This abstract of offers summarizes bids received in response to Solicitation Number W9127N20B0003 for West Coast Hopper Maintenance Dredging 2020. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Portland and sought bids for dredging projects in Humboldt Bay, CA, the Mouth of the Columbia River in OR/WA, and the Lower Columbia River in OR/WA, with estimated cubic yardages totaling 7,000,000 cubic yards. Three bids were received by the February 18, 2020 due date from Manson Construction Co., West Coast Hopper Dredging, and The Dutra Group. The bids included itemized unit pricing for mandatory and optional work items ranging from mobilization to dredging and material placement. Total bid prices were $23,464,789 from Manson Construction Co., $26,782,500 from West Coast Hopper Dredging, and $25,815,000 from The Dutra Group. The abstract documents the offers received and will support evaluation of bids and potential contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C.04_Preliminary Abstract.pdf | ||
| B.08_WCH20_ADVERTISE_SPECS.PDF | ||
| B.08_WCH20_ADVERTISE_PLANS.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NO. 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 2 PAGES
1/17/2020 2/18/2020
4. ISSUING OFFICE
DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE
PORTLAND DISTRICT, CORPS OF ENGINEERS
P.O. BOX 2946
PORTLAND, OR 97208-2946
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3
D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR
A. HIRED LABOR
B. REASONABLE CONTRACT B. BID SECURITY
X (WITHOUT PROFIT) 20% of bid price or $3 million
C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED
(INCLUDING PROFIT)
6. NUMBER OF ADDENDA ISSUED 4
7A.
ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED
NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB 6,811,289.00$ 6,811,289.00$ 6,750,000.00$ 6,750,000.00$ 7,000,000.00$ 7,000,000.00$
HUM, Bin Measure to Required Depth, HOODS Ocean Disposal 700,000 CY 3.99$ 2,793,000.00$ 4.35$ 3,045,000.00$ 5.10$ 3,570,000.00$
HUM, Bin Measure to Required Depth, HOODS Ocean Disposal (OPTIONAL) 200,000 CY 4.01$ 802,000.00$ 4.35$ 870,000.00$ 3.90$ 780,000.00$
HUM, Bin Measure to Required Depth, HOODS Ocean Disposal (OPTIONAL) 200,000 CY 4.01$ 802,000.00$ 4.30$ 860,000.00$ 3.90$ 780,000.00$
LCR Mainteance, RM 3+00 to RM 25+00, Bin Measure, Flow Lane (FL) Placement 200,000 CY 2.92$ 584,000.00$ 3.25$ 650,000.00$ 3.50$ 700,000.00$
LCR Mainteance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement 650,000 CY 3.31 2,151,500.00$ 4.75$ 3,087,500.00$ 4.00$ 2,600,000.00$
LCR Mainteance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement (OPTIONAL) 350,000 CY 3.33 1,165,500.00$ 4.75$ 1,662,500.00$ 3.50$ 1,225,000.00$
LCR Mainteance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement (OPTIONAL) 350,000 CY 3.33$ 1,165,500.00$ 4.60$ 1,610,000.00$ 3.50$ 1,225,000.00$
LCR Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth 250,000 CY 2.84$ 710,000.00$ 3.70$ 925,000.00$ 4.00$ 1,000,000.00$
LCR Increment Transit Miles for Material Placement Site (other than five miles one-way) 1,100,000 CY*MI 0.12$ 132,000.00$ 0.20$ 220,000.00$ 0.15$ 165,000.00$
0011 LCR Intra-Project Transit Miles 250 MI 528.00$ 132,000.00$ 450.00$ 112,500.00$ 500.00$ 125,000.00$
MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement 1,500,000 CY 2.52$ 3,780,000.00$ 2.60$ 3,900,000.00$ 3.10$ 4,650,000.00$
MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTIONAL) 300,000 CY 2.56$ 768,000.00$ 2.55$ 765,000.00$ 2.70$ 810,000.00$
ABSTRACT OF OFFERS
W9127N20B0003
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.
Manson Construction Co.
5209 E. Marginal Way South Seattle, WA 98134
West Coast Hopper Dredging 2020
7B. DESCRIPTION OF OFFERED ITEM
7C. EST D.
The Dutra Group 2350 Kerner Boulevard, Suite 200 San Rafael, California 94901-5595
B. BID SECURITY B. BID SECURITY
MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTIONAL) 250,000 CY 2.47$ 617,500.00$ 2.50$ 625,000.00$ 2.70$ 675,000.00$
MCR, Bin Measure, Increment for Operations and Maintenance Deep Water Site (DWS) Placement 300,000 CY 1.23$ 369,000.00$ 2.00$ 600,000.00$ 0.60$ 180,000.00$
MCR, Bin Measure, Increment for Operations and Maintenance (DWS) Placement (OPTIONAL) 300,000 CY 1.23$ 369,000.00$ 2.00$ 600,000.00$ 0.60$ 180,000.00$
MCR, Bin Measure, Increment for Operations and Maintenance (DWS) Placement (OPTIONAL) 250,000 CY 1.25$ 312,500.00$ 2.00$ 500,000.00$ 0.60$ 150,000.00$
SUBTOTAL FOR MANDATORY LINE ITEMS 17,462,789.00$ 19,290,000.00$ 19,990,000.00$ -$
SUBTOTAL FOR OPTIONAL LINE ITEMS 6,002,000.00$ 7,492,500.00$ 5,825,000.00$ -$ -$
23,464,789.00$ 26,782,500.00$ 25,815,000.00$ -$
NSN 7540-01-150-0981 1419-101
TOTAL
ACCEPTANCE LIMITATION - DAYS
INFORMALITIES
STANDARD FORM 1419 (10-3)
Sheet1
| 2020-02-19T08:47:01-0800 | |
| SALDANA.MICHAEL.E.1173444431 |
| 2020-02-19T10:15:15-0800 | |
| DVORAK.DAVID.LAWRENCE.1160820540 |
File details come from the government source that posted it. Updated .