Instructions 2.1Doors and frames
08 14 00 SD-02 Shop Drawings 2.1Doors
SD-03 Product Data 2.1Doors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
08 14 00 2.2Accessories 2.3.6Water-resistant sealer 1.4warranty
Sound transmission class rating Certification
SD-04 Samples 2.1Doors 2.3.5.1Door finish colors
08 41 13 SD-01 Preconstruction Submittals 1.2.1Sample Warranty 1.2.1Listing of Product Installations
SD-02 Shop Drawings 1.2.1Installation Drawings
1.2.1 GFabrication Drawings
SD-03 Product Data 1.2.1Manufacturer's Catalog Data
SD-04 Samples
1.2.1 GFinish and Color Samples
SD-06 Test Reports 1.2.1Certified Test Reports
SD-07 Certificates
3.4 GManufacturer's Product Warranty
08 51 13 SD-02 Shop Drawings 2.1Windows
Fabrication Drawings SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
08 51 13 2.1Windows 2.3Thermal-Barrier Windows 2.2.8Accessories 1.8.3Thermal Performance
SD-04 Samples Finish Sample Window Sample
SD-10 Operation and Maintenance Data
2.1Windows 08 71 00 SD-02 Shop Drawings
1.3Hardware schedule Keying system
SD-03 Product Data 2.3Hardware items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-11 Closeout Submittals Key Bitting
08 81 00 SD-02 Shop Drawings Installation
SD-03 Product Data 1.5.1Insulating Glass 1.3Glazing Accessories
SD-04 Samples 1.5.1Insulating Glass
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
08 81 00 2.3.2Glazing Compound 2.3.5Tape 2.3.3.1Sealant
SD-07 Certificates 1.5.1Insulating Glass
SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials
08 91 00 SD-03 Product Data 2.2Metal Wall Louvers
09 29 00 SD-03 Product Data 2.1.3Cementitious backer units 2.1.2Glass Mat Covered or Reinforced
Gypsum Sheathing 2.1.7Accessories
Certification SD-07 Certificates
2.1Asbestos Free Materials SD-08 Manufacturer’s Instructions Material Safety Data Sheets
SD-10 Operation and Maintenance Data Manufacturer maintenance instructions
3.6Waste Management 09 30 10 SD-03 Product Data
2.1Tile
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
09 30 10 2.2Setting-Bed 2.4Mortar, Grout, and Adhesive
SD-04 Samples 2.1Tile 2.4Grout
SD-07 Certificates 2.1Tile 2.4Mortar, Grout, and Adhesive
SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions
SD-10 Operation and Maintenance Data
3.2Installation 09 65 00 SD-02 Shop Drawings
2.8Resilient Flooring and Accessories
SD-03 Product Data 2.8Resilient Flooring and
Accessories 2.4Adhesives
SD-04 Samples 2.8Resilient Flooring and
Accessories SD-06 Test Reports
3.3Moisture, Alkalinity and Bond Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
09 65 00 SD-08 Manufacturer’s Instructions 3.2Surface Preparation 3.1Installation
SD-10 Operation and Maintenance Data
2.8Resilient Flooring and Accessories
09 68 00 SD-03 Product Data 2.1Carpet 2.4Moldings
SD-04 Samples 2.1Carpet 2.4Moldings
SD-06 Test Reports 3.2Moisture and Alkalinity Tests
SD-07 Certificates 2.1Carpet 1.3Regulatory Requirements
SD-08 Manufacturer’s Instructions 3.1Surface Preparation 3.4Installation
SD-10 Operation and Maintenance Data
2.1Carpet 3.5Cleaning and Protection
Maintenance Service
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
09 90 00 SD-03 Product Data Certification Manufacturer's Technical Data Sheets
Sealant 2.1Coating
SD-04 Samples GColor
Textured Wall Coating System Sample Textured Wall Coating System Mock-Up
SD-07 Certificates 1.3Applicator's qualifications 1.4.1.2Qualification Testing
SD-08 Manufacturer’s Instructions 1.7.2Manufacturer's Material Safety
Data Sheets 23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data
2.9.1.1Insulated Nonmetallic Flexible Duct Runouts
2.9.1.1Duct Connectors 2.9.2Manual Balancing Dampers
Automatic Control Damper Diffusers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
23 00 00 Registers and Grilles Louvers Wall Heaters
SD-06 Test Reports
3.10 GPerformance Tests
SD-07 Certificates Certification
SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation
Instructions 3.11.2Operation and Maintenance
Training SD-10 Operation and Maintenance Data
3.11.1Operation and Maintenance Manuals
2.9.2Manual Balancing Dampers Automatic Control Damper Wall Heaters
23 05 93 SD-01 Preconstruction Submittals
1.5.3.1 GTAB Firm
1.2 GTAB Team Engineer
1.5.3.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
23 05 93 1.3.2 GTAB Schematic Drawings and Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.3.4 GTAB Related HVAC Submittals
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.3.2 GSystems Readiness Check
1.5.4 GTAB Execution
GTAB Verification SD-06 Test Reports
GCompleted Pre-Final DALT Report
3.3.5 GCertified Final DALT Report
1.6.1.1 GTAB Design Review Report
1.5.5.2 GTAB Report for Season 1
1.5.5.2 GTAB Report for Season 2
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.6.1 GDALT and TAB Submittal and
Work Schedule
1.5.3.1 GTAB Firm
23 07 00 SD-02 Shop Drawings 3.2.2.4MICA Plates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
23 07 00 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems
SD-03 Product Data 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems
SD-04 Samples 2.2.1.3Thermal Insulation
SD-08 Manufacturer’s Instructions 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems
23 08 00.00 10 SD-02 Shop Drawings
1.5.2.2 GCommissioning Plan
SD-03 Product Data
3.2.1 GPre-Functional Performance Test
Checklists
3.2.2 GFunctional Performance Tests
SD-06 Test Reports
3.3 GCommissioning Report
SD-07 Certificates
1.5.1 GCommissioning Firm
1.5.2 GCommissioning Specialist
23 23 00 SD-02 Shop Drawings 2.3Refrigerant Piping System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
23 23 00 SD-03 Product Data 2.3Refrigerant Piping System
Spare Parts 1.3.1Qualifications 3.5Refrigerant Piping Tests 3.1Verification of Dimensions
SD-06 Test Reports 3.5Refrigerant Piping Tests
SD-10 Operation and Maintenance Data
1.5Maintenance 3.4Operation and Maintenance
Manuals 23 82 01.00 10 SD-02 Shop Drawings
3.2Installation SD-03 Product Data
1.6Spare Parts 3.6Tests
GSystem Diagrams 1.4Qualifications 3.5Field Training
SD-06 Test Reports 3.6Tests
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
23 82 01.00 10 3.5Operating and Maintenance Manuals
23 82 02.00 10 SD-02 Shop Drawings 1.4Drawings
SD-03 Product Data 2.1Materials and Equipment 1.6Spare Parts 3.3Posted Instructions 3.5System Performance Tests
3.3 GDemonstrations
SD-06 Test Reports
3.4 GRefrigerant Tests, Charging, and
Start-Up
3.5 GSystem Performance Tests
SD-07 Certificates 2.1Materials and Equipment 2.1.1Service Organization
SD-10 Operation and Maintenance Data
3.3Operation and Maintenance Manuals
26 20 00 SD-02 Shop Drawings
2.12 G DOPanelboards
SD-03 Product Data
2.11 G DOReceptacles
2.9 G DOSwitches
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
26 20 00 2.14 G DOMotor controllers
2.15 G DOManual motor starters
G DOMetering
2.23 G DOMeter base only
2.18.3 G DOGrounding Busbar
2.24 G DOSurge protective devices
SD-06 Test Reports
3.5.2 G DO600-volt wiring test
3.5.5 G DOGrounding system test
3.5.4 G DOGround-fault receptacle test
SD-07 Certificates
2.10 G DOFuses
SD-10 Operation and Maintenance Data
G DOElectrical Systems G DOMetering
26 51 00 SD-03 Product Data G DOFluorescent lighting fixtures
2.5 G DOExit signs
2.6 G DOEmergency lighting equipment
2.7 G DOOccupancy sensors
SD-06 Test Reports 3.3Operating test
SD-10 Operation and Maintenance Data
1.4.1Lighting Control System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
26 51 00 Operational Service 27 10 00 SD-02 Shop Drawings
1.6.1.1 G DOTelecommunications drawings
1.6.1.2 G DOTelecommunications Space
Drawings SD-03 Product Data
2.3 G DOTelecommunications cabling
2.5 G DOTelecommunications
outlet/connector assemblies
2.4.1 G DOEquipment support frame
2.4.2 G DOConnector blocks
1.10.3 G DOSpare Parts
SD-06 Test Reports
3.5.1 G DOTelecommunications cabling
testing SD-07 Certificates
1.6.2.1 G DOTelecommunications Contractor
1.6.2.2 G DOKey Personnel
1.6.2.3 G DOManufacturer Qualifications
1.6.3 G DOTest plan
SD-09 Manufacturer’s Field Reports
2.9.1 G DOFactory reel tests
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
27 10 00 1.10.1 G DOTelecommunications cabling and pathway system
SD-11 Closeout Submittals
1.10.2 G DORecord Documentation
28 20 99 SD-02 Shop Drawings G DOSystem One-Line Diagram
SD-03 Product Data G DOIntrusion Detection System G DOAccess Control System G DOFire Detection and Alarm System G DOKey Control Plan
Spare Parts 3.1Manufacturer's Instructions
3.4.1 GTesting
Experience SD-06 Test Reports
3.4.2Performance Verification Test SD-07 Certificates Materials and Equipment
31 00 00 SD-01 Preconstruction Submittals
3.5 GShoring
1.3.3 GDewatering Work Plan
SD-03 Product Data 3.9Utilization of Excavated Materials 3.4Opening of any Excavation or
Borrow Pit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
31 00 00 SD-06 Test Reports 3.16Testing 2.1Borrow Site Testing
SD-07 Certificates 3.16Testing
31 31 16.13 SD-03 Product Data 3.3.6Termiticide Application Plan 2.1Termiticides 3.3.3Foundation Exterior 3.3.4Utilities and Vents 3.3.5Crawl and Plenum Air Spaces 3.1Verification of Measurement 3.4.1Application Equipment 1.6Warranty
SD-04 Samples 2.1Termiticides
SD-06 Test Reports 3.4.1Equipment Calibration and Tank
Measurement 1.5.1Soil Moisture 1.3Quality Assurance
SD-07 Certificates 1.3.1Qualifications
32 16 13 SD-03 Product Data 2.1Concrete
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 22 PAGES
Toad Suck Ferry Field Office Repairs and Addition
32 16 13 3.8Field Quality Control 32 92 23 SD-03 Product Data
Fertilizer SD-06 Test Reports Topsoil composition tests
SD-07 Certificates 2.1sods
33 11 23 SD-03 Product Data 2.6Valve box 2.4.2Pressure regulator 2.5Gas equipment connectors 2.4Valves 2.7Warning and identification tape 2.2.3Risers 2.2.4Transition fittings
SD-07 Certificates 1.3.1Welder's qualifications 1.3.2PE welder's qualifications 1.3.1Welder's identification symbols
SD-08 Manufacturer’s Instructions 2.2.2PE pipe and fittings
33 71 02 SD-03 Product Data Conduit Sealing Material
SD-07 Certificates
1.5.1 G DOCable Installer Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PN 456018
Field Office Repairs and Addition
S
EE
T
O
F
I ce rt if y th at t he a bo ve s ub m it te d it em s ha ve b ee n re vi ew ed in d et ai l a nd a re c or re ct a nd in s tr ic t co nf or m an ce w it h th e co nt ra ct d ra w in gs a nd s pe ci fi ca ti on s ex ce pt a s ot he r w is e st at ed
C H
EC
K
O N
E:
T H
IS
I S A
N
EW
T R A
N S M
IT
T A
L T H
IS
I S A
R
ES
U B M
IT
T A
L
R A
N S M
IT
T A
L
D A
T E
R
EM
A R K
S
C O
N T R A
C T R
EF
ER
EN
C
E D
O C
U M
EN
T
S
PE
C
IF
IC
A
T
IO
N S
EC
N
O
(C ov er o nl y on e se ct io n w it h ea ch t ra ns m it ta l)
T O
FR
O M
PR
O
JE
C
T T
IT
LE
A N
D L
O C
A T
IO
N
C O
N T R A
C T N
O
EN
C
LO
S U
R
ES
R
ET
U R N
ED
Li st b y It em
N o.
T R A
N S M
IT
T A
L O
F S H
O P
D R A
W
IN
G S
EQ
U
IP
M
EN
T D
A T A
M
A T
ER
IA
L
S A
M
PL
ES
O
R M
A N
U
FA
C T U
R
ER
'S C
ER
T
IF
IC
A
T
ES
O F
C O
M
PL
IA
N
C E
(R ea d in st ru ct io ns o n th e re ve rs e si de p rio r to in it ia ti ng t hi s fo rm
S
EC
T
IO
N I R
EQ
U
ES
T F
O R A
PP
R O
V A
L O
F T H
E
FO
LL
O
W
IN
G
IT
EM
S (T hi s se ct io n w ill b e in it ia te d by t he c on tr ac to r)
T R A
N S M
IT
T A
L N
N A
M E, T
IT
LE
A
N D
S
IG
N A
T U
R E
O F
A
PP
R O
V
IN
G A
U T H
O R
IT
Y D
A T E
S
EC
T
IO
N I I A
PP
R O
V A
L A
C T
IO
N
IT
EM
N O a.
D
ES
C R
IP
T
IO
N O
F
IT
EM
S
U B M
IT
T
ED
(T yp e si ze m od el n um be r/ et c.
b.
M
FG
O R C
O N
T R
C A
T
C U
R V
E D
R A
W
IN
G O
R B R O
C H
U R E
N O
(S ee in st ru ct io n no c.
N O
O
F C
O
PI
ES
d.
S
PE
C
PA
R A
N
O e.
D R A
W
IN
G S H
EE
T N
O f.
FO
N T R A
C T O
R U
S E
C O
D E g.
V A
R
IA
T
IO
N (S ee in st ru ct io n N o.
h.
FO
R
C E
U S E
C O
D E i.
N A
M E
A N
D S
IG
N
A T U
R E
O F
C O
N T R A
C T O
R
EN
G
F O
R M
-R
M
A R
(P ro po ne nt
C
EM
P-
C E)
ED
IT
IO
N
O F
S
EP
I S O
B S O
LE
T E.
(E R
-1
-1
C H
EC
K
O N
E:
T
H
IS
T R A
N S M
IT
T A
L
IS
FO
IO
G
V 'T
A
PP
R O
V A
L
PN 456018
Field Office Repairs and Addition
IN
T R U
C T
IO
N S
S ec ti on
I w ill b e in it ia te d by t he C on tr ac to r in t he r eq ui re d nu m be r of c op ie s.
Ea ch t ra ns m it ta l s ha ll be n um be re d co ns ec ut iv el y in t he s pa ce p ro vi de d fo r "T ra ns m it ta l N o.
T hi s nu m be r, in a dd it io n to t he c on tr ac t nu m be r, w ill f or m a s er ia l nu m be r fo r id en ti fy in g ea ch s ub m it ta l.
F or n ew s ub m it ta ls o r re su bm it ta ls m ar k th e ap pr op ria te b ox on r es ub m it ta ls in se rt t ra ns m it ta l n um be r of la st s ub m is si on a s w el l a s th e ne w s ub m it ta l n um be r.
T he
It em
N o.
w ill b e th e sa m e
"I te m N o.
as in di ca te d on E
N G
F O
R M
-R f or e ac h en tr y on t hi s fo rm
S ub m it ta ls r eq ui rin g ex pe di ti ou s ha nd lin g w ill b e su bm it te d on a s ep ar at e fo rm
S ep ar at e tr an sm it ta l f or m w ill b e us ed f or s ub m it ta ls u nd er s ep ar at e se ct io ns o f th e sp ec if ic at io ns
A c he ck s ha ll be p la ce d in t he
V ar ia ti on co lu m n w he n a su bm it ta l i s no t in a cc or da nc e w it h th e pl an s an d sp ec if ic at io ns al so a w rit te n st at em en t to t ha t ef fe ct sh al l b e in cl ud ed in t he s pa ce p ro vi de d fo r "R em ar ks
Fo rm is s el f-tr an sm it ta l, le tt er o f tr an sm it ta l i s no t re qu ire d.
W he n a sa m pl e of m at er ia l o r M an uf ac tu re r' s C er ti fi ca te o f C om pl ia nc e is t ra ns m it te d, in di ca te
S am pl e" o r
"C er ti fi ca te in c ol um n c, S ec ti on
I
U .S
A rm y
C or ps o f En gi ne er s ap pr ov in g au th or it y w ill a ss ig n ac ti on c od es a s in di ca te d be lo w in s pa ce p ro vi de d in S ec ti on
I co lu m n i t o ea ch it em s ub m it te d.
In ad di ti on t he y w ill e ns ur e en cl os ur es a re in di ca te d an d at ta ch ed t o th e fo rm p rio r to r et ur n to t he c on tr ac to r.
he
C on tr ac to r w ill a ss ig n ac ti on c od es a s in di ca te d be lo w in
S ec ti on
I co lu m n g, t o ea ch it em s ub m it te
d. T H
E
FO
LL
O
W
IN
G A
C T
IO
N C
O D
ES
A
R E
G
IV
EN
T
O I T
EM
S S
U B M
IT
T
ED
A
A pp ro ve d as s ub m it te d.
B
A pp ro ve d, e xc ep t as n ot ed o n dr aw in gs
C
A pp ro ve d, e xc ep t as n ot ed o n dr aw in gs
R ef er t o at ta ch ed s he et r es ub m is si on r eq ui re d.
D
W ill b e re tu rn ed b y se pa ra te c or re sp on de nc e.
A pp ro va l o f it em s do es n ot r el ie ve t he c on tr ac to r fr om c om pl yi ng w it h al l t he r eq ui re m en ts o f th e co nt ra ct p la ns a nd s pe ci fic at io ns
(R ev er se o f
EN
G
F or m
-R
E
D is ap pr ov ed
S ee a tt ac he d)
F
R ec ei pt a ck no w le dg ed
FX
R ec ei pt a ck no w le dg ed do es n ot c om pl y as n ot ed w it h co nt ra ct r eq ui re m en ts
G
O th er
S pe ci fy
PN 456018
Field Office Repairs and Addition
T
IV
IT
Y
H A
Z A
R D
A N
A L
Y
SI
N T
R A
C T
N O
PR
O
JE
D
E
C A
T
IO
N
ST
IM
A T
E D
S T
A R
T D
A
PR
C
IP
A L
S T
PS
PO
E
N T
IA
L
S A
FE
T
Y /H
E A
L T
H H
A
ZA
R D
S R
E C
O M
M E
N D
E D
C O
N T
R O
L S
Id en tif y th e pr in ci pa l s te ps in vo lv ed a nd th e se qu en ce o f w or k ac tiv iti es
An al yz e ea ch p ri nc ip al st ep fo r p ot en tia l h az ar ds ev el op sp ec ifi c co nt ro ls fo r e ac h po te nt ia l h az ar d
Q
U
IP
M E
N T
T O
B E
U
SE
SP
E C
T
IO
N R
E Q
U
IR
E M
E N
T S
T R
A
IN
IN
G
R E
Q U
IR
E
M E
N T
S Li st e qu ip m en t t o be u se d in th e w or k ac tiv ity
Li st in sp ec tio n re qu ir em en ts fo r t he w or k ac tiv ity
Li st tr ai ni ng re qu ir em en ts , i nc lu di ng h az ar d co m m un ic at io n
N T
R A
C T
O R
(S ig na tu re d at e)
PN 456018
Field Office Repairs and Addition
Field Office Repairs and Addition
5.
d. CONTRACTOR'S NAME
SIDE SWIPE
BROADSIDE
OTHER (Specify)
e. BODY PART AFFECTED
REAR END
BACKING
HEAD ON
ROLL OVER
d. ESTIMATED DAYS
RESTRICTED DUTY
b. ESTIMATED
DAYS LOST
c. ESTIMATED
DAYS HOSPIT-
ALIZED
b. TYPE OF CONSTRUCTION EQUIPMENT
SUPERFUND
IRP
b. TYPE OF COLLISION/MISHAP
a. ACTIVITY AT TIME OF ACCIDENT
g. HAZARDOUS/TOXIC WASTE
ACTIVITY
(For Safety Staff only)
REPORT NO. EROC
CODE UNITED STATES ARMY CORPS OF ENGINEERS
ACCIDENT INVESTIGATION REPORT
REQUIREMENT
CONTROL SYMBOL:
CEEC-S-8(R2)
PERSONNEL CLASSIFICATION
GOVERNMENT
INJURY/ILLNESS/FATAL PROPERTY DAMAGE MOTOR VEHICLE INVOLVED DIVING
a. Name (Last, First, MI) b. AGE c. SEX d. SOCIAL SECURITY NUMBER e. GRADE
f. JOB SERIES/TITLE g. DUTY STATUS AT TIME OF ACCIDENT h. EMPLOYMENT STATUS AT TIME OF ACCIDENT
a. DATE OF ACCIDENT (month/day/year)
b. TIME OF ACCIDENT (Military time)
e. CONTRACT NUMBER f. TYPE OF CONTRACT
c. EXACT LOCATION OF ACCIDENT
a. CONSTRUCTION ACTIVITY
a. SEVERITY OF ILLNESS/INJURY
g. TYPE AND SOURCE OF INJURY/ILLNESS
f. NATURE OF ILLNESS/INJURY
a. TYPE OF VEHICLE
a. NAME OF ITEM b. OWNERSHIP c. $ AMOUNT OF DAMAGE
(1)
(2)
(3)
a. TYPE OF VESSEL/FLOATING PLANT
b. PERSONAL FLOATATION DEVICE USED?
b. TYPE OF COLLISION c. SEAT BELTS USED NOT USED NOT AVAILABLE
(1) FRONT SEAT
(2) REAR SEAT
10. ACCIDENT DESCRIPTION (Use additional paper, if necessary)
8. PROPERTY/MATERIAL INVOLVED
9. VESSEL/FLOATING PLANT ACCIDENT (Fill in line and correspondence code number in box from list - see help menu)
7. MOTOR VEHICLE ACCIDENT
INJURY/ILLNESS INFORMATION (Include name on line and corresponding code number in box for items e, f & g - see help menu)
4. CONSTRUCTION ACTIVITIES ONLY (Fill in line and corresponding code number in box from list - see help menu)
3. GENERAL INFORMATION
2. PERSONAL DATA
1. ACCIDENT CLASSIFICATION
6. PUBLIC FATALITY (Fill in line and correspondence code number in box - see help menu)
CIVILIAN MILITARY
CONTRACTOR
FIRE
INVOLVED OTHER
FIRE
INVOLVED OTHER
OTHERFATAL
MALE FEMALE
ON DUTY
OFF DUTY
TDY
ARMY ACTIVE
PERMANENT
TEMPORARY
OTHER (Specify)
ARMY RESERVE
FOREIGN NATIONAL
STUDENT
VOLUNTEER
SEASONAL
CONSTRUCTION
A/E
OTHER (Specify)
SERVICE
DREDGE
DERP
OTHER (Specify)
(1) PRIME:
(2) SUBCONTRACTOR:
(CODE) (CODE)
(CODE)
(CODE)
(CODE)
(CODE)
(CODE)
(CODE)
(CODE) (CODE)
(CODE)
CIVIL WORKS
OTHER (Specify)
MILITARY
PRIMARY
SECONDARY TYPE
SOURCE
YES N/ANO
AUTOMOBILE
OTHER (Specify)
PICKUP/VAN
TRUCK
ENG FORM 3394, MAR 99 EDITION OF SEP 89 IS OBSOLETE. Page 1 of 4 pages (Proponent: CESO ) hrs
(For Use of this Form See Help Menu and USACE Suppl to AR 385-40)
PUBLIC
Version 2
PN 456018
Field Office Repairs and Addition a.
a.
a.
b. TYPE OF TRAINING. a. WAS PERSON TRAINED TO PERFORM ACTIVITY/TASK?
b. WAS A WRITTEN JOB/ACTIVITY HAZARD ANALYSIS COMPLETED
FOR TASK BEING PERFORMED AT TIME OF ACCIDENT?
a. (CONTINUED) a. (Explain YES answers in item 13)
CAUSAL FACTOR(S) (Read Instruction Before Completing)11.
TRAINING12.
FULLY EXPLAIN WHAT ALLOWED OR CAUSED THE ACCIDENT; INCLUDE DIRECT AND INDIRECT CAUSES (See instruction for definition of direct and indirect causes.) (Use additional paper, if necessary)
13.
ACTION(S) TAKEN, ANTICIPATED OR RECOMMENDED TO ELIMINATE CAUSE(S).14.
DATES FOR ACTIONS IDENTIFIED IN BLOCK 14.15.
MANAGEMENT REVIEW (1st)16.
MANAGEMENT REVIEW (2nd - Chief Operations, Construction, Engineering, etc.)17.
SAFETY AND OCCUPATIONAL HEALTH OFFICE REVIEW18.
COMMAND APPROVAL19.
c. DATE OF MOST RECENT FORMAL TRAINING.
a. DIRECT CAUSE
b. INDIRECT CAUSE(S)
DESCRIBE FULLY:
c. SIGNATURE AND TITLE OF SUPERVISOR COMPLETING REPORT
CORPS
CONTRACTOR
d. DATE (Mo/Da/Yr) e. ORGANIZATION IDENTIFIER (Div, Br, Sect) f. OFFICE SYMBOL
SIGNATURE TITLE DATE
COMMENTS
DATE
DATE
DATECOMMANDER SIGNATURE
TITLE
TITLE
SIGNATURE
SIGNATURE
a. BEGINNING (Month/Day/Year) b. ANTICIPATED COMPLETION (Month/Day/Year)
DESIGN: Was design of facility, workplace or equipment a factor?
INSPECTION/MAINTENANCE: Were inspection & mainten-ance procedures a factor?
PERSON'S PHYSICAL CONDITION: In your opinion, was the physical condition of the person a factor?
OPERATING PROCEDURES: Were operating procedures a factor?
JOB PRACTICES: Were any job safety/health practices not followed when the accident occurred?
HUMAN FACTORS: Did any human factors such as, size or strength of person, etc., contribute to accident?
ENVIRONMENTAL FACTORS: Did heat, cold, dust, sun, glare, etc., contribute to the accident?
OFFICE FACTORS: Did office setting such as, lifting office furniture, carrying, stooping, etc., contribute to the accident?
SUPPORT FACTORS: Were inappropriate tools/resources provided to properly perform the activity/task?
PERSONAL PROTECTIVE EQUIPMENT: Did the improper selection, use or maintenance of personal protective equipment contribute to the accident?
DRUGS/ALCOHOL: In your opinion, was drugs or alcohol a factor to the accident
CHEMICAL AND PHYSICAL AGENT FACTORS: Did exposure to chemical agents, such as dust, fumes, mists, vapors or physical agents, such as, noise, radiation, etc., contribute to accident?
CONCUR b. NON CONCUR c. COMMENTS
CONCUR b. NON CONCUR c. COMMENTS
CONCUR b. NON CONCUR c. ADDITIONAL ACTIONS/COMMENTS
Page 2 of 4 pages
YES (If yes, attach a copy.) NO
NOYES ON JOBCLASSROOM (Month) (Day) (Year)
YES NO YES NO
*U.S. GOVERNMENT PRINTING OFFICE: 1993-0-791-757
Field Office Repairs and Addition
ACCIDENT DESCRIPTION (Continuation)
DIRECT CAUSE (Continuation)
10.
13a.
Page 3 of 4 pages
PN 456018
Field Office Repairs and Addition
INDIRECT CAUSES (Continuation)
ACTION(S) TAKEN, ANTICIPATED, OR RECOMMENDED TO ELIMINATE CAUSE(S) (Continuation)
13b.
14.
Page 4 of 4 pages
PN 456018
Field Office Repairs and Addition
THIS PAGE INTENTIONALLY LEFT BLANK
Field Office Repairs and Addition
H A
F o rm s fo r
R e c o rd in g W o rk
-R e la te d I n ju ri e s a n d
I ll n e ss e s W h a t’ s
In si d e
In th is p ac k ag e, yo u ’l l fi n d ev er yt h in g yo u n ee d to co m p le te
O S
H A
’s an d th e fo r th e n e x t se ve ra l ye ar s.
O n th e fo ll o w in g p ag es yo u ’l l fi n d
G en er al in st ru ct io n s fo r fi ll in g o u t th e fo rm s in th is p ac k ag e an d d ef in it io n s o f te rm s yo u sh o u ld u se w h en yo u cl as si fy yo u r ca se s as in ju ri es o r il ln es se s.
A n e x am p le to g u id e yo u in fi ll in g o u t th e p ro p er ly
S ev er al p ag es o f th e
(b u t yo u m ay m ak e as m an y co p ie s o f th e as yo u n ee d
N o ti ce th at th e is se p ar at e fr o m th e
R em o va b le p ag es fo r ea sy p o st in g at th e en d o f th e ye ar
N o te th at yo u p o st th e o n ly n o t th e
A w o rk sh ee t fo r fi g u ri n g th e av er ag e n u m b er o f em p lo ye es w h o w o rk ed fo r yo u r es ta b li sh m en t an d th e to ta l n u m b er o f h o u rs w o rk ed
A co p y o f th e
O S
H A to p ro vi d e d et ai ls ab o u t th e in ci d en t.
Y o u m ay m ak e as m an y co p ie s as yo u n ee d o r u se an eq u iv al en t fo rm
T ak e a fe w m in u te s to re vi ew th is p ac k ag e.
If yo u h av e an y q u es ti o n s, W e’ ll b e h ap p y to h el p yo u
L og
S u m m ar y of W or k-
R el at ed
In ju ri es an d
Il ln es se s
L og
L og
L og
L og
S u m m ar y.
S u m m ar y
S u m m ar y
L og
A n
O ve rv ie w R e c o rd in g
W o rk -R e la te d
I n ju ri e s a n d I ll n e ss e s
H o w t o F il l O u t th e
L o g
L o g o f W o rk
-R e la te d I n ju ri e s a n d
Il ln e ss e s
S u m m a ry o f
W o rk -R e la te d
I n ju ri e s a n d Il ln e ss e s
W o rk sh e e t to
H e lp Y o u
F il l O u t th e
S u m m a ry
O S
H A
’s
In ju ry a n d I ll n e ss
I n c id e n t R e p o rt o r vi si t u s o n li n e a t w w w
.o sh a g o v c a ll y o u r lo c a l O
S H
A o ff ic e
U.S. Department of Labor Occupational Safety and Health Administration
D e a r
E m p lo ye r:
T h is b o o k le t in cl u d es th e fo rm s n ee d ed fo r m ai n ta in in g o cc u p at io n al in ju ry an d il ln es s re co rd s fo r
T h es e n ew fo rm s h av e ch an g ed in se ve ra l im p o rt an t w ay s fr o m th e re co rd k ee p in g fo rm s.
In th e
O S
H A an n o u n ce d it s d ec is io n to ad d an o cc u p at io n al h ea ri n g lo ss co lu m n to
O S
H A
’s F o rm
L o g o f
W o rk -R el at ed In ju ri es an d Il ln es se s.
T h is fo rm s p ac k ag e co n ta in s m o d if ie d
F o rm s an d
A w h ic h in co rp o ra te th e ad d it io n al co lu m n M
(5
H ea ri n g L o ss
E m p lo ye rs re q u ir ed to co m p le te th e in ju ry an d il ln es s fo rm s m u st b eg in to u se th es e fo rm s o n
Ja n u ar y
In re sp o n se to p u b li c su g g es ti o n s, O
S H
A al so h as m ad e se ve ra l ch an g es to th e fo rm s p ac k ag e to m ak e th e re co rd k ee p in g m at er ia ls cl ea re r an d ea si er to u se
O n F o rm w e’ ve sw it ch ed th e p o si ti o n s o f th e d ay co u n t co lu m n s.
T h e d ay s
“a w ay fr o m w o rk co lu m n n o w co m es b ef o re th e d ay s “o n jo b tr an sf er o r re st ri ct io n
W e’ ve cl ar if ie d th e fo rm u la s fo r ca lc u la ti n g in ci d en ce ra te s.
W e’ ve ad d ed n ew re co rd in g cr it er ia fo r o cc u p at io n al h ea ri n g lo ss to th e
“O ve rv ie w se ct io n
O n F o rm w e’ ve m ad e th e co lu m n h ea d in g
“C la ss if y th e C as e” m o re p ro m in en t to m ak e it cl ea r th at em p lo ye rs sh o u ld m ar k o n ly o n e se le ct io n am o n g th e fo u r co lu m n s o ff er ed
T h e O cc u p at io n al S af et y an d H ea lt h A d m in is tr at io n sh ar es w it h yo u th e g o al o f p re ve n ti n g in ju ri es an d il ln es se s in o u r n at io n ’s w o rk p la ce s.
A cc u ra te in ju ry an d il ln es s re co rd s w il l h el p u s ac h ie ve th at g o al
D ec em b er
F ed er al R eg is te r
(6
F R
-7
O cc u pa ti on al S af et y an d H ea lt h A dm in is tr at io n
U .S
D ep ar tm en t of
L ab or
PN 456018
Field Office Repairs and Addition h e (F o rm is u se d to cl as si fy w o rk
-r el at ed in ju ri es an d il ln es se s an d to n o te th e e x te n t an d se ve ri ty o f ea ch ca se W h en an in ci d en t o cc u rs u se th e to re co rd sp ec if ic d et ai ls ab o u t w h at h ap p en ed an d h o w it h ap p en ed
T h e a se p ar at e fo rm (F o rm
A sh o w s th e to ta ls fo r th e ye ar in ea ch ca te g o ry A t th e en d o f th e ye ar p o st th e in a vi si b le lo ca ti o n so th at yo u r em p lo ye es ar e aw ar e o f th e in ju ri es an d il ln es se s o cc u rr in g in th ei r w o rk p la ce
E m p lo ye rs m u st k ee p a fo r ea ch es ta b li sh m en t o r si te
If yo u h av e m o re th an o n e es ta b li sh m en t, yo u m u st k ee p a se p ar at e an d fo r ea ch p h ys ic al lo ca ti o n th at is e x p ec te d to b e in o p er at io n fo r o n e ye ar o r lo n g er
N o te th at yo u r em p lo ye es h av e th e ri g h t to re vi ew yo u r in ju ry an d il ln es s re co rd s.
F o r m o re in fo rm at io n se e
C o d e o f F ed er al R eg u la ti o n s P ar t
.3
C as es li st ed o n th e ar e n o t n ec es sa ri ly el ig ib le fo r w o rk er s’ co m p en sa ti o n o r o th er in su ra n ce b en ef it s.
L is ti n g a ca se o n th e d o es n o t m ea n th at th e em p lo ye r o r w o rk er w as at fa u lt o r th at an
O S
H A st an d ar d w as vi o la te d
R ec o rd th o se w o rk
-r el at ed in ju ri es an d il ln es se s th at re su lt in d ea th lo ss o f co n sc io u sn es s, d ay s aw ay fr o m w o rk re st ri ct ed w o rk ac ti vi ty o r jo b tr an sf er o r m ed ic al tr ea tm en t b ey o n d fi rs t ai d
Y o u m u st al so re co rd w o rk
-r el at ed in ju ri es an d il ln es se s th at ar e si g n if ic an t
(a s d ef in ed b el o w o r m ee t an y o f th e ad d it io n al cr it er ia li st ed b el o w
L og of W or k-
R el at ed
In ju ri es an d
Il ln es se s
L og
S u m m ar y
S u m m ar y
L og
L og
S u m m ar y
E m pl oy ee In vo lv em en t.
L og of W or k-
R el at ed
In ju ri es an d
Il ln es se s
L og
W h e n i s a n i n ju…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .