This federal contract opportunity solicitation seeks proposals for the Cougar Spillway Gate Two Rehabilitation project. The purpose of the project is to fully rehabilitate one gate at Cougar Dam to current design standards and improve reliability, including repairing/replacing hoist equipment, installing staff gauges, replacing electrical and distribution equipment, re-conductoring from the switchgear to gates, decreasing environmental hazards by installing secondary containment around oil and grease sources greater than 50 gallons, and decreasing fall hazards by replacing damaged hand rails and installing fall protection equipment. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Portland. Proposals are due based on the specified solicitation number and contractors will be selected to complete the full rehabilitation of the spillway gate.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR IN
FORMATIO
N O
NLY
| Electrical |
| CUD-6-01-4_REV-_ |
| 1228 SK-01_D |
| CUD-6-1-8_REV-_ |
| CUD-6-1-12_REV-_ |
| CUD-6-2-13_REV-_ |
| CUD-6-2-14_REV-1 |
| CU-59-270-113-4 |
| CUD-4-31 |
| CUD-4-28 |
| CUD-4-2_REV-4 |
| CUD-4-27 |
| CUD-10-4-27.1 |
| CUD-10-4-26 |
| CU-59-270-68-27_REV-3 |
File details come from the government source that posted it. Updated .