OF_1419.pdf

PDF 193 KB Posted

Attached to
Bob's Point Bank Stabilization
Solicitation number
W9127N19B0010
Issued by

About this file

Corrected Abstract of Offers completed IAW FAR 36.701(c)

View the file

Other files

File Type Posted
W9127NB0010_0001.docx DOCX document
Preliminary_Abstract_-_Bid_Results.pdf PDF
W9127N19B0010-0001.docx DOCX document
A.07.20_Site_Visit_PowerPoint_Bobs.pptx PPTX presentation
Jun_26,_Site_visit_sign_in_sheet.pdf PDF
A.07.23_19B0010.pdf PDF
A.03_Bob_Sheets_Advertise.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

USACE - NWP

333 SW 1st Ave Portland, OR 97204

Bob's Point Bank Stabilization

Mobilization and Demobilization

Site Access and Preparation

Bedding Filter Material

Geosynthetic Bags

Riprap

Live Stakes

Hydroseed

Watering

Erosion Control Blanket

Wave Attenuator

Job

Jon

Job

Job

Job

Each

Job

Job

Job

Job

108,794.00

224,570.00

2,817.00

105,887.00

34,151.00

22.58

22,152.00

7,004.00

6,233.00

183,345.00

108,794.00

224,570.00

2,817.00

105,887.00

34,151.00

11,288.00

22,152.00

7,004.00

6,233.00

183,345.00

160,000.00

58,000.00

4,500.00

175,000.00

25,000.00

25,000.00

7,200.00

6,000.00

6,200.00

390,000.00

160,000.00

58,000.00

4,500.00

175,000.00

25,000.00

50.00

7,200.00

6,000.00

6,200.00

390,000.00

48,000.00

97,000.00

8,000.00

91,000.00

22,000.00

3.00

3,500.00

6,000.00

1,600.00

205,000.00

48,000.00

97,000.00

8,000.00

91,000.00

22,000.00

1,500.00

3,500.00

6,000.00

1,600.00

205,000.00

W9127N19B0010 1 2

Cory Pfenning, Contract Specialist

SEA Construction LKE Corporation

Bond - 20% of bid price

Yes Yes

PFENNING.CORY.RAY.

1159224291

Digitally signed by

PFENNING.CORY.RAY.1159224291

Date: 2019.09.06 12:44:07 -07'00'

07/22/201906/13/2019

09/06/2019

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

W9127N19B0010

Bond - 20% of bid price

Yes Yes No Yes

1.00300,000.001.00167,540.001.00215,000.001.00235,000.00Job110

1.004,500.001.0042,225.001.0010,400.001.0013,500.00Job19

1.0015,000.001.0058,000.001.005,000.001.0034,000.00Job18

1.003,000.001.0039,012.401.005,000.001.0012,000.00Job17

500.0025.13500.00181.62500.0022.00500.0015.00Each5006

1.0085,000.001.00175,263.001.00122,000.001.0040,000.00Job15

1.00121,000.001.00137,274.401.0090,000.001.00169,000.00Job14

1.0015,000.001.0066,415.001.0040,000.001.0033,000.00Job13

1.00149,400.001.00132,229.001.0060,000.001.00132,000.00Job12

1 Job 213,500.00 1.00 60,000.00 1.00 121,262.50 1.00 82,000.00 1.00

2 2

3 4 5 6

James Dean Contracting Braun Construction SMAF Environmental Conway Construction

File details come from the government source that posted it.