Cougar Dam Spillway Gate 2 Reference Drawings - Part 2.pdf

PDF 11 MB Posted

Attached to
COUGAR SPILLWAY GATE TWO REHABILITATION
Solicitation number
W9127N-22-R-0027
Issued by

About this file

This federal contract opportunity solicitation seeks proposals for the Cougar Spillway Gate Two Rehabilitation project. The purpose of the project is to fully rehabilitate one gate at Cougar Dam to current design standards and improve reliability, including repairing/replacing hoist equipment, installing staff gauges, replacing electrical and distribution equipment, re-conductoring from the switchgear to gates, decreasing environmental hazards by installing secondary containment around oil and grease sources greater than 50 gallons, and decreasing fall hazards by replacing damaged hand rails and installing fall protection equipment. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Portland. Proposals are due based on the specified solicitation number and contractors will be selected to complete the full rehabilitation of the spillway gate.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR IN

FORMATIO

N O

NLY

Electrical
CUD-6-01-4_REV-_
1228 SK-01_D
CUD-6-1-8_REV-_
CUD-6-1-12_REV-_
CUD-6-2-13_REV-_
CUD-6-2-14_REV-1
CU-59-270-113-4
CUD-4-31
CUD-4-28
CUD-4-2_REV-4
CUD-4-27
CUD-10-4-27.1
CUD-10-4-26
CU-59-270-68-27_REV-3

File details come from the government source that posted it. Updated .